Skip to content
Deedo home
Menu

Surya Tower 1

Completed

Bela (Ct), Bhandara 441904 |Promoter: Balaji Builders And Developers

Residential / Group HousingRERAP50600009251
22 Aug 2017Registered with MahaRERA
31 Jan 2019Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
930 sq m (10,005 sq ft)
Permissible built-up area
2,000 sq m (21,528 sq ft)
Sanctioned built-up area
2,000 sq m (21,528 sq ft)
Address
Plot No.5PIN 441904
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.50196, 73.93302
Surya Tower 1 is at latitude 18.50196, longitude 73.93302.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Jan 2019

The latest completion date on record passed 7 years and 9 months ago.

Registered
22 Aug 2017
Promised
31 Jan 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5060000925122 Aug 201731 Jan 2019—Balaji Builders And DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Surya Tower-I6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Surya Tower-I

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
  • Sanitary Fittings within the flats / premises30%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsWIP80%
  • Water SupplyWIP80%
  • Sewerage (Chamber, Lines, Septic Tank , STP)WIP80%
  • Storm Water DrainsWIP60%
  • Landscaping & Tree PlantingNOT YET STARTED0%
  • Street LightingWIP50%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterWIP80%
  • Solid Waste Management And DisposalWIP80%
  • Water conservation /Rain water harvestingNOT YET STARTED0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationWIP50%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingWIP50%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

10 documents held by Deedo, 14 filings listed on MahaRERA's project page

Title report

Encumbrance details

Form B

Form 1

Form 2

Registration certificate

Form 4

Other

Show all 24 documentsShow fewer documents

Layout plan

Allotment letter

Document library

  • Declaration in FORM BAffidavit.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Arch.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 eng.pdf · uploaded 31 Jul 2017View
  • Copy of the legal title reportTitle Search compress final.pdf · uploaded 31 Jul 2017View
  • Building Plan Approval (IOD)Approval final.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterCompress agreement format.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)Approval final.pdf · uploaded 31 Jul 2017View
  • Details of encumbrancesscan0026.pdf · uploaded 31 Jul 2017View
  • Architect’s Certificate on Completion of Project (Form 4)000 (2 files merged).pdf · uploaded 28 Jan 2021View

Promoter documents

  • Declaration Form BAffidavit.pdf · uploaded 31 Jul 2017View
  • Legal Title reportTitle Search compress final.pdf · uploaded 31 Jul 2017View

Technical documents

  • Building Plan ApprovalApproval final.pdfView
  • Layout ApprovalApproval final.pdfView

Proforma allotment letter

  • Proforma allotment letterCompress agreement format.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Bela (CT), Bhandara taluka

Survey, CTS, gat or plot numbers

5PLOT NO.5

As published on MahaRERA's project page

PLOT NO.5

Boundaries

North
43
South
51
East
23
West
26

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectYash Associates—
EngineerSajid Ali Khan—
OtherChandrakant Yele—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology