Residential / Group Housing · 3 buildings · 9 unitsRERA P51100050891

Padmavati Nagari

Completion was pushed back 4 months, to Jul 2028; no MahaRERA orders on record; 0% of its units are booked.

Nanded Waghala (M Corp.), Nanded 431605 · Promoter: Jyoti Deepak Pujari

DeliveryExtended 4 moPromised Mar 2028 · now due Jul 2028RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales0% booked0 of 9 units · as the promoter reported to MahaRERA
Padmavati Nagari project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

Completion was pushed back 4 months, to Jul 2028

  • This projectRegistered 15 May 2023, completion promised 31 Mar 2028, revised to 31 Jul 2028.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

3 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51100050891
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5110005089115 May 202331 Mar 202831 Jul 2028Jyoti Deepak PujariProject page
Documents127

1 document held by Deedo, 126 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPan Card.pdf · uploaded 17 Mar 2023Source

Legal

  • Legal Title reportLegal Title Report- Revised_11zon.pdf · uploaded 12 Apr 2023Source
  • Declaration Form BForm B Revised.pdf · uploaded 12 May 2023Source
  • Legal Title reportSERCH REPORT.pdf · uploaded 18 Jun 2024Source

Migrated

  • 1 PAN CardPan Card.pdf · uploaded 17 Mar 2023Source
  • 1 Copy of Layout Approval (in case of layout)Sanction Plan.pdf · uploaded 17 Mar 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentSanction Plan.pdf · uploaded 17 Mar 2023Source
Show all 127 documentsShow fewer documents

Migrated

  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 17 Mar 2023Source
  • 1 Proforma of Allotment letterAllotment letter of Jyoti Pujari.pdf · uploaded 21 Mar 2023Source
  • 1 Proforma of Agreement for saleAgreement to sale of Pujari.pdf · uploaded 22 Mar 2023Source
  • 1 a Details of encumbrances concerned to FinanceNon encumbrances certificate legal.pdf · uploaded 24 Mar 2023Source
  • 1 b Details of encumbrances concerned to LegalNon encumbrances certificate legal.pdf · uploaded 24 Mar 2023Source
  • 1 CERSAI detailsUndertaking of no security interest.pdf · uploaded 24 Mar 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Merged.pdf · uploaded 24 Mar 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in other Real Estate Organisation.pdf · uploaded 24 Mar 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeparate bank account including non - encumbrance.pdf · uploaded 24 Mar 2023Source
  • 1 Deviation Report with respect to Allotment letterDeviation Report.pdf · uploaded 24 Mar 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report.pdf · uploaded 24 Mar 2023Source
  • 1 Copy of the legal title reportLegal Title Report- Revised_11zon.pdf · uploaded 12 Apr 2023Source
  • 2 a Details of encumbrances concerned to FinanceNon encumbrances Revised.pdf · uploaded 12 May 2023Source
  • 2 b Details of encumbrances concerned to LegalNon encumbrances Revised.pdf · uploaded 12 May 2023Source
  • 1 Declaration about Commencement CertificateFormat D Revised.pdf · uploaded 12 May 2023Source
  • 1 Declaration in FORM BForm B Revised.pdf · uploaded 12 May 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Self Certification for no withdrawal June 23.pdf · uploaded 18 Oct 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Self Declaration by Promoters to Bank.pdf · uploaded 18 Oct 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Self Certification for no withdrawal June 23.pdf · uploaded 18 Oct 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Self Declaration by Promoters to Bank.pdf · uploaded 18 Oct 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Self Certification for no withdrawal June 23.pdf · uploaded 18 Oct 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Self Declaration by Promoters to Bank.pdf · uploaded 18 Oct 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentDWG 42 43 44.pdf · uploaded 18 May 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentDWG 20 21 22 23 24.pdf · uploaded 18 May 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentPLOT NO 20,21,22,23,24.pdf · uploaded 18 May 2024Source
  • 3 Commencement Certificates / NA Order for plotted developmentPLOT NO 42,43,44.pdf · uploaded 18 May 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)SELF- CERTIFICATION.pdf · uploaded 20 May 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Padmavati.pdf · uploaded 20 May 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)SELF- CERTIFICATION.pdf · uploaded 20 May 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Padmavati.pdf · uploaded 20 May 2024Source
  • 1 Disclosure of sold/ booked inventoryDISCOLSURE OF SOLD BOOKED INVENTORY (BUILDING WISE).pdf · uploaded 20 May 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1(MARCH 24) PADMAVATI NAGARI,NANDED.pdf · uploaded 15 Jun 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM -2 (MARCH 2024) PADMAVATI NAGARI,NANDED.pdf · uploaded 15 Jun 2024Source
  • 2 Copy of the legal title reportSERCH REPORT.pdf · uploaded 18 Jun 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)PN FORM 1 CONSLT ENGG UPTO DEC 23.pdf · uploaded 18 Jun 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)PN FORM 1 CONSLT ENGG UPTO JUN 23.pdf · uploaded 18 Jun 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)PN FORM 1 CONSLT ENGG UPTO SEP 23.pdf · uploaded 18 Jun 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)PN FORM 1 CONSLT ENGG UPTO DEC 23.pdf · uploaded 18 Jun 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)PN FORM 2 ENGG UPTO DEC 23.pdf · uploaded 18 Jun 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)PN FORM 2 ENGG UPTO JUN 23.pdf · uploaded 18 Jun 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)PN FORM 2 ENGG UPTO SEP 23.pdf · uploaded 18 Jun 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentSanction Plan 1st.pdf · uploaded 20 Jun 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentDWG 20 21 22 23 24 final.pdf · uploaded 20 Jun 2024Source
  • 6 Building Plan Approval / NA Order for plotted developmentDWG 42 43 44 final.pdf · uploaded 20 Jun 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)PN FORM 1 CONSLT ENGG UPTO JUN 23 ORG.pdf · uploaded 21 Jun 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)PN FORM 1 CONSLT ENGG SEP 23.pdf · uploaded 21 Jun 2024Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)PN FORM 1 CONSLT ENGG DEC 23.pdf · uploaded 21 Jun 2024Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1(MARCH 24) PADMAVATI NAGARI.pdf · uploaded 21 Jun 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)PN FORM 2 ENGG UPTO JUN 23 F.pdf · uploaded 21 Jun 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)PN FORM 2 ENGG UPTO SEP 23 F.pdf · uploaded 21 Jun 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)PN FORM 2 ENGG UPTO DEC 23 F.pdf · uploaded 21 Jun 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM -2 (MARCH 2024) PADMAVATI NAGARI.pdf · uploaded 21 Jun 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM2A.pdf · uploaded 21 Jun 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3- June.pdf · uploaded 21 Jun 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Sept 23 F.pdf · uploaded 21 Jun 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Dec23 Final.pdf · uploaded 21 Jun 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 March24 Final.pdf · uploaded 21 Jun 2024Source
  • Form 1Q1 FORM 1 PBD_compressed.pdf · uploaded 11 Sep 2025Source
  • Form 2Q1 From 2.pdf · uploaded 11 Sep 2025Source
  • Form 3Q1 Form 3.pdf · uploaded 11 Sep 2025Source
  • Disclosure of Sold and Booked InventoryQ1 Disclouser.pdf · uploaded 11 Sep 2025Source
  • Form 1Q2 FORM 1 PBD_compressed.pdf · uploaded 11 Sep 2025Source
  • Form 2Q2 Form 2.pdf · uploaded 11 Sep 2025Source
  • Form 3Q2 Form 3.pdf · uploaded 11 Sep 2025Source
  • Disclosure of Sold and Booked InventoryQ2 Disclouser.pdf · uploaded 11 Sep 2025Source
  • Form 1Q3 FORM 1 PBD_compressed.pdf · uploaded 11 Sep 2025Source
  • Form 2Q3 Form 2.pdf · uploaded 11 Sep 2025Source
  • Form 3Q 3 Form3.pdf · uploaded 11 Sep 2025Source
  • Disclosure of Sold and Booked InventoryQ3 Disclouser.pdf · uploaded 11 Sep 2025Source
  • Form 1Q4 FORM 1 PBD_compressed.pdf · uploaded 11 Sep 2025Source
  • Form 2Q4 From 2.pdf · uploaded 11 Sep 2025Source
  • Form 3Q4 Form 3.pdf · uploaded 11 Sep 2025Source
  • Disclosure of Sold and Booked InventoryDisclouser Q4.pdf · uploaded 11 Sep 2025Source
  • Form 5 (FY 2024-2025)Form 5 PBD.pdf · uploaded 11 Sep 2025Source
  • Withdrawal Update Form 1Form 1 Q1 25-26.pdf · uploaded 15 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Q1 25-26.pdf · uploaded 15 Oct 2025Source
  • Withdrawal Update Form 2Form 2 Q1 25-26.pdf · uploaded 15 Oct 2025Source
  • Withdrawal Update Form 2Form 2 Q1 25-26.pdf · uploaded 15 Oct 2025Source
  • Withdrawal Update Form 3Form 3 Final.pdf · uploaded 15 Oct 2025Source
  • Withdrawal Update Form 3Form 3 Final.pdf · uploaded 15 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Q1 25-26.pdf · uploaded 16 Oct 2025Source
  • Withdrawal Update Form 2Form 2 Q1 25-26.pdf · uploaded 16 Oct 2025Source
  • Withdrawal Update Form 3Form 3 Final.pdf · uploaded 16 Oct 2025Source
  • Form 2A (FY 2023-2024)Form 2A 14 Oct 2025 23-24.pdf · uploaded 29 Oct 2025Source
  • Form 5 (FY 2023-2024)Form-5 FY 23-24.pdf · uploaded 4 Nov 2025Source
  • Withdrawal Update Form 1Form 1 Q2 25-26.pdf · uploaded 8 Nov 2025Source
  • Withdrawal Update Form 1Form 1 Q2 25-26.pdf · uploaded 8 Nov 2025Source
  • Withdrawal Update Form 1Form 1 Q2 25-26.pdf · uploaded 8 Nov 2025Source
  • Withdrawal Update Form 1Form 1 Q2 25-26.pdf · uploaded 8 Nov 2025Source
  • Withdrawal Update Form 1Form 1 Q2 25-26.pdf · uploaded 8 Nov 2025Source
  • Withdrawal Update Form 2Form 2 Q2 25-26.pdf · uploaded 8 Nov 2025Source
  • Withdrawal Update Form 2Form 2 Q2 25-26.pdf · uploaded 8 Nov 2025Source
  • Withdrawal Update Form 2Form 2 Q2 25-26.pdf · uploaded 8 Nov 2025Source
  • Withdrawal Update Form 2Form 2 Q2 25-26.pdf · uploaded 8 Nov 2025Source
  • Withdrawal Update Form 2Form 2 Q2 25-26.pdf · uploaded 8 Nov 2025Source
  • Withdrawal Update Form 3Form 3 Q2 25-26.pdf · uploaded 8 Nov 2025Source
  • Withdrawal Update Form 3Form 3 Q2 25-26.pdf · uploaded 8 Nov 2025Source
  • Withdrawal Update Form 3Form 3 Q2 25-26.pdf · uploaded 8 Nov 2025Source
  • Withdrawal Update Form 3Form 3 Q2 25-26.pdf · uploaded 8 Nov 2025Source
  • Withdrawal Update Form 3Form 3 Q2 25-26.pdf · uploaded 8 Nov 2025Source
  • Form 2A (FY 2024-2025)Form 2A 16 Oct 2025 24-25.pdf · uploaded 14 Jan 2026Source
  • Withdrawal Update Form 1Form-1 PD Q3 FY 25-26.pdf · uploaded 24 Mar 2026Source
  • Withdrawal Update Form 2Form-2 PD Q3 FY 25-26.pdf · uploaded 24 Mar 2026Source
  • Withdrawal Update Form 3Form-3 PD Q3 FY 25-26.pdf · uploaded 24 Mar 2026Source
  • Withdrawal Update Form 1Form -1 Q4 PB.pdf · uploaded 22 May 2026Source
  • Withdrawal Update Form 1Form -1 Q4 PB.pdf · uploaded 22 May 2026Source
  • Withdrawal Update Form 2Form-2 PD Q3 FY 25-26.pdf · uploaded 22 May 2026Source
  • Withdrawal Update Form 2Form-2 PD Q3 FY 25-26.pdf · uploaded 22 May 2026Source
  • Withdrawal Update Form 3Form-3 PD Q3 FY 25-26.pdf · uploaded 22 May 2026Source
  • Withdrawal Update Form 3Form-3 Q4 PB.pdf · uploaded 22 May 2026Source

Technical

  • DocumentSanction Plan.pdf · uploaded 17 Mar 2023Source
  • DocumentSanction Plan.pdf · uploaded 17 Mar 2023Source
  • DocumentDWG 42 43 44.pdf · uploaded 18 May 2024Source
  • DocumentDWG 20 21 22 23 24.pdf · uploaded 18 May 2024Source
  • DocumentSanction Plan 1st.pdf · uploaded 20 Jun 2024Source
  • DocumentDWG 20 21 22 23 24 final.pdf · uploaded 20 Jun 2024Source
  • DocumentDWG 42 43 44 final.pdf · uploaded 20 Jun 2024Source

Technical (Architect)

  • DocumentForm -1 Q4 PB.pdf · uploaded 22 May 2026Source

Technical (Engineer)

  • DocumentForm-2 PD Q3 FY 25-26.pdf · uploaded 22 May 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvals21, 22

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
Row house9 units in all
Address
Gut No. 77 Part & 78 Part, Plot No. 20, 21, 22, 23, 24, 42, 43, 44, 45, 46, 47, Taroda (Kh), , NandedPIN 431605
Village
Nanded Waghala (M Corp.), Nanded taluka
Designated bank account
171
Developed in phases
Yes

Survey, CTS, gat or plot numbers

2122232442434445464778 PARTGUT NO. 77 PARTPLOT NO. 20

Boundaries

North
09 Mtr Wide Road
South
Gut No 78 79
East
12mts Wide Road
West
Plot No 44

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking9 units

0 of 9 units booked (0%), as the promoter reported to MahaRERA

Row house · 9 units
TypeCarpet areaUnitsBooked
Row house94.85 sq m · 1,021 sq ft90

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals9

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMandar Jayant Lele—
ArchitectNilesh Dineshrao Patil—
ArchitectPritam L Kandi—
Chartered accountantCA Mayur Agrawal—
Chartered accountantMayur Praful Agrawal—
Chartered accountantYash P Agrawal—
EngineerAkshay Ravindra Thakare—
EngineerKaranpalsingh Hardeepsing Hazuria—
EngineerLaxmikant Arvind Dande—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology