Shree Residency
Deedo IDDP-PUN-N8DNIts promised completion date, Dec 2023, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 100% of its units are booked.
Chikhali, Pune 411062 · Property rates in Chikhali · by Delta Buildcon
Buying a flat here?
See every deed registered on it.
Its promised completion date, Dec 2023, has passed and MahaRERA does not show it completed
- This projectRegistered 1 Aug 2019, completion promised 30 Dec 2023, and still not shown completed today.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Resale · Jul 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Jul 2026 | A1 Wing · 608 | Resale | 377 sq ft | View Resale, Jul 2026 |
17 buildings
Open a building to see every flat, floor by floor.
- A1 Wing13 floors · 87 units100% booked
- AbwingSize not on record100% booked
- Ad-WingSize not on record0% booked
- Al-WingSize not on record11% booked
- ALWingSize not on record
- ASM WingSize not on record0% booked
- A Wing13 floors · 76 units100% booked
- AWingSize not on record
- A-Wing, Al -Wing B- Wing, C-WingSize not on record55% booked
- BAWingSize not on record0% booked
- B Wing14 floors · 95 units100% booked
- BWingSize not on record
Show all 17 buildingsShow fewer buildings
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100021841
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100021841 | 1 Aug 2019 | 30 Dec 2023 | 30 Dec 2023 | Delta Buildcon | Project page |
Documents137
2 documents held by Deedo, 135 filings listed on MahaRERA's project page
Other
- OtherDate not statedView
Finance
- PAN CardPAN CARD ORIGINAL.pdf · uploaded 6 Jul 2020Source
Legal
- Legal Title reportlegal title report273.pdf · uploaded 16 Jul 2019Source
- Declaration Form BFORMB.pdf · uploaded 16 Jul 2019Source
- Legal Title reportlegal title report271.pdf · uploaded 23 Jul 2019Source
- Legal Title reportlegal title report274_1.pdf · uploaded 23 Jul 2019Source
- Legal Title reportlegal title report274_2.pdf · uploaded 23 Jul 2019Source
Show all 137 documentsShow fewer documents
Legal
- OtherCERSAI_Search_Report_200218667038_For_Asset_Based_Search_14_08_2021_12_50_42_254 SBI.pdf · uploaded 14 Aug 2021Source
Migrated
- 1 Copy of the legal title reportlegal title report273.pdf · uploaded 16 Jul 2019Source
- 1 Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 16 Jul 2019Source
- 1 Building Plan Approval (IOD)IOD.pdf · uploaded 16 Jul 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement1.pdf · uploaded 16 Jul 2019Source
- 2 Commencement Certificates / NA Order for plotted developmentCommencement2.pdf · uploaded 16 Jul 2019Source
- 1 Declaration in FORM BFORMB.pdf · uploaded 16 Jul 2019Source
- 1 Details of encumbrancesEncumbrance.pdf · uploaded 17 Jul 2019Source
- 2 Copy of the legal title reportlegal title report271.pdf · uploaded 23 Jul 2019Source
- 3 Copy of the legal title reportlegal title report274_1.pdf · uploaded 23 Jul 2019Source
- 4 Copy of the legal title reportlegal title report274_2.pdf · uploaded 23 Jul 2019Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate_compressed.pdf · uploaded 23 Jul 2019Source
- 1 Certificates of CA (Form 3)ca cert delta.pdf · uploaded 23 Jul 2019Source
- 1 Proforma of Allotment letterRERA ATS.pdf · uploaded 23 Jul 2019Source
- 1 PAN CardPAN CARD ORIGINAL.pdf · uploaded 6 Jul 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)30-12-2020.pdf · uploaded 29 Jan 2021Source
- 2 Building Plan Approval (IOD)IOD Mar-21.pdf · uploaded 29 Jul 2021Source
- 3 Commencement Certificates / NA Order for plotted developmentComm Cert.pdf · uploaded 29 Jul 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)30-06-2021.pdf · uploaded 29 Jul 2021Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg Certificate_compressed.pdf · uploaded 29 Jul 2021Source
- 2 Details of encumbrancesRERA-Encumbrance Declaration.pdf · uploaded 2 Aug 2021Source
- 3 Details of encumbrancesCERSAI_Search_Report_200218667038_For_Asset_Based_Search_14_08_2021_12_50_42_254 SBI.pdf · uploaded 14 Aug 2021Source
- 3 Building Plan Approval (IOD)IOD-23-06-2021.pdf · uploaded 14 Aug 2021Source
- 4 Commencement Certificates / NA Order for plotted developmentCC-26-03-2021 1.pdf · uploaded 14 Aug 2021Source
- 5 Commencement Certificates / NA Order for plotted developmentCC-30-07-2021.pdf · uploaded 14 Aug 2021Source
- 1 Declaration about Commencement CertificateCircular 32 March-2021 01.pdf · uploaded 14 Aug 2021Source
- 2 Declaration about Commencement CertificateCircular 32 July-2021.pdf · uploaded 14 Aug 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Cerificate.pdf · uploaded 14 Aug 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)1 Form 2A 032019.pdf · uploaded 14 Aug 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)2 Form 2A 042019.pdf · uploaded 14 Aug 2021Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)3 Form 2A 012020.pdf · uploaded 14 Aug 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)4 Form 2A 022020.pdf · uploaded 14 Aug 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)5 Form 2A 032020.pdf · uploaded 14 Aug 2021Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)6 Form 2A 042020.pdf · uploaded 14 Aug 2021Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)7 Form 2A 012021.pdf · uploaded 14 Aug 2021Source
- 1 Disclosure of sold/ booked inventoryCircular 29, March-2021 01.pdf · uploaded 14 Aug 2021Source
- 2 Disclosure of sold/ booked inventoryCircular 29, July-2021 01.pdf · uploaded 14 Aug 2021View
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)Not Applicable.pdf · uploaded 14 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Not Applicable.pdf · uploaded 14 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)AUDIT F Y 2019-20.pdf · uploaded 14 Aug 2021Source
- 1 OtherCERSAI_Search_Report_200218667038_For_Asset_Based_Search_14_08_2021_12_50_42_254 SBI.pdf · uploaded 14 Aug 2021Source
- 4 Building Plan Approval (IOD)Scan 01.pdf · uploaded 15 Aug 2021Source
- 5 Building Plan Approval (IOD)Scan 02.pdf · uploaded 15 Aug 2021Source
- 6 Building Plan Approval (IOD)Scan 03.pdf · uploaded 15 Aug 2021Source
- 7 Building Plan Approval (IOD)Scan 04.pdf · uploaded 15 Aug 2021Source
- 8 Building Plan Approval (IOD)Scan 05.pdf · uploaded 15 Aug 2021Source
- 9 Building Plan Approval (IOD)Scan 06.pdf · uploaded 15 Aug 2021Source
- 10 Building Plan Approval (IOD)Scan 07.pdf · uploaded 15 Aug 2021Source
- 11 Building Plan Approval (IOD)Scan 08.pdf · uploaded 15 Aug 2021Source
- 12 Building Plan Approval (IOD)Scan 09.pdf · uploaded 15 Aug 2021Source
- 13 Building Plan Approval (IOD)Scan 10.pdf · uploaded 15 Aug 2021Source
- 14 Building Plan Approval (IOD)Scan 11.pdf · uploaded 15 Aug 2021Source
- 15 Building Plan Approval (IOD)IMG_0001.pdf · uploaded 15 Aug 2021Source
- 16 Building Plan Approval (IOD)IMG_0002.pdf · uploaded 15 Aug 2021Source
- 17 Building Plan Approval (IOD)IMG_0003.pdf · uploaded 15 Aug 2021Source
- 18 Building Plan Approval (IOD)IMG_0004.pdf · uploaded 15 Aug 2021Source
- 19 Building Plan Approval (IOD)IMG_0005.pdf · uploaded 15 Aug 2021Source
- 20 Building Plan Approval (IOD)IMG_0006.pdf · uploaded 15 Aug 2021Source
- 21 Building Plan Approval (IOD)IMG_0006.pdf · uploaded 15 Aug 2021Source
- 22 Building Plan Approval (IOD)IMG_0007.pdf · uploaded 15 Aug 2021Source
- 23 Building Plan Approval (IOD)IMG_0009.pdf · uploaded 15 Aug 2021Source
- 24 Building Plan Approval (IOD)IMG_0010.pdf · uploaded 15 Aug 2021Source
- 6 Commencement Certificates / NA Order for plotted developmentIMG_0008.pdf · uploaded 15 Aug 2021Source
- 7 Commencement Certificates / NA Order for plotted developmentIMG_0011.pdf · uploaded 15 Aug 2021Source
- 1 CERSAI detailsCERSAI_Search_Report_200225316269_For_Asset_Based_Search_05_12_2021_11_20_47_536.pdf · uploaded 5 Dec 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)audit 2020-21.pdf · uploaded 29 Dec 2021Source
- 8 Commencement Certificates / NA Order for plotted developmentCC-15-02-2022.pdf · uploaded 6 Mar 2022Source
- 25 Building Plan Approval (IOD)IMG_0001_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- 26 Building Plan Approval (IOD)IMG_0001_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- 27 Building Plan Approval (IOD)IMG_0002_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- 28 Building Plan Approval (IOD)IMG_0003_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- 29 Building Plan Approval (IOD)IMG_0005_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- 30 Building Plan Approval (IOD)IMG_0006_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- 31 Building Plan Approval (IOD)IMG_0007_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- 32 Building Plan Approval (IOD)IMG_0008_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- 33 Building Plan Approval (IOD)IMG_0009_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- 34 Building Plan Approval (IOD)IMG_0010_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- 35 Building Plan Approval (IOD)IMG_0011_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- 36 Building Plan Approval (IOD)IMG_0012_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- 37 Building Plan Approval (IOD)IMG_0013_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- 38 Building Plan Approval (IOD)IMG_0004_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)RERA AUDIT F Y 2021-22.pdf · uploaded 30 Sep 2022Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)Society Registration Certificate C-Wing.pdf · uploaded 8 Mar 2023Source
- 4 Details of encumbrancesSBI Reconveyance Deed 21-03-2023 1-3_compressed.pdf · uploaded 23 Mar 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q3-2023.pdf · uploaded 11 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)RERA AUDIT -1-2.pdf · uploaded 26 Oct 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q4-2023.pdf · uploaded 3 Jan 2024Source
- 2 Status of Formation of Legal Entity (Society/Co Op etc.)Society Registration Certificate A, A1, B-Wing.pdf · uploaded 13 Jan 2024Source
Technical
- DocumentIOD.pdf · uploaded 16 Jul 2019Source
- DocumentLAYOUT.pdf · uploaded 16 Jul 2019Source
- DocumentIOD Mar-21.pdf · uploaded 29 Jul 2021Source
- DocumentIOD-23-06-2021.pdf · uploaded 14 Aug 2021Source
- DocumentScan 01.pdf · uploaded 15 Aug 2021Source
- DocumentScan 02.pdf · uploaded 15 Aug 2021Source
- DocumentScan 03.pdf · uploaded 15 Aug 2021Source
- DocumentScan 04.pdf · uploaded 15 Aug 2021Source
- DocumentScan 05.pdf · uploaded 15 Aug 2021Source
- DocumentScan 06.pdf · uploaded 15 Aug 2021Source
- DocumentScan 07.pdf · uploaded 15 Aug 2021Source
- DocumentScan 08.pdf · uploaded 15 Aug 2021Source
- DocumentScan 09.pdf · uploaded 15 Aug 2021Source
- DocumentScan 10.pdf · uploaded 15 Aug 2021Source
- DocumentScan 11.pdf · uploaded 15 Aug 2021Source
- DocumentIMG_0001.pdf · uploaded 15 Aug 2021Source
- DocumentIMG_0002.pdf · uploaded 15 Aug 2021Source
- DocumentIMG_0003.pdf · uploaded 15 Aug 2021Source
- DocumentIMG_0004.pdf · uploaded 15 Aug 2021Source
- DocumentIMG_0005.pdf · uploaded 15 Aug 2021Source
- DocumentIMG_0006.pdf · uploaded 15 Aug 2021Source
- DocumentIMG_0006.pdf · uploaded 15 Aug 2021Source
- DocumentIMG_0007.pdf · uploaded 15 Aug 2021Source
- DocumentIMG_0009.pdf · uploaded 15 Aug 2021Source
- DocumentIMG_0010.pdf · uploaded 15 Aug 2021Source
- DocumentIMG_0001_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- DocumentIMG_0001_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- DocumentIMG_0002_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- DocumentIMG_0003_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- DocumentIMG_0005_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- DocumentIMG_0006_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- DocumentIMG_0007_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- DocumentIMG_0008_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- DocumentIMG_0009_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- DocumentIMG_0010_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- DocumentIMG_0011_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- DocumentIMG_0012_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- DocumentIMG_0013_11zon_11zon.pdf · uploaded 7 Mar 2022Source
- DocumentIMG_0004_11zon_11zon.pdf · uploaded 7 Mar 2022Source
Technical (Architect)
- DocumentQ4-2023.pdf · uploaded 3 Jan 2024Source
Technical (Engineer)
- DocumentEngg Certificate_compressed.pdf · uploaded 29 Jul 2021Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 271, 273
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, 3BHK, Hall, Restroom, Shop399 units in all
- Address
- 271, 273, 274, Jadhavwadi, ChikhaliPIN 411062
- Village
- Pimpri Chinchawad (M Corp.), Haveli taluka
- Land area for this project
- 6,750 sq m (72,656 sq ft)
- Permissible built-up area
- 25,133 sq m (2,70,529 sq ft)
- Sanctioned built-up area
- 14,224 sq m (1,53,106 sq ft)
- Recreational open space
- 675 sq m (7,270 sq ft)
- Designated bank account
- 171
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
271, 273, 274
Boundaries
- North
- Gat No 272
- South
- Gat No 274
- East
- Gat No 276
- West
- Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking399 units
399 of 399 units booked (100%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A1 Wing | 1BHK | 33.35 sq m · 359 sq ft | 10 | 10 |
| A1 Wing | 1BHK | 35 sq m · 377 sq ft | 11 | 11 |
| A1 Wing | 2BHK | 43.74 sq m · 471 sq ft | 11 | 11 |
| A1 Wing | 2BHK | 43.75 sq m · 471 sq ft | 11 | 11 |
| A1 Wing | 2BHK | 47.35 sq m · 510 sq ft | 11 | 11 |
| A1 Wing | 2BHK | 47.38 sq m · 510 sq ft | 11 | 11 |
| A1 Wing | 2BHK | 47.49 sq m · 511 sq ft | 11 | 11 |
| A1 Wing | 2BHK | 47.52 sq m · 512 sq ft | 11 | 11 |
Show all 75 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | 1BHK | 33.31 sq m · 359 sq ft | 11 | 11 |
| A Wing | 1BHK | 34.94 sq m · 376 sq ft | 8 | 8 |
| A Wing | 2BHK | 43.74 sq m · 471 sq ft | 11 | 11 |
| A Wing | 2BHK | 47.33 sq m · 509 sq ft | 11 | 11 |
| A Wing | 2BHK | 47.52 sq m · 512 sq ft | 11 | 11 |
| A Wing | 3BHK | 68.65 sq m · 739 sq ft | 9 | 9 |
| A Wing | 3BHK | 68.73 sq m · 740 sq ft | 9 | 9 |
| A Wing | Hall | 159.55 sq m · 1,717 sq ft | 1 | 1 |
| A Wing | Restroom | 15.79 sq m · 170 sq ft | 2 | 2 |
| A Wing | Shop | 24.7 sq m · 266 sq ft | 1 | 1 |
| A Wing | Shop | 25 sq m · 269 sq ft | 1 | 1 |
| A Wing | Shop | 52 sq m · 560 sq ft | 1 | 1 |
| B Wing | 1BHK | 33.4 sq m · 360 sq ft | 12 | 12 |
| B Wing | 1BHK | 34.92 sq m · 376 sq ft | 11 | 11 |
| B Wing | 2BHK | 43.74 sq m · 471 sq ft | 12 | 12 |
| B Wing | 2BHK | 43.75 sq m · 471 sq ft | 12 | 12 |
| B Wing | 2BHK | 47.16 sq m · 508 sq ft | 12 | 12 |
| B Wing | 2BHK | 47.31 sq m · 509 sq ft | 12 | 12 |
| B Wing | 2BHK | 47.41 sq m · 510 sq ft | 12 | 12 |
| B Wing | 2BHK | 47.48 sq m · 511 sq ft | 12 | 12 |
| C Wing | 1BHK | 29.18 sq m · 314 sq ft | 3 | 3 |
| C Wing | 1BHK | 29.41 sq m · 317 sq ft | 3 | 3 |
| C Wing | 1BHK | 31.25 sq m · 336 sq ft | 1 | 1 |
| C Wing | 1BHK | 32.5 sq m · 350 sq ft | 6 | 6 |
| C Wing | 1BHK | 32.79 sq m · 353 sq ft | 3 | 3 |
| C Wing | 1BHK | 32.83 sq m · 353 sq ft | 3 | 3 |
| C Wing | 1BHK | 33.53 sq m · 361 sq ft | 3 | 3 |
| C Wing | 1BHK | 33.58 sq m · 361 sq ft | 3 | 3 |
| C Wing | 1BHK | 35.37 sq m · 381 sq ft | 3 | 3 |
| C Wing | 1BHK | 35.41 sq m · 381 sq ft | 2 | 2 |
| C Wing | 1BHK | 35.43 sq m · 381 sq ft | 2 | 2 |
| C Wing | 1BHK | 35.46 sq m · 382 sq ft | 3 | 3 |
| C Wing | 1BHK | 36.57 sq m · 394 sq ft | 3 | 3 |
| C Wing | 1BHK | 36.69 sq m · 395 sq ft | 6 | 6 |
| C Wing | 1BHK | 36.71 sq m · 395 sq ft | 3 | 3 |
| C Wing | 2BHK | 40.12 sq m · 432 sq ft | 3 | 3 |
| C Wing | 2BHK | 40.19 sq m · 433 sq ft | 3 | 3 |
| C Wing | 2BHK | 40.23 sq m · 433 sq ft | 3 | 3 |
| C Wing | 2BHK | 40.47 sq m · 436 sq ft | 2 | 2 |
| C Wing | 2BHK | 41.36 sq m · 445 sq ft | 4 | 4 |
| C Wing | 2BHK | 41.37 sq m · 445 sq ft | 2 | 2 |
| C Wing | 2BHK | 41.4 sq m · 446 sq ft | 3 | 3 |
| C Wing | 2BHK | 41.42 sq m · 446 sq ft | 2 | 2 |
| C Wing | 2BHK | 42.92 sq m · 462 sq ft | 3 | 3 |
| C Wing | 2BHK | 42.96 sq m · 462 sq ft | 5 | 5 |
| C Wing | 2BHK | 43.04 sq m · 463 sq ft | 2 | 2 |
| C Wing | 2BHK | 43.89 sq m · 472 sq ft | 3 | 3 |
| C Wing | 2BHK | 43.99 sq m · 474 sq ft | 3 | 3 |
| C Wing | 2BHK | 44.03 sq m · 474 sq ft | 3 | 3 |
| C Wing | 2BHK | 44.1 sq m · 475 sq ft | 3 | 3 |
| C Wing | 2BHK | 44.66 sq m · 481 sq ft | 2 | 2 |
| C Wing | 2BHK | 44.68 sq m · 481 sq ft | 4 | 4 |
| C Wing | 2BHK | 44.72 sq m · 481 sq ft | 4 | 4 |
| C Wing | 2BHK | 44.75 sq m · 482 sq ft | 2 | 2 |
| C Wing | 2BHK | 45.14 sq m · 486 sq ft | 3 | 3 |
| C Wing | 2BHK | 45.15 sq m · 486 sq ft | 3 | 3 |
| C Wing | 2BHK | 45.19 sq m · 486 sq ft | 3 | 3 |
| C Wing | 2BHK | 45.21 sq m · 487 sq ft | 3 | 3 |
| C Wing | 2BHK | 47.16 sq m · 508 sq ft | 3 | 3 |
| C Wing | 2BHK | 47.22 sq m · 508 sq ft | 3 | 3 |
| C Wing | 2BHK | 47.23 sq m · 508 sq ft | 4 | 4 |
| C Wing | 2BHK | 47.27 sq m · 509 sq ft | 3 | 3 |
| C Wing | 2BHK | 48.9 sq m · 526 sq ft | 3 | 3 |
| C Wing | 2BHK | 48.92 sq m · 527 sq ft | 3 | 3 |
| C Wing | 2BHK | 48.97 sq m · 527 sq ft | 5 | 5 |
| C Wing | 3BHK | 47.3 sq m · 509 sq ft | 1 | 1 |
| C Wing | 3BHK | 49.11 sq m · 529 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals28
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Kimaya Associates | — |
| Chartered accountant | V C A N Associates | — |
| Engineer | Sarvasiddhant Structural Engineers Pvt Ltd | — |
| Other | Ajinkya Lahigude | — |
| Other | Kavya Enterprises | — |
| Other | Salini Costrucion | — |
| Registered real estate agent | Ab Housing Realty Private Limited | — |
| Registered real estate agent | Akash Krishna Surwase | — |
Show all 28 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Registered real estate agent | Anton David Balid | — |
| Registered real estate agent | Bhanwarlal Seervi | — |
| Registered real estate agent | Corazon Homes Private Limited | — |
| Registered real estate agent | Dattatrya Maruti Pawar | — |
| Registered real estate agent | Gurunath Suresh Kurhade | — |
| Registered real estate agent | Hemant Sanjay Phuge | — |
| Registered real estate agent | Manisha Rameshwar Bole | — |
| Registered real estate agent | Pooja Shriram Talekar | — |
| Registered real estate agent | Pradip Ajinath Mohite | — |
| Registered real estate agent | Prashant Uddhavrao Thorat | — |
| Registered real estate agent | Raju Tukaram Hosmani | — |
| Registered real estate agent | Rameshwar Kashinathrao Bole | — |
| Registered real estate agent | Rohil Kumar Narayanrao Muley | — |
| Registered real estate agent | Shyam Kishor | — |
| Registered real estate agent | Snehal Mahesh Masulkar | — |
| Registered real estate agent | Swapnil Maruti Mhaske | — |
| Registered real estate agent | Swapnil Sahebrao Kshirsagar | — |
| Registered real estate agent | Umeash Vasant Gaikwad | — |
| Registered real estate agent | Vijaykumar Ramanjani Bhandari | — |
| Registered real estate agent | Vivek Suresh Pataskar | — |
Source: MahaRERA project page. Contact details are not shown.
Shree Residency in numbers
Registered deals, summarised
Deedo has 1 registered document at Shree Residency, from Jul 2026 to Jul 2026: 1 sale.
- How many properties have been sold at Shree Residency?
- 1 sale is registered at Shree Residency, 1 of them a resale.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Shree Residency by Deedo, last updated with deals registered in Jul 2026.
Latest deal · Resale · Jul 2026