Residential / Group Housing · 1 building · 4 unitsRERA P52100066499

Asya

Deedo IDDP-PUN-5109

MahaRERA shows it completed; no MahaRERA orders on record; 25% of its units are booked.

Karve Nagar, Pune 411052 · by Moira Spaces Opc Private Limited

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales25% booked1 of 4 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • This projectRegistered 11 Jun 2024, completion promised 30 Jun 2026.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100066499
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210006649911 Jun 202430 Jun 202630 Jun 2026Moira Spaces Opc Private LimitedProject page
Documents146

2 documents held by Deedo, 144 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardPan Card_MOIRA Spaces OPC Private Limited.pdf · uploaded 11 Apr 2024Source

Legal

  • Declaration Form BRERA_FORM B_ MOIRA_Done.pdf · uploaded 11 Apr 2024Source
  • Declaration Form BForm B Mr D Bhopatkar.pdf · uploaded 11 Apr 2024Source
  • Legal Title reportTtile Search Report.pdf · uploaded 20 May 2024Source
  • OthersAsya Commencement Certificate.pdf · uploaded 22 Jul 2025Source

Migrated

  • 1 PAN CardPan Card_MOIRA Spaces OPC Private Limited.pdf · uploaded 11 Apr 2024Source
Show all 146 documentsShow fewer documents

Migrated

  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 11 Apr 2024Source
  • 1 Declaration about Commencement CertificateDeclaration About Commencement Certificate_FORMATE D.pdf · uploaded 11 Apr 2024Source
  • 1 Declaration in FORM BRERA_FORM B_ MOIRA_Done.pdf · uploaded 11 Apr 2024Source
  • 2 Declaration in FORM BForm B Mr D Bhopatkar.pdf · uploaded 11 Apr 2024Source
  • 1 CERSAI detailsCERSAI CERTIFICATE.pdf · uploaded 20 Apr 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Real Estate Organizations.pdf · uploaded 20 Apr 2024Source
  • 1 Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 20 Apr 2024Source
  • 1 Deviation Report with respect to Allotment letterDeviation Report with respect to model copy of Allotment Letter.pdf · uploaded 20 Apr 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentREVISED CC.pdf · uploaded 3 May 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA_ASYA_Architect Certificate.pdf · uploaded 3 May 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)RERA_ASYA_ENGINEER CERTIFACTE.pdf · uploaded 3 May 2024Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Slod Inventory.pdf · uploaded 7 May 2024Source
  • 1 a Details of encumbrances concerned to FinanceNo Financial Ncumbrances Letter_Moira.pdf · uploaded 15 May 2024Source
  • 1 b Details of encumbrances concerned to LegalNo Financial Ncumbrances Letter_Moira.pdf · uploaded 15 May 2024Source
  • 1 Copy of the legal title reportTtile Search Report.pdf · uploaded 20 May 2024Source
  • 2 a Details of encumbrances concerned to FinanceNo encumbrances FINANCE.pdf · uploaded 20 May 2024Source
  • 2 b Details of encumbrances concerned to LegalNo encumbrances FINANCE.pdf · uploaded 20 May 2024Source
  • 1 Copy of Layout Approval (in case of layout)PLAN - converted (1).pdf · uploaded 20 May 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentPLAN - converted (1).pdf · uploaded 20 May 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A bank account decla (12).pdf · uploaded 20 May 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 22 May 2024Source
  • 1 Proforma of Agreement for saleASYA_Agreement to Sell.pdf · uploaded 22 May 2024Source
  • 1 Deviation Report with respect to model copy of AgreementASY_Deviation Report_Agreement.pdf · uploaded 22 May 2024Source
  • 1 Other – TechnicalANNEXURE -A.pdf · uploaded 22 May 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Asya Ar Certificate.pdf · uploaded 12 Nov 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Asya CA Certificate.pdf · uploaded 12 Nov 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Asya Engg Certificate.pdf · uploaded 12 Nov 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ar Certificate JUNE.pdf · uploaded 25 Dec 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ar Certificate SEPY.pdf · uploaded 25 Dec 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate JUNE.pdf · uploaded 25 Dec 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate SEPT.pdf · uploaded 25 Dec 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Certficate JUNE.pdf · uploaded 25 Dec 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Certificate SEPT.pdf · uploaded 25 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Asya Ar.pdf · uploaded 17 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Asya CA.pdf · uploaded 17 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Asya Engg.pdf · uploaded 17 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Asya Ar.pdf · uploaded 11 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Asya CA.pdf · uploaded 11 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Asya Engg.pdf · uploaded 11 Apr 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Asya Engg.pdf · uploaded 11 Apr 2025Source
  • Withdrawal Update Form 1Asya Ar.pdf · uploaded 17 Jul 2025Source
  • Withdrawal Update Form 1Asya Ar.pdf · uploaded 17 Jul 2025Source
  • Withdrawal Update Form 2Asya Engg.pdf · uploaded 17 Jul 2025Source
  • Withdrawal Update Form 2Asya Engg.pdf · uploaded 17 Jul 2025Source
  • Withdrawal Update Form 3Asya CA.pdf · uploaded 17 Jul 2025Source
  • Withdrawal Update Form 3Asya CA.pdf · uploaded 17 Jul 2025Source
  • Withdrawal Update Form 1Asya Ar.pdf · uploaded 7 Aug 2025Source
  • Withdrawal Update Form 1Asya Ar.pdf · uploaded 7 Aug 2025Source
  • Withdrawal Update Form 2Asya Engg.pdf · uploaded 7 Aug 2025Source
  • Withdrawal Update Form 2Asya Engg.pdf · uploaded 7 Aug 2025Source
  • Withdrawal Update Form 3Asya CA.pdf · uploaded 7 Aug 2025Source
  • Withdrawal Update Form 3Asya CA.pdf · uploaded 7 Aug 2025Source
  • Form 5 (FY 2024-2025)Moira Form 5.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 1Asya Ar.pdf · uploaded 17 Oct 2025Source
  • Withdrawal Update Form 2Asya Eng.pdf · uploaded 17 Oct 2025Source
  • Withdrawal Update Form 3Asya CA.pdf · uploaded 17 Oct 2025Source
  • Withdrawal Update Form 1Asya Ar..pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1Asya Ar..pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1Asya Ar..pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1Asya Ar..pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1Asya Ar..pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2Asya Eng Form 2.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2Asya Eng Form 2.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2Asya Eng Form 2.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2Asya Eng Form 2.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2Asya Eng Form 2.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3Asya CA Form 3.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3Asya CA Form 3.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3Asya CA Form 3.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3Asya CA Form 3.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3Asya CA Form 3.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1Asya Ar..pdf · uploaded 21 Jan 2026Source
  • Withdrawal Update Form 1Asya Ar..pdf · uploaded 21 Jan 2026Source
  • Withdrawal Update Form 2Asya Eng Form 2.pdf · uploaded 21 Jan 2026Source
  • Withdrawal Update Form 2Asya Eng Form 2.pdf · uploaded 21 Jan 2026Source
  • Withdrawal Update Form 3Asya CA Form 3.pdf · uploaded 21 Jan 2026Source
  • Withdrawal Update Form 3Asya CA Form 3.pdf · uploaded 21 Jan 2026Source
  • Form 2A (FY 2024-2025)Form 2A (1).pdf · uploaded 4 Feb 2026Source
  • Withdrawal Update Form 1Asya Ar Apr26.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2Asya Eng Apr26.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3Asya CA Apr26.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 1Asya Ar Apr26.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 2Asya Eng Apr26.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 3Asya CA Apr26.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 1Asya Ar Apr26.pdf · uploaded 8 Jun 2026Source
  • Withdrawal Update Form 2Asya Eng Apr26.pdf · uploaded 8 Jun 2026Source
  • Withdrawal Update Form 3Asya CA May26.pdf · uploaded 8 Jun 2026Source
  • Withdrawal Update Form 1Asya Ar.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 1Asya Ar.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 1Asya Ar.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 1Asya Ar.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 1Asya Ar.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 1Asya Ar.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 1Asya Ar.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 1Asya Ar.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 1Asya Ar.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 1Asya Ar.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 2Asya Eng.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 2Asya Eng.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 2Asya Eng.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 2Asya Eng.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 2Asya Eng.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 2Asya Eng.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 2Asya Eng.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 2Asya Eng.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 2Asya Eng.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 2Asya Eng.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 3Asya CA.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 3Asya CA.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 3Asya CA.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 3Asya CA.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 3Asya CA.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 3Asya CA.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 3Asya CA.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 3Asya CA.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 3Asya CA.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 3Asya CA.pdf · uploaded 9 Jul 2026Source
  • Form 2A (FY 2025-2026)Form 2A.pdf · uploaded 10 Jul 2026Source
  • Form 5 (FY 2025-2026)Form 5 Moira Spcaes.pdf · uploaded 10 Jul 2026Source
  • Occupational CertificateAsya Occupancy Certificate.pdf · uploaded 10 Jul 2026Source
  • Occupational CertificateOC Verification PMC email to MahaRera Authority.pdf · uploaded 10 Jul 2026Source

Technical

  • DocumentPLAN - converted (1).pdf · uploaded 20 May 2024Source
  • DocumentPLAN - converted (1).pdf · uploaded 20 May 2024Source
  • Other – TechnicalANNEXURE -A.pdf · uploaded 22 May 2024Source
  • DocumentAsya Revised Sanction Plan.pdf · uploaded 22 Jul 2025Source

Technical (Architect)

  • DocumentAsya Ar Certificate.pdf · uploaded 12 Nov 2024Source
  • DocumentAr Certificate JUNE.pdf · uploaded 25 Dec 2024Source
  • DocumentAr Certificate SEPY.pdf · uploaded 25 Dec 2024Source
  • DocumentAsya Ar.pdf · uploaded 17 Jan 2025Source
  • DocumentAsya Ar.pdf · uploaded 11 Apr 2025Source
  • DocumentAsya Ar.pdf · uploaded 9 Jul 2026Source

Technical (Engineer)

  • DocumentAsya Engg Certificate.pdf · uploaded 12 Nov 2024Source
  • DocumentEngg Certficate JUNE.pdf · uploaded 25 Dec 2024Source
  • DocumentEngg Certificate SEPT.pdf · uploaded 25 Dec 2024Source
  • DocumentAsya Engg.pdf · uploaded 17 Jan 2025Source
  • DocumentAsya Engg.pdf · uploaded 11 Apr 2025Source
  • DocumentAsya Engg.pdf · uploaded 11 Apr 2025Source
  • DocumentAsya Eng.pdf · uploaded 9 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel CTS No. 14, Plot No. 32

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
4BHK, 4 BHK Landowner4 units in all
Address
Plot No. 32, CTS No. 14, S.No. 25/1B, HIGANE BUDRUK, KARVE NAGARPIN 411052
Village
Pune (M Corp.), Pune City taluka
Land area for this project
347 sq m (3,739 sq ft)
Permissible built-up area
940 sq m (10,121 sq ft)
Sanctioned built-up area
940 sq m (10,121 sq ft)
Designated bank account
109
Developed in phases
No

Survey, CTS, gat or plot numbers

CTS No. 14Plot No. 32S.No. 25/1B

Land as published on MahaRERA's project page

Plot No. 32, CTS No. 14, S.No. 25/1B

Boundaries

North
By Plot No 37
South
By 6 Mtr Colony Road
East
By Plot No 31
West
By Plot No 33

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking4 units

1 of 4 units booked (25%), as the promoter reported to MahaRERA

4BHK · 3 units4 BHK Landowner · 1 unit
TypeCarpet areaUnitsBooked
4BHK161.75 sq m · 1,741 sq ft31
4 BHK Landowner322.77 sq m · 3,474 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr. Sameer Valimbe—
Chartered accountantK G Jhamvar & Co—
EngineerRam Chitale & Associates—
OtherSpectrum Consultant—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology