Deedo IDDP-PUN-5AQJCompletion was pushed back 4 months, to Sep 2029; no MahaRERA orders on record; 65% of its units are booked.
Chikhali, Pune 412105 · Property rates in Chikhali · by Primal Pride LLP
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Sep 2029
- This projectRegistered 19 Jul 2023, completion promised 31 May 2029, revised to 30 Sep 2029.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Mortgage · Oct 2026No amount
- Rental · Oct 2026
- Mortgage · Oct 2026No amount
- Mortgage · Oct 2026No amount
- Mortgage · Oct 2026No amount
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Rental · Sep 2026
- Rental · Sep 2026
- Rental · 36 mo · Sep 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Oct 2026 | Not on record | Mortgage | — | View Mortgage, Oct 2026 | |
| Oct 2026 | Not on record | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | Not on record | Mortgage | — | View Mortgage, Oct 2026 | |
| Oct 2026 | Wing A · 1 | Mortgage | — | View Mortgage, Oct 2026 | |
| Oct 2026 | Not on record | Mortgage | — | View Mortgage, Oct 2026 | |
| Sep 2026 | A Wing · 1101 | Primary sale | 786 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | B Wing · 703 | Primary sale | — | View Primary sale, Sep 2026 | |
| Sep 2026 | B Wing · 1004 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | Unit 1101 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | B Wing · 102 | Rental | — | View Rental, Sep 2026 |
7 buildings
Open a building to see every flat, floor by floor.
- A Wing12 floors · 21 units0% booked
- B Wing14 floors98% booked
- C Wing23 floors · 92 units96% booked
- D Wing13 floors · 52 units81% booked
- E Wing14 floors · 1 unit0% booked
- F Wing3 floors · 1 unit0% booked
- G Wing11 floors · 32 units0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100052020
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100052020 | 19 Jul 2023 | 31 May 2029 | 30 Sep 2029 | Primal Pride LLP | Project page |
Documents196
1 document held by Deedo, 195 filings listed on MahaRERA's project page
Finance
- PAN CardPRIMAL PRIDE LLP PAN CARD.pdf · uploaded 30 May 2023Source
Legal
Show all 196 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)scan1.pdf · uploaded 30 May 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentscan2.pdf · uploaded 30 May 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentscan3.pdf · uploaded 30 May 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentscan4.pdf · uploaded 30 May 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentscan5.pdf · uploaded 30 May 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentscan6.pdf · uploaded 30 May 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentscan7.pdf · uploaded 30 May 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentscan8.pdf · uploaded 30 May 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentscan9.pdf · uploaded 30 May 2023Source
- 9 Building Plan Approval / NA Order for plotted developmentscan10.pdf · uploaded 30 May 2023Source
- 10 Building Plan Approval / NA Order for plotted developmentscan11.pdf · uploaded 30 May 2023Source
- 11 Building Plan Approval / NA Order for plotted developmentscan12.pdf · uploaded 30 May 2023Source
- 12 Building Plan Approval / NA Order for plotted developmentscan13.pdf · uploaded 30 May 2023Source
- 13 Building Plan Approval / NA Order for plotted developmentscan14.pdf · uploaded 30 May 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentcommencement cert (1).pdf · uploaded 30 May 2023Source
- 1 Declaration about Commencement Certificatedeclaration for commencement.pdf · uploaded 30 May 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameseparate bank acc dec.pdf · uploaded 30 May 2023Source
- 1 Copy of the legal title reportSearch Report.pdf · uploaded 3 Jun 2023Source
- 2 Copy of the legal title reportLegal Title Report.pdf · uploaded 3 Jun 2023Source
- 2 a Details of encumbrances concerned to FinanceDetails of Encumbrances for legal.pdf · uploaded 3 Jun 2023Source
- 2 b Details of encumbrances concerned to LegalDetails of Encumbrances for legal.pdf · uploaded 3 Jun 2023Source
- 1 Declaration in FORM BForm B.pdf · uploaded 3 Jun 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS CERTIFICATE.pdf · uploaded 3 Jun 2023Source
- 1 CERSAI detailsSelf Declaration of non applicability of CERSAI certificate.pdf · uploaded 3 Jun 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Final.pdf · uploaded 3 Jun 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of interest in other real estate organizations.pdf · uploaded 3 Jun 2023Source
- 1 Proforma of Allotment letterallotment letter.pdf · uploaded 14 Jun 2023Source
- 1 Deviation Report with respect to Allotment letterDEVIATION.pdf · uploaded 14 Jun 2023Source
- 1 Proforma of Agreement for saleDRAFT AGREEMENT - BY LEGAL REALTY LLP - for RERA REGISTRATION.pdf · uploaded 10 Jul 2023Source
- 1 Deviation Report with respect to model copy of AgreementDEVIATION REPORT - AGREEMENT TO SALE - NEW.pdf · uploaded 15 Jul 2023Source
- 2 Copy of Layout Approval (in case of layout)Plans-1.pdf · uploaded 30 Nov 2023Source
- 14 Building Plan Approval / NA Order for plotted developmentPlans-2.pdf · uploaded 30 Nov 2023Source
- 15 Building Plan Approval / NA Order for plotted developmentPlans-3.pdf · uploaded 30 Nov 2023Source
- 16 Building Plan Approval / NA Order for plotted developmentPlans-4.pdf · uploaded 30 Nov 2023Source
- 17 Building Plan Approval / NA Order for plotted developmentPlans-5.pdf · uploaded 30 Nov 2023Source
- 18 Building Plan Approval / NA Order for plotted developmentPlans-6.pdf · uploaded 30 Nov 2023Source
- 19 Building Plan Approval / NA Order for plotted developmentPlans-7.pdf · uploaded 30 Nov 2023Source
- 20 Building Plan Approval / NA Order for plotted developmentPlans-8.pdf · uploaded 30 Nov 2023Source
- 21 Building Plan Approval / NA Order for plotted developmentPlans-9.pdf · uploaded 30 Nov 2023Source
- 22 Building Plan Approval / NA Order for plotted developmentPlans-10.pdf · uploaded 30 Nov 2023Source
- 23 Building Plan Approval / NA Order for plotted developmentPlans-11.pdf · uploaded 30 Nov 2023Source
- 2 Proforma of Agreement for saleBlank Draft Updated-29-11-2023.pdf · uploaded 20 Dec 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's Certificate.pdf · uploaded 17 May 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate.pdf · uploaded 17 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Quality Assurance Certificate.pdf · uploaded 17 May 2024Source
- 1 Disclosure of sold/ booked inventorySold Inventory.pdf · uploaded 17 May 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 converted.pdf · uploaded 17 May 2024Source
- 3 Copy of Layout Approval (in case of layout)HPSCANNER2377 Layout.pdf · uploaded 25 Jul 2024Source
- 24 Building Plan Approval / NA Order for plotted developmentHPSCANNER2376 02.pdf · uploaded 25 Jul 2024Source
- 25 Building Plan Approval / NA Order for plotted developmentHPSCANNER2375 03.pdf · uploaded 25 Jul 2024Source
- 26 Building Plan Approval / NA Order for plotted developmentHPSCANNER2374 04.pdf · uploaded 25 Jul 2024Source
- 27 Building Plan Approval / NA Order for plotted developmentHPSCANNER2373 05.pdf · uploaded 25 Jul 2024Source
- 28 Building Plan Approval / NA Order for plotted developmentHPSCANNER2372 06.pdf · uploaded 25 Jul 2024Source
- 29 Building Plan Approval / NA Order for plotted developmentHPSCANNER2371 07.pdf · uploaded 25 Jul 2024Source
- 30 Building Plan Approval / NA Order for plotted developmentHPSCANNER2370 08.pdf · uploaded 25 Jul 2024Source
- 31 Building Plan Approval / NA Order for plotted developmentHPSCANNER2369 09.pdf · uploaded 25 Jul 2024Source
- 32 Building Plan Approval / NA Order for plotted developmentHPSCANNER2367 10.pdf · uploaded 25 Jul 2024Source
- 33 Building Plan Approval / NA Order for plotted developmentHPSCANNER2366 11.pdf · uploaded 25 Jul 2024Source
- 34 Building Plan Approval / NA Order for plotted developmentHPSCANNER2365 12.pdf · uploaded 25 Jul 2024Source
- 35 Building Plan Approval / NA Order for plotted developmentHPSCANNER2364 13.pdf · uploaded 25 Jul 2024Source
- 36 Building Plan Approval / NA Order for plotted developmentHPSCANNER2363 14.pdf · uploaded 25 Jul 2024Source
- 37 Building Plan Approval / NA Order for plotted developmentHPSCANNER2362_ 15.pdf · uploaded 25 Jul 2024Source
- 38 Building Plan Approval / NA Order for plotted developmentHPSCANNER2361 16.pdf · uploaded 25 Jul 2024Source
- 39 Building Plan Approval / NA Order for plotted developmentHPSCANNER2360 17.pdf · uploaded 25 Jul 2024Source
- 40 Building Plan Approval / NA Order for plotted developmentHPSCANNER2359 18.pdf · uploaded 25 Jul 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 25 Jul 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate June Month (1).pdf · uploaded 9 Aug 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate June 2024.pdf · uploaded 9 Aug 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA June 24.pdf · uploaded 9 Aug 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech Certificate.pdf · uploaded 27 Dec 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Form 3.pdf · uploaded 27 Dec 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Enigineer Certificate.pdf · uploaded 27 Dec 2024Source
- 1 Disclosure of sold/ booked inventorySold Unsold Inventory.pdf · uploaded 27 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Primal Pride Audit Report Rera Signed.pdf · uploaded 29 Dec 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectDisclosure Of Secured Unsecured.pdf · uploaded 10 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech Certificate.pdf · uploaded 28 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)signed Form 3.pdf · uploaded 28 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 28 Mar 2025Source
- 1 Disclosure of sold/ booked inventorySold unsold inventory.pdf · uploaded 3 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1.pdf · uploaded 30 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Primal PRide Mar 25 Signed.pdf · uploaded 30 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2.pdf · uploaded 30 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of sold-Booked Inventory Mar 25.pdf · uploaded 30 Apr 2025Source
- Form 1Architect Certificate June Month (1).pdf · uploaded 4 Jun 2025Source
- Form 1Architech Certificate.pdf · uploaded 4 Jun 2025Source
- Form 1Architech Certificate.pdf · uploaded 4 Jun 2025Source
- Form 1Form-1.pdf · uploaded 4 Jun 2025Source
- Form 1Form 1 Mar 24.pdf · uploaded 4 Jun 2025Source
- Form 2Engineer Certificate June 2024.pdf · uploaded 4 Jun 2025Source
- Form 2Enigineer Certificate.pdf · uploaded 4 Jun 2025Source
- Form 2form 2 signed.pdf · uploaded 4 Jun 2025Source
- Form 2Form-2.pdf · uploaded 4 Jun 2025Source
- Form 2Engineers Certificate.pdf · uploaded 4 Jun 2025Source
- Form 3Form 3 CA June 24.pdf · uploaded 4 Jun 2025Source
- Form 3CA Form 3.pdf · uploaded 4 Jun 2025Source
- Form 3signed Form 3.pdf · uploaded 4 Jun 2025Source
- Form 3FORM 3 Primal PRide Mar 25 Signed.pdf · uploaded 4 Jun 2025Source
- Form 3Form 3 converted.pdf · uploaded 4 Jun 2025Source
- Disclosure of Sold and Booked InventorySold & Booked Inventory.pdf · uploaded 4 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Unsold Inventory.pdf · uploaded 4 Jun 2025Source
- Disclosure of Sold and Booked InventorySold & unsold inventory.pdf · uploaded 4 Jun 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold-Booked Inventory Mar 25.pdf · uploaded 4 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory.pdf · uploaded 4 Jun 2025Source
- Withdrawal Update Form 1Form-1.pdf · uploaded 4 Jun 2025Source
- Withdrawal Update Form 1Form-1.pdf · uploaded 4 Jun 2025Source
- Withdrawal Update Form 1Form-1.pdf · uploaded 4 Jun 2025Source
- Withdrawal Update Form 2Form-2.pdf · uploaded 4 Jun 2025Source
- Withdrawal Update Form 2Form-2.pdf · uploaded 4 Jun 2025Source
- Withdrawal Update Form 2Form-2.pdf · uploaded 4 Jun 2025Source
- Withdrawal Update Form 3FORM 3 Primal PRide Mar 25 Signed.pdf · uploaded 4 Jun 2025Source
- Withdrawal Update Form 3FORM 3 Primal PRide Mar 25 Signed.pdf · uploaded 4 Jun 2025Source
- Withdrawal Update Form 3FORM 3 Primal PRide Mar 25 Signed.pdf · uploaded 4 Jun 2025Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 18 Jul 2025Source
- Withdrawal Update Form 2Engineer Certificate.pdf · uploaded 18 Jul 2025Source
- Withdrawal Update Form 3Form 3 signed.pdf · uploaded 18 Jul 2025Source
- Form 2A (FY 2023-2024)Quality Assurance Certificate.pdf · uploaded 4 Sep 2025Source
- Form 2A (FY 2024-2025)FORM 2A.pdf · uploaded 4 Sep 2025Source
- Form 5 (FY 2024-2025)Form-5 signed.pdf · uploaded 30 Sep 2025Source
- Withdrawal Update Form 1Form-1.pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 2Form-2.pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 3FORM 3 Primal PRide Sep_25 Sign_compressed (1).pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 1Architech Certificate.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2Engineer Certificate.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3CA Form 3.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1Form-1.pdf · uploaded 6 May 2026Source
- Withdrawal Update Form 2Form-2 SIgn.pdf · uploaded 6 May 2026Source
- Withdrawal Update Form 3Form-3 SIgn.pdf · uploaded 6 May 2026Source
- Withdrawal Update Form 1Form 1 June26 Signed.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 2Form 2 June26 Signed.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 3Form 3 Signed.pdf · uploaded 18 Jul 2026Source
- Form 5 (FY 2025-2026)Primal Pride Form 5 Signed.pdf · uploaded 11 Sep 2026Source
Technical
- Documentscan1.pdf · uploaded 30 May 2023Source
- Documentscan2.pdf · uploaded 30 May 2023Source
- Documentscan3.pdf · uploaded 30 May 2023Source
- Documentscan4.pdf · uploaded 30 May 2023Source
- Documentscan5.pdf · uploaded 30 May 2023Source
- Documentscan6.pdf · uploaded 30 May 2023Source
- Documentscan7.pdf · uploaded 30 May 2023Source
- Documentscan8.pdf · uploaded 30 May 2023Source
- Documentscan9.pdf · uploaded 30 May 2023Source
- Documentscan10.pdf · uploaded 30 May 2023Source
- Documentscan11.pdf · uploaded 30 May 2023Source
- Documentscan12.pdf · uploaded 30 May 2023Source
- Documentscan13.pdf · uploaded 30 May 2023Source
- Documentscan14.pdf · uploaded 30 May 2023Source
- DocumentPlans-1.pdf · uploaded 30 Nov 2023Source
- DocumentPlans-10.pdf · uploaded 30 Nov 2023Source
- DocumentPlans-11.pdf · uploaded 30 Nov 2023Source
- DocumentPlans-8.pdf · uploaded 30 Nov 2023Source
- DocumentPlans-9.pdf · uploaded 30 Nov 2023Source
- DocumentPlans-2.pdf · uploaded 30 Nov 2023Source
- DocumentPlans-3.pdf · uploaded 30 Nov 2023Source
- DocumentPlans-4.pdf · uploaded 30 Nov 2023Source
- DocumentPlans-5.pdf · uploaded 30 Nov 2023Source
- DocumentPlans-6.pdf · uploaded 30 Nov 2023Source
- DocumentPlans-7.pdf · uploaded 30 Nov 2023Source
- DocumentHPSCANNER2377 Layout.pdf · uploaded 25 Jul 2024Source
- DocumentHPSCANNER2376 02.pdf · uploaded 25 Jul 2024Source
- DocumentHPSCANNER2375 03.pdf · uploaded 25 Jul 2024Source
- DocumentHPSCANNER2374 04.pdf · uploaded 25 Jul 2024Source
- DocumentHPSCANNER2373 05.pdf · uploaded 25 Jul 2024Source
- DocumentHPSCANNER2372 06.pdf · uploaded 25 Jul 2024Source
- DocumentHPSCANNER2371 07.pdf · uploaded 25 Jul 2024Source
- DocumentHPSCANNER2370 08.pdf · uploaded 25 Jul 2024Source
- DocumentHPSCANNER2369 09.pdf · uploaded 25 Jul 2024Source
- DocumentHPSCANNER2367 10.pdf · uploaded 25 Jul 2024Source
- DocumentHPSCANNER2366 11.pdf · uploaded 25 Jul 2024Source
- DocumentHPSCANNER2365 12.pdf · uploaded 25 Jul 2024Source
- DocumentHPSCANNER2364 13.pdf · uploaded 25 Jul 2024Source
- DocumentHPSCANNER2363 14.pdf · uploaded 25 Jul 2024Source
- DocumentHPSCANNER2362_ 15.pdf · uploaded 25 Jul 2024Source
- DocumentHPSCANNER2361 16.pdf · uploaded 25 Jul 2024Source
- DocumentHPSCANNER2360 17.pdf · uploaded 25 Jul 2024Source
- DocumentHPSCANNER2359 18.pdf · uploaded 25 Jul 2024Source
- Document1 Layout.pdf · uploaded 18 Jun 2026Source
- Document2-5.pdf · uploaded 18 Jun 2026Source
- Document6-9.pdf · uploaded 18 Jun 2026Source
- Document10-13.pdf · uploaded 18 Jun 2026Source
- Document14-17.pdf · uploaded 18 Jun 2026Source
- Document18-22.pdf · uploaded 18 Jun 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel S NO 72/1/P
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- Shop, 2.5 BHK, 2BHK, 3BHK, 1BHK, 1 BHK MHADA199 units in all
- Address
- S No 72/1/P, Chikhali, ChikhaliPIN 412105
- Village
- Chikhali, Haveli taluka
- Land area for this project
- 7,750 sq m (83,420 sq ft)
- Permissible built-up area
- 28,640 sq m (3,08,273 sq ft)
- Sanctioned built-up area
- 28,640 sq m (3,08,273 sq ft)
- Recreational open space
- 776 sq m (8,353 sq ft)
- Designated bank account
- 82
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S NO 72/1/P
Boundaries
- North
- Gat No 14
- South
- 24 Mtr D P Road
- East
- Gat No 15
- West
- Remaining Area Of The Gat
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking199 units
130 of 199 units booked (65%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | Shop | 18.34 sq m · 197 sq ft | 2 | 0 |
| A Wing | Shop | 24.5 sq m · 264 sq ft | 4 | 0 |
| A Wing | Shop | 24.81 sq m · 267 sq ft | 1 | 0 |
| A Wing | Shop | 26.17 sq m · 282 sq ft | 2 | 0 |
| A Wing | Shop | 27.42 sq m · 295 sq ft | 6 | 0 |
| A Wing | Shop | 36.59 sq m · 394 sq ft | 2 | 0 |
| A Wing | Shop | 39.07 sq m · 421 sq ft | 1 | 0 |
| A Wing | Shop | 40.94 sq m · 441 sq ft | 3 | 0 |
Show all 22 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| C Wing | 2.5 BHK | 70.34 sq m · 757 sq ft | 42 | 39 |
| C Wing | 2BHK | 54.28 sq m · 584 sq ft | 46 | 46 |
| C Wing | 2BHK | 56.93 sq m · 613 sq ft | 4 | 3 |
| D Wing | 2BHK | 54.28 sq m · 584 sq ft | 26 | 23 |
| D Wing | 2BHK | 55.39 sq m · 596 sq ft | 2 | 2 |
| D Wing | 3BHK | 70.34 sq m · 757 sq ft | 24 | 17 |
| E Wing | 2.5 BHK | 70.34 sq m · 757 sq ft | 1 | 0 |
| F Wing | 2BHK | 58.2 sq m · 626 sq ft | 1 | 0 |
| G Wing | 1BHK | 37.96 sq m · 409 sq ft | 2 | 0 |
| G Wing | 1BHK | 39.22 sq m · 422 sq ft | 2 | 0 |
| G Wing | 1BHK | 42.03 sq m · 452 sq ft | 2 | 0 |
| G Wing | 1 BHK MHADA | 37.96 sq m · 409 sq ft | 9 | 0 |
| G Wing | 1 BHK MHADA | 39.22 sq m · 422 sq ft | 9 | 0 |
| G Wing | 1 BHK MHADA | 42.03 sq m · 452 sq ft | 8 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | I P Associates | — |
| Chartered accountant | CA Dolly Gandhi | — |
| Chartered accountant | Navdeep Jindal & Associates | — |
| Engineer | Gorakshnath Bhosale | — |
| Engineer | YogeshWARI Chandrakant Patil | — |
Source: MahaRERA project page. Contact details are not shown.
Primal Pride in numbers
Registered deals, summarised
Deedo has 336 registered documents at Primal Pride, from Nov 2023 to Oct 2026: 247 sales, 8 leave and licence agreements, 80 mortgages. The median registered sale since Nov 2023 works out to about ₹6,600 per sq ft, at a median of ₹41 L a deal; 0% of sales were resales.
- What is the price per sq ft at Primal Pride?
- The median registered sale since Nov 2023 works out to about ₹6,600 per sq ft, at a median of ₹41 L a deal; 0% of sales were resales.
- How many properties have been sold at Primal Pride?
- 247 sales are registered at Primal Pride.
- Are properties at Primal Pride rented out?
- Yes: 8 leave and licence agreements are registered at Primal Pride, at a median rent since Nov 2023 of about ₹19,000 a month with a deposit of about ₹39,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Primal Pride by Deedo, last updated with deals registered in Oct 2026.
Latest deal · Mortgage · Oct 2026
Exact price & Index II