Abhiman Vishwa
Deedo IDDP-PUN-SWPZIt is due for completion in Dec 2027, with no extension on record; no MahaRERA orders on record; 72% of its units are booked.
Chikhali, Pune 412114 · Property rates in Chikhali · by Royalgroup
Buying a flat here?
See every deed registered on it.
It is due for completion in Dec 2027, with no extension on record
- This projectRegistered 25 Aug 2019, completion promised 31 Dec 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Resale · Sep 2026
- Loan closure · Sep 2026No amount
- Rental · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Aug 2026
- Resale · Aug 2026
- Mortgage · Jul 2026
- Rental · Jul 2026
- Rental · Jul 2026
- Primary sale · Jun 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Sep 2026 | Wing-D · 1007 | Resale | 266 sq ft | View Resale, Sep 2026 | |
| Sep 2026 | Wing-D · 608 | Loan closure | 266 sq ft | View Loan closure, Sep 2026 | |
| Sep 2026 | Wing-C · 604 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | Wing-C · 1101 | Primary sale | 450 sq ft | View Primary sale, Sep 2026 | |
| Aug 2026 | Wing-D · 1001 | Primary sale | 370 sq ft | View Primary sale, Aug 2026 | |
| Aug 2026 | Wing-D · 412 | Resale | 419 sq ft | View Resale, Aug 2026 | |
| Jul 2026 | Wing-D · 902 | Mortgage | 374 sq ft | View Mortgage, Jul 2026 | |
| Jul 2026 | Wing-D · 406 | Rental | — | View Rental, Jul 2026 | |
| Jul 2026 | Wing-D · 106 | Rental | — | View Rental, Jul 2026 | |
| Jun 2026 | Wing-C · 1105 | Primary sale | 434 sq ft | View Primary sale, Jun 2026 |
4 buildings
Open a building to see every flat, floor by floor.
- Main buildingSize not on record
- Wing BSize not on record
- Wing-C12 floors · 94 units55% booked
- Wing-D12 floors · 164 units82% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100021984
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100021984 | 25 Aug 2019 | 31 Dec 2027 | 31 Dec 2027 | Royalgroup | Project page |
Documents169
1 document held by Deedo, 168 filings listed on MahaRERA's project page
Finance
- PAN CardPAN CARD PDF ROYAL GROUP.pdf · uploaded 10 Aug 2019Source
Legal
- Legal Title reportserch report 752.pdf · uploaded 10 Aug 2019Source
- Legal Title reportserch report 1651.pdf · uploaded 10 Aug 2019Source
- Declaration Form BChikhali Pratidnyapatra_compressed (2).pdf · uploaded 10 Aug 2019Source
- Declaration Form BArchitect Certificate.pdf · uploaded 16 Feb 2023Source
- Declaration Form BForm B.pdf · uploaded 28 Mar 2025Source
Migrated
- 1 PAN CardPAN CARD PDF ROYAL GROUP.pdf · uploaded 10 Aug 2019Source
Show all 169 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportserch report 752.pdf · uploaded 10 Aug 2019Source
- 2 Copy of the legal title reportserch report 1651.pdf · uploaded 10 Aug 2019Source
- 1 Details of encumbrancesencumbrances.pdf · uploaded 10 Aug 2019Source
- 1 Copy of Layout Approval (in case of layout)LAYOUT_Sheet 01.pdf · uploaded 10 Aug 2019Source
- 1 Building Plan Approval / NA Order for plotted developmentSheet 02.pdf · uploaded 10 Aug 2019Source
- 2 Building Plan Approval / NA Order for plotted developmentSheet 03.pdf · uploaded 10 Aug 2019Source
- 3 Building Plan Approval / NA Order for plotted developmentSheet 04.pdf · uploaded 10 Aug 2019Source
- 4 Building Plan Approval / NA Order for plotted developmentSheet 05.pdf · uploaded 10 Aug 2019Source
- 5 Building Plan Approval / NA Order for plotted developmentSheet 06.pdf · uploaded 10 Aug 2019Source
- 6 Building Plan Approval / NA Order for plotted developmentSheet 07.pdf · uploaded 10 Aug 2019Source
- 7 Building Plan Approval / NA Order for plotted developmentSheet 08.pdf · uploaded 10 Aug 2019Source
- 8 Building Plan Approval / NA Order for plotted developmentSheet 09.pdf · uploaded 10 Aug 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Letter.pdf · uploaded 10 Aug 2019Source
- 1 Declaration in FORM BChikhali Pratidnyapatra_compressed (2).pdf · uploaded 10 Aug 2019Source
- 1 Proforma of Allotment letterDRAFT AGR_PDF.pdf · uploaded 10 Aug 2019Source
- 2 Proforma of Allotment letterALLOTMENT LETTER_ROYAL.pdf · uploaded 10 Aug 2019Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_FORM3.pdf · uploaded 11 Aug 2019Source
- 2 Declaration in FORM BArchitect Certificate.pdf · uploaded 16 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)ROYAL GROUP FINAL FORM 5-.pdf · uploaded 4 May 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH CER.pdf · uploaded 20 Dec 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENG CER.pdf · uploaded 20 Dec 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_.pdf · uploaded 20 Dec 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate -20-21.pdf · uploaded 28 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate -19-20.pdf · uploaded 28 Jan 2025Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate -24-25-3rd quarter.pdf · uploaded 28 Jan 2025Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate -24-25-2nd quarter.pdf · uploaded 28 Jan 2025Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate -24-25-1st quarter.pdf · uploaded 28 Jan 2025Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate -23-24-4th quarter.pdf · uploaded 28 Jan 2025Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate -23-24-3rd quarter.pdf · uploaded 28 Jan 2025Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate -23-24 1st quarter.pdf · uploaded 28 Jan 2025Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate -22-23-4th quarter.pdf · uploaded 28 Jan 2025Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate -22-23-3nd quarter.pdf · uploaded 28 Jan 2025Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate -22-23-2nd quarter.pdf · uploaded 28 Jan 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate -22-23-1st quarter.pdf · uploaded 28 Jan 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate -21-22-4th quarter.pdf · uploaded 28 Jan 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate -21-22-3nd quarter.pdf · uploaded 28 Jan 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate -21-22-2nd quarter.pdf · uploaded 28 Jan 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate -21-22-1st quarter.pdf · uploaded 28 Jan 2025Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate 24-25 Q3.pdf · uploaded 28 Jan 2025Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate 24-25 Q2_compressed.pdf · uploaded 28 Jan 2025Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate 24-25 Q1.pdf · uploaded 28 Jan 2025Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate 23-24 Q4.pdf · uploaded 28 Jan 2025Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate 23-24 Q3_compressed.pdf · uploaded 28 Jan 2025Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate 23-24 Q1_compressed.pdf · uploaded 28 Jan 2025Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate -22-23-4th quarter.pdf · uploaded 28 Jan 2025Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate -22-23-3rd quarter_compressed.pdf · uploaded 28 Jan 2025Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate -22-23-1st quarter.pdf · uploaded 28 Jan 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate -21-22-4th quarter_compressed.pdf · uploaded 28 Jan 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate -21-22-3rd quarter_compressed.pdf · uploaded 28 Jan 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate -21-22-2nd quarter.pdf · uploaded 28 Jan 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate -21-22-1st quarter.pdf · uploaded 28 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate -20-21.pdf · uploaded 28 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate -19-20.pdf · uploaded 28 Jan 2025Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate -22-23-2nd quarter.pdf · uploaded 28 Jan 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate -22-23-1st quarter.pdf · uploaded 28 Jan 2025Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate 24-25 Q3.pdf · uploaded 28 Jan 2025Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate 24-25 Q2.pdf · uploaded 28 Jan 2025Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate 24-25 Q1.pdf · uploaded 28 Jan 2025Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate -23-24-4th quarter.pdf · uploaded 28 Jan 2025Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate -23-24-3rd quarter.pdf · uploaded 28 Jan 2025Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate -23-24-1st quarter.pdf · uploaded 28 Jan 2025Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate -22-23-4th quarter.pdf · uploaded 28 Jan 2025Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate -22-23-3rd quarter.pdf · uploaded 28 Jan 2025Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate -22-23-2nd quarter (1) new.pdf · uploaded 28 Jan 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate -21-22-4th quarter.pdf · uploaded 28 Jan 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate -21-22-3rd quarter.pdf · uploaded 28 Jan 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate -21-22-2nd quarter.pdf · uploaded 28 Jan 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate -21-22-1st quarter.pdf · uploaded 28 Jan 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate -20-21.pdf · uploaded 28 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate -18-19.pdf · uploaded 28 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Quality Assurance Certificate -20-21.pdf · uploaded 28 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality Assurance Certificate -21-22.pdf · uploaded 28 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Quality Assurance Certificate -22-23.pdf · uploaded 28 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Quality Assurance Certificate -23-24.pdf · uploaded 28 Jan 2025Source
- 1 Declaration in FORM BForm B.pdf · uploaded 28 Mar 2025Source
- 1 Disclosure of sold/ booked inventoryDsclosure of Inventory.pdf · uploaded 28 Mar 2025Source
- 2 Disclosure of sold/ booked inventoryDsclosure of Inventory_29032025.pdf · uploaded 29 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate -4th quarter_page-0001.pdf · uploaded 21 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 -4th quarter Compress.pdf · uploaded 21 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 4th quarter.pdf · uploaded 21 Apr 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)ROYAL GROUP FORM NO 5 FY 22-23.pdf · uploaded 21 Apr 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)ROYAL GROUP FORM NO 5 FY 23-24.pdf · uploaded 21 Apr 2025Source
- 1 Disclosure of sold/ booked inventorysold unsold inventory.pdf · uploaded 25 Apr 2025Source
- Form 1Form 1 Dec 2025.pdf · uploaded 30 Jan 2026Source
- Form 2Form 2 Dec 2025.pdf · uploaded 30 Jan 2026Source
- Form 3Form 3 Dec 2025.pdf · uploaded 30 Jan 2026Source
- Disclosure of Sold and Booked InventoryCircular 29.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 1ARCH CER.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 1ARCH CER.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 1ARCH CER.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 1ARCH CER.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 1ARCH CER.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 1ARCH CER.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 2ENG CER.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 2ENG CER.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 2ENG CER.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 2ENG CER.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 2ENG CER.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 2ENG CER.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 3CA Certificate_.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 3CA Certificate_.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 3CA Certificate_.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 3CA Certificate_.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 3CA Certificate_.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 3CA Certificate_.pdf · uploaded 17 Feb 2026Source
- Withdrawal Update Form 1Form I _4th quarter.pdf · uploaded 19 Apr 2026Source
- Withdrawal Update Form 2Form 2 - Abhiman Vishwa CandD 31-03-2026.pdf · uploaded 19 Apr 2026Source
- Withdrawal Update Form 3Form 3 - Abhiman Vishwa C and D 31-03-2026.pdf · uploaded 19 Apr 2026Source
- Withdrawal Update Form 1ABHIMAN_VISHWA_Form1_Q1_2026-27_18-07-2026_07-53.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 2ABHIMAN_VISHWA_Form2_Q1_2026-27_18-07-2026_07-53.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 3ABHIMAN_VISHWA_Form3_Q1_2026-27_18-07-2026_05-40_doc1.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 1ABHIMAN_VISHWA_Form1_Q1_2026-27_18-07-2026_07-53.pdf · uploaded 4 Sep 2026Source
- Withdrawal Update Form 2ABHIMAN_VISHWA_Form2_Q1_2026-27_18-07-2026_07-53.pdf · uploaded 4 Sep 2026Source
- Withdrawal Update Form 3ABHIMAN_VISHWA_Form3_Q1_2026-27_18-07-2026_05-40_doc1.pdf · uploaded 4 Sep 2026Source
- Form 2A (FY 2025-2026)Form 2A_FY 2025-26.pdf · uploaded 15 Sep 2026Source
- Form 5 (FY 2025-2026)Form 5 - ABHIMAN VISHWA Fy 25-26.pdf · uploaded 5 Oct 2026Source
Technical
- DocumentLAYOUT_Sheet 01.pdf · uploaded 10 Aug 2019Source
- DocumentSheet 02.pdf · uploaded 10 Aug 2019Source
- DocumentSheet 03.pdf · uploaded 10 Aug 2019Source
- DocumentSheet 04.pdf · uploaded 10 Aug 2019Source
- DocumentSheet 05.pdf · uploaded 10 Aug 2019Source
- DocumentSheet 06.pdf · uploaded 10 Aug 2019Source
- DocumentSheet 07.pdf · uploaded 10 Aug 2019Source
- DocumentSheet 08.pdf · uploaded 10 Aug 2019Source
- DocumentSheet 09.pdf · uploaded 10 Aug 2019Source
Technical (Architect)
- DocumentArchitech certificate -19-20.pdf · uploaded 28 Jan 2025Source
- DocumentArchitech certificate -20-21.pdf · uploaded 28 Jan 2025Source
- DocumentArchitech certificate -21-22-1st quarter.pdf · uploaded 28 Jan 2025Source
- DocumentArchitech certificate -21-22-2nd quarter.pdf · uploaded 28 Jan 2025Source
- DocumentArchitech certificate -21-22-3nd quarter.pdf · uploaded 28 Jan 2025Source
- DocumentArchitech certificate -21-22-4th quarter.pdf · uploaded 28 Jan 2025Source
- DocumentArchitech certificate -22-23-1st quarter.pdf · uploaded 28 Jan 2025Source
- DocumentArchitech certificate -22-23-2nd quarter.pdf · uploaded 28 Jan 2025Source
- DocumentArchitech certificate -22-23-3nd quarter.pdf · uploaded 28 Jan 2025Source
- DocumentArchitech certificate -22-23-4th quarter.pdf · uploaded 28 Jan 2025Source
- DocumentArchitech certificate -23-24 1st quarter.pdf · uploaded 28 Jan 2025Source
- DocumentArchitech certificate -23-24-3rd quarter.pdf · uploaded 28 Jan 2025Source
- DocumentArchitech certificate -23-24-4th quarter.pdf · uploaded 28 Jan 2025Source
- DocumentArchitech certificate -24-25-1st quarter.pdf · uploaded 28 Jan 2025Source
- DocumentArchitech certificate -24-25-2nd quarter.pdf · uploaded 28 Jan 2025Source
- DocumentArchitech certificate -24-25-3rd quarter.pdf · uploaded 28 Jan 2025Source
- DocumentArchitech certificate -4th quarter_page-0001.pdf · uploaded 21 Apr 2025Source
- DocumentABHIMAN_VISHWA_Form1_Q1_2026-27_18-07-2026_07-53.pdf · uploaded 18 Jul 2026Source
Technical (Engineer)
- DocumentEngineer Certificate -18-19.pdf · uploaded 28 Jan 2025Source
- DocumentEngineer certificate -20-21.pdf · uploaded 28 Jan 2025Source
- DocumentEngineer Certificate -21-22-1st quarter.pdf · uploaded 28 Jan 2025Source
- DocumentEngineer Certificate -21-22-2nd quarter.pdf · uploaded 28 Jan 2025Source
- DocumentEngineer Certificate -21-22-3rd quarter.pdf · uploaded 28 Jan 2025Source
- DocumentEngineer Certificate -21-22-4th quarter.pdf · uploaded 28 Jan 2025Source
- DocumentEngineer Certificate -22-23-1st quarter.pdf · uploaded 28 Jan 2025Source
- DocumentEngineer certificate -22-23-2nd quarter (1) new.pdf · uploaded 28 Jan 2025Source
- DocumentEngineer certificate -22-23-3rd quarter.pdf · uploaded 28 Jan 2025Source
- DocumentEngineer certificate -22-23-4th quarter.pdf · uploaded 28 Jan 2025Source
- DocumentEngineer Certificate -23-24-1st quarter.pdf · uploaded 28 Jan 2025Source
- DocumentEngineer Certificate -23-24-3rd quarter.pdf · uploaded 28 Jan 2025Source
- DocumentEngineer Certificate -23-24-4th quarter.pdf · uploaded 28 Jan 2025Source
- DocumentEngineer certificate 24-25 Q1.pdf · uploaded 28 Jan 2025Source
- DocumentEngineer certificate 24-25 Q2.pdf · uploaded 28 Jan 2025Source
- DocumentEngineer Certificate 24-25 Q3.pdf · uploaded 28 Jan 2025Source
- DocumentForm 2 4th quarter.pdf · uploaded 21 Apr 2025Source
- DocumentABHIMAN_VISHWA_Form2_Q1_2026-27_18-07-2026_07-53.pdf · uploaded 18 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel GAT NO. 752 1651
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 1BHK258 units in all
- Address
- Gat No. 752 1651, Patil Nagar, ChikhaliPIN 412114
- Village
- Chikhali, Haveli taluka
- Location
- 18.68933, 73.81048
- Land area for this project
- 5,628 sq m (60,579 sq ft)
- Permissible built-up area
- 11,789 sq m (1,26,899 sq ft)
- Sanctioned built-up area
- 11,789 sq m (1,26,899 sq ft)
- Designated bank account
- 109
- Developed in phases
- Yes
- Also registered as
- Abhiman Vishv, अभिमान विश्व, Abhiman Vishva
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
GAT NO. 752 1651
Boundaries
- North
- Gat No 752
- South
- Gat No 752
- East
- Gat No 1651
- West
- Gat No 752
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking258 units
186 of 258 units booked (72%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing-C | 2BHK | 41.78 sq m · 450 sq ft | 1 | 1 |
| Wing-C | 2BHK | 44.34 sq m · 477 sq ft | 11 | 6 |
| Wing-C | 2BHK | 44.39 sq m · 478 sq ft | 22 | 11 |
| Wing-C | 2BHK | 44.4 sq m · 478 sq ft | 11 | 7 |
| Wing-C | 2BHK | 44.42 sq m · 478 sq ft | 12 | 6 |
| Wing-C | 2BHK | 44.48 sq m · 479 sq ft | 20 | 13 |
| Wing-C | 2BHK | 44.49 sq m · 479 sq ft | 11 | 7 |
| Wing-C | 2BHK | 44.64 sq m · 481 sq ft | 6 | 1 |
Show all 16 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing-D | 1BHK | 28.53 sq m · 307 sq ft | 80 | 67 |
| Wing-D | 2BHK | 37.49 sq m · 404 sq ft | 1 | 0 |
| Wing-D | 2BHK | 41.46 sq m · 446 sq ft | 42 | 34 |
| Wing-D | 2BHK | 41.47 sq m · 446 sq ft | 18 | 13 |
| Wing-D | 2BHK | 41.6 sq m · 448 sq ft | 5 | 4 |
| Wing-D | 2BHK | 41.64 sq m · 448 sq ft | 6 | 5 |
| Wing-D | 2BHK | 41.68 sq m · 449 sq ft | 6 | 5 |
| Wing-D | 2BHK | 47.71 sq m · 514 sq ft | 6 | 6 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals6
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Manik Bucahde | — |
| Chartered accountant | CA Parth Gada | — |
| Chartered accountant | Swati Sudhendu Patel | — |
| Engineer | Pramod Pandurang Bhondave | — |
| Engineer | Rutuj Rajaram Chinchwade | — |
| Other | Mep Systems Solutions Pvt Ltd | — |
Source: MahaRERA project page. Contact details are not shown.
Abhiman Vishwa in numbers
Registered deals, summarised
Deedo has 397 registered documents at Abhiman Vishwa, from Sep 2016 to Sep 2026: 316 sales, 44 leave and licence agreements, 18 mortgages. The median registered sale since Sep 2016 works out to about ₹6,800 per sq ft, at a median of ₹26 L a deal; 6% of sales were resales.
- What is the price per sq ft at Abhiman Vishwa?
- The median registered sale since Sep 2016 works out to about ₹6,800 per sq ft, at a median of ₹26 L a deal; 6% of sales were resales.
- How many properties have been sold at Abhiman Vishwa?
- 316 sales are registered at Abhiman Vishwa, 19 of them resales.
- Are properties at Abhiman Vishwa rented out?
- Yes: 44 leave and licence agreements are registered at Abhiman Vishwa, at a median rent since Sep 2016 of about ₹10,000 a month with a deposit of about ₹24,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Abhiman Vishwa by Deedo, last updated with deals registered in Sep 2026.
Latest deal · Resale · Sep 2026
₹25–50 L