Skip to content
Deedo home
Menu

Marigold

Completed

Nashik 422010 |Promoter: Ganaraj Associates

20 Dec 2017Registered with MahaRERA
30 Sep 2022Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Land area for this project
1,426 sq m (15,349 sq ft)
Permissible built-up area
2,573 sq m (27,700 sq ft)
Sanctioned built-up area
2,573 sq m (27,700 sq ft)
Address
Plot No 8 S No 255 And 256 Oblic 1, Ambad Khurd, Ambad KhurdPIN 422010
Designated bank account
The Nasik Merchants Cooperative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.93839, 73.73602
Marigold is at latitude 19.93839, longitude 73.73602.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Sep 2022

The latest completion date on record passed 4 years and 1 month ago.

Registered
20 Dec 2017
Promised
30 Sep 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160001468320 Dec 201730 Sep 2022—Ganaraj AssociatesProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Marigold9—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000014
Open Space000012

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Marigold

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNMC AND BOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsCOMPLETED100%
  • Electrical meter room, sub-station, receiving stationONLY ELECTRIC METER PANEL AND DP100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingCOMPLETED100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

23 documents held by Deedo, 34 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title reportTitle Certificate.pdf · uploaded 12 Dec 2017View
  • Details of encumbrancesencumbrance .pdf · uploaded 12 Dec 2017View
  • Proforma of Allotment letterDeclaration of agreement for sale.pdf · uploaded 12 Dec 2017View
  • Declaration in FORM Bform b.pdf · uploaded 12 Dec 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencement certificate.pdf · uploaded 12 Dec 2017View
  • Building Plan Approval (IOD)1.pdf · uploaded 12 Dec 2017View
  • Building Plan Approval (IOD)2.pdf · uploaded 12 Dec 2017View
  • Building Plan Approval (IOD)3.pdf · uploaded 12 Dec 2017View
  • Copy of Layout Approval (in case of layout)1.pdf · uploaded 12 Dec 2017View
  • Copy of Layout Approval (in case of layout)2.pdf · uploaded 12 Dec 2017View
  • Copy of Layout Approval (in case of layout)3.pdf · uploaded 12 Dec 2017View
  • OtherLetter.pdf · uploaded 15 Dec 2017View
  • OtherMOU FOR REFERENCE ONLY.pdf · uploaded 15 Dec 2017View
  • Building Plan Approval (IOD)Building Plan.pdf · uploaded 5 Jul 2018View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 5 Jul 2018View
  • Certificates of CA (Form 5)Rera Audit report.pdf · uploaded 15 Oct 2018View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 2 Jul 2024View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate.pdf · uploaded 2 Jul 2024View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Declaration of Apartment.pdf · uploaded 2 Jul 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 - 2018-19.pdf · uploaded 2 Jul 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 - 2019-20.pdf · uploaded 2 Jul 2024View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4 New Format.pdf · uploaded 9 Jul 2024View

Promoter documents

  • Legal Title reportTitle Certificate.pdf · uploaded 12 Dec 2017View
  • Declaration Form Bform b.pdf · uploaded 12 Dec 2017View

Technical documents

  • Building Plan Approval2.pdfView
  • Building Plan Approval3.pdfView
  • Layout Approval1.pdfView
  • Layout Approval2.pdfView
  • Layout Approval3.pdfView
  • Building Plan Approval1.pdfView
  • Building Plan ApprovalBuilding Plan.pdfView

Other legal documents

  • OtherLetter.pdfView
  • OtherMOU FOR REFERENCE ONLY.pdfView

Proforma allotment letter

  • Proforma allotment letterDeclaration of agreement for sale.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik, Nashik taluka

Survey, CTS, gat or plot numbers

256 OBLIC 18PLOT NO 8 S NO 255

As published on MahaRERA's project page

PLOT NO 8 S NO 255 AND 256 OBLIC 1

Boundaries

North
Open Space
South
30 Mtr D P Road
East
Gat No 310
West
Gat No 255

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectNitin Kute—
Chartered accountantNirav Shah—
EngineerSanjay D Ratnaparkhi—
OtherAnand Ghuge—
OtherDeepak Pandit—
OtherKanta S Chaudhari—
OtherNilesh R Panchbhai—
OtherNoor Mohammad Ansari—
OtherRavindra T Mandave—
OtherSNS Rera Consultants—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology