Rishik Appt

Completed

Nashik 422003 |Promoter: Darshit Purushottam Patel

Residential / Group HousingRERAP51600011144
31 Aug 2017Registered with MahaRERA
22 Mar 2019Promised completion
1Building
23Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
1 BHK, 2 BHK23 units in all
Land area for this project
562 sq m (6,049 sq ft)
Permissible built-up area
780 sq m (8,397 sq ft)
Sanctioned built-up area
780 sq m (8,397 sq ft)
Address
Sr No 535/2/1 Plto No 1 And 2PIN 422003
Designated bank account
Idbi Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.11065, 73.72425
Rishik Appt is at latitude 20.11065, longitude 73.72425.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 22 Mar 2019

The latest completion date on record passed 7 years and 7 months ago.

Registered
31 Aug 2017
Promised
22 Mar 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160001114431 Aug 201722 Mar 2019—Darshit Purushottam PatelProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Rishik Appt623

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

23 units registered

1 BHK · 15 units2 BHK · 8 units
TypeCarpet areaUnits
1 BHK441 sq m · 4,747 sq ft15
2 BHK340 sq m · 3,660 sq ft8

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Rishik Appt

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNASHIK MUNICIPAL CORPORATION WILL SUPPLY100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)WORK COMPLETED100%
  • Storm Water DrainsWORK COMPLETED100%
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingWORK COMPLETED100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationWORK COMPLETED100%
  • Aggregate area of recreational Open SpaceWORK COMPLETED100%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

14 documents held by Deedo, 17 filings listed on MahaRERA's project page

Title

Encumbrance

Form b

Form 1

Form 2

Registration certificate

Form 4

Form 5

Completion

Others

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title reportUntitled.pdf · uploaded 23 Aug 2017View
  • Details of encumbrancescertencumbrane.pdf · uploaded 23 Aug 2017View
  • Copy of Layout Approval (in case of layout)plotlayout.pdf · uploaded 23 Aug 2017View
  • Proforma of Allotment letterdraft.pdf · uploaded 23 Aug 2017View
  • Declaration in FORM Bformb.pdf · uploaded 23 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)architech cert.pdf · uploaded 23 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)eng cert-ilovepdf-compressed.pdf · uploaded 23 Aug 2017View
  • Building Plan Approval (IOD)buildlayout.pdf · uploaded 23 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentUntitled.pdf · uploaded 23 Aug 2017View
  • Certificates of Architect (Form 4)architechcert.pdf · uploaded 9 Jul 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)Rera Certificate.pdf · uploaded 19 Dec 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCOMPLETION CERTIFICATE.pdf · uploaded 30 May 2020View

Promoter documents

  • Legal Title reportUntitled.pdf · uploaded 23 Aug 2017View
  • Declaration Form Bformb.pdf · uploaded 23 Aug 2017View

Technical documents

  • Layout Approvalplotlayout.pdfView
  • Building Plan Approvalbuildlayout.pdfView

Proforma allotment letter

  • Proforma allotment letterdraft.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik, Nashik taluka

Survey, CTS, gat or plot numbers

2SR NO 535/2/1 PLTO NO 1

As published on MahaRERA's project page

SR NO 535/2/1 PLTO NO 1 AND 2

Boundaries

North
Sr No 555
South
7 And 50 Mtr Road
East
Plot No 3
West
Plot No 31c

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectNiki Associates—
EngineerMilind Rathi—

Source: MahaRERA project page. Contact details are not shown.