Skip to content
Others · 1 building · 145 unitsRERA P52100049452

Destination El Progreso B Building

Deedo IDDP-PUN-MKFF

Completion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 0% of its units are booked.

Borhadewadi, Pune 412105 · by El Progreso Landmarks

DeliveryExtended 4 moPromised Dec 2026 · now due Apr 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales0% booked0 of 145 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2027

  • This projectRegistered 14 Feb 2023, completion promised 31 Dec 2026, revised to 30 Apr 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100049452
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210004945214 Feb 202331 Dec 202630 Apr 2027El Progreso LandmarksProject page
Documents172

1 document held by Deedo, 171 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPan Card EL Progreso Landmarks.pdf · uploaded 10 Jan 2023Source

Legal

  • Legal Title reportR1 Rera Search Report.pdf · uploaded 10 Jan 2023Source
  • Legal Title reportSearch Report 39 25 R Borhadewadi_compressed-1-6.pdf · uploaded 10 Jan 2023Source
  • Legal Title reportSearch Report 39 25 R Borhadewadi_compressed-7-12.pdf · uploaded 10 Jan 2023Source
  • Declaration Form BAMIT GAVHANE.pdf · uploaded 10 Jan 2023Source
  • Other – LegalBorhadewadi Court Case_compressed.pdf · uploaded 12 Sep 2023Source

Migrated

  • 1 PAN CardPan Card EL Progreso Landmarks.pdf · uploaded 10 Jan 2023Source
Show all 172 documentsShow fewer documents

Migrated

  • 1 Copy of the legal title reportR1 Rera Search Report.pdf · uploaded 10 Jan 2023Source
  • 2 Copy of the legal title reportSearch Report 39 25 R Borhadewadi_compressed-1-6.pdf · uploaded 10 Jan 2023Source
  • 3 Copy of the legal title reportSearch Report 39 25 R Borhadewadi_compressed-7-12.pdf · uploaded 10 Jan 2023Source
  • 1 a Details of encumbrances concerned to FinanceEncumbaremces.pdf · uploaded 10 Jan 2023Source
  • 1 b Details of encumbrances concerned to LegalEncumbaremces.pdf · uploaded 10 Jan 2023Source
  • 1 Copy of Layout Approval (in case of layout)1 (3)_compressed.pdf · uploaded 10 Jan 2023Source
  • 1 Building Plan Approval / NA Order for plotted development2 (4)_compressed.pdf · uploaded 10 Jan 2023Source
  • 2 Building Plan Approval / NA Order for plotted development3 (2)_compressed.pdf · uploaded 10 Jan 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentIOD Letter.pdf · uploaded 10 Jan 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencment Certificate_compressed.pdf · uploaded 10 Jan 2023Source
  • 1 Declaration about Commencement CertificateCommencemnt Certificate.pdf · uploaded 10 Jan 2023Source
  • 1 Declaration in FORM BAMIT GAVHANE.pdf · uploaded 10 Jan 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Cetificate Form-1.pdf · uploaded 10 Jan 2023Source
  • 1 CERSAI detailsCERSAI_Search_Report_200257338132_For_Asset_Based_Search_11_01_2023_15_45_37_314.pdf · uploaded 10 Jan 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Cert Reg_compressed.pdf · uploaded 10 Jan 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDeclaration (1).pdf · uploaded 10 Jan 2023Source
  • 1 Proforma of Allotment letterModel form of AL_compressed.pdf · uploaded 10 Jan 2023Source
  • 1 Proforma of Agreement for saleEL Progreso B Building Agreement Draft.pdf · uploaded 10 Jan 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat -A.pdf · uploaded 10 Jan 2023Source
  • 1 Deviation Report with respect to Allotment letterDeviation Letter.pdf · uploaded 10 Jan 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Letter AFS.pdf · uploaded 10 Jan 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A - Mr Ravindra Newale.pdf · uploaded 1 Feb 2023Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A - Mr Vikrant Lande.pdf · uploaded 1 Feb 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 architect Cert.pdf · uploaded 15 Apr 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Cert.pdf · uploaded 15 Apr 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 EL progresso land B.pdf · uploaded 27 Apr 2023Source
  • 1 Disclosure of sold/ booked inventorySold Unsold B Building EL Progreso March2023.pdf · uploaded 27 May 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 EL-Progreso B Bldg.pdf · uploaded 27 Jun 2023Source
  • 2 Disclosure of sold/ booked inventorySold Unsold EL Progreso B Bldg.pdf · uploaded 27 Jun 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Destination El B.pdf · uploaded 28 Jun 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)EL Progresso Landmarks B Bldg_compressed.pdf · uploaded 19 Jul 2023Source
  • 1 Other – LegalBorhadewadi Court Case_compressed.pdf · uploaded 12 Sep 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1El Progreso B Bldg.pdf · uploaded 30 Sep 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)El Progresso B September 23.pdf · uploaded 30 Sep 2023Source
  • 3 Disclosure of sold/ booked inventorySold Unsold El Progreso B building.pdf · uploaded 30 Sep 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A, EL Progreso B Bldg.pdf · uploaded 11 Oct 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)EL Progresso Landmarks B Bldg_11zon.pdf · uploaded 19 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)EL Progreso B Bldg_compressed.pdf · uploaded 30 Oct 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 El Progreso B Bldg.pdf · uploaded 23 Dec 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)el progresso b form 2.pdf · uploaded 23 Dec 2023Source
  • 4 Disclosure of sold/ booked inventorySold Unsold B Bldg EL Progreso.pdf · uploaded 26 Dec 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3 El progresso B Build.pdf · uploaded 6 Jan 2024Source
  • 2 Copy of Layout Approval (in case of layout)7-1_11zon.pdf · uploaded 7 Mar 2024Source
  • 4 Building Plan Approval / NA Order for plotted development7-2_11zon.pdf · uploaded 7 Mar 2024Source
  • 5 Building Plan Approval / NA Order for plotted development7-3_11zon.pdf · uploaded 7 Mar 2024Source
  • 6 Building Plan Approval / NA Order for plotted development7-4_11zon.pdf · uploaded 7 Mar 2024Source
  • 7 Building Plan Approval / NA Order for plotted development7-5_11zon.pdf · uploaded 7 Mar 2024Source
  • 8 Building Plan Approval / NA Order for plotted development7-6_11zon.pdf · uploaded 7 Mar 2024Source
  • 9 Building Plan Approval / NA Order for plotted development7-7_11zon.pdf · uploaded 7 Mar 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 7 Mar 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 El Progreso B Building.pdf · uploaded 16 Apr 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2 El Progreso B.pdf · uploaded 16 Apr 2024Source
  • 5 Disclosure of sold/ booked inventoryEL Progreso B Sold unsold.pdf · uploaded 16 Apr 2024Source
  • 6 Disclosure of sold/ booked inventoryEL Progreso B Sold unsold.pdf · uploaded 16 Apr 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)EL Progreso Landmarks B Bldg (1).pdf · uploaded 16 Apr 2024Source
  • 3 Copy of Layout Approval (in case of layout)1 (7)11zon.pdf · uploaded 24 Apr 2024Source
  • 10 Building Plan Approval / NA Order for plotted development2 (5).pdf · uploaded 24 Apr 2024Source
  • 11 Building Plan Approval / NA Order for plotted development3 (2).pdf · uploaded 24 Apr 2024Source
  • 12 Building Plan Approval / NA Order for plotted development4 (1).pdf · uploaded 24 Apr 2024Source
  • 13 Building Plan Approval / NA Order for plotted development5 (70).pdf · uploaded 24 Apr 2024Source
  • 14 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 24 Apr 2024Source
  • 3 Commencement Certificates / NA Order for plotted developmentCom (1) 11zon.pdf · uploaded 24 Apr 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Architect Certificate B Bldg El Progreso.pdf · uploaded 6 Jul 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 6 Jul 2024Source
  • 7 Disclosure of sold/ booked inventorySOLD UNSOLD B BLDG EL-PROGRESO.pdf · uploaded 6 Jul 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 6 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)f2a.pdf · uploaded 9 Aug 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 EL PROGRESO B BUILDING.pdf · uploaded 23 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate_11zon (1).pdf · uploaded 23 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate (3).pdf · uploaded 23 Oct 2024Source
  • 2 Disclosure of sold/ booked inventorySold Unsold B Wing EL Progreso.pdf · uploaded 23 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 EL-Progreso B Building.pdf · uploaded 30 Jan 2025Source
  • 1 Disclosure of sold/ booked inventorySold Unnsold EL-Progreso B Building.pdf · uploaded 30 Jan 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form-5 El Progresso Landmarks.pdf · uploaded 30 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 B Bldg EL Progreso (1).pdf · uploaded 14 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)EL Progreso B Building Engineer's Certificate.pdf · uploaded 14 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorySold Unsold B Bldg EL Progreso.pdf · uploaded 14 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)EL Progreso Landmarks B Bldg_compressed.pdf · uploaded 17 Apr 2025Source
  • Form 1F1 MARCH 23.pdf · uploaded 20 Jul 2025Source
  • Form 2F2 MARCH 23.pdf · uploaded 20 Jul 2025Source
  • Form 3F3 MARC 23.pdf · uploaded 20 Jul 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 20 Jul 2025Source
  • Form 1F1 JUNE 23.pdf · uploaded 20 Jul 2025Source
  • Form 2F2 JUNE 23.pdf · uploaded 20 Jul 2025Source
  • Form 3F3 JUNE 23.pdf · uploaded 20 Jul 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 20 Jul 2025Source
  • Form 1F1 SEPT 23.pdf · uploaded 20 Jul 2025Source
  • Form 2F2 SEPT 23.pdf · uploaded 20 Jul 2025Source
  • Form 3F3 SEPT 23.pdf · uploaded 20 Jul 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 20 Jul 2025Source
  • Form 1F1 DEC 23.pdf · uploaded 20 Jul 2025Source
  • Form 2F2 DEC 23 (1).pdf · uploaded 20 Jul 2025Source
  • Form 3F3 DEC 23.pdf · uploaded 20 Jul 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 20 Jul 2025Source
  • Form 1F1 MARC 24.pdf · uploaded 20 Jul 2025Source
  • Form 2F2 MAR 24.pdf · uploaded 20 Jul 2025Source
  • Form 3F3 MAR 24.pdf · uploaded 20 Jul 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 20 Jul 2025Source
  • Form 1F1 JUNE 24.pdf · uploaded 20 Jul 2025Source
  • Form 2F2 JUNE 24.pdf · uploaded 20 Jul 2025Source
  • Form 3F3 JUNE 24.pdf · uploaded 20 Jul 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 20 Jul 2025Source
  • Form 1F1 SEPT 24.pdf · uploaded 20 Jul 2025Source
  • Form 2F2 SEPT 24.pdf · uploaded 20 Jul 2025Source
  • Form 3F3 SEPT 24.pdf · uploaded 20 Jul 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 20 Jul 2025Source
  • Form 1F1 DEC 24.pdf · uploaded 20 Jul 2025Source
  • Form 2el progress dec 24 (1).pdf · uploaded 20 Jul 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 20 Jul 2025Source
  • Form 3F3 DEC 24_compressed (1).pdf · uploaded 20 Jul 2025Source
  • Form 1Form 1.pdf · uploaded 20 Jul 2025Source
  • Form 22.pdf · uploaded 20 Jul 2025Source
  • Form 33.pdf · uploaded 20 Jul 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 20 Jul 2025Source
  • Form 1Form1 El Progreso B Building.pdf · uploaded 20 Jul 2025Source
  • Form 2el progressi EL (1).pdf · uploaded 20 Jul 2025Source
  • Form 3EL Progreso B Wing.pdf · uploaded 20 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold El Progreso B Bldg.pdf · uploaded 20 Jul 2025Source
  • Form 2A (FY 2022-2023)2223 2A.pdf · uploaded 27 Jul 2025Source
  • Form 2A (FY 2023-2024)2323 2a.pdf · uploaded 27 Jul 2025Source
  • Form 5 (FY 2022-2023)2223 55.pdf · uploaded 27 Jul 2025Source
  • Form 5 (FY 2023-2024)2324 55.pdf · uploaded 27 Jul 2025Source
  • Form 1Form-1 B Bldg El progreso landmark.pdf · uploaded 25 Oct 2025Source
  • Form 2Enginner's Certificate El Progreso B Bldg.pdf · uploaded 25 Oct 2025Source
  • Form 3ELPL B Bld Form 3 Sept 2025.pdf · uploaded 25 Oct 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold El Progreso B Bldg.pdf · uploaded 25 Oct 2025Source
  • Form 5 (FY 2024-2025)EL Progreso Landmarks Form 5 (1).pdf · uploaded 29 Nov 2025Source
  • Form 2A (FY 2024-2025)Form 2A EL Progreso B Building_organized.pdf · uploaded 20 Dec 2025Source
  • Withdrawal Update Form 1Form-1 El Progreso B bldg.pdf · uploaded 29 Jan 2026Source
  • Withdrawal Update Form 2Form-2 EL Progreso B Bldg.pdf · uploaded 29 Jan 2026Source
  • Withdrawal Update Form 3ilovepdf_merged (35)_compressed.pdf · uploaded 29 Jan 2026Source
  • Withdrawal Update Form 1Form-1 El Progreso B Bldg (2).pdf · uploaded 25 Apr 2026Source
  • Withdrawal Update Form 2Form-2 El Progreso B Bldg March 2026.pdf · uploaded 25 Apr 2026Source
  • Withdrawal Update Form 3ELPL.pdf · uploaded 25 Apr 2026Source
  • Withdrawal Update Form 1Form-1 B Bldg EL Progreso.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 1Form-1 B Bldg EL Progreso.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2Form-2 El Progreso Bldg.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2Form-2 El Progreso Bldg.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3Form 3 EL Progresso Landmarks B Bldg-.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3Form 3 EL Progresso Landmarks B Bldg-.pdf · uploaded 20 Jul 2026Source

Technical

  • Document1 (3)_compressed.pdf · uploaded 10 Jan 2023Source
  • Document2 (4)_compressed.pdf · uploaded 10 Jan 2023Source
  • Document3 (2)_compressed.pdf · uploaded 10 Jan 2023Source
  • DocumentIOD Letter.pdf · uploaded 10 Jan 2023Source
  • Document7-1_11zon.pdf · uploaded 7 Mar 2024Source
  • Document7-2_11zon.pdf · uploaded 7 Mar 2024Source
  • Document7-3_11zon.pdf · uploaded 7 Mar 2024Source
  • Document7-4_11zon.pdf · uploaded 7 Mar 2024Source
  • Document7-5_11zon.pdf · uploaded 7 Mar 2024Source
  • Document7-6_11zon.pdf · uploaded 7 Mar 2024Source
  • Document7-7_11zon.pdf · uploaded 7 Mar 2024Source
  • Document1 (7)11zon.pdf · uploaded 24 Apr 2024Source
  • Document2 (5).pdf · uploaded 24 Apr 2024Source
  • Document3 (2).pdf · uploaded 24 Apr 2024Source
  • Document4 (1).pdf · uploaded 24 Apr 2024Source
  • Document5 (70).pdf · uploaded 24 Apr 2024Source
  • Document6.pdf · uploaded 24 Apr 2024Source

Technical (Architect)

  • DocumentFORM 1 EL PROGRESO B BUILDING.pdf · uploaded 23 Oct 2024Source
  • DocumentForm-1 EL-Progreso B Building.pdf · uploaded 30 Jan 2025Source
  • DocumentForm-1 B Bldg EL Progreso (1).pdf · uploaded 14 Apr 2025Source
  • DocumentForm-1 B Bldg EL Progreso.pdf · uploaded 20 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 Engineer Certificate (3).pdf · uploaded 23 Oct 2024Source
  • DocumentEL Progreso B Building Engineer's Certificate.pdf · uploaded 14 Apr 2025Source
  • DocumentForm-2 El Progreso Bldg.pdf · uploaded 20 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel GAT NO 75 BORHADEWADI

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
2BHK, 3BHK, Shop145 units in all
Address
Gat No 75 Borhadewadi, Borhadewadi, BorhadewadiPIN 412105
Village
Pimpri Chinchawad (M Corp.), Haveli taluka
Land area for this project
3,950 sq m (42,517 sq ft)
Permissible built-up area
14,479 sq m (1,55,856 sq ft)
Sanctioned built-up area
6,910 sq m (74,382 sq ft)
Recreational open space
395 sq m (4,252 sq ft)
Designated bank account
103
Developed in phases
No

Survey, CTS, gat or plot numbers

GAT NO 75 BORHADEWADI

Land as published on MahaRERA's project page

GAT NO 75 BORHADEWADI

Boundaries

North
By Destination El Progreso A Building
South
By Boundary Of Pcntda
East
By Boundary Of Pcntda
West
By Gat No 79 Old Gat No 1199

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking145 units

0 of 145 units booked (0%), as the promoter reported to MahaRERA

2BHK · 65 units3BHK · 66 unitsShop · 14 units
TypeCarpet areaUnitsBooked
2BHK55.57 sq m · 598 sq ft100
2BHK55.57 sq m · 598 sq ft110
2BHK56.24 sq m · 605 sq ft110
2BHK57.42 sq m · 618 sq ft330
3BHK67.44 sq m · 726 sq ft220
3BHK70.49 sq m · 759 sq ft220
3BHK71.22 sq m · 767 sq ft220
Shop16.37 sq m · 176 sq ft60
Show all 12 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Shop17.19 sq m · 185 sq ft20
Shop19.37 sq m · 208 sq ft40
Shop22.92 sq m · 247 sq ft10
Shop28 sq m · 301 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals6

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPatil And Bugde Associates—
Chartered accountantCa Parag S Savale And Associates—
EngineerHanmant Nimbal—
EngineerKishor Sohandas Vaishanav—
EngineerMr Pravin More—
EngineerRohinee Badgujar—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology