J. K. Heights
Deedo IDDP-BHA-3D5YIt is due for completion in Dec 2026, with no extension on record; no MahaRERA orders on record; 0% of its units are booked.
Tumsar (M Cl), Bhandara 441912 · by Sky Developers And Promoters India Pvt. Ltd · 40% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
It is due for completion in Dec 2026, with no extension on record
- This projectRegistered 7 Jan 2020, completion promised 31 Dec 2026.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP50600023850
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P50600023850 | 7 Jan 2020 | 31 Dec 2026 | 31 Dec 2026 | Sky Developers And Promoters India Pvt. Ltd. | Project page |
Documents137
1 document held by Deedo, 136 filings listed on MahaRERA's project page
Legal
Migrated
- 1 PAN CardSKY PAN.pdf · uploaded 12 Dec 2019Source
- 1 Copy of the legal title reportlegal title report_compressed (1).pdf · uploaded 12 Dec 2019Source
- 1 Details of encumbranceslegal title report_compressed (1).pdf · uploaded 12 Dec 2019Source
- 1 Copy of Layout Approval (in case of layout)tumsar sanction plan_compressed.pdf · uploaded 12 Dec 2019Source
- 1 Building Plan Approval / NA Order for plotted developmenttumsar sanction plan_compressed.pdf · uploaded 12 Dec 2019Source
Show all 137 documentsShow fewer documents
Migrated
- 1 Commencement Certificates / NA Order for plotted developmentCert_B__115aALWOSign.pdf · uploaded 12 Dec 2019Source
- 1 Declaration in FORM Bform b_compressed.pdf · uploaded 12 Dec 2019Source
- 1 Proforma of Allotment letterallotment.pdf · uploaded 12 Dec 2019Source
- 2 Proforma of Allotment letterAGREEMENT-AS PER RERA-FORMAT-NEW (1).pdf · uploaded 12 Dec 2019Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA FORM3_compressed (1).pdf · uploaded 30 Dec 2019Source
- 1 Declaration about Commencement CertificateCommencement Certificate.pdf · uploaded 2 Jul 2021Source
- 2 Declaration about Commencement CertificateCommencement Certificate.pdf · uploaded 2 Jul 2021Source
- 3 Declaration about Commencement CertificateCommencement Certificate.pdf · uploaded 2 Jul 2021Source
- Form 1Form1 Jan-March20.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 Jan-March20.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 Jan-March20.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory Jan-March20.pdf · uploaded 26 Jun 2025Source
- Form 1Form1 April-June20.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 April-Jun20.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 April- June20.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory April-June20.pdf · uploaded 26 Jun 2025Source
- Form 1Form1 July-Sep20.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 July-Sep20.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 July-Sep20.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory July-Sep20.pdf · uploaded 26 Jun 2025Source
- Form 1Form1 Oct-Dec20.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 Oct-Dec20.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 Oct-Dec20.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory Oct-Dec20.pdf · uploaded 26 Jun 2025Source
- Form 1Form1 Jan-March21.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 Jan-March21.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 Jan-March21.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory Jan-March21.pdf · uploaded 26 Jun 2025Source
- Form 1Form1 April-June21.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 April-Jun21.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 April-Jun21.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory April-June21.pdf · uploaded 26 Jun 2025Source
- Form 1Form1 July-Sep21.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 July-Sep21.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 July -Sep21.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory July-Sep21.pdf · uploaded 26 Jun 2025Source
- Form 1Form1 Oct-Dec21.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 Oct-Dec21.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 Oct-Dec21.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory Oct-Dec21.pdf · uploaded 26 Jun 2025Source
- Form 1Form1 Jan-March22.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 Jan-March22.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 Jan-March22.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory Jan-March22.pdf · uploaded 26 Jun 2025Source
- Form 1Form1 April-June22.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 April-June22.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 April-June22.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory April-June22.pdf · uploaded 26 Jun 2025Source
- Form 1Form1 July-Sep22.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 July-Sep22.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 July-Sep22.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory July-Sep22.pdf · uploaded 26 Jun 2025Source
- Form 1Form1 Oct-Dec22.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 Oct-Dec22.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 Oct-Dec22.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory Oct-Dec22.pdf · uploaded 26 Jun 2025Source
- Form 1Form1 Jan-March23.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 Jan-Marc23.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 Jan-March23.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory Jan-March23.pdf · uploaded 26 Jun 2025Source
- Form 1Form1 April-June23.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 April-Jun23.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 April -June23.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory April-June23.pdf · uploaded 26 Jun 2025Source
- Form 1Form1 July-Sep23.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 July-Sep23.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 July-Sep23.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory July-Sep23.pdf · uploaded 26 Jun 2025Source
- Form 1Form1 Oct-Dec23.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 Oct-Dec23.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 Oct-Dec23.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory Oct-Dec23.pdf · uploaded 26 Jun 2025Source
- Form 1Form1 Jan-March24.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 Jan-March24.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 Jan-March24.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory Jan-March20.pdf · uploaded 26 Jun 2025Source
- Form 1Form1 April-June24.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 April-June24.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 April-June24.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory April-June24.pdf · uploaded 26 Jun 2025Source
- Form 1Form1 July-Sep24.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 July-Sep24.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 July-Sep24.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory July-Sep24.pdf · uploaded 26 Jun 2025Source
- Form 1Form1 Oct-Dec24.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 Oct-Dec24.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 Oct-Dec24.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Inventory Oct-Dec24.pdf · uploaded 26 Jun 2025Source
- Form 1Form1 Jan-March25.pdf · uploaded 26 Jun 2025Source
- Form 2Form2 Jan-March25.pdf · uploaded 26 Jun 2025Source
- Form 3Form3 Jan-March25.pdf · uploaded 26 Jun 2025Source
- Disclosure of Sold and Booked InventorySold inventory Jan-March25.pdf · uploaded 26 Jun 2025Source
- Withdrawal Update Form 1Form1 Jan-March25.pdf · uploaded 26 Jun 2025Source
- Withdrawal Update Form 2Form2 Jan-March25.pdf · uploaded 26 Jun 2025Source
- Withdrawal Update Form 3Form3 Jan-March25.pdf · uploaded 26 Jun 2025Source
- Withdrawal Update Form 1Form1 Jan-March25.pdf · uploaded 27 Jun 2025Source
- Withdrawal Update Form 2Form2 Jan-March25.pdf · uploaded 27 Jun 2025Source
- Withdrawal Update Form 3Form3 Jan-March25.pdf · uploaded 27 Jun 2025Source
- Form 2A (FY 2019-2020)Form 2A 2020-2020.pdf · uploaded 27 Jun 2025Source
- Form 2A (FY 2020-2021)Form 2A 2020-2021.pdf · uploaded 27 Jun 2025Source
- Form 2A (FY 2021-2022)Form 2A 2021-2022.pdf · uploaded 27 Jun 2025Source
- Form 2A (FY 2022-2023)Form 2A (FY 2022-2023) · uploaded 27 Jun 2025Source
- Form 2A (FY 2023-2024)Form 2A 2023-2024.pdf · uploaded 27 Jun 2025Source
- Form 5 (FY 2019-2020)Form5 2020-2020.pdf · uploaded 27 Jun 2025Source
- Form 5 (FY 2020-2021)Form5 2020-2021.pdf · uploaded 27 Jun 2025Source
- Form 5 (FY 2021-2022)Form5 2021-2022.pdf · uploaded 27 Jun 2025Source
- Form 5 (FY 2022-2023)Form5 2022-2023.pdf · uploaded 27 Jun 2025Source
- Form 5 (FY 2023-2024)Form5 2023-2024.pdf · uploaded 27 Jun 2025Source
- Withdrawal Update Form 1Form1 JK Heights April-June25.pdf · uploaded 17 Nov 2025Source
- Withdrawal Update Form 1Form1 JK Heights April-June25.pdf · uploaded 17 Nov 2025Source
- Withdrawal Update Form 2Form2 JK Heights April-June25.pdf · uploaded 17 Nov 2025Source
- Withdrawal Update Form 2Form2 JK Heights April-June25.pdf · uploaded 17 Nov 2025Source
- Withdrawal Update Form 3Form3 JK Heights April-June25.pdf · uploaded 17 Nov 2025Source
- Withdrawal Update Form 3Form3 JK Heights April-June25.pdf · uploaded 17 Nov 2025Source
- Withdrawal Update Form 1Form1 j k Heights July-Sep25.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form2 J K Heights July-Sep25.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Form3 J K Heights July-Sep25.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form1 JK Heights Oct-Dec25.pdf · uploaded 28 Jan 2026Source
- Withdrawal Update Form 2Form2 JK Heights Oct-Dec25.pdf · uploaded 28 Jan 2026Source
- Withdrawal Update Form 3Form3 JK Heights Oct-Dec25.pdf · uploaded 28 Jan 2026Source
- Form 2A (FY 2024-2025)Form 2A 24-25.pdf · uploaded 28 Jan 2026Source
- Form 5 (FY 2024-2025)Form-5 JK Heights 24-25.pdf · uploaded 28 Jan 2026Source
- Withdrawal Update Form 1Form1 jk Heights jan26 (1).pdf · uploaded 8 May 2026Source
- Withdrawal Update Form 2Form2 jk Heights jan26.pdf · uploaded 8 May 2026Source
- Withdrawal Update Form 3Form3 jk Heights jan 26.pdf · uploaded 8 May 2026Source
Technical
Technical (Architect)
- DocumentForm1 jk Heights jan26 (1).pdf · uploaded 8 May 2026Source
Technical (Engineer)
- DocumentForm2 jk Heights jan26.pdf · uploaded 8 May 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 16/171, 16/172
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, Shop79 units in all
- Address
- 1943, 42, 16/171, 1943, 42, 16/172, Rajendra Nagar, Sarafa BazaarPIN 441912
- Village
- Tumsar (M Cl), Tumsar taluka
- Location
- 21.38271, 79.74988
- Land area for this project
- 1,642 sq m (17,677 sq ft)
- Permissible built-up area
- 6,430 sq m (69,207 sq ft)
- Sanctioned built-up area
- 3,230 sq m (34,763 sq ft)
- Designated bank account
- 220
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
1943,42,16/171,1943,42,16/172
Boundaries
- North
- Nagar Palika Cement Road
- South
- Tumsar Rampayli Pwd Road
- East
- Tumsar Rampayli Pwd Road
- West
- House Of Subhash Karemore And Jagdish Karemoere
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking79 units
0 of 79 units booked (0%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 43.12 sq m · 464 sq ft | 2 | 0 |
| 2BHK | 43.51 sq m · 468 sq ft | 1 | 0 |
| 2BHK | 47.06 sq m · 507 sq ft | 2 | 0 |
| 2BHK | 47.15 sq m · 508 sq ft | 2 | 0 |
| 2BHK | 47.45 sq m · 511 sq ft | 1 | 0 |
| 2BHK | 48.55 sq m · 523 sq ft | 2 | 0 |
| 2BHK | 53.17 sq m · 572 sq ft | 2 | 0 |
| 2BHK | 54.01 sq m · 581 sq ft | 2 | 0 |
Show all 50 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Shop | 11.97 sq m · 129 sq ft | 1 | 0 |
| Shop | 15.01 sq m · 162 sq ft | 1 | 0 |
| Shop | 15.6 sq m · 168 sq ft | 1 | 0 |
| Shop | 15.64 sq m · 168 sq ft | 1 | 0 |
| Shop | 15.71 sq m · 169 sq ft | 1 | 0 |
| Shop | 15.82 sq m · 170 sq ft | 1 | 0 |
| Shop | 16.59 sq m · 179 sq ft | 1 | 0 |
| Shop | 16.59 sq m · 179 sq ft | 1 | 0 |
| Shop | 16.68 sq m · 180 sq ft | 2 | 0 |
| Shop | 16.68 sq m · 180 sq ft | 3 | 0 |
| Shop | 16.69 sq m · 180 sq ft | 1 | 0 |
| Shop | 17.73 sq m · 191 sq ft | 2 | 0 |
| Shop | 17.86 sq m · 192 sq ft | 1 | 0 |
| Shop | 17.87 sq m · 192 sq ft | 2 | 0 |
| Shop | 17.87 sq m · 192 sq ft | 4 | 0 |
| Shop | 17.88 sq m · 192 sq ft | 1 | 0 |
| Shop | 18.15 sq m · 195 sq ft | 1 | 0 |
| Shop | 18.16 sq m · 195 sq ft | 1 | 0 |
| Shop | 18.24 sq m · 196 sq ft | 1 | 0 |
| Shop | 18.25 sq m · 196 sq ft | 1 | 0 |
| Shop | 18.61 sq m · 200 sq ft | 1 | 0 |
| Shop | 18.64 sq m · 201 sq ft | 8 | 0 |
| Shop | 18.65 sq m · 201 sq ft | 1 | 0 |
| Shop | 18.81 sq m · 202 sq ft | 4 | 0 |
| Shop | 18.83 sq m · 203 sq ft | 1 | 0 |
| Shop | 19.02 sq m · 205 sq ft | 1 | 0 |
| Shop | 19.12 sq m · 206 sq ft | 1 | 0 |
| Shop | 19.16 sq m · 206 sq ft | 3 | 0 |
| Shop | 19.35 sq m · 208 sq ft | 1 | 0 |
| Shop | 20.13 sq m · 217 sq ft | 1 | 0 |
| Shop | 20.62 sq m · 222 sq ft | 2 | 0 |
| Shop | 20.71 sq m · 223 sq ft | 2 | 0 |
| Shop | 22.16 sq m · 239 sq ft | 1 | 0 |
| Shop | 22.16 sq m · 239 sq ft | 1 | 0 |
| Shop | 22.42 sq m · 241 sq ft | 2 | 0 |
| Shop | 23.6 sq m · 254 sq ft | 1 | 0 |
| Shop | 23.62 sq m · 254 sq ft | 1 | 0 |
| Shop | 25.52 sq m · 275 sq ft | 1 | 0 |
| Shop | 27.72 sq m · 298 sq ft | 1 | 0 |
| Shop | 27.79 sq m · 299 sq ft | 1 | 0 |
| Shop | 31.37 sq m · 338 sq ft | 1 | 0 |
| Shop | 31.67 sq m · 341 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals7
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Suraj Pashine | — |
| Architect | Vishwash Gupta | — |
| Chartered accountant | Jayendra Chilate | — |
| Chartered accountant | Parvez Mohsin Ali | — |
| Engineer | Ashfaque Husain | — |
| Engineer | Salim N Sheikh | — |
| Other | Haripal Pandhre | — |
Source: MahaRERA project page. Contact details are not shown.