Residential / Group Housing · 3 buildings · 48 unitsRERA P99000019854

Sunshine Complex

Deedo IDDP-PAL-2VPZ

It is due for completion in Jun 2027, with no extension on record; no MahaRERA orders on record; 92% of its units are booked.

Makane, Palghar 401102 · by Aditi Developers

DeliveryDue Jun 2027No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales92% booked44 of 48 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

It is due for completion in Jun 2027, with no extension on record

  • This projectRegistered 5 Mar 2019, completion promised 30 Jun 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

3 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP99000019854
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P990000198545 Mar 201930 Jun 202730 Jun 2027Aditi DevelopersProject page
Documents125

1 document held by Deedo, 124 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Card02 Aditi Developers PAN.pdf · uploaded 3 Mar 2019Source

Legal

  • Legal Title report05 Advocate Title Clearance Certificate.pdf · uploaded 3 Mar 2019Source
  • Declaration Form B01 Advocate Form B.pdf · uploaded 3 Mar 2019Source
  • Declaration Form BFORM B Extention.pdf · uploaded 15 Jan 2024Source

Migrated

  • 1 PAN Card02 Aditi Developers PAN.pdf · uploaded 3 Mar 2019Source
  • 1 Copy of the legal title report05 Advocate Title Clearance Certificate.pdf · uploaded 3 Mar 2019Source
  • 1 Details of encumbrances03 Advocate Encumbrance Certificate.pdf · uploaded 3 Mar 2019Source
Show all 125 documentsShow fewer documents

Migrated

  • 1 Copy of Layout Approval (in case of layout)09 layout plan.pdf · uploaded 3 Mar 2019Source
  • 1 Building Plan Approval (IOD)07 -1 -Bldg no 4 - Swajit Apartment A2- Aditi Developers.pdf · uploaded 3 Mar 2019Source
  • 2 Building Plan Approval (IOD)07 -2 -Bldg no 5 - Sapna Apartment B- Aditi Developers.pdf · uploaded 3 Mar 2019Source
  • 3 Building Plan Approval (IOD)07 -3 -Bldg no 6 - Laxmi Apartment C- Aditi Developers.pdf · uploaded 3 Mar 2019Source
  • 1 Commencement Certificates / NA Order for plotted development04 CC - Bldg permission.pdf · uploaded 3 Mar 2019Source
  • 1 Declaration in FORM B01 Advocate Form B.pdf · uploaded 3 Mar 2019Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architeture Certificate.pdf · uploaded 3 Mar 2019Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate.pdf · uploaded 3 Mar 2019Source
  • 1 Certificates of CA (Form 3)06 CA Certificate.pdf · uploaded 3 Mar 2019Source
  • 1 Proforma of Allotment letter08 Advocate Sunshine Complex RERA Draft Sale Agreement.pdf · uploaded 3 Mar 2019Source
  • 1 Declaration about Commencement CertificateCC - Bldg permission.pdf · uploaded 2 Aug 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)02 BS.pdf · uploaded 3 Mar 2022Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)03 PL.pdf · uploaded 3 Mar 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 FY 2021-22.pdf · uploaded 1 Feb 2023Source
  • 2 Declaration about Commencement CertificateCC Declaration Format D.pdf · uploaded 15 Jan 2024Source
  • 2 Declaration in FORM BFORM B Extention.pdf · uploaded 15 Jan 2024Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory.pdf · uploaded 15 Jan 2024Source
  • 2 a Details of encumbrances concerned to Finance03 Advocate Encumbrance Certificate.pdf · uploaded 16 Jan 2024Source
  • 1 b Details of encumbrances concerned to Legal03 Advocate Encumbrance Certificate.pdf · uploaded 16 Jan 2024Source
  • 1 CERSAI detailsCERSAI Report fRERA.pdf · uploaded 16 Jan 2024Source
  • 2 CERSAI detailsCERSAI Report.pdf · uploaded 16 Jan 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure Of Interest in Other Real Estate Organization.pdf · uploaded 16 Jan 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)CA Certificate Form 5 FY 17-2018.pdf · uploaded 16 Jan 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)CA Certificate Form 5 FY 18-19.pdf · uploaded 16 Jan 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)CA Certificate Form 5 FY 19-20.pdf · uploaded 16 Jan 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)CA Certificate Form 5 FY 22-2023.pdf · uploaded 16 Jan 2024Source
  • 1 Proforma of Agreement for sale08 Draft Sale Agreement.pdf · uploaded 16 Jan 2024Source
  • 1 Deviation Report with respect to Allotment letterAllotment Letter Format.pdf · uploaded 16 Jan 2024Source
  • 1 Deviation Report with respect to model copy of Agreement08 Draft Sale Agreement.pdf · uploaded 16 Jan 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)CA Certificate Form 5 FY 17-18.pdf · uploaded 25 Jan 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)CA Certificate Form 5 FY 18-19.pdf · uploaded 25 Jan 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)CA Certificate Form 5 FY 19-20.pdf · uploaded 25 Jan 2024Source
  • 3 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)CA Certificate Form 5 FY 20-21.pdf · uploaded 25 Jan 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)CA Certificate Form 5 FY 22-2023.pdf · uploaded 25 Jan 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)CA Certificate Form 5 FY 21-22.pdf · uploaded 25 Jan 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Declaration Format A by Promoter1.pdf · uploaded 25 Jan 2024Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - Architect Certificate 14 29 Dec 23.pdf · uploaded 29 Jan 2024Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - Architect Certificate 09 07 Mar 22.pdf · uploaded 29 Jan 2024Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - Architect Certificate 06 01 Mar 21.pdf · uploaded 29 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A Engineer Quality Certificate 12 Mar 20.pdf · uploaded 29 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Engineer Quality Certificate 12 Mar 21.pdf · uploaded 29 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Engineer Quality Certificate 12 Mar 22.pdf · uploaded 29 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Engineer Quality Certificate 12 Mar 23.pdf · uploaded 29 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Engineer Quality Certificate 12 Mar 24.pdf · uploaded 7 Aug 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)CA Certificate Form 5 FY 23-24.pdf · uploaded 7 Aug 2024Source
  • 2 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory 20240630.pdf · uploaded 14 Aug 2024Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)1 FORM 1_ SEP 24.pdf · uploaded 21 Nov 2024Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2 FOR M 2_ SEP 24.pdf · uploaded 21 Nov 2024Source
  • 1 Disclosure of sold/ booked inventory4 SOLD UNSOL_ SEP 24_compressed.pdf · uploaded 21 Nov 2024Source
  • 1 Certificates of CA (Form 3)3 FORM 3_ SEP 24_compressed.pdf · uploaded 21 Nov 2024Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)1 FORM 1_ SEP 24.pdf · uploaded 21 Nov 2024Source
  • 2 Certificates of CA (Form 3)3 FORM 3_ SEP 24_compressed.pdf · uploaded 21 Nov 2024Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2 FOR M 2_ SEP 24.pdf · uploaded 21 Nov 2024Source
  • 2 Disclosure of sold/ booked inventory4 SOLD UNSOL_ SEP 24_compressed.pdf · uploaded 21 Nov 2024Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - Architect Certificate 2025_01-20.pdf · uploaded 25 Jan 2025Source
  • 1 Certificates of CA (Form 3)Form 3 CA Certificate 2025_01_23_com.pdf · uploaded 25 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory 2024_12_31.pdf · uploaded 25 Jan 2025Source
  • Form 1Form 1 - Architect Certificate 2025_03_31.pdf · uploaded 5 Aug 2025Source
  • Form 2Form 2 Engineers Cert 2025_03_31.pdf · uploaded 5 Aug 2025Source
  • Form 3Form 3 CA Certificate 2025_03_31.pdf · uploaded 5 Aug 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Inventory 2025_03_31.pdf · uploaded 5 Aug 2025Source
  • Form 2A (FY 2019-2020)Form 2A Engg Quality Cert 2020_03_31.pdf · uploaded 5 Aug 2025Source
  • Form 2A (FY 2020-2021)Form 2A Engg Quality Cert 2021_03_31.pdf · uploaded 5 Aug 2025Source
  • Form 2A (FY 2021-2022)Form 2A Engg Quality Cert 2022_03_31.pdf · uploaded 5 Aug 2025Source
  • Form 2A (FY 2022-2023)Form 2A Engg Quality Cert 2022_03_31.pdf · uploaded 5 Aug 2025Source
  • Form 2A (FY 2023-2024)Form 2A Engg Quality Cert 2024_03_31.pdf · uploaded 5 Aug 2025Source
  • Form 2A (FY 2024-2025)Form 2A Engg Quality Cert 2025_03_31 Signed.pdf · uploaded 5 Aug 2025Source
  • Form 2A (FY 2024-2025)FORM 2A_ MARCH 25_ SUNSHINE COMPLEX.pdf · uploaded 5 Aug 2025Source
  • Form 5 (FY 2018-2019)Form 5 CA Cert FY 18-19.pdf · uploaded 5 Aug 2025Source
  • Form 5 (FY 2019-2020)Form 5 CA Cert FY 19-20.pdf · uploaded 5 Aug 2025Source
  • Form 5 (FY 2020-2021)Form 5 CA Cert FY 20-21.pdf · uploaded 5 Aug 2025Source
  • Form 5 (FY 2021-2022)Form 5 CA Cert FY 21-22.pdf · uploaded 5 Aug 2025Source
  • Form 5 (FY 2022-2023)Form 5 CA Cert FY 22-23.pdf · uploaded 5 Aug 2025Source
  • Form 5 (FY 2023-2024)Form 5 CA Cert FY 23-24.pdf · uploaded 5 Aug 2025Source
  • Form 5 (FY 2024-2025)Form 5 CA Cert FY 24-25.pdf · uploaded 5 Aug 2025Source
  • Form 5 (FY 2024-2025)Form 5 CA Cert FY 24-25.pdf · uploaded 5 Aug 2025Source
  • Form 11 FORM 1_ SEP 24_ SUNSHINE COMPLEX.pdf · uploaded 21 Aug 2025Source
  • Form 22 FORM 2_ SEP 24_ SUNSHINE COMPLEX.pdf · uploaded 21 Aug 2025Source
  • Form 3FORM 3_ SEPT 24_ SUNSHINE COMPLEX.pdf · uploaded 21 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD_ SEP 24_ SUNSHINE COMPLEX.pdf · uploaded 21 Aug 2025Source
  • Form 1FORM 1_ DEC 24_ SUNSHINE COMPLEX.pdf · uploaded 21 Aug 2025Source
  • Form 2FORM 2_ DEC 24_ SUNSHINE COMPLEX.pdf · uploaded 21 Aug 2025Source
  • Form 3FORM 3_ DEC 24_ SUNSHINE COMPLEX.pdf · uploaded 21 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD_ DEC 24_ SUNSHINE COMPLEX.pdf · uploaded 21 Aug 2025Source
  • Withdrawal Update Form 1Form 1 - Architect Cert 2025_06_30 SS.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 2Form 2 Engineers Cert 2025_06_30 SS.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 3Form 3 CA Cert 2025_06_30 SS.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 1Form 1 - Architect Cert 2025_09_30 SS.pdf · uploaded 25 Jun 2026Source
  • Withdrawal Update Form 1Form 1 - Architect Cert 2025_12_31 SS.pdf · uploaded 25 Jun 2026Source
  • Withdrawal Update Form 1Form 1 - Architect Cert 2026_03_31 SS.pdf · uploaded 25 Jun 2026Source
  • Withdrawal Update Form 2Form 2 Engineers Cert 2025_09_30 SS.pdf · uploaded 25 Jun 2026Source
  • Withdrawal Update Form 2Form 2 Engineers Cert 2025_09_30 SS.pdf · uploaded 25 Jun 2026Source
  • Withdrawal Update Form 2Form 2 Engineers Cert 2026_03_31 SS.pdf · uploaded 25 Jun 2026Source
  • Withdrawal Update Form 3Form 3 CA Cert 2025_09_30 SS.pdf · uploaded 25 Jun 2026Source
  • Withdrawal Update Form 3Form 3 CA Cert 2025_12_31 SS.pdf · uploaded 25 Jun 2026Source
  • Withdrawal Update Form 3Form 3 CA Cert 2026_03_31 SS.pdf · uploaded 25 Jun 2026Source
  • Withdrawal Update Form 1Form 1 - Architect Cert 2026_06_30 SS.pdf · uploaded 14 Jul 2026Source
  • Withdrawal Update Form 2Form 2 Engineers Cert 2026_06_30 SS.pdf · uploaded 14 Jul 2026Source
  • Withdrawal Update Form 3Form 3 CA Cert 2026_06_30 SS.pdf · uploaded 14 Jul 2026Source
  • Form 5 (FY 2025-2026)FORM 5_ MARCH 26_ SUNSHINE COMPLEX.pdf · uploaded 16 Jul 2026Source
  • Form 5 (FY 2025-2026)FORM 5_ MARCH 26_ SUNSHINE COMPLEX.pdf · uploaded 16 Jul 2026Source
  • Form 2A (FY 2025-2026)FORM 2A_ MARCH 26_ SUNSHINE COMPLEX.pdf · uploaded 22 Jul 2026Source
  • Form 2A (FY 2025-2026)FORM 2A_ MARCH 26_ SUNSHINE COMPLEX.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 1Form 1 - Architect Cert 2026_09_30 SS.pdf · uploaded 13 Oct 2026Source
  • Withdrawal Update Form 2Form 2 Engineers Cert 2026_09_30 SS.pdf · uploaded 13 Oct 2026Source
  • Withdrawal Update Form 3Form 3 CA Cert 2026_09_30 SS.pdf · uploaded 13 Oct 2026Source

Technical

  • Document07 -1 -Bldg no 4 - Swajit Apartment A2- Aditi Developers.pdf · uploaded 3 Mar 2019Source
  • Document07 -2 -Bldg no 5 - Sapna Apartment B- Aditi Developers.pdf · uploaded 3 Mar 2019Source
  • Document07 -3 -Bldg no 6 - Laxmi Apartment C- Aditi Developers.pdf · uploaded 3 Mar 2019Source
  • Document09 layout plan.pdf · uploaded 3 Mar 2019Source

Technical (Architect)

  • Document1 FORM 1_ SEP 24.pdf · uploaded 21 Nov 2024Source
  • Document1 FORM 1_ SEP 24.pdf · uploaded 21 Nov 2024Source
  • DocumentForm 1 - Architect Certificate 2025_01-20.pdf · uploaded 25 Jan 2025Source
  • DocumentForm 1 - Architect Cert 2026_09_30 SS.pdf · uploaded 11 Oct 2026Source

Technical (Engineer)

  • Document2 FOR M 2_ SEP 24.pdf · uploaded 21 Nov 2024Source
  • Document2 FOR M 2_ SEP 24.pdf · uploaded 21 Nov 2024Source
  • DocumentForm 2 Engineers Cert 2026_09_30 SS.pdf · uploaded 11 Oct 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 38

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1 BHK, 1 BHK TF, 1 hk, 1 hk tf48 units in all
Address
38, Makane Village Road, Makane VillagePIN 401102
Village
Makane, Palghar taluka
Land area for this project
4,140 sq m (44,563 sq ft)
Permissible built-up area
1,755 sq m (18,888 sq ft)
Sanctioned built-up area
1,755 sq m (18,888 sq ft)
Recreational open space
415 sq m (4,464 sq ft)
Designated bank account
82
Developed in phases
Yes

Survey, CTS, gat or plot numbers

38

Land as published on MahaRERA's project page

38

Boundaries

North
Land of Shree Harishchandra Tare
South
Gut No 28
East
Gut No 28
West
Gut No 28

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking48 units

44 of 48 units booked (92%), as the promoter reported to MahaRERA

1 BHK · 36 units1 BHK TF · 5 units1 hk · 6 units1 hk tf · 1 unit
BuildingTypeCarpet areaUnitsBooked
A2 - Swajit Apartment 41 BHK29.01 sq m · 312 sq ft1211
A2 - Swajit Apartment 41 BHK TF29.01 sq m · 312 sq ft22
B - Sapna Apartment 51 BHK26.68 sq m · 287 sq ft66
B - Sapna Apartment 51 BHK26.9 sq m · 290 sq ft66
B - Sapna Apartment 51 BHK28.89 sq m · 311 sq ft33
B - Sapna Apartment 51 BHK29.79 sq m · 321 sq ft32
B - Sapna Apartment 51 BHK TF26.68 sq m · 287 sq ft11
B - Sapna Apartment 51 BHK TF26.9 sq m · 290 sq ft11
Show all 12 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
C - Laxmi Apartment 61 BHK28.32 sq m · 305 sq ft66
C - Laxmi Apartment 61 BHK TF28.32 sq m · 305 sq ft11
C - Laxmi Apartment 61 hk21.24 sq m · 229 sq ft65
C - Laxmi Apartment 61 hk tf21.24 sq m · 229 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectGauresh Navalkar—
Chartered accountantTanuja Tiwatane—
EngineerGaurav Patil—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Makane

All 86 projects in Makane · Compare Sunshine Complex with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology