Poorva Heights

Active

Wadi, Nagpur 440023 |Promoter: Anand Ravindra Palandurkar & Amol Ravindra Palandurkar

Residential / Group HousingRERAP50500017222
23 Jul 2018Registered with MahaRERA
31 Dec 2019Promised completion
30 Nov 2026Revised completionPushed back 6 years and 11 months
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
1
Land area for this project
472 sq m (5,076 sq ft)
Permissible built-up area
634 sq m (6,823 sq ft)
Sanctioned built-up area
634 sq m (6,823 sq ft)
Planning authority
Nagar Parishad Wadi
Address
3125, Wadi, Tirupati Cooperative Housing SocietyPIN 440023
Designated bank account
Union Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.15296, 78.99441
Poorva Heights is at latitude 21.15296, longitude 78.99441.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 6 years and 11 months

Registered
23 Jul 2018
Promised
31 Dec 2019
Revised
30 Nov 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050001722223 Jul 201831 Dec 201930 Nov 2026Anand Ravindra Palandurkar & Amol Ravindra PalandurkarProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Poorva Heights32—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Poorva Heights

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure90%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
  • Sanitary Fittings within the flats / premises90%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAS PER PLAN - WIP90%
  • Sewerage (Chamber, Lines, Septic Tank , STP)WIP90%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterWIP90%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER PLAN - WIP90%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAs per plan - WIP90%
  • Electrical meter room, sub-station, receiving stationAS PER PLAN - WIP90%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

14 documents held by Deedo, 23 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificates

Form b

Registration certificate

Form 2as

Others

Extension certificate

Layout plan

Building plan

Document library

  • Details of encumbrancesencumbrance.pdf · uploaded 20 Dec 2017View
  • Copy of Layout Approval (in case of layout)Layout Sanction.pdf · uploaded 20 Dec 2017View
  • Building Plan Approval (IOD)Building Plan Approval.pdf · uploaded 20 Dec 2017View
  • Proforma of Allotment letterPROFORMA.pdf · uploaded 20 Dec 2017Source
  • Copy of the legal title reportTITLE VERIFICATION AND SEARCH REPORT.pdf · uploaded 20 Dec 2017View
  • Commencement Certificates / NA Order for plotted developmentBuilding Permit and Commencement.pdf · uploaded 20 Dec 2017View
  • Declaration in FORM BPART B.pdf · uploaded 22 Jun 2018View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)CA Certificate.pdf · uploaded 18 Oct 2021Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)CA Certificate.pdf · uploaded 18 Oct 2021Source
  • Disclosure of sold/ booked inventorySold Book 1.pdf · uploaded 21 Oct 2021View
  • Disclosure of sold/ booked inventorySold Book 2.pdf · uploaded 21 Oct 2021Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)IMG0001.pdf · uploaded 21 Oct 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)IMG0002.pdf · uploaded 21 Oct 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5.pdf · uploaded 27 Oct 2021Source
  • Declaration about Commencement Certificatecommencement certificate.pdf · uploaded 27 Oct 2021View
  • CERSAI detailsENCUBRANCE.pdf · uploaded 29 Nov 2021Source
  • CERSAI detailsCERSAI Search Report.pdf · uploaded 30 Nov 2021Source
  • CERSAI detailsCERSAI.pdf · uploaded 1 Dec 2021Source

Promoter documents

  • Legal Title reportTITLE VERIFICATION AND SEARCH REPORT.pdf · uploaded 20 Dec 2017View
  • Declaration Form BPART B.pdf · uploaded 22 Jun 2018View

Technical documents

  • Layout ApprovalLayout Sanction.pdfView
  • Building Plan ApprovalBuilding Plan Approval.pdfView

Proforma allotment letter

  • Proforma allotment letterPROFORMA.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Wadi, Nagpur (Rural) taluka

Survey, CTS, gat or plot numbers

3125

As published on MahaRERA's project page

3125

Boundaries

North
Road
South
Road
East
Godown
West
Khadgaon Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPralay R Paunikar—
ArchitectPralay R Paunikar—
ArchitectPralay R Paunikar—
ArchitectPralay R Paunikar—
ArchitectPralay R Paunikar—
ArchitectPralay R Paunikar—
ArchitectPralay R Paunikar—
ArchitectPralay R Paunikar—
ArchitectPralay R Paunikar—
Chartered accountantKamlesh Kukreja—
EngineerPralay R Paunikar—
EngineerPralay R Paunikar—
EngineerPralay R Paunikar—
EngineerPralay R Paunikar—
EngineerPralay R Paunikar—
EngineerPralay R Paunikar—
EngineerPralay R Paunikar—
EngineerPralay R Paunikar—
EngineerPralay R Paunikar—
OtherVinod Lonare—
OtherVinod Lonare—
OtherVinod Lonare—
OtherVinod Lonare—
OtherVinod Lonare—
OtherVinod Lonare—
OtherVinod Lonare—
OtherVinod Lonare—
OtherVinod Lonare—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology