Main building, Maple Grove

Deedo IDDP-PUN-2BF9-MG

MahaRERA has not published a flat-by-flat record for this tower, and no registered deed names it yet.

All of Maple Grove
Median saleNot on recordneeds 3 or more sales
Completion30 Dec 2026as registered
Units & parking in Main building

MahaRERA's project page with unit types hasn't been imported for this registration.

Parking: Closed/Covered 35 · Open Space 0 (as declared to MahaRERA)

Construction progress (declared)

Work completed, as the promoter reported it to MahaRERA (Form 1). Not verified on site.

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
As registered with MahaRERA
RERA registration
P52100053959 · registered 18 Dec 2023
Promised completion
30 Dec 2026
Revised completion
30 Dec 2026
Sanctioned habitable floors
5
Building
MAPLE GROVE
Sanctioned floors (incl. basement, stilt, podium)
5
Units declared
0
Homes
0
Shops and offices
0
MahaRERA status
Certificate Signed
Also named
Maple Grove
Deedo ID
DP-PUN-2BF9-MG
Questions about Main building

When is Main building due for completion?

The MahaRERA registration promises 30 Dec 2026.

How many floors does Main building have?

5 sanctioned habitable floors, as registered with MahaRERA.

Data through2 Nov 2026SourcesMahaRERA registration and project page · IGR Maharashtra Index IIFloors and units are as registered; a promoter can revise them in later filings. Party names appear only inside an unlocked Index II.Report a problemMethodology