Plotted · 1 building · 29 unitsRERA P52100055730

Keystone Bliss 2

Deedo IDDP-PUN-021G

Completion was pushed back 4 months, to Apr 2028; no MahaRERA orders on record; 0% of its units are booked.

Dhayari (Part), Pune 411041 · by Rucha Associates

DeliveryExtended 4 moPromised Dec 2027 · now due Apr 2028RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales0% booked0 of 29 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2028

  • This projectRegistered 16 Apr 2024, completion promised 31 Dec 2027, revised to 30 Apr 2028.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100055730
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210005573016 Apr 202431 Dec 202730 Apr 2028Rucha AssociatesProject page
Documents158

2 documents held by Deedo, 156 filings listed on MahaRERA's project page

Registration certificate

Other

  • OtherDate not statedView

Finance

  • PAN CardPAN CARD -RUCHA ASSOCIATES.pdf · uploaded 25 Mar 2024Source

Legal

  • Declaration Form Bform b promoter declaation.pdf · uploaded 22 Mar 2024Source
  • Legal Title reportlegal title report plot 3_compressed_11zon.pdf · uploaded 28 Mar 2024Source
  • Other – LegalAGREEMENT RUCHA ASSOCATES 132-1-3-2-2_compressed.pdf · uploaded 5 Apr 2024Source
  • Other – LegalAgreement_Rucha Associates_Sumeru Buildcon Pvt Ltd_Document No 18224-2022_compressed_compressed.pdf · uploaded 5 Apr 2024Source
  • Other – LegalGAIKWAD-RUCHA.pdf · uploaded 5 Apr 2024Source
Show all 158 documentsShow fewer documents

Legal

  • Other – LegalSALE DEED-128-2-4_compressed (1).pdf · uploaded 5 Apr 2024Source
  • Other – LegalGetUserDocumentFileContent (20).pdf · uploaded 5 Apr 2024Source
  • Other – LegalRAYKAR-RUCHA-29-44.pdf · uploaded 5 Apr 2024Source
  • Others128-2-4.pdf · uploaded 8 Jan 2026Source
  • Others128-2-5.pdf · uploaded 8 Jan 2026Source
  • Others132-1-1b.pdf · uploaded 8 Jan 2026Source
  • Others132-1-2.pdf · uploaded 8 Jan 2026Source
  • Others132-1-3-2-1.pdf · uploaded 8 Jan 2026Source
  • Others132-1-3-2-2.pdf · uploaded 8 Jan 2026Source
  • Others132-1-4-2.pdf · uploaded 8 Jan 2026Source
  • Others133-1-4-2.pdf · uploaded 8 Jan 2026Source
  • Declaration Form B128-2-4.pdf · uploaded 19 Jan 2026Source
  • Declaration Form B128-2-5.pdf · uploaded 19 Jan 2026Source
  • Declaration Form B132-1-1b.pdf · uploaded 19 Jan 2026Source
  • Declaration Form B132-1-2.pdf · uploaded 19 Jan 2026Source
  • Declaration Form B132-1-3-2-1.pdf · uploaded 19 Jan 2026Source
  • Declaration Form B132-1-3-2-2.pdf · uploaded 19 Jan 2026Source
  • Declaration Form B132-1-4-2.pdf · uploaded 19 Jan 2026Source
  • Declaration Form B133-1-4-2.pdf · uploaded 19 Jan 2026Source

Migrated

  • 1 Declaration about Commencement Certificate1 Declaration about Commencement Certificate plot 3.pdf · uploaded 22 Mar 2024Source
  • 1 Declaration in FORM Bform b promoter declaation.pdf · uploaded 22 Mar 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECT CERTICATE.pdf · uploaded 22 Mar 2024Source
  • 1 Disclosure of Interest in Other Real Estate Organizations1 Disclosure of Interest in Other Real Estate Organizations (2) (2).pdf · uploaded 22 Mar 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same (8) (1).pdf · uploaded 23 Mar 2024Source
  • 1 PAN CardPAN CARD -RUCHA ASSOCIATES.pdf · uploaded 25 Mar 2024Source
  • 1 a Details of encumbrances concerned to FinanceGetUserDocumentFileContent (16) (2).pdf · uploaded 25 Mar 2024Source
  • 2 a Details of encumbrances concerned to FinanceGetUserDocumentFileContent (19) (1).pdf · uploaded 25 Mar 2024Source
  • 1 b Details of encumbrances concerned to LegalGetUserDocumentFileContent (16) (2).pdf · uploaded 25 Mar 2024Source
  • 2 b Details of encumbrances concerned to LegalGetUserDocumentFileContent (19) (1).pdf · uploaded 25 Mar 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentrevised CC plot 3.pdf · uploaded 25 Mar 2024Source
  • 1 Copy of Layout Approval (in case of layout)SHEET NO 1_compressed (1).pdf · uploaded 26 Mar 2024Source
  • 1 Copy of the legal title reportlegal title report plot 3_compressed_11zon.pdf · uploaded 28 Mar 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate (2).pdf · uploaded 28 Mar 2024Source
  • 1 Proforma of Agreement for saleAgreement To Sell.pdf · uploaded 28 Mar 2024Source
  • 1 Proforma of Allotment letterREVSED Allotment Letter.pdf · uploaded 28 Mar 2024Source
  • 1 Deviation Report with respect to Allotment letterdeviation report Allotment Letters.pdf · uploaded 28 Mar 2024Source
  • 1 Deviation Report with respect to model copy of Agreementdeclaration (5).pdf · uploaded 28 Mar 2024Source
  • 1 Building Plan Approval / NA Order for plotted development1 Copy of Layout Approval (in case of layout) (36).pdf · uploaded 29 Mar 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentcc verification 130.pdf · uploaded 29 Mar 2024Source
  • 1 CERSAI detailsCERSAI DECLARATION (4).pdf · uploaded 29 Mar 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA-KEYSTONE 2.pdf · uploaded 29 Mar 2024Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A - Seema Nilawar.pdf · uploaded 29 Mar 2024Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A - Prashant Nilawar.pdf · uploaded 29 Mar 2024Source
  • 1 Other – Technicalrevised declation annex a 29-03-2024 (1).pdf · uploaded 29 Mar 2024Source
  • 1 Other – LegalAGREEMENT RUCHA ASSOCATES 132-1-3-2-2_compressed.pdf · uploaded 5 Apr 2024Source
  • 2 Other – LegalAgreement_Rucha Associates_Sumeru Buildcon Pvt Ltd_Document No 18224-2022_compressed_compressed.pdf · uploaded 5 Apr 2024Source
  • 3 Other – LegalGAIKWAD-RUCHA.pdf · uploaded 5 Apr 2024Source
  • 4 Other – LegalSALE DEED-128-2-4_compressed (1).pdf · uploaded 5 Apr 2024Source
  • 5 Other – LegalGetUserDocumentFileContent (20).pdf · uploaded 5 Apr 2024Source
  • 6 Other – LegalRAYKAR-RUCHA-29-44.pdf · uploaded 5 Apr 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)RE-ARCHITECT CERTIFICATE BLISS 2.pdf · uploaded 31 Jul 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE BLIIS 2.pdf · uploaded 31 Jul 2024Source
  • 1 Disclosure of sold/ booked inventorySOLD INVENTORY BLISS 2.pdf · uploaded 31 Jul 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE BLISS 2.pdf · uploaded 31 Jul 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)SOLD INVENTORY BLISS 2.pdf · uploaded 31 Jul 2024Source
  • 1 Proforma of Agreement for saleAGR-bliss 2 (deviation marked).pdf · uploaded 7 Oct 2024Source
  • 1 Proforma of Agreement for saleAGR-bliss 2 (deviation marked).pdf · uploaded 7 Oct 2024Source
  • 1 Proforma of Agreement for saleAGR-bliss 2 (deviation marked).pdf · uploaded 7 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE BLISS 2 SEP DONE.pdf · uploaded 17 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE KEYSTONE BLISS 2.pdf · uploaded 17 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE KEYSTONE BLISS 2 SEP DONE.pdf · uploaded 17 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryUNSOLD INVENTORY KEYSTONE BLISS 2 DONE.pdf · uploaded 17 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE BLISS 2 SEP DONE.pdf · uploaded 17 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE KEYSTONE BLISS 2.pdf · uploaded 17 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE KEYSTONE BLISS 2 SEP DONE.pdf · uploaded 17 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryUNSOLD INVENTORY KEYSTONE BLISS 2 DONE.pdf · uploaded 17 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE BLISS 2 SEP DONE.pdf · uploaded 17 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE KEYSTONE BLISS 2.pdf · uploaded 17 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE KEYSTONE BLISS 2 SEP DONE.pdf · uploaded 17 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryUNSOLD INVENTORY KEYSTONE BLISS 2 DONE.pdf · uploaded 17 Oct 2024Source
  • 1 Proforma of Agreement for saleAGREEMENT KEYSTONE BLISS 2_rotated_compressed.pdf · uploaded 23 Dec 2024Source
  • 1 Deviation Report with respect to model copy of AgreementDEVIATION REPORT KEYSTONE BLISS 2.pdf · uploaded 23 Dec 2024Source
  • 1 Proforma of Agreement for saleAGREEMENT KEYSTONE BLISS 2_rotated_compressed.pdf · uploaded 23 Dec 2024Source
  • 1 Deviation Report with respect to model copy of AgreementDEVIATION REPORT KEYSTONE BLISS 2.pdf · uploaded 23 Dec 2024Source
  • 1 Deviation Report with respect to model copy of AgreementDEVIATION REPORT KEYSTONE BLISS 2.pdf · uploaded 23 Dec 2024Source
  • 2 Proforma of Agreement for saleAGREEMENT KEYSTONE BLISS 2_rotated_compressed.pdf · uploaded 23 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Bliss 2.pdf · uploaded 18 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Bliss 2.pdf · uploaded 18 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE - BLISS 2.pdf · uploaded 18 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Bliss 2.pdf · uploaded 18 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Bliss 2.pdf · uploaded 18 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE - BLISS 2.pdf · uploaded 18 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Bliss 2.pdf · uploaded 18 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE - BLISS 2.pdf · uploaded 18 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Bliss 2.pdf · uploaded 18 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryUNSOLD INVENTORY KEYSTONE BLISS 2.pdf · uploaded 20 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryUNSOLD INVENTORY KEYSTONE BLISS 2.pdf · uploaded 20 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryUNSOLD INVENTORY KEYSTONE BLISS 2.pdf · uploaded 20 Jan 2025Source
  • 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B-Keystone Bliss 2.pdf · uploaded 21 Feb 2025Source
  • 1 Disclosure of sold/ booked inventoryUNSOLD INVENTORY KEYSTONE BLISS 2.pdf · uploaded 20 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 31 MARCH 2025.pdf · uploaded 19 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Q4 KEYSTONE - BLISS 2 SINED_compressed.pdf · uploaded 19 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ER -keystone Bliss -2.pdf · uploaded 19 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryUNSOLD INVENTORY KEYSTONE BLISS 2 .pdf · uploaded 19 Apr 2025Source
  • Withdrawal Update Form 1Architectsu0027s Certificate BLISS 2.pdf · uploaded 20 Jul 2025Source
  • Withdrawal Update Form 2ENGINEER CERTIFICATE BLIIS 2.pdf · uploaded 20 Jul 2025Source
  • Withdrawal Update Form 3CA CERTIFICATE BLISS 2.pdf · uploaded 20 Jul 2025Source
  • Withdrawal Update Form 1Architectsu0027s Certificate BLISS 2.pdf · uploaded 8 Oct 2025Source
  • Withdrawal Update Form 2ENGINEER CERTIFICATE BLIIS 2.pdf · uploaded 8 Oct 2025Source
  • Withdrawal Update Form 3CA CERTIFICATE BLISS 2.pdf · uploaded 8 Oct 2025Source
  • Withdrawal Update Form 1keystone Bliss 2 Form 1.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 2Keystone bliss 2-Form2(15-10-2025)_compressed.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 3FORM 3 SEP 2025.pdf · uploaded 18 Oct 2025Source
  • Form 1FORM 1- BLISS 2 -18-04-2025.pdf · uploaded 11 Dec 2025Source
  • Form 1Form 1 Bliss 2.pdf · uploaded 11 Dec 2025Source
  • Form 1FORM -1 CA CERTIFICATE BLISS 2- 30-06-2024.pdf · uploaded 11 Dec 2025Source
  • Form 1FORM 1 30-09-2024.pdf · uploaded 11 Dec 2025Source
  • Form 2FORM 2 -keystone Bliss -2.pdf · uploaded 11 Dec 2025Source
  • Form 2Form 2 Bliss 2 31-12-2024.pdf · uploaded 11 Dec 2025Source
  • Form 2FORM-2 30-06-2024.pdf · uploaded 11 Dec 2025Source
  • Form 2FORM 2- 30-09-2024.pdf · uploaded 11 Dec 2025Source
  • Form 3FORM 3 MARCH 25.pdf · uploaded 11 Dec 2025Source
  • Form 3form 3 bliss 2 31-12-2024.pdf · uploaded 11 Dec 2025Source
  • Form 3FORM 3 30-06-2024.pdf · uploaded 11 Dec 2025Source
  • Form 3FORM 3 30-09-2024.pdf · uploaded 11 Dec 2025Source
  • Disclosure of Sold and Booked InventoryUNSOLD INVENTORY KEYSTONE BLISS 2 .pdf · uploaded 11 Dec 2025View
  • Disclosure of Sold and Booked InventorySOLD AND UNSOLD 31-12-2024.pdf · uploaded 11 Dec 2025View
  • Disclosure of Sold and Booked InventorySOLD AND UNSOLD 30-06-2024.pdf · uploaded 11 Dec 2025View
  • Disclosure of Sold and Booked InventorySOLD AND UNSOLD 30-09-2024.pdf · uploaded 11 Dec 2025View
  • Withdrawal Update Form 1Form 1 Bliss 2 Dec 25.pdf · uploaded 19 Jan 2026Source
  • Withdrawal Update Form 2Form 2 Keystone Bliss 2.pdf · uploaded 19 Jan 2026Source
  • Withdrawal Update Form 3FORM 3 BLISS -2 31-12-2025.pdf · uploaded 19 Jan 2026Source
  • Form 2A (FY 2024-2025)Form 2A 24 - 25.pdf · uploaded 19 Jan 2026Source
  • Form 5 (FY 2024-2025)Form 5 Bliss 2.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 18 Apr 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 18 Apr 2026Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 18 Apr 2026Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2form 2.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3form 3_ fINAL.pdf · uploaded 20 Jul 2026Source

Technical

  • DocumentSHEET NO 1_compressed (1).pdf · uploaded 26 Mar 2024Source
  • Document1 Copy of Layout Approval (in case of layout) (36).pdf · uploaded 29 Mar 2024Source
  • Other – Technicalrevised declation annex a 29-03-2024 (1).pdf · uploaded 29 Mar 2024Source
  • Document1 LAYOUT DATED 10-04-2024.pdf · uploaded 19 Jan 2026Source

Technical (Architect)

  • DocumentARCHITECT CERTIFICATE BLISS 2 SEP DONE.pdf · uploaded 17 Oct 2024Source
  • DocumentARCHITECT CERTIFICATE BLISS 2 SEP DONE.pdf · uploaded 17 Oct 2024Source
  • DocumentARCHITECT CERTIFICATE BLISS 2 SEP DONE.pdf · uploaded 17 Oct 2024Source
  • DocumentForm 1 Bliss 2.pdf · uploaded 18 Jan 2025Source
  • DocumentForm 1 Bliss 2.pdf · uploaded 18 Jan 2025Source
  • DocumentForm 1 Bliss 2.pdf · uploaded 18 Jan 2025Source
  • DocumentFORM 1 31 MARCH 2025.pdf · uploaded 19 Apr 2025Source
  • DocumentFORM 1.pdf · uploaded 20 Jul 2026Source

Technical (Engineer)

  • DocumentENGINEER CERTIFICATE KEYSTONE BLISS 2 SEP DONE.pdf · uploaded 17 Oct 2024Source
  • DocumentENGINEER CERTIFICATE KEYSTONE BLISS 2 SEP DONE.pdf · uploaded 17 Oct 2024Source
  • DocumentENGINEER CERTIFICATE KEYSTONE BLISS 2 SEP DONE.pdf · uploaded 17 Oct 2024Source
  • DocumentForm 2 Bliss 2.pdf · uploaded 18 Jan 2025Source
  • DocumentForm 2 Bliss 2.pdf · uploaded 18 Jan 2025Source
  • DocumentForm 2 Bliss 2.pdf · uploaded 18 Jan 2025Source
  • DocumentER -keystone Bliss -2.pdf · uploaded 19 Apr 2025Source
  • Documentform 2.pdf · uploaded 20 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 128/2/4, 128/2/5 SUB PLOT NO 3

As registered with MahaRERA and published on its project page

Project type
Plotted
Status on MahaRERA
Certificate Signed
Address
S. No. 133/1/4/2, 132/1/2, 132/1/4/2, 132/1/3/2/1, 132/1/3/2/2, 132/1/1b, 128/2/4, 128/2/5 Sub Plot No 3, DhayariPIN 411041
Village
Dhayari (Part), Haveli taluka
Land area for this project
10,048 sq m (1,08,153 sq ft)
Permissible built-up area
0 sq m (0 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Recreational open space
0 sq m (0 sq ft)
Designated bank account
171
Developed in phases
No

Survey, CTS, gat or plot numbers

128/2/4128/2/5 SUB PLOT NO 3132/1/1B132/1/2132/1/3/2/1132/1/3/2/2132/1/4/2S. NO. 133/1/4/2

Land as published on MahaRERA's project page

S. NO. 133/1/4/2, 132/1/2, 132/1/4/2, 132/1/3/2/1, 132/1/3/2/2, 132/1/1B, 128/2/4, 128/2/5 SUB PLOT NO 3

Boundaries

North
By Survey No 133
South
By 18 Mtr Wide D P Road
East
By Adj Sub Plot 2
West
By Open Space And Amenity Area

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectJaideep Sunil Deshpande—
Chartered accountantChirag Shah—
Chartered accountantYash Paltewar—
EngineerSavan Padmawar—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology