Ramana Myra
Deedo IDDP-PUN-FQ4SCompletion was pushed back 4 months, to Apr 2028; no MahaRERA orders on record; 15% of its units are booked.
Dhayari (Part), Pune 411041 · by Sai And Shantishobha Venture
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2028
- This projectRegistered 23 Oct 2023, completion promised 31 Dec 2027, revised to 30 Apr 2028.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100053249
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100053249 | 23 Oct 2023 | 31 Dec 2027 | 30 Apr 2028 | Sai And Shantishobha Venture | Project page |
Documents160
1 document held by Deedo, 159 filings listed on MahaRERA's project page
Finance
- PAN CardFirm PAN CARD.pdf · uploaded 22 Sep 2023Source
Legal
- Declaration Form BForm B - Developer.pdf · uploaded 22 Sep 2023Source
- Other – LegalFirm Name Change Declaration.pdf · uploaded 27 Sep 2023Source
- Other – LegalPartnership Deed Sai and shantishobha Venture.pdf · uploaded 30 Sep 2023Source
- Other – Legal1 - Pan- Sarthak Shanti shobha Ventures.pdf · uploaded 30 Sep 2023Source
- Legal Title reportSearch Title Report_merged0.pdf · uploaded 8 Oct 2023Source
- Legal Title reportFormat A revised.pdf · uploaded 12 Oct 2023Source
Show all 160 documentsShow fewer documents
Legal
- Declaration Form BForm B Promoter.pdf · uploaded 12 Oct 2023Source
Migrated
- 1 PAN CardFirm PAN CARD.pdf · uploaded 22 Sep 2023Source
- 1 Copy of Layout Approval (in case of layout)1.pdf · uploaded 22 Sep 2023Source
- 1 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 22 Sep 2023Source
- 2 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 22 Sep 2023Source
- 3 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 22 Sep 2023Source
- 4 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 22 Sep 2023Source
- 5 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 22 Sep 2023Source
- 6 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 22 Sep 2023Source
- 7 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 22 Sep 2023Source
- 8 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 22 Sep 2023Source
- 9 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 22 Sep 2023Source
- 10 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 22 Sep 2023Source
- 11 Building Plan Approval / NA Order for plotted development12.pdf · uploaded 22 Sep 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencment Certificate.pdf · uploaded 22 Sep 2023Source
- 1 Declaration in FORM BForm B - Developer.pdf · uploaded 22 Sep 2023Source
- 1 a Details of encumbrances concerned to FinanceEnumbrance Certificate Finance.pdf · uploaded 25 Sep 2023Source
- 2 a Details of encumbrances concerned to FinanceDeclaration of no Encumbrance - Legal.pdf · uploaded 25 Sep 2023Source
- 1 b Details of encumbrances concerned to LegalEnumbrance Certificate Finance.pdf · uploaded 25 Sep 2023Source
- 2 b Details of encumbrances concerned to LegalDeclaration of no Encumbrance - Legal.pdf · uploaded 25 Sep 2023Source
- 1 Declaration about Commencement CertificateFormat D-Commencement and Plan.pdf · uploaded 25 Sep 2023Source
- 1 CERSAI detailsUndertaking CERSAI.pdf · uploaded 25 Sep 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Disclosure of Interest in Entities Avinash.pdf · uploaded 25 Sep 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Disclosure of Interest in Entities Pratik.pdf · uploaded 25 Sep 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Disclosure of Interest in Entities Rushikesh.pdf · uploaded 25 Sep 2023Source
- 1 Proforma of Allotment letterAllotment letter as per order 31.pdf · uploaded 25 Sep 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration about seperate bank account as per order 34.pdf · uploaded 25 Sep 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation Report Allotment Letter.pdf · uploaded 25 Sep 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentOld CC Declaration final upload.pdf · uploaded 27 Sep 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vikram Chavan Cerifficate form 1.pdf · uploaded 27 Sep 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation of Agreement for sale.pdf · uploaded 27 Sep 2023Source
- 1 Other – LegalFirm Name Change Declaration.pdf · uploaded 27 Sep 2023Source
- 1 Proforma of Agreement for saleLatest sale Draft Rera.pdf · uploaded 28 Sep 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Chartered Accountant Certificate.pdf · uploaded 30 Sep 2023Source
- 2 Other – LegalPartnership Deed Sai and shantishobha Venture.pdf · uploaded 30 Sep 2023Source
- 3 Other – Legal1 - Pan- Sarthak Shanti shobha Ventures.pdf · uploaded 30 Sep 2023Source
- 1 Copy of the legal title reportSearch Title Report_merged0.pdf · uploaded 8 Oct 2023Source
- 2 Copy of the legal title reportFormat A revised.pdf · uploaded 12 Oct 2023Source
- 2 Declaration in FORM BForm B Promoter.pdf · uploaded 12 Oct 2023Source
- 1 Other – TechnicalHighlighted plan.pdf · uploaded 12 Oct 2023Source
- 3 a Details of encumbrances concerned to FinanceIncubarance Letter.pdf · uploaded 20 Jul 2024Source
- 3 b Details of encumbrances concerned to LegalIncubarance Letter.pdf · uploaded 20 Jul 2024Source
- 2 Proforma of Agreement for saleAgreement Draft.pdf · uploaded 20 Jul 2024Source
- Form 1Form 1.pdf · uploaded 3 Oct 2024Source
- Form 2Form 2.pdf · uploaded 3 Oct 2024Source
- Form 3Q2 FY 24-25 FORM 3 Chartered Accountant Certificate signed with UDIN.pdf · uploaded 3 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 24 Dec 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q2 FY 24-25 FORM 3 Chartered Accountant Certificate signed with UDIN.pdf · uploaded 24 Dec 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 24 Dec 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q3 FY 24-25 FORM 3 Chartered Accountant Certificate ramana myra.pdf · uploaded 22 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 22 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySoldunsold.pdf · uploaded 22 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 24 Jan 2025Source
- 2 Copy of Layout Approval (in case of layout)Plan 01.pdf · uploaded 3 Feb 2025Source
- 1 Copy of Layout Approval (in case of layout)Plan 01.pdf · uploaded 3 Feb 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentscan20250130002113.pdf · uploaded 3 Feb 2025Source
- 14 Building Plan Approval / NA Order for plotted developmentPlan 03.pdf · uploaded 3 Feb 2025Source
- 9 Building Plan Approval / NA Order for plotted developmentPlan 10.pdf · uploaded 3 Feb 2025Source
- 15 Building Plan Approval / NA Order for plotted developmentPlan 04.pdf · uploaded 3 Feb 2025Source
- 16 Building Plan Approval / NA Order for plotted developmentPlan 05.pdf · uploaded 3 Feb 2025Source
- 17 Building Plan Approval / NA Order for plotted developmentPlan 06.pdf · uploaded 3 Feb 2025Source
- 18 Building Plan Approval / NA Order for plotted developmentPlan 07.pdf · uploaded 3 Feb 2025Source
- 19 Building Plan Approval / NA Order for plotted developmentPlan 08.pdf · uploaded 3 Feb 2025Source
- 20 Building Plan Approval / NA Order for plotted developmentPlan 09.pdf · uploaded 3 Feb 2025Source
- 21 Building Plan Approval / NA Order for plotted developmentPlan 10.pdf · uploaded 3 Feb 2025Source
- 22 Building Plan Approval / NA Order for plotted developmentPlan 11.pdf · uploaded 3 Feb 2025Source
- 23 Building Plan Approval / NA Order for plotted developmentPlan 12.pdf · uploaded 3 Feb 2025Source
- 24 Building Plan Approval / NA Order for plotted developmentPlan 13.pdf · uploaded 3 Feb 2025Source
- 13 Building Plan Approval / NA Order for plotted developmentPlan 02.pdf · uploaded 3 Feb 2025Source
- 12 Building Plan Approval / NA Order for plotted developmentPlan 13.pdf · uploaded 3 Feb 2025Source
- 11 Building Plan Approval / NA Order for plotted developmentPlan 12.pdf · uploaded 3 Feb 2025Source
- 10 Building Plan Approval / NA Order for plotted developmentPlan 11.pdf · uploaded 3 Feb 2025Source
- 8 Building Plan Approval / NA Order for plotted developmentPlan 09.pdf · uploaded 3 Feb 2025Source
- 7 Building Plan Approval / NA Order for plotted developmentPlan 08.pdf · uploaded 3 Feb 2025Source
- 6 Building Plan Approval / NA Order for plotted developmentPlan 07.pdf · uploaded 3 Feb 2025Source
- 5 Building Plan Approval / NA Order for plotted developmentPlan 06.pdf · uploaded 3 Feb 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentPlan 05.pdf · uploaded 3 Feb 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentPlan 04.pdf · uploaded 3 Feb 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentPlan 03.pdf · uploaded 3 Feb 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 02.pdf · uploaded 3 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A-FY 2023-24.pdf · uploaded 11 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 4 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q4 FY 24-25 FORM 3 Chartered Accountant Certificate ramana myra.pdf · uploaded 4 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 4 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 4 Apr 2025Source
- Form 1Form 1 Architect Certificate Ramana Myra Q1.pdf · uploaded 19 Sep 2025Source
- Form 2Form 2 Engineer Certificate Ramana Myra Q1.pdf · uploaded 19 Sep 2025Source
- Form 3Q1 FY 25-26 FORM 3 Chartered Accountant Certificate ramana myra.pdf · uploaded 19 Sep 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 19 Sep 2025Source
- Form 1Form 1 Architect Certificate Q2 Ramana myra.pdf · uploaded 16 Oct 2025Source
- Form 2Form 2 Engineer Certificate Q2 Ramana myra.pdf · uploaded 16 Oct 2025Source
- Form 3Q2 FY 25-26 FORM 3 Chartered Accountant Certificate ramana myra.pdf · uploaded 16 Oct 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 16 Oct 2025Source
- Form 1Q3 Form 1 Architect Certificates FY 2025-26.pdf · uploaded 7 Feb 2026Source
- Form 2Q3 Form 2 FY 2025-26.pdf · uploaded 7 Feb 2026Source
- Form 3Q3 FY 25-26 FORM 3 Chartered Accountant Certificate ramana myra.pdf · uploaded 7 Feb 2026Source
- Disclosure of Sold and Booked InventoryQ3 Decleration of Sold Unsold Inventory FY 2025-26.pdf · uploaded 7 Feb 2026Source
- Form 1Form 1 Architect Certificate Q4 FY 2025-26.pdf · uploaded 20 May 2026Source
- Form 2Form 2 Engineers Certificate Q4 FY 2025-26.pdf · uploaded 20 May 2026Source
- Form 3Form 3 Chartered Accountant Certificate Q4 FY 2025-26.pdf · uploaded 20 May 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory Q4 FY 2025-26.pdf · uploaded 20 May 2026Source
- Form 1Q1 FY 26-27 FORM 1 - Architec Certificate - Ramana Myra.pdf · uploaded 8 Aug 2026Source
- Form 2Q1 FY 26-27 FORM 2 - Engineer Certificate ramana myra.pdf · uploaded 8 Aug 2026Source
- Form 3Q1 FY 26-27 FORM 3 - Chartered Accountant Certificate ramana myra.pdf · uploaded 8 Aug 2026Source
- Disclosure of Sold and Booked InventoryQ1 FY 26-27 Decleration of Sold Unsold Inventory.pdf · uploaded 8 Aug 2026Source
Technical
- Document1.pdf · uploaded 22 Sep 2023Source
- Document2.pdf · uploaded 22 Sep 2023Source
- Document3.pdf · uploaded 22 Sep 2023Source
- Document4.pdf · uploaded 22 Sep 2023Source
- Document5.pdf · uploaded 22 Sep 2023Source
- Document6.pdf · uploaded 22 Sep 2023Source
- Document7.pdf · uploaded 22 Sep 2023Source
- Document8.pdf · uploaded 22 Sep 2023Source
- Document9.pdf · uploaded 22 Sep 2023Source
- Document10.pdf · uploaded 22 Sep 2023Source
- Document11.pdf · uploaded 22 Sep 2023Source
- Document12.pdf · uploaded 22 Sep 2023Source
- Other – TechnicalHighlighted plan.pdf · uploaded 12 Oct 2023Source
- DocumentPlan 01.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 01.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 02.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 03.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 04.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 05.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 06.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 07.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 08.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 09.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 10.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 11.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 12.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 13.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 02.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 03.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 04.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 05.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 06.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 07.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 08.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 09.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 10.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 11.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 12.pdf · uploaded 3 Feb 2025Source
- DocumentPlan 13.pdf · uploaded 3 Feb 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel S.No. 128/5/1
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- Wing A 1BHK, Wing A 2BHK, Wing B 1BHK, Wing B 2BHK297 units in all
- Address
- S.No. 128/5/1, Dhayari, Taluka Haveli, District Pune 411041, Dhayari, Pune cityPIN 411041
- Village
- Dhayari (Part), Haveli taluka
- Location
- 18.44900, 73.79873
- Land area for this project
- 5,800 sq m (62,431 sq ft)
- Permissible built-up area
- 23,205 sq m (2,49,772 sq ft)
- Sanctioned built-up area
- 10,205 sq m (1,09,841 sq ft)
- Designated bank account
- 82
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S.No. 128/5/1, Dhayari, Taluka Haveli, District Pune 411041
Boundaries
- North
- By road and by Part of Survey No 128 5 2
- South
- By land of Bajirao pokale and Mr Gulab and Shivaji
- East
- By property of giving s no 128 H No 5 1 pt land
- West
- By land of Mr Pandurang Pokale
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking297 units
44 of 297 units booked (15%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Wing A 1BHK | 37.35 sq m · 402 sq ft | 29 | 5 |
| Wing A 1BHK | 38.65 sq m · 416 sq ft | 5 | 5 |
| Wing A 1BHK | 38.83 sq m · 418 sq ft | 5 | 0 |
| Wing A 1BHK | 39.02 sq m · 420 sq ft | 1 | 1 |
| Wing A 1BHK | 39.58 sq m · 426 sq ft | 5 | 0 |
| Wing A 1BHK | 39.86 sq m · 429 sq ft | 25 | 0 |
| Wing A 2BHK | 58.34 sq m · 628 sq ft | 10 | 1 |
| Wing A 2BHK | 58.71 sq m · 632 sq ft | 1 | 0 |
Show all 28 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Wing A 2BHK | 60.2 sq m · 648 sq ft | 31 | 11 |
| Wing A 2BHK | 60.29 sq m · 649 sq ft | 10 | 0 |
| Wing A 2BHK | 60.57 sq m · 652 sq ft | 2 | 2 |
| Wing A 2BHK | 62.89 sq m · 677 sq ft | 22 | 6 |
| Wing A 2BHK | 63.27 sq m · 681 sq ft | 2 | 2 |
| Wing B 1BHK | 37.35 sq m · 402 sq ft | 52 | 0 |
| Wing B 1BHK | 37.63 sq m · 405 sq ft | 5 | 4 |
| Wing B 1BHK | 38.83 sq m · 418 sq ft | 11 | 0 |
| Wing B 1BHK | 39.11 sq m · 421 sq ft | 1 | 1 |
| Wing B 2BHK | 58.34 sq m · 628 sq ft | 10 | 3 |
| Wing B 2BHK | 58.71 sq m · 632 sq ft | 1 | 0 |
| Wing B 2BHK | 60.11 sq m · 647 sq ft | 2 | 0 |
| Wing B 2BHK | 60.2 sq m · 648 sq ft | 30 | 0 |
| Wing B 2BHK | 60.29 sq m · 649 sq ft | 11 | 0 |
| Wing B 2BHK | 60.48 sq m · 651 sq ft | 2 | 0 |
| Wing B 2BHK | 60.57 sq m · 652 sq ft | 1 | 0 |
| Wing B 2BHK | 60.67 sq m · 653 sq ft | 1 | 1 |
| Wing B 2BHK | 62.89 sq m · 677 sq ft | 20 | 0 |
| Wing B 2BHK | 63.17 sq m · 680 sq ft | 1 | 1 |
| Wing B 2BHK | 63.27 sq m · 681 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals6
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Ankur Assocaites | — |
| Chartered accountant | Phule Wagh & Associates LLP | — |
| Engineer | G. A. Bhilare Consaltants Pvt. Ltd. | — |
| Engineer | Prashant Kadam | — |
| Engineer | Pratik Rajendra Pathare | — |
| Registered real estate agent | Chinmay Niphadkar | — |
Source: MahaRERA project page. Contact details are not shown.