Mauli Town

Deedo IDDP-NGP-5128

Completion was pushed back 4 months, to Apr 2030; no MahaRERA orders on record.

Bothali, Nagpur 441108 · by Ppj Properties Private Limited

DeliveryExtended 4 moPromised Dec 2029 · now due Apr 2030RegulatoryNo ordersNot in any MahaRERA list or order Deedo has read

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2030

  • P50500080825Registered 14 Jul 2025, completion promised 31 Dec 2028, revised to 30 Apr 2029.
  • P50500080878Registered 28 Jul 2025, completion promised 31 Dec 2028.
  • PP1190002500675Registered 28 Aug 2025, completion promised 31 Dec 2029, revised to 30 Apr 2030.

No extension certificate on record.

3 registrations · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.
Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrations3
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050008082514 Jul 202531 Dec 202830 Apr 2029Ppj Properties Private LimitedProject page
P5050008087828 Jul 202531 Dec 2028—Ppj Properties Private LimitedProject page
PP119000250067528 Aug 202531 Dec 202930 Apr 2030Ppj Properties Private LimitedProject page
Documents209

40 documents held by Deedo, 169 filings listed on MahaRERA's project page

Title report

Encumbrance details (2)

  • Encumbrance detailsP50500080878 · 27 Feb 2025ViewSource
  • Encumbrance detailsP50500080878 · 27 Feb 2025ViewSource

Form 1 (5)

Show all 209 documentsShow fewer documents

Other (15)

Allotment letter (2)

  • Allotment letterP50500080878 · 27 Feb 2025ViewSource
  • Allotment letterP50500080878 · Date not statedViewSource

Form B

Registration certificate (3)

  • Registration certificateP50500080825 · 14 Jul 2025ViewSource
  • Registration certificateP50500080878 · 28 Jul 2025ViewSource
  • Registration certificatePP1190002500675 · 28 Aug 2025ViewSource

Commencement certificate (4)

  • Commencement certificateP50500080878 · 21 Jul 2025ViewSource
  • Commencement certificateP50500080878 · 21 Jul 2025ViewSource
  • Commencement certificateP50500080878 · 21 Jul 2025ViewSource
  • Commencement certificateP50500080878 · 21 Jul 2025ViewSource

Form 2 (4)

Form 2A

Layout plan

Building plan

  • Building planP50500080878 · Date not statedViewSource

Document library

  • Copy of Layout Approval (in case of layout)P50500080878 · BOTHALI 30 TENTIVE SANCTION PLAN_compressed.pdf · uploaded 27 Feb 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsP50500080878 · Disclosure of lnterest PRATIK SARAOGI.pdf · uploaded 27 Feb 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsP50500080878 · Disclosure of lnterest PRAVIN JAIN (PPJ).pdf · uploaded 27 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500080878 · FORM-1, MT-30.pdf · uploaded 27 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)P50500080878 · FORM-2, MT-30.pdf · uploaded 27 Feb 2025View
  • Deviation Report with respect to Allotment letterP50500080878 · DEVIATION REPORT- ALLOTMENT LETTER.pdf · uploaded 27 Feb 2025View
  • Deviation Report with respect to model copy of AgreementP50500080878 · DEVIATION REPORT- AGREEMENT TO SALE.pdf · uploaded 27 Feb 2025View
  • Disclosure for secured/unsecured finance availed for the projectP50500080878 · SEC UNSEC.pdf · uploaded 27 Feb 2025View
  • Other – LegalP50500080878 · Saledeed - PPJ Properties Pvt Ltd_-40-59.pdf · uploaded 27 Feb 2025View
  • Other – LegalP50500080878 · Saledeed - PPJ Properties Pvt Ltd_-1-20.pdf · uploaded 27 Feb 2025View
  • Other – LegalP50500080878 · Saledeed - PPJ Properties Pvt Ltd_-21-39.pdf · uploaded 27 Feb 2025View
  • Other – FinanceP50500080878 · Saledeed - PPJ Properties Pvt Ltd_-21-39.pdf · uploaded 27 Feb 2025View
  • Other – FinanceP50500080878 · Saledeed - PPJ Properties Pvt Ltd_-40-59.pdf · uploaded 27 Feb 2025View
  • Other – FinanceP50500080878 · Saledeed - PPJ Properties Pvt Ltd_-1-20.pdf · uploaded 27 Feb 2025View
  • Other – FinanceP50500080878 · COI ppj.pdf · uploaded 27 Feb 2025View
  • a Details of encumbrances concerned to FinanceP50500080878 · encum finan 30.pdf · uploaded 27 Feb 2025View
  • a Details of encumbrances concerned to FinanceP50500080878 · encum legal.pdf · uploaded 27 Feb 2025View
  • b Details of encumbrances concerned to LegalP50500080878 · encum finan 30.pdf · uploaded 27 Feb 2025View
  • b Details of encumbrances concerned to LegalP50500080878 · encum legal.pdf · uploaded 27 Feb 2025View
  • Copy of the legal title reportP50500080878 · ltr 30.pdf · uploaded 27 Feb 2025View
  • CERSAI detailsP50500080878 · cersai 30.pdf · uploaded 27 Feb 2025View
  • Proforma of Allotment letterP50500080878 · allotment letter 30.pdf · uploaded 27 Feb 2025View
  • Other – LegalP50500080878 · COI ppj.pdf · uploaded 27 Feb 2025View
  • Other – TechnicalP50500080878 · qa 30.pdf · uploaded 27 Feb 2025View
  • Proforma of Agreement for saleP50500080878 · ats 30.pdf · uploaded 27 Feb 2025View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)P50500080878 · format b 30.pdf · uploaded 27 Feb 2025View
  • Declaration in FORM BP50500080878 · FORM-B, MT-30.pdf · uploaded 28 Feb 2025View
  • Commencement Certificates / NA Order for plotted developmentP50500080878 · bothali 30 final certificate.pdf · uploaded 21 Jul 2025View
  • Building Plan Approval / NA Order for plotted developmentP50500080878 · BOTHALI 30 FINAL SANCTION PLAN.pdf · uploaded 21 Jul 2025View
  • Commencement Certificates / NA Order for plotted developmentP50500080878 · NA Order MT-30.pdf · uploaded 21 Jul 2025View
  • Declaration about Commencement CertificateP50500080878 · FORMAT D_MAULI TOWN-30.pdf · uploaded 21 Jul 2025View
  • Commencement Certificates / NA Order for plotted developmentP50500080878 · CC MAIL_MAULI TOWN -30.pdf · uploaded 21 Jul 2025View
  • Declaration about all RERA Designated Bank Accounts (Format A)P50500080878 · FORMAT A_MAULI TOWN-30.pdf · uploaded 21 Jul 2025View
  • Withdrawal Update Form 1P50500080878 · FORM-1, MT-30_page-0001.pdf · uploaded 17 Oct 2025View
  • Withdrawal Update Form 2P50500080878 · FORM-2, MT-30.pdf · uploaded 17 Oct 2025View
  • Withdrawal Update Form 1P50500080878 · form 1 MT 30 DECEMBER 2025.pdf · uploaded 19 Jan 2026View
  • Withdrawal Update Form 2P50500080878 · FFORM 2 MT 30 DECEMBER 2025.pdf · uploaded 19 Jan 2026View
  • Withdrawal Update Form 1P50500080878 · FORAM 1 MAULI 30 MARCH 2026.pdf · uploaded 17 Apr 2026View
  • Withdrawal Update Form 2P50500080878 · FORM 2 MAULI 30 MARCH 2026.pdf · uploaded 17 Apr 2026View
  • Form 2A (FY 2025-2026)P50500080878 · FORM 2A MAULI TOWN 30 MARCH 2026.pdf · uploaded 20 May 2026View
  • Withdrawal Update Form 1P50500080878 · FORM-1 MT-30.pdf · uploaded 18 Jul 2026View
  • Withdrawal Update Form 2P50500080878 · FORM 2 MAULI 30 MARCH 2026.pdf · uploaded 18 Jul 2026View
  • Withdrawal Update Form 1P50500080878 · FORM-1 MT-30.pdf · uploaded 20 Jul 2026View
  • Withdrawal Update Form 2P50500080878 · FORM-2 MT-30 upload.pdf · uploaded 20 Jul 2026View

Promoter documents

  • Legal Title reportP50500080878 · ltr 30.pdf · uploaded 27 Feb 2025View
  • Declaration Form BP50500080878 · FORM-B, MT-30.pdf · uploaded 28 Feb 2025View

Technical documents

  • Layout ApprovalP50500080878 · BOTHALI 30 TENTIVE SANCTION PLAN_compressed.pdfView
  • NA Order for Plotted DevelopmentP50500080878 · BOTHALI 30 FINAL SANCTION PLAN.pdfView

Other legal documents

  • Other – LegalP50500080878 · Saledeed - PPJ Properties Pvt Ltd_-1-20.pdfView
  • Other – LegalP50500080878 · Saledeed - PPJ Properties Pvt Ltd_-21-39.pdfView
  • Other – LegalP50500080878 · Saledeed - PPJ Properties Pvt Ltd_-40-59.pdfView
  • Other – LegalP50500080878 · COI ppj.pdfView

Financial documents

  • Other – FinanceP50500080878 · Saledeed - PPJ Properties Pvt Ltd_-1-20.pdf · uploaded 27 Feb 2025View
  • Other – FinanceP50500080878 · Saledeed - PPJ Properties Pvt Ltd_-21-39.pdf · uploaded 27 Feb 2025View
  • Other – FinanceP50500080878 · Saledeed - PPJ Properties Pvt Ltd_-40-59.pdf · uploaded 27 Feb 2025View
  • Other – FinanceP50500080878 · COI ppj.pdf · uploaded 27 Feb 2025View

Proforma allotment letter

  • Proforma allotment letterP50500080878 · allotment letter 30.pdfView

Finance

  • PAN CardP50500080825 · 1 PAN Card.pdf · uploaded 6 Mar 2025Source
  • Other – FinanceP50500080825 · s 1.pdf · uploaded 6 Mar 2025Source
  • Other – FinanceP50500080825 · s 2.pdf · uploaded 6 Mar 2025Source
  • Other – FinanceP50500080825 · s 3.pdf · uploaded 6 Mar 2025Source
  • Other – FinanceP50500080825 · coi ppj.pdf · uploaded 6 Mar 2025Source
  • PAN CardPP1190002500675 · PAN_PPJ PROPERTIES PRIVATE LIMITED.pdf · uploaded 2 Aug 2025Source
  • OthersPP1190002500675 · ENCUMBRANCE CERTIFICATE FINANCE.pdf · uploaded 2 Aug 2025Source
  • OthersPP1190002500675 · CERSAI DECLARATION.pdf · uploaded 2 Aug 2025Source
  • OthersPP1190002500675 · CERTIFICATE OF INCORPORATION.pdf · uploaded 2 Aug 2025Source

Legal

  • Other – LegalP50500080825 · s 1.pdf · uploaded 6 Mar 2025Source
  • Other – LegalP50500080825 · s 2.pdf · uploaded 6 Mar 2025Source
  • Other – LegalP50500080825 · s 3.pdf · uploaded 6 Mar 2025Source
  • Other – LegalP50500080825 · coi ppj.pdf · uploaded 6 Mar 2025Source
  • Legal Title reportP50500080825 · LTR MAULI TOWN 32.pdf · uploaded 6 Mar 2025Source
  • Declaration Form BP50500080825 · form b 32.pdf · uploaded 6 Mar 2025Source
  • OthersPP1190002500675 · ENCUMBRANCE CERTIFICATE LEGAL.pdf · uploaded 2 Aug 2025Source
  • OthersPP1190002500675 · SALE DEED PART 1.pdf · uploaded 2 Aug 2025Source
  • OthersPP1190002500675 · SALE DEED PART 2.pdf · uploaded 2 Aug 2025Source
  • OthersPP1190002500675 · SALE DEED PART 3.pdf · uploaded 2 Aug 2025Source
  • OthersPP1190002500675 · 7-12 EXTRACT.pdf · uploaded 2 Aug 2025Source
  • OthersPP1190002500675 · DISCLOSURE OF INTEREST IN OTHER REAL ESTATE ORGANIZATIONS_PRATIK SARAOGI.pdf · uploaded 2 Aug 2025Source
  • OthersPP1190002500675 · DISCLOSURE OF INTEREST IN OTHER REAL ESTATE ORGANIZATIONS_PRAVIN JAIN.pdf · uploaded 2 Aug 2025Source
  • OthersPP1190002500675 · CERTIFICATE OF INCORPORATION.pdf · uploaded 2 Aug 2025Source
  • Declaration Form BPP1190002500675 · LEGAL TITLE REPORT.pdf · uploaded 2 Aug 2025Source
  • Declaration Form BPP1190002500675 · FORM B.pdf · uploaded 2 Aug 2025Source
  • Declaration Form BPP1190002500675 · SALE DEED PART 1.pdf · uploaded 2 Aug 2025Source
  • Declaration Form BPP1190002500675 · SALE DEED PART 2.pdf · uploaded 2 Aug 2025Source
  • Declaration Form BPP1190002500675 · SALE DEED PART 3.pdf · uploaded 2 Aug 2025Source

Migrated

  • 1 PAN CardP50500080825 · 1 PAN Card.pdf · uploaded 6 Mar 2025Source
  • 1 Copy of the legal title reportP50500080825 · LTR MAULI TOWN 32.pdf · uploaded 6 Mar 2025Source
  • 1 a Details of encumbrances concerned to FinanceP50500080825 · encum fin 32.pdf · uploaded 6 Mar 2025Source
  • 2 a Details of encumbrances concerned to FinanceP50500080825 · encum legal 32.pdf · uploaded 6 Mar 2025Source
  • 1 Proforma of Allotment letterP50500080825 · Allotment to Plot Mt-32_compressed.pdf · uploaded 6 Mar 2025Source
  • 1 Declaration in FORM BP50500080825 · form b 32.pdf · uploaded 6 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500080825 · FORM 1 32.pdf · uploaded 6 Mar 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P50500080825 · form 3.pdf · uploaded 6 Mar 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P50500080825 · FORM 2 32.pdf · uploaded 6 Mar 2025Source
  • 4 Other – LegalP50500080825 · coi ppj.pdf · uploaded 6 Mar 2025Source
  • 3 Other – LegalP50500080825 · s 3.pdf · uploaded 6 Mar 2025Source
  • 1 Other – LegalP50500080825 · s 1.pdf · uploaded 6 Mar 2025Source
  • 2 Other – LegalP50500080825 · s 2.pdf · uploaded 6 Mar 2025Source
  • 1 CERSAI detailsP50500080825 · cersai 32.pdf · uploaded 6 Mar 2025Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)P50500080825 · format a 32.pdf · uploaded 6 Mar 2025Source
  • 1 Deviation Report with respect to Allotment letterP50500080825 · DEV ATS 32.pdf · uploaded 6 Mar 2025Source
  • 1 b Details of encumbrances concerned to LegalP50500080825 · encum fin 32.pdf · uploaded 6 Mar 2025Source
  • 2 b Details of encumbrances concerned to LegalP50500080825 · encum legal 32.pdf · uploaded 6 Mar 2025Source
  • 2 Other – FinanceP50500080825 · s 2.pdf · uploaded 6 Mar 2025Source
  • 4 Other – FinanceP50500080825 · coi ppj.pdf · uploaded 6 Mar 2025Source
  • 3 Other – FinanceP50500080825 · s 3.pdf · uploaded 6 Mar 2025Source
  • 1 Other – FinanceP50500080825 · s 1.pdf · uploaded 6 Mar 2025Source
  • 1 Other – TechnicalP50500080825 · qa 32.pdf · uploaded 6 Mar 2025Source
  • 1 Deviation Report with respect to model copy of AgreementP50500080825 · dev ats 32.pdf · uploaded 6 Mar 2025Source
  • 1 Proforma of Agreement for saleP50500080825 · ATS 32.pdf · uploaded 6 Mar 2025Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP50500080825 · Disclosure of lnterest PRATIK SARAOGI.pdf · uploaded 6 Mar 2025Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsP50500080825 · Disclosure of lnterest PRAVIN JAIN.pdf · uploaded 6 Mar 2025Source
  • 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)P50500080825 · format b 32.pdf · uploaded 6 Mar 2025Source
  • 1 Disclosure for secured/unsecured finance availed for the projectP50500080825 · sec unsec 32.pdf · uploaded 6 Mar 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentP50500080825 · NA Order MT-32.pdf · uploaded 27 Mar 2025Source
  • 1 Copy of Layout Approval (in case of layout)P50500080825 · BOTHALI 32 FINAL SANCTION PLAN.pdf · uploaded 11 Jul 2025Source
  • 2 Commencement Certificates / NA Order for plotted developmentP50500080825 · BOTHALI 32 FINAL CERTIFICATE.pdf · uploaded 11 Jul 2025Source
  • 3 Commencement Certificates / NA Order for plotted developmentP50500080825 · CC MAIL MAULI TOWN-32.pdf · uploaded 11 Jul 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentP50500080825 · BOTHALI 32 FINAL SANCTION PLAN.pdf · uploaded 11 Jul 2025Source
  • 1 Declaration about Commencement CertificateP50500080825 · FORMAT D_MAULI TOWN-32.pdf · uploaded 11 Jul 2025Source
  • Withdrawal Update Form 1P50500080825 · FORM-1, MT-32_page-0001.pdf · uploaded 16 Oct 2025Source
  • Withdrawal Update Form 1P50500080825 · FORM-1, MT-32_page-0001.pdf · uploaded 16 Oct 2025Source
  • Withdrawal Update Form 2P50500080825 · FORM-2, MT-32.pdf · uploaded 16 Oct 2025Source
  • Withdrawal Update Form 2P50500080825 · FORM-2, MT-32.pdf · uploaded 16 Oct 2025Source
  • Withdrawal Update Form 3P50500080825 · FORM-3, MT-32.pdf · uploaded 16 Oct 2025Source
  • Withdrawal Update Form 3P50500080825 · FORM-3, MT-32.pdf · uploaded 16 Oct 2025Source
  • Withdrawal Update Form 1PP1190002500675 · FORM-1, MT-34_page-0001.pdf · uploaded 16 Oct 2025Source
  • Withdrawal Update Form 2PP1190002500675 · FORM-2, MT-34.pdf · uploaded 16 Oct 2025Source
  • Withdrawal Update Form 3PP1190002500675 · FORM-3, MT-34.pdf · uploaded 16 Oct 2025Source
  • Withdrawal Update Form 1P50500080825 · Form 1 MT 32 DECEMBER 2025.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2P50500080825 · Form 2 M-32 DECEMBER 2025.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3P50500080825 · Form 3 mauli 32 december 2025_compressed (1).pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1PP1190002500675 · FORM 1 MAULI 34 2025.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2PP1190002500675 · Form 2 MT 34 DECEMBER 2025.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3PP1190002500675 · FORM 3 MT 34 DECEMBER 2025.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1P50500080825 · FORM 1 MAULI 32 MARCH 2026.pdf · uploaded 17 Apr 2026Source
  • Withdrawal Update Form 2P50500080825 · FORM 2 MAULI 32 MARCH 2026.pdf · uploaded 17 Apr 2026Source
  • Withdrawal Update Form 3P50500080825 · FORM 3 MAULI 32 MARCH 2026.pdf · uploaded 17 Apr 2026Source
  • Withdrawal Update Form 1PP1190002500675 · FORM 1 MAULI 34 MARCH 2026.pdf · uploaded 17 Apr 2026Source
  • Withdrawal Update Form 2PP1190002500675 · FORM 2 MAULI 34 MARCH 2026.pdf · uploaded 17 Apr 2026Source
  • Withdrawal Update Form 3PP1190002500675 · FORM 3 MAULI 34 MARCH 2026.pdf · uploaded 17 Apr 2026Source
  • Form 2A (FY 2025-2026)P50500080825 · FORM 2A MAULI TOWN 32 MARCH 2026.pdf · uploaded 20 May 2026Source
  • Form 2A (FY 2025-2026)PP1190002500675 · FORM 2A MAULI TOWN 34 MARCH 2026.pdf · uploaded 20 May 2026Source
  • Withdrawal Update Form 1P50500080825 · FORM-1 MT-32.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 2P50500080825 · FORM 2 MAULI 32 MARCH 2026.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 3P50500080825 · FORM 3 MAULI 32 MARCH 2026.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 1PP1190002500675 · FORM-1 MT-34.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 2PP1190002500675 · FORM 2 MAULI 34 MARCH 2026.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 3PP1190002500675 · FORM 3 MAULI 34 MARCH 2026.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 1P50500080825 · FORM-1 MT-32.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2P50500080825 · FORM-2 MT-32 upload.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3P50500080825 · form 3 MAULI TOWN-32 june 2026 upload.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 1PP1190002500675 · FORM-1 MT-34.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2PP1190002500675 · FORM-2 MT-34 upload.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3PP1190002500675 · FORM-3 MT-34 upload.pdf · uploaded 20 Jul 2026Source

Technical

  • Other – TechnicalP50500080825 · qa 32.pdf · uploaded 6 Mar 2025Source
  • DocumentP50500080825 · BOTHALI 32 FINAL SANCTION PLAN.pdf · uploaded 11 Jul 2025Source
  • DocumentP50500080825 · BOTHALI 32 FINAL SANCTION PLAN.pdf · uploaded 11 Jul 2025Source
  • DocumentPP1190002500675 · ANNEXURE A.pdf · uploaded 2 Aug 2025Source
  • OthersPP1190002500675 · FORMAT D.pdf · uploaded 2 Aug 2025Source
  • OthersPP1190002500675 · FORM 1_Architect Certificate.pdf · uploaded 2 Aug 2025Source
  • OthersPP1190002500675 · FORM 2_Engineers Certificate.pdf · uploaded 2 Aug 2025Source
  • DocumentPP1190002500675 · FINAL SANCTION PLAN .pdf · uploaded 25 Aug 2025Source
  • OthersPP1190002500675 · FORMAT D_revised.pdf · uploaded 25 Aug 2025Source
  • OthersPP1190002500675 · CC MAIL (1).pdf · uploaded 25 Aug 2025Source

Technical (Architect)

  • DocumentP50500080825 · FORM-1 MT-32.pdf · uploaded 5 Oct 2026Source
  • DocumentPP1190002500675 · FORM-1 MT-34.pdf · uploaded 5 Oct 2026Source

Technical (Engineer)

  • DocumentP50500080825 · FORM-2 MT-32 upload.pdf · uploaded 20 Jul 2026Source
  • DocumentPP1190002500675 · FORM-2 MT-34 upload.pdf · uploaded 20 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel KHASRA NO. 27/2, Khasra No.32

As registered with MahaRERA and published on its project page

Project type
Plotted
Status on MahaRERA
Certificate Signed
Phases
3
Address
Khasra No.32, PH. NO. 74/A, MOUZA-BOTHALI, MOUZA-BOTHALI, MOUZA-BOTHALIPIN 441108
Village
Bothali, Nagpur (Rural) taluka
Land area for this project
6,901 sq m (74,278 sq ft)
Permissible built-up area
0 sq m (0 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Recreational open space
1,195 sq m (12,859 sq ft)
Designated bank account
76
Developed in phases
No
Also registered as
Mauli Town-32, Mauli Town-34, Mauli Town-30

Survey, CTS, gat or plot numbers

KHASRA NO. 27/2Khasra No.32KH. NO.30PH. NO. 74/A

Land as published on MahaRERA's project page

Khasra No.32, PH. NO. 74/A, MOUZA-BOTHALI

Boundaries

North
Kh No 33
South
Kh No 31
East
Kh No 39
West
Kh No 29

Source: registration certificates and MahaRERA's project page, as stated there.

Construction progress2 buildings and areas

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Common areas and amenities

  • Internal Roads & FootpathsAS PER SANCTIONED LAYOUT PLAN95%
  • Water SupplyCOMPLETED100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER SANCTIONED LAYOUT PLAN95%
  • Storm Water DrainsAS PER SANCTIONED LAYOUT PLAN95%
  • Landscaping & Tree PlantingAS PER SANCTIONED LAYOUT PLAN70%
  • Street LightingAS PER SANCTIONED LAYOUT PLAN70%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterAS PER SANCTIONED LAYOUT PLAN50%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCOMPLETED100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER SANCTIONED LAYOUT PLAN50%
  • Aggregate area of recreational Open SpaceAS PER SANCTIONED LAYOUT PLAN90%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Professionals9

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectAr PAWAN GUPTA—P50500080878
ArchitectAr PAWAN GUPTA GUPTA—P50500080825
ArchitectPawan Raviprasad Gupta—PP1190002500675
Chartered accountantAnkit Vikram Talreja—PP1190002500675
Chartered accountantCa Ankit Talreja—P50500080825
Chartered accountantCa Ankit Talreja—P50500080878
EngineerEr N B LANDE—P50500080825
EngineerNamdeo B Lande—PP1190002500675
EngineerN B Lande—P50500080878

Source: MahaRERA project page. Contact details are not shown.

Other projects in Bothali

All 8 projects in Bothali · Compare Mauli Town with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology