Elevia
Deedo IDDP-MSB-BV3KCompletion was pushed back 4 months, to Apr 2032; no MahaRERA orders on record; 0% of its units are booked.
Borla, Mumbai Suburban 400071 · by Vida Infrahub Llp
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2032
- This projectRegistered 4 Aug 2025, completion promised 31 Dec 2031, revised to 30 Apr 2032.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
4 buildings
Open a building to see every flat, floor by floor.
- Wing A14 floors · 27 units0% booked
- Wing B14 floors · 27 units0% booked
- Wing C14 floors · 55 units0% booked
- Wing D14 floors · 55 units0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51800080902
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51800080902 | 4 Aug 2025 | 31 Dec 2031 | 30 Apr 2032 | Vida Infrahub LLP | Project page |
Documents271
1 document held by Deedo, 270 filings listed on MahaRERA's project page
Finance
- PAN CardPAN CARD VIDA INFRAHUB LLP.PDF · uploaded 19 Oct 2024Source
- PAN CardPAN CARD VIDA INFRAHUB LLP.PDF · uploaded 19 Oct 2024Source
- Other – FinanceElevia_ Final Landowners Declaration for no sale.pdf · uploaded 11 Jul 2025Source
- Other – FinanceElevia_ Final Landowners Declaration for no sale.pdf · uploaded 11 Jul 2025Source
Show all 271 documentsShow fewer documents
Legal
- Other – Legalpage-00002_p19-p30.pdf · uploaded 11 Apr 2025Source
- Other – Legalpage-00003_p31-p47.pdf · uploaded 11 Apr 2025Source
- Other – Legalpage-00004_p48-p63.pdf · uploaded 11 Apr 2025Source
- Other – Legalpage-00005_p64-p80.pdf · uploaded 11 Apr 2025Source
- Other – Legalpage-00006_p81-p104.pdf · uploaded 11 Apr 2025Source
- Other – Legalpage-00007_p105-p126.pdf · uploaded 11 Apr 2025Source
- Other – Legal1.pdf · uploaded 11 Apr 2025Source
- Other – Legalpage-00001_p1-p18.pdf · uploaded 11 Apr 2025Source
- Other – Legalpage-00002_p19-p30.pdf · uploaded 11 Apr 2025Source
- Other – Legalpage-00003_p31-p47.pdf · uploaded 11 Apr 2025Source
- Other – Legalpage-00004_p48-p63.pdf · uploaded 11 Apr 2025Source
- Other – Legalpage-00005_p64-p80.pdf · uploaded 11 Apr 2025Source
- Other – Legalpage-00006_p81-p104.pdf · uploaded 11 Apr 2025Source
- Other – Legalpage-00007_p105-p126.pdf · uploaded 11 Apr 2025Source
- Other – Legal1.pdf · uploaded 11 Apr 2025Source
- Other – LegalMCA VIDA INFRAHUB LLP.PDF · uploaded 30 May 2025Source
- Other – LegalMCA VIDA INFRAHUB LLP.PDF · uploaded 30 May 2025Source
- Legal Title reportTitle Certificate - NS (1)_1-9.pdf · uploaded 11 Jul 2025Source
- Legal Title reportTitle Certificate - NS (1)_1-9.pdf · uploaded 11 Jul 2025Source
- Legal Title reportTitle Certificate - NS (1)_10-end.pdf · uploaded 21 Jul 2025Source
- Legal Title reportTitle Certificate - NS (1)_10-end.pdf · uploaded 21 Jul 2025Source
- Other – Legal2.pdf · uploaded 25 Jul 2025Source
- Other – Legal3.pdf · uploaded 25 Jul 2025Source
- Other – Legal4.pdf · uploaded 25 Jul 2025Source
- Other – LegalSDA 1-35.pdf · uploaded 25 Jul 2025Source
- Other – LegalSDA 36-104.pdf · uploaded 25 Jul 2025Source
- Other – LegalSDA 105-138.pdf · uploaded 25 Jul 2025Source
- Other – LegalSDA 139-172.pdf · uploaded 25 Jul 2025Source
- Other – LegalSDA 173-206.pdf · uploaded 25 Jul 2025Source
- Other – LegalSDA 207-240.pdf · uploaded 25 Jul 2025Source
- Other – LegalSDA 241-274.pdf · uploaded 25 Jul 2025Source
- Other – LegalSDA 275-308.pdf · uploaded 25 Jul 2025Source
- Other – LegalSDA 309-end.pdf · uploaded 25 Jul 2025Source
- Other – Legal1_SDA POA.pdf · uploaded 25 Jul 2025Source
- Other – Legal2_SDA POA.pdf · uploaded 25 Jul 2025Source
- Other – Legalpage-00001_p1-p35.pdf · uploaded 25 Jul 2025Source
- Other – Legalpage-00002_p36-p77.pdf · uploaded 25 Jul 2025Source
- Other – Legalpage-00003_p78-p120.pdf · uploaded 25 Jul 2025Source
- Other – Legalpage-00004_p121-p158.pdf · uploaded 25 Jul 2025Source
- Other – Legalpage-00005_p159-p198.pdf · uploaded 25 Jul 2025Source
- Other – Legalpage-00006_p199-p240.pdf · uploaded 25 Jul 2025Source
- Other – Legalpage-00007_p241-p282.pdf · uploaded 25 Jul 2025Source
- Other – Legalpage-00008_p283-p321.pdf · uploaded 25 Jul 2025Source
- Other – Legalpage-00009_p322-p340.pdf · uploaded 25 Jul 2025Source
- Other – Legalsabari DA 9117-2020 Index II.PDF · uploaded 25 Jul 2025Source
- Other – LegalVida Infahub LLP_Declaration on legal heirs.pdf · uploaded 25 Jul 2025Source
- Other – Legal2.pdf · uploaded 25 Jul 2025Source
- Other – Legal3.pdf · uploaded 25 Jul 2025Source
- Other – Legal4.pdf · uploaded 25 Jul 2025Source
- Other – LegalSDA 1-35.pdf · uploaded 25 Jul 2025Source
- Other – LegalSDA 36-104.pdf · uploaded 25 Jul 2025Source
- Other – LegalSDA 105-138.pdf · uploaded 25 Jul 2025Source
- Other – LegalSDA 139-172.pdf · uploaded 25 Jul 2025Source
- Other – LegalSDA 173-206.pdf · uploaded 25 Jul 2025Source
- Other – LegalSDA 207-240.pdf · uploaded 25 Jul 2025Source
- Other – LegalSDA 241-274.pdf · uploaded 25 Jul 2025Source
- Other – LegalSDA 275-308.pdf · uploaded 25 Jul 2025Source
- Other – LegalSDA 309-end.pdf · uploaded 25 Jul 2025Source
- Other – Legal1_SDA POA.pdf · uploaded 25 Jul 2025Source
- Other – Legal2_SDA POA.pdf · uploaded 25 Jul 2025Source
- Other – Legalpage-00001_p1-p35.pdf · uploaded 25 Jul 2025Source
- Other – Legalpage-00002_p36-p77.pdf · uploaded 25 Jul 2025Source
- Other – Legalpage-00003_p78-p120.pdf · uploaded 25 Jul 2025Source
- Other – Legalpage-00004_p121-p158.pdf · uploaded 25 Jul 2025Source
- Other – Legalpage-00005_p159-p198.pdf · uploaded 25 Jul 2025Source
- Other – Legalpage-00006_p199-p240.pdf · uploaded 25 Jul 2025Source
- Other – Legalpage-00007_p241-p282.pdf · uploaded 25 Jul 2025Source
- Other – Legalpage-00008_p283-p321.pdf · uploaded 25 Jul 2025Source
- Other – Legalpage-00009_p322-p340.pdf · uploaded 25 Jul 2025Source
- Other – Legalsabari DA 9117-2020 Index II.PDF · uploaded 25 Jul 2025Source
- Other – LegalVida Infahub LLP_Declaration on legal heirs.pdf · uploaded 25 Jul 2025Source
- Other – Legalloi sabari.pdf · uploaded 31 Jul 2025Source
- Other – LegalDeclaration_31-07-2025.pdf · uploaded 31 Jul 2025Source
- Other – Legalloi sabari.pdf · uploaded 31 Jul 2025Source
- Other – LegalDeclaration_31-07-2025.pdf · uploaded 31 Jul 2025Source
Migrated
- 1 PAN CardPAN CARD VIDA INFRAHUB LLP.PDF · uploaded 19 Oct 2024Source
- 1 a Details of encumbrances concerned to FinanceNo encumbrance Self-Declaration_Financial_Dt 07 11 24.pdf · uploaded 19 Oct 2024Source
- 10 Copy of Layout Approval (in case of layout)1_11zon.pdf · uploaded 19 Oct 2024Source
- 1 Proforma of Allotment letter1 Proforma of Allotment letter (20).pdf · uploaded 19 Oct 2024Source
- 1 Declaration in FORM BPROMOTER FORM B NEW 3-4-25.pdf · uploaded 19 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 Architect certificate Elevia.pdf · uploaded 19 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final CA Certificate Form 3 Elevia (2).pdf · uploaded 19 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Form 2_Elevia.pdf · uploaded 19 Oct 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentSabari Plinth CC dtd 27-02-2025.pdf · uploaded 19 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentIOA Corving Letter for Sabari_compressed.pdf · uploaded 19 Oct 2024Source
- 1 Declaration about Commencement CertificateSabari CC declaration for RERA.PDF · uploaded 19 Oct 2024Source
- 1 CERSAI detailsCersai Declaration_ Elevia 07 11 24.pdf · uploaded 19 Oct 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)FORMAT A -29-03-2025.pdf · uploaded 19 Oct 2024Source
- 1 Deviation Report with respect to Allotment letterNo Deviation report allotment letter_Elevia.pdf · uploaded 19 Oct 2024Source
- 1 b Details of encumbrances concerned to LegalNo encumbrance Self-Declaration_Financial_Dt 07 11 24.pdf · uploaded 19 Oct 2024Source
- 1 Deviation Report with respect to model copy of AgreementDeviation report for agreement for sale_Elevia.pdf · uploaded 19 Oct 2024Source
- 1 Proforma of Agreement for sale1 Proforma of Agreement for sale (81) (1).pdf · uploaded 19 Oct 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDOI of all partners merged.pdf · uploaded 19 Oct 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Vida Format B.pdf · uploaded 19 Oct 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectDisclosure of Secure Unsecured_Elevia.pdf · uploaded 19 Oct 2024Source
- 1 PAN CardPAN CARD VIDA INFRAHUB LLP.PDF · uploaded 19 Oct 2024Source
- 1 a Details of encumbrances concerned to FinanceNo encumbrance Self-Declaration_Financial_Dt 07 11 24.pdf · uploaded 19 Oct 2024Source
- 10 Copy of Layout Approval (in case of layout)1_11zon.pdf · uploaded 19 Oct 2024Source
- 1 Proforma of Allotment letter1 Proforma of Allotment letter (20).pdf · uploaded 19 Oct 2024Source
- 1 Declaration in FORM BPROMOTER FORM B NEW 3-4-25.pdf · uploaded 19 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 Architect certificate Elevia.pdf · uploaded 19 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final CA Certificate Form 3 Elevia (2).pdf · uploaded 19 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Form 2_Elevia.pdf · uploaded 19 Oct 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentSabari Plinth CC dtd 27-02-2025.pdf · uploaded 19 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentIOA Corving Letter for Sabari_compressed.pdf · uploaded 19 Oct 2024Source
- 1 Declaration about Commencement CertificateSabari CC declaration for RERA.PDF · uploaded 19 Oct 2024Source
- 1 CERSAI detailsCersai Declaration_ Elevia 07 11 24.pdf · uploaded 19 Oct 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)FORMAT A -29-03-2025.pdf · uploaded 19 Oct 2024Source
- 1 Deviation Report with respect to Allotment letterNo Deviation report allotment letter_Elevia.pdf · uploaded 19 Oct 2024Source
- 1 b Details of encumbrances concerned to LegalNo encumbrance Self-Declaration_Financial_Dt 07 11 24.pdf · uploaded 19 Oct 2024Source
- 1 Deviation Report with respect to model copy of AgreementDeviation report for agreement for sale_Elevia.pdf · uploaded 19 Oct 2024Source
- 1 Proforma of Agreement for sale1 Proforma of Agreement for sale (81) (1).pdf · uploaded 19 Oct 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDOI of all partners merged.pdf · uploaded 19 Oct 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Vida Format B.pdf · uploaded 19 Oct 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectDisclosure of Secure Unsecured_Elevia.pdf · uploaded 19 Oct 2024Source
- 2 a Details of encumbrances concerned to FinanceNo encumbrances Self Declaration legal_Elevia.pdf · uploaded 26 Nov 2024Source
- 2 b Details of encumbrances concerned to LegalNo encumbrances Self Declaration legal_Elevia.pdf · uploaded 26 Nov 2024Source
- 2 a Details of encumbrances concerned to FinanceNo encumbrances Self Declaration legal_Elevia.pdf · uploaded 26 Nov 2024Source
- 2 b Details of encumbrances concerned to LegalNo encumbrances Self Declaration legal_Elevia.pdf · uploaded 26 Nov 2024Source
- 1 Other – TechnicalSpecimen format of Declaration - standalone_Elevia.pdf · uploaded 29 Nov 2024Source
- 1 Other – TechnicalSpecimen format of Declaration - standalone_Elevia.pdf · uploaded 29 Nov 2024Source
- 7 Copy of Layout Approval (in case of layout)IOA Plan 8-16 (1)_7-7.pdf · uploaded 2 Apr 2025Source
- 9 Copy of Layout Approval (in case of layout)IOA Plan 8-16 (1)_9-end.pdf · uploaded 2 Apr 2025Source
- 8 Copy of Layout Approval (in case of layout)IOA Plan 8-16 (1)_8-8.pdf · uploaded 2 Apr 2025Source
- 6 Copy of Layout Approval (in case of layout)IOA Plan 8-16 (1)_6-6.pdf · uploaded 2 Apr 2025Source
- 5 Copy of Layout Approval (in case of layout)IOA Plan 8-16 (1)_5-5.pdf · uploaded 2 Apr 2025Source
- 4 Copy of Layout Approval (in case of layout)IOA Plan 8-16 (1)_4-4.pdf · uploaded 2 Apr 2025Source
- 3 Copy of Layout Approval (in case of layout)IOA Plan 8-16 (1)_3-3.pdf · uploaded 2 Apr 2025Source
- 2 Copy of Layout Approval (in case of layout)3_11zon.pdf · uploaded 2 Apr 2025Source
- 1 Copy of Layout Approval (in case of layout)IOA Plan 1-7 (1)_2-2.pdf · uploaded 2 Apr 2025Source
- 7 Copy of Layout Approval (in case of layout)IOA Plan 8-16 (1)_7-7.pdf · uploaded 2 Apr 2025Source
- 9 Copy of Layout Approval (in case of layout)IOA Plan 8-16 (1)_9-end.pdf · uploaded 2 Apr 2025Source
- 8 Copy of Layout Approval (in case of layout)IOA Plan 8-16 (1)_8-8.pdf · uploaded 2 Apr 2025Source
- 6 Copy of Layout Approval (in case of layout)IOA Plan 8-16 (1)_6-6.pdf · uploaded 2 Apr 2025Source
- 5 Copy of Layout Approval (in case of layout)IOA Plan 8-16 (1)_5-5.pdf · uploaded 2 Apr 2025Source
- 4 Copy of Layout Approval (in case of layout)IOA Plan 8-16 (1)_4-4.pdf · uploaded 2 Apr 2025Source
- 3 Copy of Layout Approval (in case of layout)IOA Plan 8-16 (1)_3-3.pdf · uploaded 2 Apr 2025Source
- 2 Copy of Layout Approval (in case of layout)3_11zon.pdf · uploaded 2 Apr 2025Source
- 1 Copy of Layout Approval (in case of layout)IOA Plan 1-7 (1)_2-2.pdf · uploaded 2 Apr 2025Source
- 1 Other – Legalpage-00001_p1-p18.pdf · uploaded 11 Apr 2025Source
- 2 Other – Legalpage-00002_p19-p30.pdf · uploaded 11 Apr 2025Source
- 3 Other – Legalpage-00003_p31-p47.pdf · uploaded 11 Apr 2025Source
- 4 Other – Legalpage-00004_p48-p63.pdf · uploaded 11 Apr 2025Source
- 5 Other – Legalpage-00005_p64-p80.pdf · uploaded 11 Apr 2025Source
- 6 Other – Legalpage-00006_p81-p104.pdf · uploaded 11 Apr 2025Source
- 7 Other – Legalpage-00007_p105-p126.pdf · uploaded 11 Apr 2025Source
- 8 Other – Legal1.pdf · uploaded 11 Apr 2025Source
- 1 Other – Legalpage-00001_p1-p18.pdf · uploaded 11 Apr 2025Source
- 2 Other – Legalpage-00002_p19-p30.pdf · uploaded 11 Apr 2025Source
- 3 Other – Legalpage-00003_p31-p47.pdf · uploaded 11 Apr 2025Source
- 4 Other – Legalpage-00004_p48-p63.pdf · uploaded 11 Apr 2025Source
- 5 Other – Legalpage-00005_p64-p80.pdf · uploaded 11 Apr 2025Source
- 6 Other – Legalpage-00006_p81-p104.pdf · uploaded 11 Apr 2025Source
- 7 Other – Legalpage-00007_p105-p126.pdf · uploaded 11 Apr 2025Source
- 8 Other – Legal1.pdf · uploaded 11 Apr 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentdeclaration merged.pdf · uploaded 30 Apr 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentdeclaration merged.pdf · uploaded 30 Apr 2025Source
- 9 Other – LegalMCA VIDA INFRAHUB LLP.PDF · uploaded 30 May 2025Source
- 9 Other – LegalMCA VIDA INFRAHUB LLP.PDF · uploaded 30 May 2025Source
- 1 Copy of the legal title reportTitle Certificate - NS (1)_1-9.pdf · uploaded 11 Jul 2025Source
- 1 Other – FinanceElevia_ Final Landowners Declaration for no sale.pdf · uploaded 11 Jul 2025Source
- 1 Copy of the legal title reportTitle Certificate - NS (1)_1-9.pdf · uploaded 11 Jul 2025Source
- 1 Other – FinanceElevia_ Final Landowners Declaration for no sale.pdf · uploaded 11 Jul 2025Source
- 2 Copy of the legal title reportTitle Certificate - NS (1)_10-end.pdf · uploaded 21 Jul 2025Source
- 2 Copy of the legal title reportTitle Certificate - NS (1)_10-end.pdf · uploaded 21 Jul 2025Source
- 20 Other – LegalSDA 275-308.pdf · uploaded 25 Jul 2025Source
- 21 Other – LegalSDA 309-end.pdf · uploaded 25 Jul 2025Source
- 22 Other – Legal1_SDA POA.pdf · uploaded 25 Jul 2025Source
- 23 Other – Legal2_SDA POA.pdf · uploaded 25 Jul 2025Source
- 14 Other – LegalSDA 36-104.pdf · uploaded 25 Jul 2025Source
- 24 Other – Legalpage-00001_p1-p35.pdf · uploaded 25 Jul 2025Source
- 25 Other – Legalpage-00002_p36-p77.pdf · uploaded 25 Jul 2025Source
- 26 Other – Legalpage-00003_p78-p120.pdf · uploaded 25 Jul 2025Source
- 27 Other – Legalpage-00004_p121-p158.pdf · uploaded 25 Jul 2025Source
- 28 Other – Legalpage-00005_p159-p198.pdf · uploaded 25 Jul 2025Source
- 29 Other – Legalpage-00006_p199-p240.pdf · uploaded 25 Jul 2025Source
- 30 Other – Legalpage-00007_p241-p282.pdf · uploaded 25 Jul 2025Source
- 31 Other – Legalpage-00008_p283-p321.pdf · uploaded 25 Jul 2025Source
- 32 Other – Legalpage-00009_p322-p340.pdf · uploaded 25 Jul 2025Source
- 33 Other – Legalsabari DA 9117-2020 Index II.PDF · uploaded 25 Jul 2025Source
- 34 Other – LegalVida Infahub LLP_Declaration on legal heirs.pdf · uploaded 25 Jul 2025Source
- 18 Other – LegalSDA 207-240.pdf · uploaded 25 Jul 2025Source
- 10 Other – Legal2.pdf · uploaded 25 Jul 2025Source
- 11 Other – Legal3.pdf · uploaded 25 Jul 2025Source
- 12 Other – Legal4.pdf · uploaded 25 Jul 2025Source
- 13 Other – LegalSDA 1-35.pdf · uploaded 25 Jul 2025Source
- 15 Other – LegalSDA 105-138.pdf · uploaded 25 Jul 2025Source
- 16 Other – LegalSDA 139-172.pdf · uploaded 25 Jul 2025Source
- 17 Other – LegalSDA 173-206.pdf · uploaded 25 Jul 2025Source
- 19 Other – LegalSDA 241-274.pdf · uploaded 25 Jul 2025Source
- 20 Other – LegalSDA 275-308.pdf · uploaded 25 Jul 2025Source
- 21 Other – LegalSDA 309-end.pdf · uploaded 25 Jul 2025Source
- 22 Other – Legal1_SDA POA.pdf · uploaded 25 Jul 2025Source
- 23 Other – Legal2_SDA POA.pdf · uploaded 25 Jul 2025Source
- 14 Other – LegalSDA 36-104.pdf · uploaded 25 Jul 2025Source
- 24 Other – Legalpage-00001_p1-p35.pdf · uploaded 25 Jul 2025Source
- 25 Other – Legalpage-00002_p36-p77.pdf · uploaded 25 Jul 2025Source
- 26 Other – Legalpage-00003_p78-p120.pdf · uploaded 25 Jul 2025Source
- 27 Other – Legalpage-00004_p121-p158.pdf · uploaded 25 Jul 2025Source
- 28 Other – Legalpage-00005_p159-p198.pdf · uploaded 25 Jul 2025Source
- 29 Other – Legalpage-00006_p199-p240.pdf · uploaded 25 Jul 2025Source
- 30 Other – Legalpage-00007_p241-p282.pdf · uploaded 25 Jul 2025Source
- 31 Other – Legalpage-00008_p283-p321.pdf · uploaded 25 Jul 2025Source
- 32 Other – Legalpage-00009_p322-p340.pdf · uploaded 25 Jul 2025Source
- 33 Other – Legalsabari DA 9117-2020 Index II.PDF · uploaded 25 Jul 2025Source
- 34 Other – LegalVida Infahub LLP_Declaration on legal heirs.pdf · uploaded 25 Jul 2025Source
- 18 Other – LegalSDA 207-240.pdf · uploaded 25 Jul 2025Source
- 10 Other – Legal2.pdf · uploaded 25 Jul 2025Source
- 11 Other – Legal3.pdf · uploaded 25 Jul 2025Source
- 12 Other – Legal4.pdf · uploaded 25 Jul 2025Source
- 13 Other – LegalSDA 1-35.pdf · uploaded 25 Jul 2025Source
- 15 Other – LegalSDA 105-138.pdf · uploaded 25 Jul 2025Source
- 16 Other – LegalSDA 139-172.pdf · uploaded 25 Jul 2025Source
- 17 Other – LegalSDA 173-206.pdf · uploaded 25 Jul 2025Source
- 19 Other – LegalSDA 241-274.pdf · uploaded 25 Jul 2025Source
- 35 Other – Legalloi sabari.pdf · uploaded 31 Jul 2025Source
- 36 Other – LegalDeclaration_31-07-2025.pdf · uploaded 31 Jul 2025Source
- 35 Other – Legalloi sabari.pdf · uploaded 31 Jul 2025Source
- 36 Other – LegalDeclaration_31-07-2025.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 1Elevia Arch Certificate July 25 to Sept 25 10 10 2025.pdf · uploaded 27 May 2026Source
- Withdrawal Update Form 2Elevia Engineer Certificate July 25 to Sept 25.pdf · uploaded 27 May 2026Source
- Withdrawal Update Form 3CA Certificate Form 3 June 25 to Sept 25 quarter_11zon.pdf · uploaded 27 May 2026Source
- Withdrawal Update Form 1Withdrawal Update Form 1 · uploaded 28 May 2026Source
- Withdrawal Update Form 1form 1 architect certificate ELEVIA till Dec 2025.pdf · uploaded 28 May 2026Source
- Withdrawal Update Form 2Withdrawal Update Form 2 · uploaded 28 May 2026Source
- Withdrawal Update Form 2Engineer certificate Elevia Oct 2025 to Dec 2025.pdf · uploaded 28 May 2026Source
- Withdrawal Update Form 3Withdrawal Update Form 3 · uploaded 28 May 2026Source
- Withdrawal Update Form 3CA certificate Form 3 Oct 2025 to Dec 2025 Elevia.pdf · uploaded 28 May 2026Source
- Withdrawal Update Form 1Elevia ARchitect Certificate till 31 03 2026.pdf · uploaded 1 Jun 2026Source
- Withdrawal Update Form 2FORM 2 ELEVIA Jan 26 to March 26.pdf · uploaded 1 Jun 2026Source
- Withdrawal Update Form 3CA Certificate Form 3 Elevia Jan 26 to Mar 26 (1).pdf · uploaded 1 Jun 2026Source
- Withdrawal Update Form 1Elevia Architect Certificate till June 30 2026.pdf · uploaded 4 Sep 2026Source
- Withdrawal Update Form 2Elevia form 2 Engineeer certificate till June 2026.pdf · uploaded 4 Sep 2026Source
- Withdrawal Update Form 3CA Certificate June 2026 quarter Elevia.pdf · uploaded 4 Sep 2026Source
- Form 2A (FY 2025-2026)Form 2A_Elevia_April 2025 to March 2026.pdf · uploaded 6 Oct 2026Source
Technical
- Document1_11zon.pdf · uploaded 19 Oct 2024Source
- Document1_11zon.pdf · uploaded 19 Oct 2024Source
- DocumentIOA Corving Letter for Sabari_compressed.pdf · uploaded 19 Oct 2024Source
- DocumentIOA Corving Letter for Sabari_compressed.pdf · uploaded 19 Oct 2024Source
- Other – TechnicalSpecimen format of Declaration - standalone_Elevia.pdf · uploaded 29 Nov 2024Source
- Other – TechnicalSpecimen format of Declaration - standalone_Elevia.pdf · uploaded 29 Nov 2024Source
- DocumentIOA Plan 1-7 (1)_2-2.pdf · uploaded 2 Apr 2025Source
- Document3_11zon.pdf · uploaded 2 Apr 2025Source
- DocumentIOA Plan 8-16 (1)_3-3.pdf · uploaded 2 Apr 2025Source
- DocumentIOA Plan 8-16 (1)_4-4.pdf · uploaded 2 Apr 2025Source
- DocumentIOA Plan 8-16 (1)_5-5.pdf · uploaded 2 Apr 2025Source
- DocumentIOA Plan 8-16 (1)_6-6.pdf · uploaded 2 Apr 2025Source
- DocumentIOA Plan 8-16 (1)_7-7.pdf · uploaded 2 Apr 2025Source
- DocumentIOA Plan 8-16 (1)_8-8.pdf · uploaded 2 Apr 2025Source
- DocumentIOA Plan 8-16 (1)_9-end.pdf · uploaded 2 Apr 2025Source
- DocumentIOA Plan 1-7 (1)_2-2.pdf · uploaded 2 Apr 2025Source
- Document3_11zon.pdf · uploaded 2 Apr 2025Source
- DocumentIOA Plan 8-16 (1)_3-3.pdf · uploaded 2 Apr 2025Source
- DocumentIOA Plan 8-16 (1)_4-4.pdf · uploaded 2 Apr 2025Source
- DocumentIOA Plan 8-16 (1)_5-5.pdf · uploaded 2 Apr 2025Source
- DocumentIOA Plan 8-16 (1)_6-6.pdf · uploaded 2 Apr 2025Source
- DocumentIOA Plan 8-16 (1)_7-7.pdf · uploaded 2 Apr 2025Source
- DocumentIOA Plan 8-16 (1)_8-8.pdf · uploaded 2 Apr 2025Source
- DocumentIOA Plan 8-16 (1)_9-end.pdf · uploaded 2 Apr 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 704/1 to 5, 705
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 3BHK, landowner flat, 4BHK, 2BHK164 units in all
- Address
- CTS.NO 704, 704/1 to 5, 705, 705/1 to 4, 721, 721/1 to 18, 722, 722/1 to 14, 723, 723/1 to 11, 724, 724/1 to 4, 725, 725/1 to 2 & 726, 727, 727/1 to 7 of VILLAGE BORLAE BORLA, BORLA EAST, CHEMBURPIN 400071
- Village
- Borla, Kurla taluka
- Land area for this project
- 4,480 sq m (48,222 sq ft)
- Permissible built-up area
- 23,767 sq m (2,55,825 sq ft)
- Sanctioned built-up area
- 11,207 sq m (1,20,626 sq ft)
- Recreational open space
- 0 sq m (0 sq ft)
- Designated bank account
- 76
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
CTS.NO 704,704/1 to 5, 705,705/1 to 4, 721,721/1 to 18, 722,722/1 to 14, 723,723/1 to 11, 724,724/1 to 4,725,725/1 to 2 & 726,727,727/1 to 7 of VILLAGE BORLAE BORLA
Boundaries
- North
- Din Quary Road
- South
- CTS No 728
- East
- Green Acre Society
- West
- Eastern Free Way
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking164 units
0 of 164 units booked (0%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing A | 1BHK | 39.69 sq m · 427 sq ft | 9 | 0 |
| Wing A | 3BHK | 88.06 sq m · 948 sq ft | 8 | 0 |
| Wing A | landowner flat | 39.69 sq m · 427 sq ft | 4 | 0 |
| Wing A | landowner flat | 88.06 sq m · 948 sq ft | 5 | 0 |
| Wing A | landowner flat | 92.4 sq m · 995 sq ft | 1 | 0 |
| Wing B | 3BHK | 63.35 sq m · 682 sq ft | 7 | 0 |
| Wing B | 3BHK | 84.39 sq m · 908 sq ft | 12 | 0 |
| Wing B | 4BHK | 107.39 sq m · 1,156 sq ft | 1 | 0 |
Show all 21 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing B | landowner flat | 63.35 sq m · 682 sq ft | 6 | 0 |
| Wing B | landowner flat | 84.39 sq m · 908 sq ft | 1 | 0 |
| Wing C | 2BHK | 58.97 sq m · 635 sq ft | 14 | 0 |
| Wing C | 2BHK | 59.62 sq m · 642 sq ft | 14 | 0 |
| Wing C | 3BHK | 61.36 sq m · 660 sq ft | 13 | 0 |
| Wing C | 3BHK | 61.44 sq m · 661 sq ft | 12 | 0 |
| Wing C | landowner flat | 61.36 sq m · 660 sq ft | 1 | 0 |
| Wing C | landowner flat | 61.44 sq m · 661 sq ft | 1 | 0 |
| Wing D | 2BHK | 58.97 sq m · 635 sq ft | 28 | 0 |
| Wing D | 3BHK | 60.5 sq m · 651 sq ft | 11 | 0 |
| Wing D | 3BHK | 61.43 sq m · 661 sq ft | 10 | 0 |
| Wing D | landowner flat | 60.5 sq m · 651 sq ft | 3 | 0 |
| Wing D | landowner flat | 61.43 sq m · 661 sq ft | 3 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Mr Mehul Vaghela | — |
| Chartered accountant | Sn Katdare And Co | — |
| Engineer | Rajesh tiwari | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Borla
- Chhadva HarmonyRERA PM1180002502732
- One UttamRERA PR1180002501996
- Business SquareRERA PC1180002501468
- Shree Raam ResidencyRERA PR1180002500484
- One Meraki Wing ERERA P51800077475
All 6 projects in Borla · Compare Elevia with another project