Completed8 floorsRERA P50500008022

Main building, Krishna Pride

Deedo IDDP-NGP-DZ8J-KP

MahaRERA has not published a flat-by-flat record for this tower, and no registered deed names it yet.

All of Krishna Pride
Median saleNot on recordneeds 3 or more sales
Completion28 Nov 2022as registered
Units & parking in Main building
TypeCarpet areaUnitsBooked
A Type32 m² (344 sq.ft)26Not on record
B Type36 m² (388 sq.ft)2Not on record
C Type34 m² (366 sq.ft)12Not on record
D Type21 m² (226 sq.ft)6Not on record
E Type22 m² (237 sq.ft)6Not on record
F Type33 m² (355 sq.ft)12Not on record

Parking: Closed/Covered 92 · Open Space 68 (as declared to MahaRERA)

Construction progress (declared)

Work completed, as the promoter reported it to MahaRERA (Form 1). Not verified on site.

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
As registered with MahaRERA
RERA registration
P50500008022 · registered 18 Aug 2017
Promised completion
28 Nov 2022
Sanctioned habitable floors
8
Also named
Krishna Pride
Deedo ID
DP-NGP-DZ8J-KP
Questions about Main building

When is Main building due for completion?

The MahaRERA registration promises 28 Nov 2022.

How many floors does Main building have?

8 sanctioned habitable floors, as registered with MahaRERA.

Data through9 Oct 2026SourcesMahaRERA registration and project page · IGR Maharashtra Index IIFloors and units are as registered; a promoter can revise them in later filings. Party names appear only inside an unlocked Index II.Report a problemMethodology