Skip to content
Deedo home
Menu

Pyramid Amara

Active

Pipla, Nagpur 440034 |Promoter: Swami Builders And Developers

6 Feb 2025Registered with MahaRERA
31 Dec 2032Promised completion
4Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Mixed
Status on MahaRERA
Active
Buildings
4
Land area for this project
24,300 sq m (2,61,563 sq ft)
Permissible built-up area
73,513 sq m (7,91,283 sq ft)
Sanctioned built-up area
52,378 sq m (5,63,797 sq ft)
Recreational open space
2,364 sq m (25,443 sq ft)
Address
KH No 122 Ph No 38 Mouza Pipla, MOUZA PIPLA, NAGPURPIN 440034
Designated bank account
State Bank Of India
Developed in phases
No
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.08155, 79.11418
Pyramid Amara is at latitude 21.08155, longitude 79.11418.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2032

Registered
6 Feb 2025
Promised
31 Dec 2032

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P505000791306 Feb 202531 Dec 2032—Swami Builders And DevelopersProject page

4 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building 2 Tower C15—
Building 3 Tower D15—
Building 4 Tower E15—
Building 4 Tower F15—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Building 2 Tower CClosed/Covered1174300160
Building 2 Tower COpen Space00000
Building 3 Tower DClosed/Covered1163600152
Building 3 Tower DOpen Space00000
Building 4 Tower EClosed/Covered1073500142
Building 4 Tower FClosed/Covered1073500142

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building 2 Tower C

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth90%
  • Stilt Floor70%
  • Slabs of Super Structure75%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building 3 Tower D

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth90%
  • Stilt Floor70%
  • Slabs of Super Structure75%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building 4 Tower E

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building 4 Tower F

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsWORK IN PROCESS10%
  • Water SupplyWORK IN PROCESS0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)WORK IN PROCESS0%
  • Storm Water DrainsWORK IN PROCESS0%
  • Landscaping & Tree PlantingWORK IN PROCESS0%
  • Street LightingWORK IN PROCESS0%
  • Community BuildingsWORK IN PROCESS0%
  • Treatment And Disposal Of Sewage And Sullage WaterWORK IN PROCESS0%
  • Solid Waste Management And DisposalWORK IN PROCESS0%
  • Water conservation /Rain water harvestingWORK IN PROCESS0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsWORK IN PROCESS0%
  • Electrical meter room, sub-station, receiving stationWORK IN PROCESS0%
  • Aggregate area of recreational Open SpaceWORK IN PROCESS0%
  • Open ParkingWORK IN PROCESS0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

67 documents held by Deedo, 86 filings listed on MahaRERA's project page

Title

Form b

Others

Allotment letters

Encumbrances

Form 1s

Form 2s

Commencement certificates

Form 5

Form 2a

Registration certificate

Layout plans

Building plans

Document library

  • Copy of the legal title reportSearch Report_compressed.pdf · uploaded 26 Nov 2024View
  • Declaration in FORM BFrom B edited.pdf · uploaded 28 Nov 2024View
  • Deviation Report with respect to Allotment letterreports in allotment letter.pdf · uploaded 28 Nov 2024View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)sbi.pdf · uploaded 28 Nov 2024View
  • Deviation Report with respect to model copy of Agreementreport in agreement to sale.pdf · uploaded 28 Nov 2024View
  • Disclosure for secured/unsecured finance availed for the projectDisclosure For secured.pdf · uploaded 28 Nov 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnesure A Mr Nitin M Upare.pdf · uploaded 28 Nov 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnesure A Mr Shyamsunder R mittal.pdf · uploaded 28 Nov 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Mr Narendra S kohli.pdf · uploaded 28 Nov 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Mr Ranjeetsingh T chhabda.pdf · uploaded 28 Nov 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A mr sandip O agarwal.pdf · uploaded 28 Nov 2024View
  • CERSAI detailsCERSAI_Search_Report_200329284339_For_Asset_Based_Search_28_11_2024_13_43_57_389.pdf · uploaded 28 Nov 2024View
  • Declaration about all RERA Designated Bank Accounts (Format A)all bank.pdf · uploaded 30 Nov 2024View
  • a Details of encumbrances concerned to FinanceEdited Non-Encumbrances.pdf · uploaded 13 Dec 2024View
  • b Details of encumbrances concerned to LegalEdited Non-Encumbrances.pdf · uploaded 13 Dec 2024View
  • Copy of Layout Approval (in case of layout)Final Sanction layout plan_compressed (2).pdf · uploaded 17 Dec 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)NEW Vinod Mahato Engineer Certificate.pdf · uploaded 17 Dec 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsA SANJAY GOSAVI.pdf · uploaded 17 Dec 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsA TATAWAR DPIN.pdf · uploaded 17 Dec 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Samir A pimpalshende.pdf · uploaded 17 Dec 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Jitendra Mittal.pdf · uploaded 17 Dec 2024View
  • Commencement Certificates / NA Order for plotted developmentFinal Sanction layout plan forwading letter.PDF · uploaded 17 Dec 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's CERTIFICATE (Sanjay Soni)_removed.pdf · uploaded 17 Dec 2024View
  • a Details of encumbrances concerned to Financefinance encumbrances.pdf · uploaded 17 Dec 2024View
  • b Details of encumbrances concerned to Legalfinance encumbrances.pdf · uploaded 17 Dec 2024View
  • Proforma of Allotment letterchange Allotment Letter Draft New.pdf · uploaded 17 Dec 2024View
  • CERSAI detailsCERSAI DECLARATION.pdf · uploaded 19 Dec 2024View
  • Other – Legal2.pdf · uploaded 24 Dec 2024View
  • Other – Legal1 ZION.pdf · uploaded 24 Dec 2024View
  • Other – Legalपिपळा_122_Satbara (New).pdf · uploaded 24 Dec 2024View
  • Declaration about Commencement CertificateNEW COMM DECLARATION.pdf · uploaded 24 Dec 2024View
  • Commencement Certificates / NA Order for plotted development11-A-Building Permit Letter.pdf · uploaded 28 Dec 2024View
  • Building Plan Approval / NA Order for plotted development11-B-Sanction Building Plan 1.pdf · uploaded 28 Dec 2024View
  • Building Plan Approval / NA Order for plotted development11-B-Sanction Building Plan 3.pdf · uploaded 28 Dec 2024View
  • Building Plan Approval / NA Order for plotted development11-B-Sanction Building Plan 5.pdf · uploaded 28 Dec 2024View
  • Building Plan Approval / NA Order for plotted development11-B-Sanction Building Plan 7.pdf · uploaded 28 Dec 2024View
  • Other – Technicalletter (1).pdf · uploaded 9 Jan 2025View
  • Proforma of Agreement for saleNEW AGREEMENT.pdf · uploaded 17 Jan 2025View
  • Other – TechnicalUNDERTAKING.pdf · uploaded 23 Jan 2025View
  • Copy of Layout Approval (in case of layout)1 Building Plan Approval _ NA Order for plotted development_merge Copy.pdf · uploaded 24 Jan 2025View
  • Other – Technicalnew mail ss.pdf · uploaded 3 Feb 2025View
  • Copy of Layout Approval (in case of layout)AMARA MAP.pdf · uploaded 3 Feb 2025View
  • Form 1Architect Certificate.pdf · uploaded 31 May 2025View
  • Form 2engineer Certificate.pdf · uploaded 31 May 2025View
  • Disclosure of Sold and Booked Inventorydisclosure of sold inventory.pdf · uploaded 31 May 2025View
  • Withdrawal Update Form 1Architect Certificate June.pdf · uploaded 11 Aug 2025View
  • Withdrawal Update Form 2ENGINEERu0027S CERTIFICATE JUNE.pdf · uploaded 11 Aug 2025View
  • Withdrawal Update Form 1Architect Certificate June.pdf · uploaded 11 Aug 2025View
  • Withdrawal Update Form 2ENGINEERu0027S CERTIFICATE JUNE.pdf · uploaded 11 Aug 2025View
  • Withdrawal Update Form 1Architect Certificate June.pdf · uploaded 29 Aug 2025View
  • Withdrawal Update Form 2ENGINEERu0027S CERTIFICATE JUNE.pdf · uploaded 29 Aug 2025View
  • Withdrawal Update Form 1Architect Certificate June.pdf · uploaded 30 Aug 2025View
  • Withdrawal Update Form 2ENGINEERu0027S CERTIFICATE JUNE.pdf · uploaded 30 Aug 2025View
  • Withdrawal Update Form 1Architect Certificate June.pdf · uploaded 30 Aug 2025View
  • Withdrawal Update Form 2ENGINEERu0027S CERTIFICATE JUNE.pdf · uploaded 30 Aug 2025View
  • Withdrawal Update Form 1Architect Certificate.pdf · uploaded 4 Dec 2025View
  • Withdrawal Update Form 2ENGINEERu0027S CERTIFICATE SWAMI BUILDERS AND DEVELOPERS.pdf · uploaded 4 Dec 2025View
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 20 Feb 2026View
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 20 Feb 2026View
  • Withdrawal Update Form 1FROM 1.pdf · uploaded 6 May 2026View
  • Withdrawal Update Form 2FROM 2.pdf · uploaded 6 May 2026View
  • Withdrawal Update Form 1Architech Certificate (Swami).pdf · uploaded 13 Jul 2026View
  • Withdrawal Update Form 2Engineering Certificate (Swami).pdf · uploaded 13 Jul 2026View
  • Form 5 (FY 2025-2026)FORM 5 Signed.pdf · uploaded 13 Jul 2026View
  • Form 2A (FY 2025-2026)Form _ 2A_0001.pdf · uploaded 14 Jul 2026View

Promoter documents

  • Legal Title reportSearch Report_compressed.pdf · uploaded 26 Nov 2024View
  • Declaration Form BFrom B edited.pdf · uploaded 28 Nov 2024View

Technical documents

  • Layout ApprovalFinal Sanction layout plan_compressed (2).pdfView
  • Layout ApprovalAMARA MAP.pdfView
  • Layout Approval1 Building Plan Approval _ NA Order for plotted development_merge Copy.pdfView
  • Building Plan Approval11-B-Sanction Building Plan 7.pdfView
  • Building Plan Approval11-B-Sanction Building Plan 5.pdfView
  • Building Plan Approval11-B-Sanction Building Plan 3.pdfView
  • Building Plan Approval11-B-Sanction Building Plan 1.pdfView
  • Building Plan ApprovalAmara Revised Building Plan_compressed.pdfView
  • Building Plan ApprovalCDEF Building Plan Sheet No-1-8-7-6-5.pdfView
  • Building Plan ApprovalCDEF Building Plan Sheet No-4-9-10-11-12.pdfView
  • Building Plan ApprovalCDEF Building Plan Sheet No-13-14-15-3-2.pdfView
  • Building Plan ApprovalCDEF Building Plan Sheet No-16-17-18-19-20.pdfView
  • Building Plan ApprovalCDEF Building Plan Sheet No-21-22-23-24.pdfView

Other legal documents

  • Other – Legalपिपळा_122_Satbara (New).pdfView
  • Other – Legal1 ZION.pdfView
  • Other – Legal2.pdfView

Commencement certificates and NA orders

  • Commencement certificate / NA orderSource
  • Commencement certificate / NA orderSource

Proforma allotment letter

  • Proforma allotment letterchange Allotment Letter Draft New.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Pipla, Nagpur (Rural) taluka

Survey, CTS, gat or plot numbers

plot_no - city_survey_gut_no KH. NO. 122 final_plot_no - sector_no - mauje PIPLA road_street - society -

As published on MahaRERA's project page

plot_no - city_survey_gut_no KH. NO. 122 final_plot_no - sector_no - mauje PIPLA road_street - society -

Boundaries

North
By 24mtrs Wide Dp Road
South
Khasara No 124
East
Khasara No 119 120 121
West
Khasara No 123

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSanjay Soni—
Chartered accountantCa Saroj Vidhani—
Chartered accountantSp Dara And Associates—
EngineerVinod Mahato—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology