Galaxy Apartment
Deedo IDDP-PAL-CVBGIts promised completion date, Dec 2025, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 53% of its units are booked.
Makane, Palghar 401102 · by Ace Developers
Buying a flat here?
See every deed registered on it.
Its promised completion date, Dec 2025, has passed and MahaRERA does not show it completed
- This projectRegistered 29 May 2021, completion promised 31 Dec 2025, and still not shown completed today.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP99000029401
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P99000029401 | 29 May 2021 | 31 Dec 2025 | 31 Dec 2025 | Ace Developers | Project page |
Documents159
2 documents held by Deedo, 157 filings listed on MahaRERA's project page
Finance
- PAN CardPan Card Ace Developers.pdf · uploaded 8 Apr 2021Source
Show all 159 documentsShow fewer documents
Legal
- OtherProject details.pdf · uploaded 15 May 2021Source
- OtherRPM_MCHI_990000_PAL_779.pdf · uploaded 21 May 2021Source
- Declaration Form Bform b affidavite 2025.pdf · uploaded 13 Feb 2025Source
- Declaration Form Bform b affidavite 2025.pdf · uploaded 13 Feb 2025Source
- Otherarihant time line.pdf · uploaded 1 Apr 2025Source
- Otherarihant time line.pdf · uploaded 1 Apr 2025Source
- Declaration Form Btitle1.pdf · uploaded 1 Apr 2026Source
Migrated
- 1 PAN CardPan Card Ace Developers.pdf · uploaded 8 Apr 2021Source
- 1 Copy of the legal title reportTitle Search Report.pdf · uploaded 8 Apr 2021Source
- 1 Copy of Layout Approval (in case of layout)Complex Layout Plan Approval.pdf · uploaded 8 Apr 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Approval Plan.pdf · uploaded 8 Apr 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentCC Copy.pdf · uploaded 8 Apr 2021Source
- 2 Commencement Certificates / NA Order for plotted developmentNA Order.pdf · uploaded 8 Apr 2021Source
- 1 Declaration in FORM BACE (affidavit) FORM B.pdf · uploaded 8 Apr 2021Source
- 1 Proforma of Allotment letterRera Allotment.pdf · uploaded 8 Apr 2021Source
- 2 Proforma of Allotment letterAce Developers Sale Agreement.pdf · uploaded 8 Apr 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 6 May 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Certificate.pdf · uploaded 6 May 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA RERA Certificate.pdf · uploaded 6 May 2021Source
- 1 Details of encumbrancesEncumbrance Certificate.pdf · uploaded 15 May 2021Source
- 2 Building Plan Approval / NA Order for plotted developmentBuilding Plan.pdf · uploaded 15 May 2021Source
- 3 Building Plan Approval / NA Order for plotted developmentComplex Layout Plan Approval.pdf · uploaded 15 May 2021Source
- 1 OtherForm B.pdf · uploaded 15 May 2021Source
- 2 OtherOther -2.pdf · uploaded 15 May 2021Source
- 3 OtherPOA.pdf · uploaded 15 May 2021Source
- 4 OtherProject details.pdf · uploaded 15 May 2021Source
- 5 OtherRPM_MCHI_990000_PAL_779.pdf · uploaded 21 May 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form -01 _galaxy apartment.pdf · uploaded 27 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)F II BLDG NO 13A OCT DEC 2024 Final.pdf · uploaded 27 Jan 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)F-II BLDG NO 13A OCT DEC 2024 Ace and Arihant.pdf · uploaded 27 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form -01 _galaxy apartment.pdf · uploaded 27 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)F II BLDG NO 13A OCT DEC 2024 Final.pdf · uploaded 27 Jan 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)F-II BLDG NO 13A OCT DEC 2024 Ace and Arihant.pdf · uploaded 27 Jan 2025Source
- 1 Declaration in FORM Bform b affidavite 2025.pdf · uploaded 13 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryInventory Disclosure Final.pdf · uploaded 13 Feb 2025Source
- 1 Declaration in FORM Bform b affidavite 2025.pdf · uploaded 13 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryInventory Disclosure Final.pdf · uploaded 13 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Building No13A JUL SEP 2023.pdf · uploaded 27 Mar 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 01 June 2023.pdf · uploaded 27 Mar 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 01 Sep 2023.pdf · uploaded 27 Mar 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 01 Dec 2023.pdf · uploaded 27 Mar 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 01 June 2024.pdf · uploaded 27 Mar 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 01 Mar 2024.pdf · uploaded 27 Mar 2025Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 01 Sep 2024.pdf · uploaded 27 Mar 2025Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 01 Mar 2023.pdf · uploaded 27 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Building No13A APR JUN 2023.pdf · uploaded 27 Mar 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Mar 2024_compressed.pdf · uploaded 27 Mar 2025Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Dec 2024_compressed.pdf · uploaded 27 Mar 2025Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Sep 2024_compressed.pdf · uploaded 27 Mar 2025Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Jun 2024_compressed.pdf · uploaded 27 Mar 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Dec 2023_compressed.pdf · uploaded 27 Mar 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Sep 2023_compressed.pdf · uploaded 27 Mar 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Jun 2023_compressed.pdf · uploaded 27 Mar 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Mar 2023_compressed.pdf · uploaded 27 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 01 Mar 2023.pdf · uploaded 27 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Building No 13A ARIHANT Developers JAN MAR 2023.pdf · uploaded 27 Mar 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Building No 13A ARIHANT Developers APR JUN 2023.pdf · uploaded 27 Mar 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Building No 13A ARIHANT Developers JUL SEP 2023.pdf · uploaded 27 Mar 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Building No 13A ARIHANT Developers OCT DEC 2023.pdf · uploaded 27 Mar 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Building No 13A ARIHANT Developers JAN MAR 2024.pdf · uploaded 27 Mar 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Building No 13A ARIHANT Developers JUL SEP 2024.pdf · uploaded 27 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Arihant Ace Developers Year Ending march 2023.pdf · uploaded 27 Mar 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 FY 2022-2023.pdf · uploaded 27 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Arihant Ace Developers Year Ending March 2024.pdf · uploaded 27 Mar 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 FY 2023-2024.pdf · uploaded 27 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Building No13A APR JUN 2024.pdf · uploaded 1 Apr 2025Source
- 1 Otherarihant time line.pdf · uploaded 1 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Building No13A APR JUN 2024.pdf · uploaded 1 Apr 2025Source
- 1 Otherarihant time line.pdf · uploaded 1 Apr 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 01 June 2023.pdf · uploaded 13 Apr 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 01 Sep 2023.pdf · uploaded 13 Apr 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 01 Dec 2023.pdf · uploaded 13 Apr 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 01 Mar 2024.pdf · uploaded 13 Apr 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 01 June 2024.pdf · uploaded 13 Apr 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 01 Sep 2024.pdf · uploaded 13 Apr 2025Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 01 Dec 2024.pdf · uploaded 13 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 01 Mar 2023.pdf · uploaded 13 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Mar 2023.pdf · uploaded 13 Apr 2025Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec 2024.pdf · uploaded 13 Apr 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sep 2024.pdf · uploaded 13 Apr 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Jun 2024.pdf · uploaded 13 Apr 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Mar 2024.pdf · uploaded 13 Apr 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec 2023.pdf · uploaded 13 Apr 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sep 2023.pdf · uploaded 13 Apr 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Jun 2023.pdf · uploaded 13 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryDiscloser Inventary sold unsold.pdf · uploaded 13 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form1.pdf · uploaded 20 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3.pdf · uploaded 20 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2.pdf · uploaded 20 May 2025Source
- 1 Disclosure of sold/ booked inventorysold unsold 31-03-2025.pdf · uploaded 20 May 2025Source
- Withdrawal Update Form 1form -01 _ galaxy apartment (1).pdf · uploaded 11 Dec 2025Source
- Withdrawal Update Form 1FORM -01 _ GALAXY APARTMENT.pdf · uploaded 11 Dec 2025Source
- Withdrawal Update Form 2F-II 30 JUN 2025.pdf · uploaded 11 Dec 2025Source
- Withdrawal Update Form 2F-II JUL SEP 2025.pdf · uploaded 11 Dec 2025Source
- Withdrawal Update Form 3Rera Certificate Merge (1).pdf · uploaded 11 Dec 2025Source
- Withdrawal Update Form 3Rera Certificate Merge Sep 2025.pdf · uploaded 11 Dec 2025Source
- Form 5 (FY 2024-2025)Form 5_merged.pdf · uploaded 27 Dec 2025Source
- Withdrawal Update Form 1FORM -01 GALAXY APRTMEN Dec 2025.pdf · uploaded 31 Jan 2026Source
- Withdrawal Update Form 2FII BLDG NO 13A OCT DEC 2025.pdf · uploaded 31 Jan 2026Source
- Withdrawal Update Form 3Rera Certificate Sacnned Merage.pdf · uploaded 31 Jan 2026Source
- Form 2A (FY 2022-2023)Form 2A Arihant Ace Developers Year Ending march 2023.pdf · uploaded 6 Oct 2026Source
- Form 2A (FY 2023-2024)Form 2A Arihant Ace Developers Year Ending march 2023.pdf · uploaded 6 Oct 2026Source
Technical
- DocumentBuilding Plan.pdf · uploaded 15 May 2021Source
- DocumentComplex Layout Plan Approval.pdf · uploaded 15 May 2021Source
- Othersform c application.pdf · uploaded 31 Dec 2025Source
- Othersform C consent.pdf · uploaded 31 Dec 2025Source
- DocumentBLDG No 13 Layout Plan_compressed.pdf · uploaded 1 Apr 2026Source
- DocumentBLDG NO 13 BLDG Plan_compressed.pdf · uploaded 1 Apr 2026Source
Technical (Architect)
- Documentform -01 _galaxy apartment.pdf · uploaded 27 Jan 2025Source
- Documentform -01 _galaxy apartment.pdf · uploaded 27 Jan 2025Source
- DocumentBuilding No13A APR JUN 2023.pdf · uploaded 27 Mar 2025Source
- DocumentBuilding No13A JUL SEP 2023.pdf · uploaded 27 Mar 2025Source
- DocumentFORM 01 June 2023.pdf · uploaded 27 Mar 2025Source
- DocumentFORM 01 Sep 2023.pdf · uploaded 27 Mar 2025Source
- DocumentFORM 01 Dec 2023.pdf · uploaded 27 Mar 2025Source
- DocumentFORM 01 June 2024.pdf · uploaded 27 Mar 2025Source
- DocumentFORM 01 Mar 2024.pdf · uploaded 27 Mar 2025Source
- DocumentFORM 01 Sep 2024.pdf · uploaded 27 Mar 2025Source
- DocumentFORM 01 Mar 2023.pdf · uploaded 27 Mar 2025Source
- DocumentFORM 01 Mar 2023.pdf · uploaded 13 Apr 2025Source
- DocumentFORM 01 June 2023.pdf · uploaded 13 Apr 2025Source
- DocumentFORM 01 Sep 2023.pdf · uploaded 13 Apr 2025Source
- DocumentFORM 01 Dec 2023.pdf · uploaded 13 Apr 2025Source
- DocumentFORM 01 Mar 2024.pdf · uploaded 13 Apr 2025Source
- DocumentFORM 01 June 2024.pdf · uploaded 13 Apr 2025Source
- DocumentFORM 01 Sep 2024.pdf · uploaded 13 Apr 2025Source
- DocumentFORM 01 Dec 2024.pdf · uploaded 13 Apr 2025Source
- Documentform1.pdf · uploaded 20 May 2025Source
- DocumentFORM 1 Galaxy Apartment March 2026.pdf · uploaded 17 Aug 2026Source
Technical (Engineer)
- DocumentF II BLDG NO 13A OCT DEC 2024 Final.pdf · uploaded 27 Jan 2025Source
- DocumentF-II BLDG NO 13A OCT DEC 2024 Ace and Arihant.pdf · uploaded 27 Jan 2025Source
- DocumentF II BLDG NO 13A OCT DEC 2024 Final.pdf · uploaded 27 Jan 2025Source
- DocumentF-II BLDG NO 13A OCT DEC 2024 Ace and Arihant.pdf · uploaded 27 Jan 2025Source
- DocumentBuilding No 13A ARIHANT Developers JAN MAR 2023.pdf · uploaded 27 Mar 2025Source
- DocumentBuilding No 13A ARIHANT Developers APR JUN 2023.pdf · uploaded 27 Mar 2025Source
- DocumentBuilding No 13A ARIHANT Developers JUL SEP 2023.pdf · uploaded 27 Mar 2025Source
- DocumentBuilding No 13A ARIHANT Developers OCT DEC 2023.pdf · uploaded 27 Mar 2025Source
- DocumentBuilding No 13A ARIHANT Developers JAN MAR 2024.pdf · uploaded 27 Mar 2025Source
- DocumentBuilding No 13A ARIHANT Developers JUL SEP 2024.pdf · uploaded 27 Mar 2025Source
- DocumentBuilding No13A APR JUN 2024.pdf · uploaded 1 Apr 2025Source
- DocumentBuilding No13A APR JUN 2024.pdf · uploaded 1 Apr 2025Source
- DocumentForm 2 Mar 2023.pdf · uploaded 13 Apr 2025Source
- DocumentForm 2 Jun 2023.pdf · uploaded 13 Apr 2025Source
- DocumentForm 2 Sep 2023.pdf · uploaded 13 Apr 2025Source
- DocumentForm 2 Dec 2023.pdf · uploaded 13 Apr 2025Source
- DocumentForm 2 Mar 2024.pdf · uploaded 13 Apr 2025Source
- DocumentForm 2 Jun 2024.pdf · uploaded 13 Apr 2025Source
- DocumentForm 2 Sep 2024.pdf · uploaded 13 Apr 2025Source
- DocumentForm 2 Dec 2024.pdf · uploaded 13 Apr 2025Source
- DocumentForm2.pdf · uploaded 20 May 2025Source
- DocumentBLDG No 13A JAN MAR 2026.pdf · uploaded 17 Aug 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel G. NO. 224, GUT NO 226/2
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK30 units in all
- Address
- G. No. 224, Gut No 226/2, Gut No 226/3, Pandit Pada, Saphale WestPIN 401102
- Village
- Makane, Palghar taluka
- Location
- 19.57514, 72.80437
- Land area for this project
- 1,109 sq m (11,934 sq ft)
- Permissible built-up area
- 1,109 sq m (11,934 sq ft)
- Sanctioned built-up area
- 1,109 sq m (11,934 sq ft)
- Designated bank account
- 82
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
G. NO. 224, GUT NO 226/2 ,GUT NO 226/3
Boundaries
- North
- 9 mt wide road
- South
- Garden
- East
- Building No 14
- West
- Building No 12
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking30 units
16 of 30 units booked (53%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 25.32 sq m · 273 sq ft | 20 | 11 |
| 1BHK | 28.52 sq m · 307 sq ft | 5 | 2 |
| 2BHK | 39.57 sq m · 426 sq ft | 5 | 3 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Ar Roshan Ravindra Patil | — |
| Chartered accountant | Kishor Sheth M Sheth | — |
| Engineer | Jay Shree Krishna Consulting Engg. | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Makane
- Golden HarmonyRERA PR1240002602643
- Fortune HightsRERA PR1240002602290
- Angel ApartmentRERA PR1240002601460
- Nine Star Crown Bldg No. 6 DiamondRERA PR1243032600872
- Angel HomesRERA PR1240002600121
- Om SankulanRERA PM1240002600108
- Nine Star Crown Bldg No. 4 SapphireRERA PR1242022502990
- Aditya ResidencyRERA PR1240002502671
All 86 projects in Makane · Compare Galaxy Apartment with another project