Jeevan Baug
Deedo IDDP-NSK-YB33Its promised completion date, Jul 2025, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 48% of its units are booked.
Nashik (M Corp.), Nashik 422222 · by Divine Builders
Buying a flat here?
See every deed registered on it.
Its promised completion date, Jul 2025, has passed and MahaRERA does not show it completed
- This projectRegistered 19 Sep 2019, completion promised 20 Jul 2025, and still not shown completed today.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
8 buildings
Open a building to see every flat, floor by floor.
- Wing-A11 floors · 27 units52% booked
- Wing B11 floors · 27 units59% booked
- Wing C11 floors · 29 units55% booked
- Wing D11 floors · 30 units63% booked
- Wing E10 floors · 30 units40% booked
- Wing F11 floors · 30 units47% booked
- Wing G11 floors · 30 units10% booked
- Wing H11 floors · 23 units65% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51600022403
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51600022403 | 19 Sep 2019 | 20 Jul 2025 | 20 Jul 2025 | Divine Builders | Project page |
Documents164
1 document held by Deedo, 163 filings listed on MahaRERA's project page
Finance
- PAN CardPAN divine.pdf · uploaded 3 Sep 2019Source
Legal
Migrated
- 1 PAN CardPAN divine.pdf · uploaded 3 Sep 2019Source
- 1 Copy of the legal title reportTITLE REPORT.pdf · uploaded 3 Sep 2019Source
- 1 Details of encumbrancesEncumberance Cert.pdf · uploaded 3 Sep 2019Source
- 1 Copy of Layout Approval (in case of layout)Layout Plan 66-7 (1).pdf · uploaded 3 Sep 2019Source
Show all 164 documentsShow fewer documents
Migrated
- 1 Building Plan Approval / NA Order for plotted developmentSanctioned Plan Com.pdf · uploaded 3 Sep 2019Source
- 2 Building Plan Approval / NA Order for plotted developmentFlr Plan AB.pdf · uploaded 3 Sep 2019Source
- 3 Building Plan Approval / NA Order for plotted developmentFlr Plan CD.pdf · uploaded 3 Sep 2019Source
- 4 Building Plan Approval / NA Order for plotted developmentFlr Plan EFGH.pdf · uploaded 3 Sep 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMECEMENT.pdf · uploaded 3 Sep 2019Source
- 1 Declaration in FORM BForm B Developer.pdf · uploaded 3 Sep 2019Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 3 Sep 2019Source
- 1 Proforma of Allotment letterAllottment and Agreement for Sale.pdf · uploaded 3 Sep 2019Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate April 07 2021.pdf · uploaded 26 Aug 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Jeevan Baug March 2021.pdf · uploaded 26 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Signed Form 5.pdf · uploaded 6 Sep 2021Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Divine Form 5.pdf · uploaded 1 Oct 2021Source
- 1 Disclosure of sold/ booked inventoryJeevan Baug_Inventory Q2 FY 21-22.pdf · uploaded 22 Nov 2021Source
- 2 Disclosure of sold/ booked inventoryJeevan Baug_Inventory Q2 FY 21-22.pdf · uploaded 27 Jan 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Sept 21.pdf · uploaded 27 Jan 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS Divine Builders 2022-23 Q1.pdf · uploaded 4 Feb 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS Divine Builders 2022-23 Q2.pdf · uploaded 4 Feb 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS Divine Builders 2022-23 Q3.pdf · uploaded 4 Feb 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Divine F-3 30-6-22.pdf · uploaded 4 Feb 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Divine F-3 30-9-22.pdf · uploaded 4 Feb 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Divine F-3-31-12-22.pdf · uploaded 4 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 Divine Builders 2021-22.pdf · uploaded 4 Feb 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 Divine Builders 2020-21.pdf · uploaded 4 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Divine Builders 2021-22.pdf · uploaded 4 Feb 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Divine Builders Form 3 31-03-2020.pdf · uploaded 17 Feb 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS Divine Builders 2019-20 Q4.pdf · uploaded 18 Feb 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS Divine Builders 2020-21 Q1.pdf · uploaded 18 Feb 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS Divine Builders 2020-21 Q2.pdf · uploaded 18 Feb 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS Divine Builders 2020-21 Q3.pdf · uploaded 18 Feb 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS Divine Builders 2021-22 Q1.pdf · uploaded 18 Feb 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS Divine Builders 2021-22 Q2.pdf · uploaded 18 Feb 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS Divine Builders 2021-22 Q3.pdf · uploaded 18 Feb 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS Divine Builders 2021-22 Q4.pdf · uploaded 18 Feb 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Divine Builders Engineer Certificate 12-08-2019.pdf · uploaded 18 Feb 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Divine Builders Engineer Certificate 31-12-2019.pdf · uploaded 18 Feb 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Divine Builders Engineer Certificate 31-03-2020.pdf · uploaded 18 Feb 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Divine Builders Engineer Certificate 30-06-2020.pdf · uploaded 18 Feb 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Divine Builders Engineer Certificate 30-09-2020.pdf · uploaded 18 Feb 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Divine Builders Engineer Certificate 31-12-2020.pdf · uploaded 18 Feb 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Divine Builders Engineer Certificate 31-03-2021.pdf · uploaded 18 Feb 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Divine Builders Engineer Certificate 30-06-2021.pdf · uploaded 18 Feb 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Divine Builders Engineer Certificate 30-09-2021.pdf · uploaded 18 Feb 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Divine Builders Engineer Certificate 31-12-2021.pdf · uploaded 18 Feb 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Divine Builders Engineer Certificate 31-03-2022.pdf · uploaded 18 Feb 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Divine Builders Engineer Certificate 30-06-2022.pdf · uploaded 18 Feb 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Divine Builders Engineer Certificate 30-09-2022.pdf · uploaded 18 Feb 2023Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)Divine Builders Engineer Certificate 31-12-2022.pdf · uploaded 18 Feb 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Divine Builders Form 3 31-03-2022_compressed-compressed.pdf · uploaded 18 Feb 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Divine Builders Form 3 30-06-2021.pdf · uploaded 18 Feb 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed Form 3.pdf · uploaded 19 Jun 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Q1 23-24.PDF · uploaded 26 Aug 2023Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Q1 23-24.pdf · uploaded 26 Aug 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed Form 3.pdf · uploaded 26 Aug 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Jeevan Baug Form - 5 31-03-2023.pdf · uploaded 1 Dec 2023Source
- 2 Details of encumbrancesEncumbrance Letter.pdf · uploaded 3 Jan 2024Source
- 1 CERSAI detailsCERSAI_Search_Report_200292301424_For_Debtor_Based_Search_03_01_2024_15_04_17_085.pdf · uploaded 3 Jan 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate - 30-09-2023.pdf · uploaded 2 Feb 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)JEEVAN BAUG F2 30-9-23.pdf · uploaded 2 Feb 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 2 Feb 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Jeevan Baug F3 30-9-23 - Compressed.pdf · uploaded 2 Feb 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed Form 3.pdf · uploaded 2 Feb 2024Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (2).pdf · uploaded 3 Feb 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Divine Q4 23-24 Form 3 Signed_compressed.pdf · uploaded 13 May 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect certificate - Mar-2024.pdf · uploaded 8 Apr 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect certificate - Jun-2024.pdf · uploaded 8 Apr 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect certificate - Sept-2024.pdf · uploaded 8 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Divine Builder F3 Q1 2024-25.pdf · uploaded 8 Apr 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Divine Builder F3 Q2 2024-25.pdf · uploaded 8 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate 31-03-2024.pdf · uploaded 8 Apr 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate 30-06-2024.pdf · uploaded 8 Apr 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate 30-09-2024.pdf · uploaded 8 Apr 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Divine Builders F5 2023-24.pdf · uploaded 8 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Jeevan Baug Architects Certificate 2024-25 Q3.pdf · uploaded 11 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Jeevan Baug F3 2024-25 Q3.pdf · uploaded 11 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Sold Unsold 24-25 Q2.pdf · uploaded 11 Apr 2025Source
- 6 Disclosure of sold/ booked inventorySold Unsold 23-24 Q1.pdf · uploaded 11 Apr 2025Source
- 12 Disclosure of sold/ booked inventorySold Unsold 24-25 Q3.pdf · uploaded 11 Apr 2025Source
- 11 Disclosure of sold/ booked inventorySold Unsold 24-25 Q2.pdf · uploaded 11 Apr 2025Source
- 10 Disclosure of sold/ booked inventorySold Unsold 24-25 Q1.pdf · uploaded 11 Apr 2025Source
- 9 Disclosure of sold/ booked inventorySold Unsold 23-24 Q4.pdf · uploaded 11 Apr 2025Source
- 8 Disclosure of sold/ booked inventorySold Unsold 23-24 Q3.pdf · uploaded 11 Apr 2025Source
- 7 Disclosure of sold/ booked inventorySold Unsold 23-24 Q2.pdf · uploaded 11 Apr 2025Source
- 5 Disclosure of sold/ booked inventorySold Unsold 22-23 Q4.pdf · uploaded 11 Apr 2025Source
- 4 Disclosure of sold/ booked inventorySold Unsold 22-23 Q3.pdf · uploaded 11 Apr 2025Source
- 3 Disclosure of sold/ booked inventorySold Unsold 22-23 Q2.pdf · uploaded 11 Apr 2025Source
- 2 Disclosure of sold/ booked inventorySold Unsold 22-23 Q1.pdf · uploaded 11 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySold Unsold 21-22 Q4.pdf · uploaded 11 Apr 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Jeevan Baug F2 24-25 Q3.pdf · uploaded 12 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Jeevan Baug F-2A 31-3-21.pdf · uploaded 12 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Divine Builders Form-2A 31-3-2022.pdf · uploaded 12 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Jeevan Baug F-2A 31-3-23.pdf · uploaded 12 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Jeevan Baug F2A 23-24.pdf · uploaded 12 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Jeevan Baug Architect Certificate 2024-25 Q4.pdf · uploaded 19 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Jeevan Baug Form 3 Q4 2024-25.pdf · uploaded 19 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Jeevan Baug Form 2 Q4 2024-25.pdf · uploaded 23 May 2025Source
- 1 Other – TechnicalJeevan Baug Form 2A Q4 2024-25.pdf · uploaded 23 May 2025Source
- Form 1Jeevan Baug Architect Certificate 2024-25 Q4.pdf · uploaded 16 Jul 2025Source
- Form 2Jeevan Baug Form 2 Q4 2024-25.pdf · uploaded 16 Jul 2025Source
- Form 3Jeevan Baug Form 3 Q4 2024-25.pdf · uploaded 16 Jul 2025Source
- Disclosure of Sold and Booked InventoryJeevan Baug Sold & Unsold Q4 2024-2025.pdf · uploaded 16 Jul 2025Source
- Form 1Architect Certificate.pdf · uploaded 16 Jul 2025Source
- Form 2Engineer.pdf · uploaded 16 Jul 2025Source
- Form 3Jeevan Baug F3 2024-25 Q3 - converted.pdf · uploaded 16 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Unsold.pdf · uploaded 16 Jul 2025Source
- Form 1Form 1 Architect certificate - Sept-2024.pdf · uploaded 16 Jul 2025Source
- Form 2Form 2.pdf · uploaded 16 Jul 2025Source
- Form 3Divine Builder F3 Q2 2024-25 (1)_11zon.pdf · uploaded 16 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Unsold.pdf · uploaded 16 Jul 2025Source
- Form 1Form 1 Architect certificate - Jun-2024.pdf · uploaded 16 Jul 2025Source
- Form 2Form 2.pdf · uploaded 16 Jul 2025Source
- Form 3Divine Builder F3 Q1 2024-25 (1)_11zon.pdf · uploaded 16 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Unsold.pdf · uploaded 16 Jul 2025Source
- Withdrawal Update Form 1Jeevan Baug Architect Certificate 2025-26 Q1.pdf · uploaded 13 Nov 2025Source
- Withdrawal Update Form 2Jeevan Baug Form 2 Q4 2024-25.pdf · uploaded 13 Nov 2025Source
- Withdrawal Update Form 3Jeevan Baug form 3 2025-26 Q1 Compressed.pdf · uploaded 13 Nov 2025Source
- Withdrawal Update Form 1Jeevan Baug Architect Certificate 25-07-25.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 2Jeevan Baug Form-2 2025-26 Q2.pdf · uploaded 22 Nov 2025Source
- Withdrawal Update Form 3Jeevan Baug Form-3 2025-26 Q2_compressed.pdf · uploaded 22 Nov 2025Source
- Form 1Form 1 23-24 Q4.pdf · uploaded 12 Aug 2026Source
- Form 2Form 2 23-24 Q4.pdf · uploaded 12 Aug 2026Source
- Form 323-24 Q4.pdf · uploaded 12 Aug 2026Source
- Disclosure of Sold and Booked Inventory23-24 Q4 Inventory.pdf · uploaded 12 Aug 2026Source
- Form 2A (FY 2024-2025)Devise.pdf · uploaded 14 Aug 2026Source
- Form 2A (FY 2025-2026)Form 2A Divine 25-26.pdf · uploaded 19 Aug 2026Source
- Form 5 (FY 2024-2025)Jeevan Baug Form5 2024-2025.pdf · uploaded 19 Aug 2026Source
Technical
- DocumentLayout Plan 66-7 (1).pdf · uploaded 3 Sep 2019Source
- DocumentSanctioned Plan Com.pdf · uploaded 3 Sep 2019Source
- DocumentFlr Plan AB.pdf · uploaded 3 Sep 2019Source
- DocumentFlr Plan CD.pdf · uploaded 3 Sep 2019Source
- DocumentFlr Plan EFGH.pdf · uploaded 3 Sep 2019Source
- Other – TechnicalJeevan Baug Form 2A Q4 2024-25.pdf · uploaded 23 May 2025Source
- Document1-1 site plan.pdf · uploaded 22 Nov 2025Source
- Document1-2 ground floor.pdf · uploaded 22 Nov 2025Source
- Document1-3 first (podion).pdf · uploaded 22 Nov 2025Source
- Document4-12 WING A-B.pdf · uploaded 22 Nov 2025Source
- Document5-12 WING A-B.pdf · uploaded 22 Nov 2025Source
- Document6-12 WING A-B.pdf · uploaded 22 Nov 2025Source
- Document7-12 WING C-D.pdf · uploaded 22 Nov 2025Source
- Document8-12 WING C-D.pdf · uploaded 22 Nov 2025Source
- Document9-12 WING E+F+G+H.pdf · uploaded 22 Nov 2025Source
- Document10-12 WING E+F+G+H.pdf · uploaded 22 Nov 2025Source
- Document11-12 WING E+F+G+H.pdf · uploaded 22 Nov 2025Source
- Document12-12 WING E+F+G+H.pdf · uploaded 22 Nov 2025Source
Technical (Architect)
- DocumentForm 1 Architect certificate - Mar-2024.pdf · uploaded 8 Apr 2025Source
- DocumentForm 1 Architect certificate - Jun-2024.pdf · uploaded 8 Apr 2025Source
- DocumentForm 1 Architect certificate - Sept-2024.pdf · uploaded 8 Apr 2025Source
- DocumentJeevan Baug Architects Certificate 2024-25 Q3.pdf · uploaded 11 Apr 2025Source
- DocumentJeevan Baug Architect Certificate 2024-25 Q4.pdf · uploaded 19 May 2025Source
- DocumentJeevan Baug Architect Certificate 25-07-25.pdf · uploaded 22 Nov 2025Source
Technical (Engineer)
- DocumentForm 2 Engineer Certificate 31-03-2024.pdf · uploaded 8 Apr 2025Source
- DocumentForm 2 Engineer Certificate 30-06-2024.pdf · uploaded 8 Apr 2025Source
- DocumentForm 2 Engineer Certificate 30-09-2024.pdf · uploaded 8 Apr 2025Source
- DocumentSold Unsold 24-25 Q2.pdf · uploaded 11 Apr 2025Source
- DocumentJeevan Baug F2 24-25 Q3.pdf · uploaded 12 Apr 2025Source
- DocumentJeevan Baug Form 2 Q4 2024-25.pdf · uploaded 23 May 2025Source
- DocumentJeevan Baug Form-2 2025-26 Q2.pdf · uploaded 22 Nov 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel PLOT NO.01, SURVEY NO.66/7
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, Shop, Shops, 1BHK226 units in all
- Address
- Survey No.-66/7, Plot No.-01, Gangapur Trimbak Link Road, Motiwala NagarPIN 422222
- Village
- Nashik (M Corp.), Nashik taluka
- Land area for this project
- 5,509 sq m (59,300 sq ft)
- Permissible built-up area
- 11,878 sq m (1,27,859 sq ft)
- Sanctioned built-up area
- 11,878 sq m (1,27,859 sq ft)
- Designated bank account
- 171
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
SURVEY NO.-66/7, PLOT NO.-01
Boundaries
- North
- Canal
- South
- Motiwala College
- East
- Motiwala College Ground
- West
- 3o Mtr Wide Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking226 units
109 of 226 units booked (48%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing-A | 2BHK | 59.09 sq m · 636 sq ft | 7 | 4 |
| Wing-A | 2BHK | 60 sq m · 646 sq ft | 7 | 3 |
| Wing-A | 2BHK | 61.01 sq m · 657 sq ft | 7 | 5 |
| Wing-A | Shop | 32.69 sq m · 352 sq ft | 2 | 2 |
| Wing-A | Shop | 33.78 sq m · 364 sq ft | 1 | 0 |
| Wing-A | Shop | 38.41 sq m · 413 sq ft | 1 | 0 |
| Wing-A | Shop | 46.32 sq m · 499 sq ft | 1 | 0 |
| Wing-A | Shops | 53.03 sq m · 571 sq ft | 1 | 0 |
Show all 28 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing B | 2BHK | 59.8 sq m · 644 sq ft | 7 | 4 |
| Wing B | 2BHK | 67.1 sq m · 722 sq ft | 7 | 4 |
| Wing B | 2BHK | 70.24 sq m · 756 sq ft | 7 | 4 |
| Wing B | Shop | 32.69 sq m · 352 sq ft | 2 | 2 |
| Wing B | Shop | 35.96 sq m · 387 sq ft | 1 | 1 |
| Wing B | Shop | 36.5 sq m · 393 sq ft | 1 | 0 |
| Wing B | Shop | 46.86 sq m · 504 sq ft | 1 | 1 |
| Wing B | Shop | 60.42 sq m · 650 sq ft | 1 | 0 |
| Wing C | 1BHK | 39.52 sq m · 425 sq ft | 7 | 4 |
| Wing C | 1BHK | 39.9 sq m · 429 sq ft | 8 | 4 |
| Wing C | 2BHK | 59.68 sq m · 642 sq ft | 14 | 8 |
| Wing D | 1BHK | 39.52 sq m · 425 sq ft | 7 | 5 |
| Wing D | 1BHK | 39.53 sq m · 425 sq ft | 16 | 9 |
| Wing D | 1BHK | 39.83 sq m · 429 sq ft | 7 | 5 |
| Wing E | 1BHK | 39.9 sq m · 429 sq ft | 15 | 8 |
| Wing E | 2BHK | 58.31 sq m · 628 sq ft | 15 | 4 |
| Wing F | 1BHK | 39.9 sq m · 429 sq ft | 30 | 14 |
| Wing G | 1BHK | 39.9 sq m · 429 sq ft | 30 | 3 |
| Wing H | 1BHK | 39.9 sq m · 429 sq ft | 15 | 10 |
| Wing H | 2BHK | 58.58 sq m · 631 sq ft | 8 | 5 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals7
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Sankhala Associates | — |
| Chartered accountant | A R N R and Associates | — |
| Chartered accountant | Ca Pravin R Rathi | — |
| Chartered accountant | Rahul Abhaykumar Chhallani | — |
| Engineer | Devise Property Development Services | — |
| Other | Parimal Devi | — |
| Registered real estate agent | Prasad Eknath Bagad | — |
Source: MahaRERA project page. Contact details are not shown.