Sunshine Complex
Deedo IDDP-PAL-2VPZIt is due for completion in Jun 2027, with no extension on record; no MahaRERA orders on record; 92% of its units are booked.
Makane, Palghar 401102 · by Aditi Developers
Buying a flat here?
See every deed registered on it.
It is due for completion in Jun 2027, with no extension on record
- This projectRegistered 5 Mar 2019, completion promised 30 Jun 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
3 buildings
Open a building to see every flat, floor by floor.
- A2 - Swajit Apartment 44 floors · 14 units93% booked
- B - Sapna Apartment 54 floors · 20 units95% booked
- C - Laxmi Apartment 64 floors · 14 units86% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP99000019854
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P99000019854 | 5 Mar 2019 | 30 Jun 2027 | 30 Jun 2027 | Aditi Developers | Project page |
Documents125
1 document held by Deedo, 124 filings listed on MahaRERA's project page
Finance
- PAN Card02 Aditi Developers PAN.pdf · uploaded 3 Mar 2019Source
Legal
Show all 125 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)09 layout plan.pdf · uploaded 3 Mar 2019Source
- 1 Building Plan Approval (IOD)07 -1 -Bldg no 4 - Swajit Apartment A2- Aditi Developers.pdf · uploaded 3 Mar 2019Source
- 2 Building Plan Approval (IOD)07 -2 -Bldg no 5 - Sapna Apartment B- Aditi Developers.pdf · uploaded 3 Mar 2019Source
- 3 Building Plan Approval (IOD)07 -3 -Bldg no 6 - Laxmi Apartment C- Aditi Developers.pdf · uploaded 3 Mar 2019Source
- 1 Commencement Certificates / NA Order for plotted development04 CC - Bldg permission.pdf · uploaded 3 Mar 2019Source
- 1 Declaration in FORM B01 Advocate Form B.pdf · uploaded 3 Mar 2019Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architeture Certificate.pdf · uploaded 3 Mar 2019Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate.pdf · uploaded 3 Mar 2019Source
- 1 Certificates of CA (Form 3)06 CA Certificate.pdf · uploaded 3 Mar 2019Source
- 1 Proforma of Allotment letter08 Advocate Sunshine Complex RERA Draft Sale Agreement.pdf · uploaded 3 Mar 2019Source
- 1 Declaration about Commencement CertificateCC - Bldg permission.pdf · uploaded 2 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)02 BS.pdf · uploaded 3 Mar 2022Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)03 PL.pdf · uploaded 3 Mar 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 FY 2021-22.pdf · uploaded 1 Feb 2023Source
- 2 Declaration about Commencement CertificateCC Declaration Format D.pdf · uploaded 15 Jan 2024Source
- 2 Declaration in FORM BFORM B Extention.pdf · uploaded 15 Jan 2024Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory.pdf · uploaded 15 Jan 2024Source
- 2 a Details of encumbrances concerned to Finance03 Advocate Encumbrance Certificate.pdf · uploaded 16 Jan 2024Source
- 1 b Details of encumbrances concerned to Legal03 Advocate Encumbrance Certificate.pdf · uploaded 16 Jan 2024Source
- 1 CERSAI detailsCERSAI Report fRERA.pdf · uploaded 16 Jan 2024Source
- 2 CERSAI detailsCERSAI Report.pdf · uploaded 16 Jan 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure Of Interest in Other Real Estate Organization.pdf · uploaded 16 Jan 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)CA Certificate Form 5 FY 17-2018.pdf · uploaded 16 Jan 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)CA Certificate Form 5 FY 18-19.pdf · uploaded 16 Jan 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)CA Certificate Form 5 FY 19-20.pdf · uploaded 16 Jan 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)CA Certificate Form 5 FY 22-2023.pdf · uploaded 16 Jan 2024Source
- 1 Proforma of Agreement for sale08 Draft Sale Agreement.pdf · uploaded 16 Jan 2024Source
- 1 Deviation Report with respect to Allotment letterAllotment Letter Format.pdf · uploaded 16 Jan 2024Source
- 1 Deviation Report with respect to model copy of Agreement08 Draft Sale Agreement.pdf · uploaded 16 Jan 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)CA Certificate Form 5 FY 17-18.pdf · uploaded 25 Jan 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)CA Certificate Form 5 FY 18-19.pdf · uploaded 25 Jan 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)CA Certificate Form 5 FY 19-20.pdf · uploaded 25 Jan 2024Source
- 3 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)CA Certificate Form 5 FY 20-21.pdf · uploaded 25 Jan 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)CA Certificate Form 5 FY 22-2023.pdf · uploaded 25 Jan 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)CA Certificate Form 5 FY 21-22.pdf · uploaded 25 Jan 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Declaration Format A by Promoter1.pdf · uploaded 25 Jan 2024Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - Architect Certificate 14 29 Dec 23.pdf · uploaded 29 Jan 2024Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - Architect Certificate 09 07 Mar 22.pdf · uploaded 29 Jan 2024Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - Architect Certificate 06 01 Mar 21.pdf · uploaded 29 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A Engineer Quality Certificate 12 Mar 20.pdf · uploaded 29 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Engineer Quality Certificate 12 Mar 21.pdf · uploaded 29 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Engineer Quality Certificate 12 Mar 22.pdf · uploaded 29 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Engineer Quality Certificate 12 Mar 23.pdf · uploaded 29 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Engineer Quality Certificate 12 Mar 24.pdf · uploaded 7 Aug 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)CA Certificate Form 5 FY 23-24.pdf · uploaded 7 Aug 2024Source
- 2 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory 20240630.pdf · uploaded 14 Aug 2024Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)1 FORM 1_ SEP 24.pdf · uploaded 21 Nov 2024Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2 FOR M 2_ SEP 24.pdf · uploaded 21 Nov 2024Source
- 1 Disclosure of sold/ booked inventory4 SOLD UNSOL_ SEP 24_compressed.pdf · uploaded 21 Nov 2024Source
- 1 Certificates of CA (Form 3)3 FORM 3_ SEP 24_compressed.pdf · uploaded 21 Nov 2024Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)1 FORM 1_ SEP 24.pdf · uploaded 21 Nov 2024Source
- 2 Certificates of CA (Form 3)3 FORM 3_ SEP 24_compressed.pdf · uploaded 21 Nov 2024Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2 FOR M 2_ SEP 24.pdf · uploaded 21 Nov 2024Source
- 2 Disclosure of sold/ booked inventory4 SOLD UNSOL_ SEP 24_compressed.pdf · uploaded 21 Nov 2024Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - Architect Certificate 2025_01-20.pdf · uploaded 25 Jan 2025Source
- 1 Certificates of CA (Form 3)Form 3 CA Certificate 2025_01_23_com.pdf · uploaded 25 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory 2024_12_31.pdf · uploaded 25 Jan 2025Source
- Form 1Form 1 - Architect Certificate 2025_03_31.pdf · uploaded 5 Aug 2025Source
- Form 2Form 2 Engineers Cert 2025_03_31.pdf · uploaded 5 Aug 2025Source
- Form 3Form 3 CA Certificate 2025_03_31.pdf · uploaded 5 Aug 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Inventory 2025_03_31.pdf · uploaded 5 Aug 2025Source
- Form 2A (FY 2019-2020)Form 2A Engg Quality Cert 2020_03_31.pdf · uploaded 5 Aug 2025Source
- Form 2A (FY 2020-2021)Form 2A Engg Quality Cert 2021_03_31.pdf · uploaded 5 Aug 2025Source
- Form 2A (FY 2021-2022)Form 2A Engg Quality Cert 2022_03_31.pdf · uploaded 5 Aug 2025Source
- Form 2A (FY 2022-2023)Form 2A Engg Quality Cert 2022_03_31.pdf · uploaded 5 Aug 2025Source
- Form 2A (FY 2023-2024)Form 2A Engg Quality Cert 2024_03_31.pdf · uploaded 5 Aug 2025Source
- Form 2A (FY 2024-2025)Form 2A Engg Quality Cert 2025_03_31 Signed.pdf · uploaded 5 Aug 2025Source
- Form 2A (FY 2024-2025)FORM 2A_ MARCH 25_ SUNSHINE COMPLEX.pdf · uploaded 5 Aug 2025Source
- Form 5 (FY 2018-2019)Form 5 CA Cert FY 18-19.pdf · uploaded 5 Aug 2025Source
- Form 5 (FY 2019-2020)Form 5 CA Cert FY 19-20.pdf · uploaded 5 Aug 2025Source
- Form 5 (FY 2020-2021)Form 5 CA Cert FY 20-21.pdf · uploaded 5 Aug 2025Source
- Form 5 (FY 2021-2022)Form 5 CA Cert FY 21-22.pdf · uploaded 5 Aug 2025Source
- Form 5 (FY 2022-2023)Form 5 CA Cert FY 22-23.pdf · uploaded 5 Aug 2025Source
- Form 5 (FY 2023-2024)Form 5 CA Cert FY 23-24.pdf · uploaded 5 Aug 2025Source
- Form 5 (FY 2024-2025)Form 5 CA Cert FY 24-25.pdf · uploaded 5 Aug 2025Source
- Form 5 (FY 2024-2025)Form 5 CA Cert FY 24-25.pdf · uploaded 5 Aug 2025Source
- Form 11 FORM 1_ SEP 24_ SUNSHINE COMPLEX.pdf · uploaded 21 Aug 2025Source
- Form 22 FORM 2_ SEP 24_ SUNSHINE COMPLEX.pdf · uploaded 21 Aug 2025Source
- Form 3FORM 3_ SEPT 24_ SUNSHINE COMPLEX.pdf · uploaded 21 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD_ SEP 24_ SUNSHINE COMPLEX.pdf · uploaded 21 Aug 2025Source
- Form 1FORM 1_ DEC 24_ SUNSHINE COMPLEX.pdf · uploaded 21 Aug 2025Source
- Form 2FORM 2_ DEC 24_ SUNSHINE COMPLEX.pdf · uploaded 21 Aug 2025Source
- Form 3FORM 3_ DEC 24_ SUNSHINE COMPLEX.pdf · uploaded 21 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD_ DEC 24_ SUNSHINE COMPLEX.pdf · uploaded 21 Aug 2025Source
- Withdrawal Update Form 1Form 1 - Architect Cert 2025_06_30 SS.pdf · uploaded 24 Jun 2026Source
- Withdrawal Update Form 2Form 2 Engineers Cert 2025_06_30 SS.pdf · uploaded 24 Jun 2026Source
- Withdrawal Update Form 3Form 3 CA Cert 2025_06_30 SS.pdf · uploaded 24 Jun 2026Source
- Withdrawal Update Form 1Form 1 - Architect Cert 2025_09_30 SS.pdf · uploaded 25 Jun 2026Source
- Withdrawal Update Form 1Form 1 - Architect Cert 2025_12_31 SS.pdf · uploaded 25 Jun 2026Source
- Withdrawal Update Form 1Form 1 - Architect Cert 2026_03_31 SS.pdf · uploaded 25 Jun 2026Source
- Withdrawal Update Form 2Form 2 Engineers Cert 2025_09_30 SS.pdf · uploaded 25 Jun 2026Source
- Withdrawal Update Form 2Form 2 Engineers Cert 2025_09_30 SS.pdf · uploaded 25 Jun 2026Source
- Withdrawal Update Form 2Form 2 Engineers Cert 2026_03_31 SS.pdf · uploaded 25 Jun 2026Source
- Withdrawal Update Form 3Form 3 CA Cert 2025_09_30 SS.pdf · uploaded 25 Jun 2026Source
- Withdrawal Update Form 3Form 3 CA Cert 2025_12_31 SS.pdf · uploaded 25 Jun 2026Source
- Withdrawal Update Form 3Form 3 CA Cert 2026_03_31 SS.pdf · uploaded 25 Jun 2026Source
- Withdrawal Update Form 1Form 1 - Architect Cert 2026_06_30 SS.pdf · uploaded 14 Jul 2026Source
- Withdrawal Update Form 2Form 2 Engineers Cert 2026_06_30 SS.pdf · uploaded 14 Jul 2026Source
- Withdrawal Update Form 3Form 3 CA Cert 2026_06_30 SS.pdf · uploaded 14 Jul 2026Source
- Form 5 (FY 2025-2026)FORM 5_ MARCH 26_ SUNSHINE COMPLEX.pdf · uploaded 16 Jul 2026Source
- Form 5 (FY 2025-2026)FORM 5_ MARCH 26_ SUNSHINE COMPLEX.pdf · uploaded 16 Jul 2026Source
- Form 2A (FY 2025-2026)FORM 2A_ MARCH 26_ SUNSHINE COMPLEX.pdf · uploaded 22 Jul 2026Source
- Form 2A (FY 2025-2026)FORM 2A_ MARCH 26_ SUNSHINE COMPLEX.pdf · uploaded 22 Jul 2026Source
- Withdrawal Update Form 1Form 1 - Architect Cert 2026_09_30 SS.pdf · uploaded 13 Oct 2026Source
- Withdrawal Update Form 2Form 2 Engineers Cert 2026_09_30 SS.pdf · uploaded 13 Oct 2026Source
- Withdrawal Update Form 3Form 3 CA Cert 2026_09_30 SS.pdf · uploaded 13 Oct 2026Source
Technical
- Document07 -1 -Bldg no 4 - Swajit Apartment A2- Aditi Developers.pdf · uploaded 3 Mar 2019Source
- Document07 -2 -Bldg no 5 - Sapna Apartment B- Aditi Developers.pdf · uploaded 3 Mar 2019Source
- Document07 -3 -Bldg no 6 - Laxmi Apartment C- Aditi Developers.pdf · uploaded 3 Mar 2019Source
- Document09 layout plan.pdf · uploaded 3 Mar 2019Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 38
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1 BHK, 1 BHK TF, 1 hk, 1 hk tf48 units in all
- Address
- 38, Makane Village Road, Makane VillagePIN 401102
- Village
- Makane, Palghar taluka
- Land area for this project
- 4,140 sq m (44,563 sq ft)
- Permissible built-up area
- 1,755 sq m (18,888 sq ft)
- Sanctioned built-up area
- 1,755 sq m (18,888 sq ft)
- Recreational open space
- 415 sq m (4,464 sq ft)
- Designated bank account
- 82
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
38
Boundaries
- North
- Land of Shree Harishchandra Tare
- South
- Gut No 28
- East
- Gut No 28
- West
- Gut No 28
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking48 units
44 of 48 units booked (92%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A2 - Swajit Apartment 4 | 1 BHK | 29.01 sq m · 312 sq ft | 12 | 11 |
| A2 - Swajit Apartment 4 | 1 BHK TF | 29.01 sq m · 312 sq ft | 2 | 2 |
| B - Sapna Apartment 5 | 1 BHK | 26.68 sq m · 287 sq ft | 6 | 6 |
| B - Sapna Apartment 5 | 1 BHK | 26.9 sq m · 290 sq ft | 6 | 6 |
| B - Sapna Apartment 5 | 1 BHK | 28.89 sq m · 311 sq ft | 3 | 3 |
| B - Sapna Apartment 5 | 1 BHK | 29.79 sq m · 321 sq ft | 3 | 2 |
| B - Sapna Apartment 5 | 1 BHK TF | 26.68 sq m · 287 sq ft | 1 | 1 |
| B - Sapna Apartment 5 | 1 BHK TF | 26.9 sq m · 290 sq ft | 1 | 1 |
Show all 12 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| C - Laxmi Apartment 6 | 1 BHK | 28.32 sq m · 305 sq ft | 6 | 6 |
| C - Laxmi Apartment 6 | 1 BHK TF | 28.32 sq m · 305 sq ft | 1 | 1 |
| C - Laxmi Apartment 6 | 1 hk | 21.24 sq m · 229 sq ft | 6 | 5 |
| C - Laxmi Apartment 6 | 1 hk tf | 21.24 sq m · 229 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Gauresh Navalkar | — |
| Chartered accountant | Tanuja Tiwatane | — |
| Engineer | Gaurav Patil | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Makane
- Golden HarmonyRERA PR1240002602643
- Fortune HightsRERA PR1240002602290
- Angel ApartmentRERA PR1240002601460
- Nine Star Crown Bldg No. 6 DiamondRERA PR1243032600872
- Angel HomesRERA PR1240002600121
- Om SankulanRERA PM1240002600108
- Nine Star Crown Bldg No. 4 SapphireRERA PR1242022502990
- Aditya ResidencyRERA PR1240002502671
All 86 projects in Makane · Compare Sunshine Complex with another project