Sai Heights
Deedo IDDP-PUN-BY1FCompletion was pushed back 4 months, to Oct 2027; no MahaRERA orders on record; 32% of its units are booked.
Chandkhed, Pune 410506 · by Guddwill Homes
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Oct 2027
- This projectRegistered 27 Dec 2023, completion promised 30 Jun 2027, revised to 30 Oct 2027.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100054043
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100054043 | 27 Dec 2023 | 30 Jun 2027 | 30 Oct 2027 | Guddwill Homes | Project page |
Documents148
2 documents held by Deedo, 146 filings listed on MahaRERA's project page
Finance
Legal
- Declaration Form BFORM B_Sai heights_Aniket Kamble_Megha Zende.pdf · uploaded 12 Oct 2023Source
- Other – LegalDevelopment Agreement Hogale-1-20.pdf · uploaded 15 Dec 2023Source
- Other – LegalDevelopment Agreement Hogale-21-40.pdf · uploaded 15 Dec 2023Source
- Other – LegalDevelopment Agreement Hogale-41-51.pdf · uploaded 15 Dec 2023Source
Show all 148 documentsShow fewer documents
Legal
- Other – LegalPOA.pdf · uploaded 15 Dec 2023Source
- Other – LegalCorrection Deed Chandkhed 40-1-20.pdf · uploaded 15 Dec 2023Source
- Other – LegalCorrection Deed Chandkhed 40-21-37.pdf · uploaded 15 Dec 2023Source
- Legal Title report01_Format A (1).pdf · uploaded 15 Dec 2023Source
- Legal Title report02_Flow of TItle.pdf · uploaded 15 Dec 2023Source
- Legal Title report03_Legal Search Report (1).pdf · uploaded 15 Dec 2023Source
- Legal Title report04_V K Shaha-1-3_merged.pdf · uploaded 15 Dec 2023Source
- Declaration Form BForm B - Guddwill.pdf · uploaded 16 Apr 2025Source
- Declaration Form BFinal Legal Search Report.pdf · uploaded 15 May 2026Source
- OthersPower Of Attoreny -195-2025.pdf · uploaded 18 May 2026Source
- Declaration Form BDevelopment Agreement Gud Will Homes.pdf · uploaded 19 May 2026Source
Migrated
- 1 PAN Card02_Pan Card.pdf · uploaded 10 Oct 2023Source
- 1 a Details of encumbrances concerned to FinanceDECLARATION CUM UNDERTAKING_FINANCE_Legal.pdf · uploaded 12 Oct 2023Source
- 1 b Details of encumbrances concerned to LegalDECLARATION CUM UNDERTAKING_FINANCE_Legal.pdf · uploaded 12 Oct 2023Source
- 1 Building Plan Approval / NA Order for plotted development02_Blue Print_1_compressed.pdf · uploaded 12 Oct 2023Source
- 1 Declaration about Commencement CertificateRevises DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf · uploaded 12 Oct 2023Source
- 1 Declaration in FORM BFORM B_Sai heights_Aniket Kamble_Megha Zende.pdf · uploaded 12 Oct 2023Source
- 1 CERSAI detailsCersai Report.pdf · uploaded 12 Oct 2023Source
- 1 Disclosure of Interest in Other Real Estate Organizations02_Disclosure of interest in other organisations_Aniket Kamble_Megha Zene.pdf · uploaded 12 Oct 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation Report with respect to Allotment letter_Shrushti ABhilasha Infra Pvt Ltd.pdf · uploaded 12 Oct 2023Source
- 1 Proforma of Agreement for saleAgreement Draft_Final.pdf · uploaded 13 Oct 2023Source
- 1 Proforma of Allotment letterAllotment Letter_Final.pdf · uploaded 13 Oct 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report with respect to model copy of Agreement_v1.pdf · uploaded 13 Oct 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentComencment Cetificate_compressed.pdf · uploaded 11 Nov 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameRevise Bank Account Confirmation.pdf · uploaded 11 Nov 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Ca Certificate.pdf · uploaded 13 Nov 2023Source
- 1 Copy of Layout Approval (in case of layout)03_Layout Plan_compressed.pdf · uploaded 22 Nov 2023Source
- 1 Other – TechnicalDevelopment Agreement Hogale-1-20_V1.pdf · uploaded 30 Nov 2023Source
- 2 Other – TechnicalDevelopment Agreement Hogale-21-40_V1.pdf · uploaded 30 Nov 2023Source
- 3 Other – TechnicalDevelopment Agreement Hogale-41-51_V1.pdf · uploaded 30 Nov 2023Source
- 4 Other – TechnicalPOA.pdf · uploaded 30 Nov 2023Source
- 1 Copy of the legal title report01_Format A (1).pdf · uploaded 15 Dec 2023Source
- 2 Copy of the legal title report02_Flow of TItle.pdf · uploaded 15 Dec 2023Source
- 3 Copy of the legal title report03_Legal Search Report (1).pdf · uploaded 15 Dec 2023Source
- 4 Copy of the legal title report04_V K Shaha-1-3_merged.pdf · uploaded 15 Dec 2023Source
- 1 Other – LegalDevelopment Agreement Hogale-1-20.pdf · uploaded 15 Dec 2023Source
- 2 Other – LegalDevelopment Agreement Hogale-21-40.pdf · uploaded 15 Dec 2023Source
- 3 Other – LegalDevelopment Agreement Hogale-41-51.pdf · uploaded 15 Dec 2023Source
- 4 Other – LegalPOA.pdf · uploaded 15 Dec 2023Source
- 5 Other – LegalCorrection Deed Chandkhed 40-1-20.pdf · uploaded 15 Dec 2023Source
- 6 Other – LegalCorrection Deed Chandkhed 40-21-37.pdf · uploaded 15 Dec 2023Source
- 5 Other – TechnicalCorrection Deed Chandkhed 40-1-20.pdf · uploaded 15 Dec 2023Source
- 6 Other – TechnicalCorrection Deed Chandkhed 40-21-37.pdf · uploaded 15 Dec 2023Source
- 7 Other – TechnicalCC Verificationcompressed.pdf · uploaded 15 Dec 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech Certificate From 1_Final.pdf · uploaded 9 Apr 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q3_Architech Certificate.pdf · uploaded 9 Apr 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q4_Architech Certificate.pdf · uploaded 9 Apr 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q2_EngineerCertificate _Revises.pdf · uploaded 9 Apr 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q3_Engineer Certificate.pdf · uploaded 9 Apr 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q4_Engineer Certificate.pdf · uploaded 9 Apr 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q3_ CA Certificate.pdf · uploaded 9 Apr 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q4_CA Certificate.pdf · uploaded 9 Apr 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q3_ CA Certificate.pdf · uploaded 9 Apr 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)From 1 Sai Heights_Jun 2024.pdf · uploaded 23 Jul 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)From 2_Sai Heights_Jun 2024.pdf · uploaded 23 Jul 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)From 3_Sai Heights _Jun 2024.pdf · uploaded 23 Jul 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FROM_1_SAI HEIGHTS_Sep 2024_Final.pdf · uploaded 22 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)From 3_Sep 2024.pdf · uploaded 22 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)From 2 _ Sai Heights_Sep 2024.pdf · uploaded 22 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)From 5 FY 23-24.pdf · uploaded 22 Jan 2025Source
- 1 Declaration in FORM BForm B - Guddwill.pdf · uploaded 16 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)From 1 Dec 2024.pdf · uploaded 16 Apr 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 16 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)From 3 Dec 2024.pdf · uploaded 16 Apr 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 16 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)From 2 Dec 2024.pdf · uploaded 16 Apr 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 16 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySold Inventory Dec 2024.pdf · uploaded 16 Apr 2025Source
- 2 Disclosure of sold/ booked inventorySold - Unsold.pdf · uploaded 16 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)From 2A_Sai Heights Fy23-24.pdf · uploaded 16 Apr 2025Source
- Form 1Form 1.pdf · uploaded 14 Jul 2025Source
- Form 2Form 2.pdf · uploaded 14 Jul 2025Source
- Form 3Form 3.pdf · uploaded 14 Jul 2025Source
- Disclosure of Sold and Booked InventorySold - Unsold.pdf · uploaded 14 Jul 2025Source
- Form 1Q4- 2023-24- Form 1-Architects Certificate 04-04-2024.pdf · uploaded 14 Jan 2026Source
- Form 1Q2- 2024-25- Form 1- Architects Certificate 01-10-2024.pdf · uploaded 14 Jan 2026Source
- Form 1Q3- 2023-24- Form 1- Architects Certificate 10-10-2023.pdf · uploaded 14 Jan 2026Source
- Form 2Q4- 2023-24- Form 2- Engineers Certificate 02-04-2024.pdf · uploaded 14 Jan 2026Source
- Form 2Q2- 2024-25- Form 2- Engineers Certificate 17-10-2024.pdf · uploaded 14 Jan 2026Source
- Form 2Q3- 2023-24- Form 2- Engineers Certificate 06-10-2023.pdf · uploaded 14 Jan 2026Source
- Form 3Q4- 2023-24- Form 3- Ca Certificate 07-04-2024.pdf · uploaded 14 Jan 2026Source
- Form 3Q2- 2024-25- Form 3- 07-10-2024.pdf · uploaded 14 Jan 2026Source
- Form 3Q3- 2023-24- Form 3- Ca Certificate 12-10-2023.pdf · uploaded 14 Jan 2026Source
- Disclosure of Sold and Booked InventoryQ4- 2023-24- Sold Unsold- 31-03-2024.pdf · uploaded 14 Jan 2026Source
- Disclosure of Sold and Booked InventoryQ2- 2024-25- Sold Unsold- 30-09-2024.pdf · uploaded 14 Jan 2026Source
- Disclosure of Sold and Booked InventoryQ3- 2023-34- Sold Unsold- 31-12-2023.pdf · uploaded 14 Jan 2026Source
- Form 1From 1 Sai Heights_Jun 2024.pdf · uploaded 30 Jan 2026Source
- Form 2From 2_Sai Heights_Jun 2024.pdf · uploaded 30 Jan 2026Source
- Form 3From 3_Sai Heights _Jun 2024_Final.pdf · uploaded 30 Jan 2026Source
- Disclosure of Sold and Booked InventoryQ1- Sold Unsold- 2024-25.pdf · uploaded 30 Jan 2026Source
- Form 1Q4- Form 1- Architects Certificate 31-03-2025.pdf · uploaded 13 Feb 2026Source
- Form 2Q4- form 2- Engineers Certificate 31-03-2025.pdf · uploaded 13 Feb 2026Source
- Form 3Q4-Form 3- CA Certificate 16-06-2025.pdf · uploaded 13 Feb 2026Source
- Disclosure of Sold and Booked InventoryQ4- Sold-Unsold 31-03-2025.pdf · uploaded 13 Feb 2026Source
- Withdrawal Update Form 1Q1- Architects Certificate 30-06-2025.pdf · uploaded 13 Feb 2026Source
- Withdrawal Update Form 2Engineers Certificate 30-06-2025.pdf · uploaded 13 Feb 2026Source
- Withdrawal Update Form 3Q1- Form 3- CA Certificate 06-02-2026.pdf · uploaded 13 Feb 2026Source
- Withdrawal Update Form 1Q2- Form 1- Architects Certificate 31-09-2025.pdf · uploaded 14 Feb 2026Source
- Withdrawal Update Form 1Q2- Form 1- Architects Certificate 31-09-2025.pdf · uploaded 14 Feb 2026Source
- Withdrawal Update Form 2Engineers Certificate 30-09-2025.pdf · uploaded 14 Feb 2026Source
- Withdrawal Update Form 2Engineers Certificate 30-09-2025.pdf · uploaded 14 Feb 2026Source
- Withdrawal Update Form 3Q2- Form 3- CA Certificate 30-09-2025.pdf · uploaded 14 Feb 2026Source
- Withdrawal Update Form 3Q2- Form 3- CA Certificate 30-09-2025.pdf · uploaded 14 Feb 2026Source
- Withdrawal Update Form 1Form 1 - Sai Heights as on Dec 2025.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 2Form 2 - Sai Heights as on Dec 2025.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 3Form 3 - Sai Heights as on 31-12-2025.pdf · uploaded 18 Feb 2026Source
- Form 2A (FY 2023-2024)Form 2A 23-24.pdf · uploaded 8 May 2026Source
- Withdrawal Update Form 1Form 1 - Sai Heights March 2026.pdf · uploaded 15 May 2026Source
- Withdrawal Update Form 2Form 2 - Sai Heights March 2026.pdf · uploaded 15 May 2026Source
- Withdrawal Update Form 3Form 3 March 2026.pdf · uploaded 15 May 2026Source
- Form 2A (FY 2024-2025)Form-2A-FY-24-25.pdf · uploaded 15 May 2026Source
- Form 2A (FY 2025-2026)Form-2A-FY-25-26.pdf · uploaded 15 May 2026Source
- Form 5 (FY 2023-2024)Form 5 23-24.pdf · uploaded 15 May 2026Source
- Form 5 (FY 2024-2025)Form 5 of Sai Heights for FY 2024-25.pdf · uploaded 19 May 2026Source
- Withdrawal Update Form 1Form-1 Architect Certificate Sai Heights 07-07-2026.pdf · uploaded 19 Jul 2026Source
- Withdrawal Update Form 2Sai_Heights_Form2_Q1_2026-27_17-07-2026_15-21.pdf · uploaded 19 Jul 2026Source
- Withdrawal Update Form 3Sai_Heights_Form3_Q1_2026-27_17-07-2026_14-38_doc1.pdf · uploaded 19 Jul 2026Source
- Withdrawal Update Form 1Form-1 Architect Certificate Sai Heights 07-07-2026.pdf · uploaded 2 Sep 2026Source
- Withdrawal Update Form 2Sai_Heights_Form2_Q1_2026-27_17-07-2026_15-21.pdf · uploaded 2 Sep 2026Source
- Withdrawal Update Form 3Sai_Heights_Form3_Q1_2026-27_17-07-2026_14-38_doc1.pdf · uploaded 2 Sep 2026Source
Technical
- Document02_Blue Print_1_compressed.pdf · uploaded 12 Oct 2023Source
- Document03_Layout Plan_compressed.pdf · uploaded 22 Nov 2023Source
- Other – TechnicalPOA.pdf · uploaded 30 Nov 2023Source
- Other – TechnicalDevelopment Agreement Hogale-1-20_V1.pdf · uploaded 30 Nov 2023Source
- Other – TechnicalDevelopment Agreement Hogale-21-40_V1.pdf · uploaded 30 Nov 2023Source
- Other – TechnicalDevelopment Agreement Hogale-41-51_V1.pdf · uploaded 30 Nov 2023Source
- Other – TechnicalCorrection Deed Chandkhed 40-1-20.pdf · uploaded 15 Dec 2023Source
- Other – TechnicalCorrection Deed Chandkhed 40-21-37.pdf · uploaded 15 Dec 2023Source
- Other – TechnicalCC Verificationcompressed.pdf · uploaded 15 Dec 2023Source
- DocumentLayout Plan Highlighted.pdf · uploaded 20 May 2026Source
- DocumentBuilding Plan Page 2.pdf · uploaded 20 May 2026Source
- DocumentBuilding Plan Page 3.pdf · uploaded 20 May 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel GAT NO 40 PART
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- —34 units in all
- Address
- Gat No 40 Part, Kasarsai - Chandkhed Road, ChandkhedPIN 410506
- Village
- Chandkhed, Mawal taluka
- Location
- 18.64560, 73.65183
- Land area for this project
- 2,000 sq m (21,528 sq ft)
- Permissible built-up area
- 1,622 sq m (17,458 sq ft)
- Sanctioned built-up area
- 1,622 sq m (17,458 sq ft)
- Designated bank account
- 220
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
GAT NO 40 PART
Boundaries
- North
- Road
- South
- Pandhan
- East
- Gat No. 43
- West
- Gat No 39 Part
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking34 units
34 units registered
| Type | Carpet area | Units |
|---|---|---|
| — | — | 34 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Kaustubh Babar | — |
| Architect | Kaustubh Chandrakant Babar | — |
| Chartered accountant | Jugal Patil | — |
| Engineer | Sagar Patil | — |
| Engineer | Vishal Rokade | — |
Source: MahaRERA project page. Contact details are not shown.