Skip to content
Residential / Group Housing · 4 buildings · 52 unitsRERA P51600009809

Hill Woods

Deedo IDDP-NSK-EC1P

Its promised completion date, Jan 2023, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 48% of its units are booked.

Deolali (Cb), Nashik 422401 · by S.V.Enterprises

Delivery3 yrs 10 mo past duePromised Jan 2023 · no extension on record · not shown completedRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales48% booked25 of 52 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Its promised completion date, Jan 2023, has passed and MahaRERA does not show it completed

  • This projectRegistered 22 Aug 2017, completion promised 1 Jan 2023, and still not shown completed today.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

4 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51600009809
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160000980922 Aug 20171 Jan 20231 Jan 2023S.v.enterprisesProject page
Documents151

1 document held by Deedo, 150 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN PDF.pdf · uploaded 29 Jul 2017Source

Legal

  • Legal Title reportTITLE SR.pdf · uploaded 30 Jul 2017Source
  • Declaration Form BFORM B.pdf · uploaded 31 Jul 2017Source
  • Legal Title reporttitle search report.pdf · uploaded 16 Nov 2017Source
  • OtherPHOTO-2019-12-11-19-46-58.pdf · uploaded 11 Dec 2019Source
  • OtherScan Apr 07, 2023.pdf · uploaded 7 Apr 2023Source
  • Otherform 4 Hill Woods.pdf · uploaded 15 Feb 2025Source
Show all 151 documentsShow fewer documents

Legal

  • OtherRera Hw.pdf · uploaded 22 Mar 2025Source

Migrated

  • 1 PAN CardPAN PDF.pdf · uploaded 29 Jul 2017Source
  • 1 Copy of the legal title reportTITLE SR.pdf · uploaded 30 Jul 2017Source
  • 1 Details of encumbrancesDECLARATION OF ENCUMBRANCES.pdf · uploaded 30 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)SANCTION PLAN 3.pdf · uploaded 30 Jul 2017Source
  • 2 Copy of Layout Approval (in case of layout)DECLATION OF LAYOUT.pdf · uploaded 30 Jul 2017Source
  • 1 Building Plan Approval (IOD)SANCTION PLAN 1.pdf · uploaded 30 Jul 2017Source
  • 2 Building Plan Approval (IOD)SANCTION PLAN 2.pdf · uploaded 30 Jul 2017Source
  • 3 Building Plan Approval (IOD)SANCTION PLAN 3.pdf · uploaded 30 Jul 2017Source
  • 4 Building Plan Approval (IOD)SANCTION STAMP.pdf · uploaded 30 Jul 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 30 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1.pdf · uploaded 30 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 30 Jul 2017Source
  • 1 Certificates of CA (Form 3)Form 3.pdf · uploaded 30 Jul 2017Source
  • 1 Proforma of Allotment letterallotment letter.pdf · uploaded 30 Jul 2017Source
  • 2 Proforma of Allotment letterAGREEMENT FOR SALE (DRAFT).pdf · uploaded 30 Jul 2017Source
  • 1 Declaration in FORM BFORM B.pdf · uploaded 31 Jul 2017Source
  • 2 Copy of the legal title reporttitle search report.pdf · uploaded 16 Nov 2017Source
  • 5 Building Plan Approval (IOD)IOD 1.pdf · uploaded 16 Nov 2017Source
  • 6 Building Plan Approval (IOD)IOD 2.pdf · uploaded 16 Nov 2017Source
  • 7 Building Plan Approval (IOD)IOD 3.pdf · uploaded 16 Nov 2017Source
  • 2 Commencement Certificates / NA Order for plotted developmentcommencement certificate.pdf · uploaded 16 Nov 2017Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE.pdf · uploaded 10 Dec 2017Source
  • 3 Proforma of Allotment letterrevised customer agreement draft.pdf · uploaded 31 Mar 2018Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Form 1.pdf · uploaded 21 Jul 2019Source
  • 1 OtherPHOTO-2019-12-11-19-46-58.pdf · uploaded 11 Dec 2019Source
  • 2 OtherScan Apr 07, 2023.pdf · uploaded 7 Apr 2023Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)jun 19 form 1 Arc certif.pdf · uploaded 12 May 2023Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ACS Form1 2019-compressed.pdf · uploaded 12 May 2023Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ACS FormDec 2019-compressed.pdf · uploaded 12 May 2023Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ACS form1 Mar 2020-compressed.pdf · uploaded 12 May 2023Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)form 1hw jun 20.pdf · uploaded 12 May 2023Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ACS From 1 Sept 2020-compressed.pdf · uploaded 12 May 2023Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)DEC 20 FORM 1 HW.pdf · uploaded 12 May 2023Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)MAR 21 FORM 1.pdf · uploaded 12 May 2023Source
  • 1 Otherform 4 Hill Woods.pdf · uploaded 15 Feb 2025Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)form 1 AC 30 sept 21 hw_11zon.pdf · uploaded 6 Mar 2025Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)form 1 AC 31 dec 21 hw_11zon.pdf · uploaded 6 Mar 2025Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)form 1 AC 31 marc 22 hw_11zon.pdf · uploaded 6 Mar 2025Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 AC 30 june 22 hw_11zon.pdf · uploaded 6 Mar 2025Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Ac 30 sept 22 hw_11zon.pdf · uploaded 6 Mar 2025Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)form 1 AC 31 dec 22 hw_11zon.pdf · uploaded 6 Mar 2025Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 MAR 23.pdf · uploaded 6 Mar 2025Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 JUN 23.pdf · uploaded 6 Mar 2025Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM1 SEP 23.pdf · uploaded 6 Mar 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)form 1 Ac 30 jun 21 hw_11zon.pdf · uploaded 6 Mar 2025Source
  • 13 Certificates of CA (Form 3)form 3 hw 1.pdf · uploaded 6 Mar 2025Source
  • 21 Certificates of CA (Form 3)form 3 hw 10.pdf · uploaded 6 Mar 2025Source
  • 14 Certificates of CA (Form 3)form 3 hw 2.pdf · uploaded 6 Mar 2025Source
  • 15 Certificates of CA (Form 3)form 3 hw 3.pdf · uploaded 6 Mar 2025Source
  • 16 Certificates of CA (Form 3)form 3 hw 4.pdf · uploaded 6 Mar 2025Source
  • 17 Certificates of CA (Form 3)form 3 hw 5.pdf · uploaded 6 Mar 2025Source
  • 18 Certificates of CA (Form 3)form 3 hw 7.pdf · uploaded 6 Mar 2025Source
  • 19 Certificates of CA (Form 3)form 3 hw 8.pdf · uploaded 6 Mar 2025Source
  • 20 Certificates of CA (Form 3)form 3 hw 9.pdf · uploaded 6 Mar 2025Source
  • 22 Certificates of CA (Form 3)form 3 hw 11.pdf · uploaded 6 Mar 2025Source
  • 23 Certificates of CA (Form 3)form 3 hw 6.pdf · uploaded 6 Mar 2025Source
  • 11 Certificates of CA (Form 3)Ca hw ref 3084 2023.pdf · uploaded 6 Mar 2025Source
  • 12 Certificates of CA (Form 3)Ca Hw Ref 3085 2023.pdf · uploaded 6 Mar 2025Source
  • 1 Certificates of CA (Form 3)Ca hw ref 3074 2023.pdf · uploaded 6 Mar 2025Source
  • 2 Certificates of CA (Form 3)Ca Hw ref 3075 2023.pdf · uploaded 6 Mar 2025Source
  • 3 Certificates of CA (Form 3)Ca hw ref 3076 2023.pdf · uploaded 6 Mar 2025Source
  • 4 Certificates of CA (Form 3)Ca hw ref 3077 2023.pdf · uploaded 6 Mar 2025Source
  • 5 Certificates of CA (Form 3)Ca hw ref 3078 2023.pdf · uploaded 6 Mar 2025Source
  • 6 Certificates of CA (Form 3)Ca Hw ref 3079 2023.pdf · uploaded 6 Mar 2025Source
  • 7 Certificates of CA (Form 3)ca hw ref 3080.pdf · uploaded 6 Mar 2025Source
  • 8 Certificates of CA (Form 3)Ca hw ref 3081 2023.pdf · uploaded 6 Mar 2025Source
  • 9 Certificates of CA (Form 3)Ca hw ref 3082 2023.pdf · uploaded 6 Mar 2025Source
  • 10 Certificates of CA (Form 3)Ca Hw ref 3083 2023.pdf · uploaded 6 Mar 2025Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)EC form 2 - 311220.pdf · uploaded 6 Mar 2025Source
  • 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form 2 Ec 30 sept 22 hw_11zon.pdf · uploaded 6 Mar 2025Source
  • 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form 2 EC 31 dec 22_compressed.pdf · uploaded 6 Mar 2025Source
  • 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form2 EC 31323.pdf · uploaded 6 Mar 2025Source
  • 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form 2 Ec 30 june 22 hw_11zon.pdf · uploaded 6 Mar 2025Source
  • 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 623.pdf · uploaded 6 Mar 2025Source
  • 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 923.pdf · uploaded 6 Mar 2025Source
  • 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 1223.pdf · uploaded 6 Mar 2025Source
  • 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 324.pdf · uploaded 6 Mar 2025Source
  • 22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 624.pdf · uploaded 6 Mar 2025Source
  • 23 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 924.pdf · uploaded 6 Mar 2025Source
  • 24 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 1224.pdf · uploaded 6 Mar 2025Source
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form2 EC 31 mar 22_compressed.pdf · uploaded 6 Mar 2025Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 311221.pdf · uploaded 6 Mar 2025Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form2 EC 30 sep 21_compressed.pdf · uploaded 6 Mar 2025Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form 2 EC 30 june 21_compressed.pdf · uploaded 6 Mar 2025Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form2 EC 310321.pdf · uploaded 6 Mar 2025Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Ec form 2- 300920.pdf · uploaded 6 Mar 2025Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Ec Form 2 - 30-06-20.pdf · uploaded 6 Mar 2025Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Ec form 2 - 310320.pdf · uploaded 6 Mar 2025Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Ec form 2 - 311219.pdf · uploaded 6 Mar 2025Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)EC form 2 - 300919.pdf · uploaded 6 Mar 2025Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Ec form 2 - 300619.pdf · uploaded 6 Mar 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Ec form 2 - 310319.pdf · uploaded 6 Mar 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)form no 5 hw 22 - 23_11zon.pdf · uploaded 6 Mar 2025Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)form 3 hw 6.pdf · uploaded 6 Mar 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)form no 5 hw 23 - 24_11zon.pdf · uploaded 6 Mar 2025Source
  • 1 Commencement Certificates / NA Order for plotted development1.pdf · uploaded 22 Mar 2025Source
  • 1 OtherRera Hw.pdf · uploaded 22 Mar 2025Source

Technical

  • DocumentDECLATION OF LAYOUT.pdf · uploaded 30 Jul 2017Source
  • DocumentSANCTION PLAN 3.pdf · uploaded 30 Jul 2017Source
  • DocumentSANCTION PLAN 1.pdf · uploaded 30 Jul 2017Source
  • DocumentSANCTION PLAN 2.pdf · uploaded 30 Jul 2017Source
  • DocumentSANCTION PLAN 3.pdf · uploaded 30 Jul 2017Source
  • DocumentSANCTION STAMP.pdf · uploaded 30 Jul 2017Source
  • DocumentIOD 1.pdf · uploaded 16 Nov 2017Source
  • DocumentIOD 2.pdf · uploaded 16 Nov 2017Source
  • DocumentIOD 3.pdf · uploaded 16 Nov 2017Source

Technical (Architect)

  • DocumentMAR 21 FORM 1.pdf · uploaded 12 May 2023Source
  • Documentform 1 Ac 30 jun 21 hw_11zon.pdf · uploaded 6 Mar 2025Source
  • Documentform 1 AC 30 sept 21 hw_11zon.pdf · uploaded 6 Mar 2025Source
  • Documentform 1 AC 31 dec 21 hw_11zon.pdf · uploaded 6 Mar 2025Source
  • Documentform 1 AC 31 marc 22 hw_11zon.pdf · uploaded 6 Mar 2025Source
  • DocumentForm 1 AC 30 june 22 hw_11zon.pdf · uploaded 6 Mar 2025Source
  • DocumentForm 1 Ac 30 sept 22 hw_11zon.pdf · uploaded 6 Mar 2025Source
  • Documentform 1 AC 31 dec 22 hw_11zon.pdf · uploaded 6 Mar 2025Source
  • DocumentFORM 1 MAR 23.pdf · uploaded 6 Mar 2025Source
  • DocumentFORM 1 JUN 23.pdf · uploaded 6 Mar 2025Source
  • DocumentFORM1 SEP 23.pdf · uploaded 6 Mar 2025Source

Technical (Engineer)

  • DocumentForm 2.pdf · uploaded 30 Jul 2017Source
  • DocumentEc form 2 - 310319.pdf · uploaded 6 Mar 2025Source
  • DocumentEc form 2 - 300619.pdf · uploaded 6 Mar 2025Source
  • DocumentEC form 2 - 300919.pdf · uploaded 6 Mar 2025Source
  • DocumentEc form 2 - 311219.pdf · uploaded 6 Mar 2025Source
  • DocumentEc form 2 - 310320.pdf · uploaded 6 Mar 2025Source
  • DocumentEc Form 2 - 30-06-20.pdf · uploaded 6 Mar 2025Source
  • DocumentEc form 2- 300920.pdf · uploaded 6 Mar 2025Source
  • DocumentEC form 2 - 311220.pdf · uploaded 6 Mar 2025Source
  • DocumentForm2 EC 310321.pdf · uploaded 6 Mar 2025Source
  • Documentform 2 EC 30 june 21_compressed.pdf · uploaded 6 Mar 2025Source
  • Documentform2 EC 30 sep 21_compressed.pdf · uploaded 6 Mar 2025Source
  • DocumentFORM 2 311221.pdf · uploaded 6 Mar 2025Source
  • DocumentForm2 EC 31 mar 22_compressed.pdf · uploaded 6 Mar 2025Source
  • Documentform 2 Ec 30 june 22 hw_11zon.pdf · uploaded 6 Mar 2025Source
  • Documentform 2 Ec 30 sept 22 hw_11zon.pdf · uploaded 6 Mar 2025Source
  • Documentform 2 EC 31 dec 22_compressed.pdf · uploaded 6 Mar 2025Source
  • Documentform2 EC 31323.pdf · uploaded 6 Mar 2025Source
  • DocumentFORM 2 623.pdf · uploaded 6 Mar 2025Source
  • DocumentFORM 2 923.pdf · uploaded 6 Mar 2025Source
  • DocumentFORM 2 1223.pdf · uploaded 6 Mar 2025Source
  • DocumentFORM 2 324.pdf · uploaded 6 Mar 2025Source
  • DocumentFORM 2 624.pdf · uploaded 6 Mar 2025Source
  • DocumentFORM 2 924.pdf · uploaded 6 Mar 2025Source
  • DocumentFORM 1224.pdf · uploaded 6 Mar 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 102, 103

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
—52 units in all
Address
102, 103, 104, 105, 106/2, 106/3, 107, 120/3, Anand Road, Hill RangePIN 422401
Village
Deolali (CB), Nashik taluka
Land area for this project
7,000 sq m (75,342 sq ft)
Permissible built-up area
3,493 sq m (37,595 sq ft)
Sanctioned built-up area
3,493 sq m (37,595 sq ft)
Designated bank account
220
Developed in phases
Yes

Survey, CTS, gat or plot numbers

102103104105106/2106/3107120/3

Land as published on MahaRERA's project page

102,103,104,105,106/2,106/3,107,120/3

Boundaries

North
Part Of Plot No 119 Plot No 121
South
Plot No 45 And 9 Meter Road
East
Plot No 51 52 53 54
West
Survey No 106 1

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking52 units

52 units registered

— · 52 units
BuildingTypeCarpet areaUnits
A Type——11
B Type——8
C Type——25
Tb Type——8

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals5

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMukul S Patil—
Chartered accountantSunil G Kundnani—
EngineerSunil H Patel—
OtherTushar Chavan—
OtherVilas Jadhav—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Deolali (Cb)

All 50 projects in Deolali (Cb) · Compare Hill Woods with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology