Deedo IDDP-MSB-JEAWCompletion was pushed back 4 months, to May 2029; no MahaRERA orders on record; 6% of its units are booked.
Poisar, Mumbai Suburban 400101 · by Bitcon India Infrastructure Developers Private Limited
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to May 2029
- This projectRegistered 23 Apr 2024, completion promised 31 Jan 2029, revised to 31 May 2029.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
3 buildings
Open a building to see every flat, floor by floor.
- Bitcon Elysium Wing A17 floors · 19 units0% booked
- Bitcon Elysium Wing B23 floors · 86 units9% booked
- Bitcon Elysium Wing C17 floors · 26 units0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51800055839
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51800055839 | 23 Apr 2024 | 31 Jan 2029 | 31 May 2029 | Bitcon India Infrastructure Developers Private Limited | Project page |
Documents138
1 document held by Deedo, 137 filings listed on MahaRERA's project page
Finance
- PAN CardPAN CARD.pdf · uploaded 5 Feb 2024Source
Legal
- Declaration Form BFORM B.pdf · uploaded 7 Feb 2024Source
- Legal Title reportREVISED TITLE REPORT.pdf · uploaded 8 Feb 2024Source
- Legal Title reportKandivali Search Report July 2021.pdf · uploaded 8 Feb 2024Source
- Legal Title reportSearch Report 2021 to 2024.pdf · uploaded 8 Feb 2024Source
- Other – LegalSUPPLEMENT DEED.pdf · uploaded 29 Feb 2024Source
- Other – LegalConsent Terms.pdf · uploaded 15 Mar 2024Source
Show all 138 documentsShow fewer documents
Legal
- Other – LegalPRC (4).pdf · uploaded 15 Mar 2024Source
Migrated
- 1 PAN CardPAN CARD.pdf · uploaded 5 Feb 2024Source
- 1 a Details of encumbrances concerned to FinanceFINANCE AND LEGAL.pdf · uploaded 5 Feb 2024Source
- 1 b Details of encumbrances concerned to LegalFINANCE AND LEGAL.pdf · uploaded 5 Feb 2024Source
- 1 Copy of Layout Approval (in case of layout)1 (1).pdf · uploaded 5 Feb 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentIOD.pdf · uploaded 5 Feb 2024Source
- 2 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 5 Feb 2024Source
- 3 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 5 Feb 2024Source
- 4 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 5 Feb 2024Source
- 5 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 5 Feb 2024Source
- 6 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 5 Feb 2024Source
- 7 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 5 Feb 2024Source
- 8 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 5 Feb 2024Source
- 9 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 5 Feb 2024Source
- 10 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 5 Feb 2024Source
- 11 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 5 Feb 2024Source
- 12 Building Plan Approval / NA Order for plotted development12.pdf · uploaded 5 Feb 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 5 Feb 2024Source
- 1 Declaration about Commencement CertificateDCC.pdf · uploaded 5 Feb 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 5 Feb 2024Source
- 1 CERSAI detailsCERSAI LETTER.pdf · uploaded 5 Feb 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)ca bitcon.pdf · uploaded 5 Feb 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE OF PARTNERS.pdf · uploaded 5 Feb 2024Source
- 1 Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 5 Feb 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBANK LETTER.pdf · uploaded 5 Feb 2024Source
- 1 Declaration in FORM BFORM B.pdf · uploaded 7 Feb 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 7 Feb 2024Source
- 1 Copy of the legal title reportREVISED TITLE REPORT.pdf · uploaded 8 Feb 2024Source
- 2 Copy of the legal title reportKandivali Search Report July 2021.pdf · uploaded 8 Feb 2024Source
- 3 Copy of the legal title reportSearch Report 2021 to 2024.pdf · uploaded 8 Feb 2024Source
- 1 Other – TechnicalFINAL ORDER 50.pdf · uploaded 9 Feb 2024Source
- 1 Deviation Report with respect to Allotment letterALLOTMENT DEVIATION 1.pdf · uploaded 21 Feb 2024Source
- 1 Proforma of Agreement for saleFINAL AFS.pdf · uploaded 29 Feb 2024Source
- 1 Other – LegalSUPPLEMENT DEED.pdf · uploaded 29 Feb 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentBITCON REVALIDATED CC.pdf · uploaded 5 Mar 2024Source
- 2 Other – LegalConsent Terms.pdf · uploaded 15 Mar 2024Source
- 3 Other – LegalPRC (4).pdf · uploaded 15 Mar 2024Source
- 1 Deviation Report with respect to model copy of AgreementFinal Deviation AFS.pdf · uploaded 29 Mar 2024Source
- 2 Declaration about Commencement CertificateDeclaration of CC.pdf · uploaded 16 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect form 1.pdf · uploaded 16 Jul 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFIACTE.pdf · uploaded 29 Jul 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE (1).pdf · uploaded 29 Jul 2024Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY (2).pdf · uploaded 29 Jul 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE (2).pdf · uploaded 29 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 13 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE FORM 3.pdf · uploaded 13 Nov 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE.pdf · uploaded 13 Nov 2024Source
- 2 Declaration about Commencement CertificateDECLARATION OF Commencement Certificate.pdf · uploaded 13 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate (2).pdf · uploaded 18 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA CERTIFIACTE (1).pdf · uploaded 30 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySold Unsold Inventory Q3.pdf · uploaded 30 Jan 2025Source
- 1 Declaration about Commencement CertificateDeclaration of CC.pdf · uploaded 30 Jan 2025Source
- 1 Copy of Layout Approval (in case of layout)Drawing (4)_1-1.pdf · uploaded 5 Apr 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentDrawing (4)_2-2.pdf · uploaded 5 Apr 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentDrawing (4)_3-3.pdf · uploaded 5 Apr 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentDrawing (4)_4-4.pdf · uploaded 5 Apr 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentDrawing (4)_5-5.pdf · uploaded 5 Apr 2025Source
- 5 Building Plan Approval / NA Order for plotted developmentDrawing (4)_6-6.pdf · uploaded 5 Apr 2025Source
- 6 Building Plan Approval / NA Order for plotted developmentDrawing (4)_7-7.pdf · uploaded 5 Apr 2025Source
- 7 Building Plan Approval / NA Order for plotted developmentDrawing (4)_8-8.pdf · uploaded 5 Apr 2025Source
- 8 Building Plan Approval / NA Order for plotted developmentDrawing (4)_9-9.pdf · uploaded 5 Apr 2025Source
- 9 Building Plan Approval / NA Order for plotted developmentDrawing (4)_10-10.pdf · uploaded 5 Apr 2025Source
- 10 Building Plan Approval / NA Order for plotted developmentDrawing (4)_11-11.pdf · uploaded 5 Apr 2025Source
- 11 Building Plan Approval / NA Order for plotted developmentDrawing (4)_12-12.pdf · uploaded 5 Apr 2025Source
- 12 Building Plan Approval / NA Order for plotted developmentDrawing (4)_13-end.pdf · uploaded 5 Apr 2025Source
- 13 Building Plan Approval / NA Order for plotted developmentAmended Approval Letter.pdf · uploaded 5 Apr 2025Source
- Form 1Architect Signed certificate.pdf · uploaded 10 Jun 2025Source
- Form 2Form 2 Engineer Certificate.pdf · uploaded 10 Jun 2025Source
- Form 3CA CERTIFICATE FORM 3.pdf · uploaded 10 Jun 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold InventoryQ4.pdf · uploaded 10 Jun 2025Source
- Form 1FORM 1 - 31-12-2025.pdf · uploaded 6 Mar 2026Source
- Form 2FORM 2 - 31-12-2025.pdf · uploaded 6 Mar 2026Source
- Form 3FORM 3 - 31-12-2025.pdf · uploaded 6 Mar 2026Source
- Disclosure of Sold and Booked InventorySold Unsold Inventory - 31-12-2025.pdf · uploaded 6 Mar 2026Source
- Form 1FORM 1 - 30-09-2025.pdf · uploaded 6 Mar 2026Source
- Form 2FORM 2 - 30-09-2025.pdf · uploaded 6 Mar 2026Source
- Form 3FORM 3 - 30-09-2025.pdf · uploaded 6 Mar 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of sold unsold inventory - 30-09-2025.pdf · uploaded 6 Mar 2026Source
- Form 1FORM 1 - 31-03-2026.pdf · uploaded 25 Apr 2026Source
- Form 2Form 2 - 31-03-2026.pdf · uploaded 25 Apr 2026Source
- Form 3Form 3 - 31-03-2026.pdf · uploaded 25 Apr 2026Source
- Disclosure of Sold and Booked InventorySold Unsold Inventory - 31-03-2026.pdf · uploaded 25 Apr 2026Source
- Withdrawal Update Form 1FORM 1 - 30-06-2026.pdf · uploaded 10 Sep 2026Source
- Withdrawal Update Form 1FORM 1 - 30-06-2025.pdf · uploaded 10 Sep 2026Source
- Withdrawal Update Form 1FORM 1 - 30-06-2026.pdf · uploaded 10 Sep 2026Source
- Withdrawal Update Form 2FORM 2 - 30-06-2026.pdf · uploaded 10 Sep 2026Source
- Withdrawal Update Form 2FORM 2 - 30-06-2025.pdf · uploaded 10 Sep 2026Source
- Withdrawal Update Form 2FORM 2 - 30-06-2026.pdf · uploaded 10 Sep 2026Source
- Withdrawal Update Form 3FORM 3 - 30-06-2026.pdf · uploaded 10 Sep 2026Source
- Withdrawal Update Form 3FORM 3 - 30-06-2026.pdf · uploaded 10 Sep 2026Source
- Withdrawal Update Form 3FORM 3 - 30-06-2026.pdf · uploaded 10 Sep 2026Source
- Withdrawal Update Form 1FORM 1 - 30-06-2026.pdf · uploaded 28 Sep 2026Source
- Withdrawal Update Form 2FORM 2 - 30-06-2026.pdf · uploaded 28 Sep 2026Source
- Withdrawal Update Form 3FORM 3 - 30-06-2026.pdf · uploaded 28 Sep 2026Source
- Form 2A (FY 2024-2025)FORM 2A FY 24-25.pdf · uploaded 28 Sep 2026Source
Technical
- Document1 (1).pdf · uploaded 5 Feb 2024Source
- DocumentIOD.pdf · uploaded 5 Feb 2024Source
- Document2.pdf · uploaded 5 Feb 2024Source
- Document3.pdf · uploaded 5 Feb 2024Source
- Document4.pdf · uploaded 5 Feb 2024Source
- Document5.pdf · uploaded 5 Feb 2024Source
- Document6.pdf · uploaded 5 Feb 2024Source
- Document7.pdf · uploaded 5 Feb 2024Source
- Document8.pdf · uploaded 5 Feb 2024Source
- Document9.pdf · uploaded 5 Feb 2024Source
- Document10.pdf · uploaded 5 Feb 2024Source
- Document11.pdf · uploaded 5 Feb 2024Source
- Document12.pdf · uploaded 5 Feb 2024Source
- Other – TechnicalFINAL ORDER 50.pdf · uploaded 9 Feb 2024Source
- DocumentDrawing (4)_1-1.pdf · uploaded 5 Apr 2025Source
- DocumentDrawing (4)_2-2.pdf · uploaded 5 Apr 2025Source
- DocumentDrawing (4)_3-3.pdf · uploaded 5 Apr 2025Source
- DocumentDrawing (4)_4-4.pdf · uploaded 5 Apr 2025Source
- DocumentDrawing (4)_5-5.pdf · uploaded 5 Apr 2025Source
- DocumentDrawing (4)_6-6.pdf · uploaded 5 Apr 2025Source
- DocumentDrawing (4)_7-7.pdf · uploaded 5 Apr 2025Source
- DocumentDrawing (4)_8-8.pdf · uploaded 5 Apr 2025Source
- DocumentDrawing (4)_9-9.pdf · uploaded 5 Apr 2025Source
- DocumentDrawing (4)_10-10.pdf · uploaded 5 Apr 2025Source
- DocumentDrawing (4)_11-11.pdf · uploaded 5 Apr 2025Source
- DocumentDrawing (4)_12-12.pdf · uploaded 5 Apr 2025Source
- DocumentDrawing (4)_13-end.pdf · uploaded 5 Apr 2025Source
- DocumentAmended Approval Letter.pdf · uploaded 5 Apr 2025Source
- DocumentLATEST PLAN.pdf · uploaded 28 Sep 2026Source
- DocumentFULL CC.pdf · uploaded 28 Sep 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvals
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, Shop 1, Shop 1a, Shop 2, Shop 3, 3BHK, Shop no 10, Shop no 11, Shop no 12, Shop no 13, Shop no 14, Shop no 4, Shop no 5, Shop no 6, Shop no 7, Shop no 8, Shop no 9, Shop no 15, Shop no 16, Shop no 17, Shop no 18131 units in all
- Address
- 809/A/1/19a/1/1/1a/3a/1/3/A, 809/A/1/19a/1/1/1a/3a/1/3/B, 809/A/1/19a/1/1/1a/3a/1/3/C, Poisar At Thakur Village, Kandivali East, MumbaiPIN 400101
- Village
- Poisar, Borivali taluka
- Location
- 19.20808, 72.87769
- Land area for this project
- 3,566 sq m (38,384 sq ft)
- Permissible built-up area
- 12,982 sq m (1,39,734 sq ft)
- Sanctioned built-up area
- 6,796 sq m (73,148 sq ft)
- Designated bank account
- 212
- Developed in phases
- Yes
Land as published on MahaRERA's project page
809/A/1/19A/1/1/1A/3A/1/3/A , 809/A/1/19A/1/1/1A/3A/1/3/B , 809/A/1/19A/1/1/1A/3A/1/3/C
Boundaries
- North
- 18 POINT 30m wide DP Road
- South
- Windsor Apts
- East
- Ng Suncity
- West
- 18 POINT 30m wide DP Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking131 units
8 of 131 units booked (6%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Bitcon Elysium Wing A | 1BHK | 39.99 sq m · 430 sq ft | 7 | 0 |
| Bitcon Elysium Wing A | 2BHK | 57.83 sq m · 622 sq ft | 1 | 0 |
| Bitcon Elysium Wing A | 2BHK | 60.29 sq m · 649 sq ft | 7 | 0 |
| Bitcon Elysium Wing A | Shop 1 | 19.17 sq m · 206 sq ft | 1 | 0 |
| Bitcon Elysium Wing A | Shop 1a | 15.95 sq m · 172 sq ft | 1 | 0 |
| Bitcon Elysium Wing A | Shop 2 | 22.18 sq m · 239 sq ft | 1 | 0 |
| Bitcon Elysium Wing A | Shop 3 | 20.39 sq m · 219 sq ft | 1 | 0 |
| Bitcon Elysium Wing B | 1BHK | 39.93 sq m · 430 sq ft | 20 | 3 |
Show all 30 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Bitcon Elysium Wing B | 1BHK | 40.71 sq m · 438 sq ft | 14 | 0 |
| Bitcon Elysium Wing B | 1BHK | 40.82 sq m · 439 sq ft | 20 | 2 |
| Bitcon Elysium Wing B | 2BHK | 59.55 sq m · 641 sq ft | 20 | 3 |
| Bitcon Elysium Wing B | 3BHK | 87.47 sq m · 942 sq ft | 1 | 0 |
| Bitcon Elysium Wing B | Shop no 10 | 17.95 sq m · 193 sq ft | 1 | 0 |
| Bitcon Elysium Wing B | Shop no 11 | 9.94 sq m · 107 sq ft | 1 | 0 |
| Bitcon Elysium Wing B | Shop no 12 | 14.29 sq m · 154 sq ft | 1 | 0 |
| Bitcon Elysium Wing B | Shop no 13 | 15.06 sq m · 162 sq ft | 1 | 0 |
| Bitcon Elysium Wing B | Shop no 14 | 12.29 sq m · 132 sq ft | 1 | 0 |
| Bitcon Elysium Wing B | Shop no 4 | 10.93 sq m · 118 sq ft | 1 | 0 |
| Bitcon Elysium Wing B | Shop no 5 | 14.69 sq m · 158 sq ft | 1 | 0 |
| Bitcon Elysium Wing B | Shop no 6 | 16.9 sq m · 182 sq ft | 1 | 0 |
| Bitcon Elysium Wing B | Shop no 7 | 14.6 sq m · 157 sq ft | 1 | 0 |
| Bitcon Elysium Wing B | Shop no 8 | 17.8 sq m · 192 sq ft | 1 | 0 |
| Bitcon Elysium Wing B | Shop no 9 | 15.13 sq m · 163 sq ft | 1 | 0 |
| Bitcon Elysium Wing C | 2BHK | 59 sq m · 635 sq ft | 7 | 0 |
| Bitcon Elysium Wing C | 2BHK | 59.83 sq m · 644 sq ft | 7 | 0 |
| Bitcon Elysium Wing C | 3BHK | 75.22 sq m · 810 sq ft | 8 | 0 |
| Bitcon Elysium Wing C | Shop no 15 | 20.14 sq m · 217 sq ft | 1 | 0 |
| Bitcon Elysium Wing C | Shop no 16 | 22.14 sq m · 238 sq ft | 1 | 0 |
| Bitcon Elysium Wing C | Shop no 17 | 18.36 sq m · 198 sq ft | 1 | 0 |
| Bitcon Elysium Wing C | Shop no 18 | 15.69 sq m · 169 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Manish Shah | — |
| Chartered accountant | Paresh JAIN | — |
| Engineer | Dimple Bhavsar | — |
| Engineer | Ramakanth Bapuji Nandawadekar | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Poisar
- Evershine PalazzoRERA PM1180002602668
- Np 1.2 BRERA PM1181012503072
- Np 1.2 ARERA PM1181012503066
- Modern Roop-Kamal Co-Operative Housing Society LtdRERA PR1180002501123
- Vencon Bhagat NiwasRERA P51800080226
- Swastik House - C WingRERA P51800077432
- Goldmist Co-Operative Housing Society LimitedRERA P51800054965
- Modi ArcadeRERA P51800054984
All 11 projects in Poisar · Compare Bitcon Elysium with another project