Jay Malhar

Lapsed

Nashik 422003 |Promoter: Rajendra Karbhari Pawar

Residential / Group HousingRERAP51600012692
7 Sep 2017Registered with MahaRERA
20 Aug 2020Promised completion
1Building
14Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
1
Unit types
Jay malhar apartment14 units in all
Land area for this project
329 sq m (3,537 sq ft)
Permissible built-up area
593 sq m (6,383 sq ft)
Sanctioned built-up area
547 sq m (5,891 sq ft)
Address
31/2a/1b/1 Plot No 1PIN 422003
Designated bank account
Indian Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.24677, 73.14234
Jay Malhar is at latitude 19.24677, longitude 73.14234.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 20 Aug 2020

The latest completion date on record passed 6 years and 2 months ago.

Registered
7 Sep 2017
Promised
20 Aug 2020

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P516000126927 Sep 201720 Aug 2020—Rajendra Karbhari PawarProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Jay Malhar614

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

14 units registered

Jay malhar apartment · 14 units
TypeCarpet areaUnits
Jay malhar apartment573.39 sq m · 6,172 sq ft14

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Jay Malhar

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water Supply00%
  • Sewerage (Chamber, Lines, Septic Tank , STP)00%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree Planting00%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvesting00%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving station00%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open Parking00%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

12 documents held by Deedo, 16 filings listed on MahaRERA's project page

Title report

Encumbrance details

Commencement certificate

Form B

Form 1

Registration certificate

Other (3)

Show all 28 documentsShow fewer documents

Other (3)

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title reporttitale report 31-2b-1a-1.pdf · uploaded 8 Aug 2017View
  • Details of encumbrancesENCRUBANCE PARER.pdf · uploaded 8 Aug 2017View
  • Copy of Layout Approval (in case of layout)lay out for rera.pdf · uploaded 8 Aug 2017View
  • Declaration in FORM BDeclaration rera 31-2b-1a-1.pdf · uploaded 8 Aug 2017View
  • Proforma of Allotment letterAgrement Alotment 31-2b-1a-1.pdf · uploaded 8 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect cert.pdf · uploaded 8 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer cert.pdf · uploaded 8 Aug 2017View
  • Building Plan Approval (IOD)SCAN COPY PLAN.pdf · uploaded 8 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentcommencement 31-2b-1a-1 (4) (1).pdf · uploaded 8 Aug 2017View
  • OtherORGANIZATION CERTIFICATE.pdf · uploaded 8 Aug 2017View

Promoter documents

  • Legal Title reporttitale report 31-2b-1a-1.pdf · uploaded 8 Aug 2017View
  • Declaration Form BDeclaration rera 31-2b-1a-1.pdf · uploaded 8 Aug 2017View

Technical documents

  • Layout Approvallay out for rera.pdfView
  • Building Plan ApprovalSCAN COPY PLAN.pdfView

Other legal documents

  • OtherORGANIZATION CERTIFICATE.pdfView

Proforma allotment letter

  • Proforma allotment letterAgrement Alotment 31-2b-1a-1.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik, Nashik taluka

Survey, CTS, gat or plot numbers

131/2A/1B/1 PLOT NO 1

As published on MahaRERA's project page

31/2A/1B/1 PLOT NO 1

Boundaries

North
9 Mt Wide Road
South
S No 31-3
East
P No 2
West
6 Mt Wide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMukund Bagul—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology