Skip to content
Residential / Group Housing · 1 building · 60 unitsRERA P53000053102

Vathare Elites

Deedo IDDP-KOL-RRTE

Completion was pushed back 4 months, to Jan 2028; no MahaRERA orders on record; 48% of its units are booked.

Ichalkaranji (M Cl), Kolhapur 416115 · by Jahir Chandsab Soudagar

DeliveryExtended 4 moPromised Sep 2027 · now due Jan 2028RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales48% booked29 of 60 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Jan 2028

  • This projectRegistered 16 Oct 2023, completion promised 25 Sep 2027, revised to 25 Jan 2028.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP53000053102
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5300005310216 Oct 202325 Sep 202725 Jan 2028Jahir Chandsab SoudagarProject page
Documents162

1 document held by Deedo, 161 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardJAHIR SOUDAGAR PAN CARD.pdf · uploaded 17 Apr 2023Source
  • PAN CardAbvhijit vathare pan card.pdf · uploaded 17 Apr 2023Source
  • PAN Cardbharmu vathare pan 001.pdf · uploaded 17 Apr 2023Source
  • PAN Cardkallappa vathare pan 001.pdf · uploaded 17 Apr 2023Source
  • PAN Cardmahavir vathare pan card.pdf · uploaded 17 Apr 2023Source
  • PAN CardRamchandra vathare pan card 001.pdf · uploaded 17 Apr 2023Source
  • PAN Cardraosaheb vathare pan card.pdf · uploaded 24 Apr 2023Source
Show all 162 documentsShow fewer documents

Legal

  • Other – LegalPower of atorney-1-22.pdf · uploaded 17 Apr 2023Source
  • Other – LegalPower of atorney-23-44.pdf · uploaded 17 Apr 2023Source
  • Other – Legaldevelopment agreement-1-18.pdf · uploaded 17 Apr 2023Source
  • Other – Legaldevelopment agreement-19-37.pdf · uploaded 17 Apr 2023Source
  • Other – Legaldevelopment agreement-38-56.pdf · uploaded 17 Apr 2023Source
  • Declaration Form BFORM B.pdf · uploaded 17 Apr 2023Source
  • Other – Legal7-12.pdf · uploaded 20 Apr 2023Source
  • Other – Legalsearch report.pdf · uploaded 22 Apr 2023Source
  • Legal Title reportlegal report.pdf · uploaded 24 Apr 2023Source
  • Other – LegalAFFIDAVIT -RAMCHANDRA VATHARE.pdf · uploaded 28 Apr 2023Source
  • Other – Legalform for renewal of building permission.pdf · uploaded 28 Apr 2023Source

Migrated

  • 1 PAN CardJAHIR SOUDAGAR PAN CARD.pdf · uploaded 17 Apr 2023Source
  • 2 PAN CardAbvhijit vathare pan card.pdf · uploaded 17 Apr 2023Source
  • 3 PAN Cardbharmu vathare pan 001.pdf · uploaded 17 Apr 2023Source
  • 4 PAN Cardkallappa vathare pan 001.pdf · uploaded 17 Apr 2023Source
  • 5 PAN Cardmahavir vathare pan card.pdf · uploaded 17 Apr 2023Source
  • 6 PAN CardRamchandra vathare pan card 001.pdf · uploaded 17 Apr 2023Source
  • 1 Copy of Layout Approval (in case of layout)layout plan_compressed.pdf · uploaded 17 Apr 2023Source
  • 2 Copy of Layout Approval (in case of layout)LAYOUT APPROVAL CERTIFICATE.pdf · uploaded 17 Apr 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentsanctioned dwg 1_compressed.pdf · uploaded 17 Apr 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentsanctioned dwg 2_compressed.pdf · uploaded 17 Apr 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentBANDHKAM PERMISSION 001.pdf · uploaded 17 Apr 2023Source
  • 1 Declaration in FORM BFORM B.pdf · uploaded 17 Apr 2023Source
  • 1 Other – LegalPower of atorney-1-22.pdf · uploaded 17 Apr 2023Source
  • 2 Other – LegalPower of atorney-23-44.pdf · uploaded 17 Apr 2023Source
  • 3 Other – Legaldevelopment agreement-1-18.pdf · uploaded 17 Apr 2023Source
  • 4 Other – Legaldevelopment agreement-19-37.pdf · uploaded 17 Apr 2023Source
  • 5 Other – Legaldevelopment agreement-38-56.pdf · uploaded 17 Apr 2023Source
  • 3 Copy of Layout Approval (in case of layout)PRATHMIK REKHANKAN.pdf · uploaded 18 Apr 2023Source
  • 4 Copy of Layout Approval (in case of layout)prathmik rekhankan 001.pdf · uploaded 18 Apr 2023Source
  • 1 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf · uploaded 18 Apr 2023Source
  • 1 CERSAI detailsCERSAI 001.pdf · uploaded 18 Apr 2023Source
  • 1 Proforma of Allotment letterAllottment Letter Vathare Elites.pdf · uploaded 18 Apr 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentprathmik rekhankan 001.pdf · uploaded 19 Apr 2023Source
  • 6 Other – Legal7-12.pdf · uploaded 20 Apr 2023Source
  • 1 a Details of encumbrances concerned to FinanceENCUMBRANCE CERTIFICATE.pdf · uploaded 22 Apr 2023Source
  • 2 a Details of encumbrances concerned to Financeno encumbrances legal.pdf · uploaded 22 Apr 2023Source
  • 1 b Details of encumbrances concerned to LegalENCUMBRANCE CERTIFICATE.pdf · uploaded 22 Apr 2023Source
  • 2 b Details of encumbrances concerned to Legalno encumbrances legal.pdf · uploaded 22 Apr 2023Source
  • 7 Other – Legalsearch report.pdf · uploaded 22 Apr 2023Source
  • 7 PAN Cardraosaheb vathare pan card.pdf · uploaded 24 Apr 2023Source
  • 1 Copy of the legal title reportlegal report.pdf · uploaded 24 Apr 2023Source
  • 1 Deviation Report with respect to Allotment letterdeviation of allotment letter.pdf · uploaded 26 Apr 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-ARCHITECTS CERTIFICATE.pdf · uploaded 28 Apr 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-ENGINNERING CERTIFICATE.pdf · uploaded 28 Apr 2023Source
  • 8 Other – LegalAFFIDAVIT -RAMCHANDRA VATHARE.pdf · uploaded 28 Apr 2023Source
  • 9 Other – Legalform for renewal of building permission.pdf · uploaded 28 Apr 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSEPERATE BANK AC DECLARATION 001.pdf · uploaded 3 May 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsCorrected Disclosure of interest in other real estate organization.pdf · uploaded 8 May 2023Source
  • 1 Other – Technicalletter to maharera.pdf · uploaded 13 May 2023Source
  • 1 Proforma of Agreement for salerevised agreement for sale-3.pdf · uploaded 18 May 2023Source
  • 1 Deviation Report with respect to model copy of AgreementRevised deviation agreement for sale.pdf · uploaded 20 May 2023Source
  • 4 Building Plan Approval / NA Order for plotted developmentform for renewal of building permission.pdf · uploaded 6 Sep 2023Source
  • 5 Building Plan Approval / NA Order for plotted developmentcertificate of renewal CC.pdf · uploaded 6 Sep 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 -CA CERTIFICATE-6.pdf · uploaded 13 Sep 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentcertificate of renewal CC.pdf · uploaded 11 Oct 2023Source
  • 2 Declaration about Commencement CertificateREVISED DECLARTION FOR CC 001.pdf · uploaded 11 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)form 2A.pdf · uploaded 19 Feb 2025Source
  • 1 Disclosure of sold/ booked inventoryINVENTORY.pdf · uploaded 19 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5.pdf · uploaded 19 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)form 2A.pdf · uploaded 19 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5.pdf · uploaded 19 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 B.pdf · uploaded 20 Feb 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 C.pdf · uploaded 20 Feb 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 D.pdf · uploaded 20 Feb 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 E.pdf · uploaded 20 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 A.pdf · uploaded 20 Feb 2025Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 N C.pdf · uploaded 20 Feb 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 D C.pdf · uploaded 20 Feb 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 B C.pdf · uploaded 20 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 A.pdf · uploaded 20 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 1.pdf · uploaded 20 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 C.pdf · uploaded 20 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 D.pdf · uploaded 20 Feb 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 A.pdf · uploaded 20 Feb 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 B.pdf · uploaded 20 Feb 2025Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 E.pdf · uploaded 20 Feb 2025Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 4_compressed.pdf · uploaded 22 Feb 2025Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 5_compressed.pdf · uploaded 22 Feb 2025Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 3_compressed.pdf · uploaded 22 Feb 2025Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 2 C.pdf · uploaded 22 Feb 2025Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 C.pdf · uploaded 22 Feb 2025Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)form 5.pdf · uploaded 22 Feb 2025Source
  • Form 1Form 1.pdf · uploaded 28 Jun 2025Source
  • Form 2Form 2.pdf · uploaded 28 Jun 2025Source
  • Form 3Form 3 (2).pdf · uploaded 28 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDislosure.pdf · uploaded 28 Jun 2025Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 28 Jun 2025Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 28 Jun 2025Source
  • Withdrawal Update Form 3FORM 3 -CA CERTIFICATE-6.pdf · uploaded 28 Jun 2025Source
  • Form 1Form 1 _ 06 10 25.pdf · uploaded 7 Oct 2025Source
  • Form 2Form 2 06 10 25.pdf · uploaded 7 Oct 2025Source
  • Form 3Form 3 06 10 25.pdf · uploaded 7 Oct 2025Source
  • Disclosure of Sold and Booked Inventorydisclosure.pdf · uploaded 7 Oct 2025Source
  • Withdrawal Update Form 1Form 1 _ 06 10 25.pdf · uploaded 7 Oct 2025Source
  • Withdrawal Update Form 2Form 2 06 10 25.pdf · uploaded 7 Oct 2025Source
  • Withdrawal Update Form 3Form 3 06 10 25.pdf · uploaded 7 Oct 2025Source
  • Form 2A (FY 2024-2025)form 2a vatare.pdf · uploaded 11 Nov 2025Source
  • Withdrawal Update Form 1form 1 vatare.pdf · uploaded 8 Dec 2025Source
  • Withdrawal Update Form 1form 1 vatare.pdf · uploaded 8 Dec 2025Source
  • Withdrawal Update Form 2form 2 vatare.pdf · uploaded 8 Dec 2025Source
  • Withdrawal Update Form 2form 2 vatare.pdf · uploaded 8 Dec 2025Source
  • Withdrawal Update Form 3Form 3 06 10 25.pdf · uploaded 8 Dec 2025Source
  • Withdrawal Update Form 3Form 3 06 10 25.pdf · uploaded 8 Dec 2025Source
  • Withdrawal Update Form 1form 1 vatare.pdf · uploaded 9 Dec 2025Source
  • Withdrawal Update Form 1form 1 vatare.pdf · uploaded 9 Dec 2025Source
  • Withdrawal Update Form 1form 1 vatare.pdf · uploaded 9 Dec 2025Source
  • Withdrawal Update Form 1form 1 vatare.pdf · uploaded 9 Dec 2025Source
  • Withdrawal Update Form 1form 1 vatare.pdf · uploaded 9 Dec 2025Source
  • Withdrawal Update Form 2form 2 vatare.pdf · uploaded 9 Dec 2025Source
  • Withdrawal Update Form 2form 2 vatare.pdf · uploaded 9 Dec 2025Source
  • Withdrawal Update Form 2form 2 vatare.pdf · uploaded 9 Dec 2025Source
  • Withdrawal Update Form 2form 2 vatare.pdf · uploaded 9 Dec 2025Source
  • Withdrawal Update Form 2form 2 vatare.pdf · uploaded 9 Dec 2025Source
  • Withdrawal Update Form 3Form 3 New.pdf · uploaded 9 Dec 2025Source
  • Withdrawal Update Form 3Form 3 New.pdf · uploaded 9 Dec 2025Source
  • Withdrawal Update Form 3Form 3 New.pdf · uploaded 9 Dec 2025Source
  • Withdrawal Update Form 3Form 3 New.pdf · uploaded 9 Dec 2025Source
  • Withdrawal Update Form 3Form 3 New.pdf · uploaded 9 Dec 2025Source
  • Form 5 (FY 2024-2025)Form 5_ Vathare.pdf · uploaded 9 Dec 2025Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 10 Mar 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 10 Mar 2026Source
  • Withdrawal Update Form 3FORM 3_compressed.pdf · uploaded 10 Mar 2026Source
  • Withdrawal Update Form 1FORM 1 SIGNED.pdf · uploaded 21 May 2026Source
  • Withdrawal Update Form 2Form 2 - signed.pdf · uploaded 21 May 2026Source
  • Withdrawal Update Form 3Form 3 - signed.pdf · uploaded 21 May 2026Source
  • Withdrawal Update Form 1Form 1 Jahir Soudagar.pdf · uploaded 22 Sep 2026Source
  • Withdrawal Update Form 2Form 2 Jahir Soudagar.pdf · uploaded 22 Sep 2026Source
  • Withdrawal Update Form 3Form 3 Jahir Soudagar.pdf · uploaded 22 Sep 2026Source
  • Withdrawal Update Form 1Form 1 Jahir Soudagar.pdf · uploaded 7 Oct 2026Source
  • Withdrawal Update Form 2Form 2 Jahir Soudagar.pdf · uploaded 7 Oct 2026Source
  • Withdrawal Update Form 3Form 3 Jahir Soudagar.pdf · uploaded 7 Oct 2026Source

Technical

  • Documentlayout plan_compressed.pdf · uploaded 17 Apr 2023Source
  • DocumentLAYOUT APPROVAL CERTIFICATE.pdf · uploaded 17 Apr 2023Source
  • Documentsanctioned dwg 1_compressed.pdf · uploaded 17 Apr 2023Source
  • Documentsanctioned dwg 2_compressed.pdf · uploaded 17 Apr 2023Source
  • DocumentBANDHKAM PERMISSION 001.pdf · uploaded 17 Apr 2023Source
  • DocumentPRATHMIK REKHANKAN.pdf · uploaded 18 Apr 2023Source
  • Documentprathmik rekhankan 001.pdf · uploaded 18 Apr 2023Source
  • Other – Technicalletter to maharera.pdf · uploaded 13 May 2023Source
  • Documentform for renewal of building permission.pdf · uploaded 6 Sep 2023Source
  • Documentcertificate of renewal CC.pdf · uploaded 6 Sep 2023Source

Technical (Architect)

  • DocumentFORM 1 A.pdf · uploaded 20 Feb 2025Source
  • DocumentFORM 1 B.pdf · uploaded 20 Feb 2025Source
  • DocumentFORM 1 C.pdf · uploaded 20 Feb 2025Source
  • DocumentFORM 1 D.pdf · uploaded 20 Feb 2025Source
  • DocumentFORM 1 E.pdf · uploaded 20 Feb 2025Source
  • DocumentForm 1 Jahir Soudagar.pdf · uploaded 22 Sep 2026Source

Technical (Engineer)

  • DocumentFORM 2 C.pdf · uploaded 20 Feb 2025Source
  • DocumentFORM 2 D.pdf · uploaded 20 Feb 2025Source
  • DocumentFORM 2 A.pdf · uploaded 20 Feb 2025Source
  • DocumentFORM 2 B.pdf · uploaded 20 Feb 2025Source
  • DocumentFORM 2 E.pdf · uploaded 20 Feb 2025Source
  • DocumentForm 2 Jahir Soudagar.pdf · uploaded 22 Sep 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel PLOT NO 4 R S NO 659/3 C S NO 18135

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
—60 units in all
Address
Plot No 4 R S No 659/3 C S No 18135, Madhuban Society Road, Dkte Marathi Medium School Narayan MalaPIN 416115
Village
Ichalkaranji (M Cl), Hatkanangle taluka
Land area for this project
1,248 sq m (13,439 sq ft)
Permissible built-up area
8,488 sq m (91,369 sq ft)
Sanctioned built-up area
3,855 sq m (41,495 sq ft)
Designated bank account
66
Developed in phases
No

Survey, CTS, gat or plot numbers

PLOT NO 4 R S NO 659/3 C S NO 18135

Land as published on MahaRERA's project page

PLOT NO 4 R S NO 659/3 C S NO 18135

Boundaries

North
Mr Gandhi
South
Open Space And Road
East
Plot No 3
West
R S No 18125

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking60 units

60 units registered

— · 60 units
TypeCarpet areaUnits
——60

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSantosh Raosaheb Bhise—
Chartered accountantSushant Balasaheb Devnal—
EngineerSantosh Raosaheb Bhise—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology