Deedo IDDP-AUR-5XP2Completion was pushed back 4 years and 5 months, to Dec 2027; no MahaRERA orders on record; 33% of its units are booked.
Devlai, Aurangabad 431001 · by Auracon Infra Prop. Manoj Kapurchand Kala
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 years and 5 months, to Dec 2027
- This projectRegistered 25 Aug 2019, completion promised 31 Jul 2023, revised to 31 Dec 2027.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
6 buildings
Open a building to see every flat, floor by floor.
- 6bSize not on record100% booked
- '8' WingSize not on record58% booked
- A Wing7 floors · 28 units54% booked
- Building (P51500022033)Size not on record71% booked
- B Wing7 floors · 28 units39% booked
- C Wing7 floors · 28 units7% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51500022033
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51500022033 | 25 Aug 2019 | 31 Jul 2023 | 31 Dec 2027 | Auracon Infra Prop. Manoj Kapurchand Kala | Project page |
Documents126
3 documents held by Deedo, 123 filings listed on MahaRERA's project page
Other
- OtherDate not statedView
Legal
- Legal Title reportLTR-compressed.pdf · uploaded 9 Jul 2019Source
- Declaration Form BForm B Corrected.pdf · uploaded 19 Aug 2019Source
- Declaration Form Brera document_compressed (1).pdf · uploaded 1 Jan 2021Source
- Declaration Form BForm- B Manoj Kala.pdf · uploaded 12 Apr 2025Source
- Declaration Form BForm- B Manoj Kala.pdf · uploaded 12 Apr 2025Source
Show all 126 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportLTR-compressed.pdf · uploaded 9 Jul 2019Source
- 1 Details of encumbrancesDeclaration of Encumbrances.pdf · uploaded 13 Jul 2019Source
- 1 Copy of Layout Approval (in case of layout)Drawing2.pdf · uploaded 13 Jul 2019Source
- 1 Building Plan Approval (IOD)Drawing2.pdf · uploaded 13 Jul 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 13 Jul 2019Source
- 1 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 13 Jul 2019Source
- 1 Proforma of Allotment letterProforma-converted.pdf · uploaded 13 Jul 2019Source
- 1 Declaration in FORM BForm B Corrected.pdf · uploaded 19 Aug 2019Source
- 2 Proforma of Allotment letterAGREEMENT FOR SALE - Draft - Auracon Infra Shubhalaya.pdf · uploaded 19 Aug 2019Source
- 3 Proforma of Allotment letterProforma-converted.pdf · uploaded 19 Aug 2019Source
- 4 Proforma of Allotment letterFinal draft agreement to sale.pdf · uploaded 29 Dec 2020Source
- 2 Declaration in FORM Brera document_compressed (1).pdf · uploaded 1 Jan 2021Source
- 1 Disclosure of sold/ booked inventoryInventory Details Auracon Infra_compressed.pdf · uploaded 9 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form no5 Mrach 2020.pdf · uploaded 9 Aug 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Arch Commpressed.pdf · uploaded 15 Aug 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Certificate Final_compressed.pdf · uploaded 15 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5.pdf · uploaded 15 Aug 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2Amarch.pdf · uploaded 16 Aug 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed.pdf · uploaded 13 Oct 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 13 Oct 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 13 Oct 2021Source
- 2 Disclosure of sold/ booked inventoryInventory Discloser_compressed.pdf · uploaded 13 Oct 2021Source
- 1 CERSAI detailsCERSAI_Search_Report_200225726322_For_Asset_Based_Search_11_12_2021_19_52_59_513.pdf · uploaded 11 Dec 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2021.pdf · uploaded 14 Mar 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec 2021.pdf · uploaded 14 Mar 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Dec 2021.pdf · uploaded 14 Mar 2022Source
- 3 Disclosure of sold/ booked inventorySol Unsold_compressed.pdf · uploaded 14 Mar 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)arch cert march 2022_compressed.pdf · uploaded 20 Jun 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 2022.pdf · uploaded 20 Jun 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A march 2022.pdf · uploaded 20 Jun 2022Source
- 4 Disclosure of sold/ booked inventorysold un sold march 2022.pdf · uploaded 20 Jun 2022Source
- 2 Certificates of CA (Form 3)Aurum Form 3compressed.pdf · uploaded 12 Jul 2022Source
- 2 a Details of encumbrances concerned to FinanceNo ENC.pdf · uploaded 25 Jan 2023Source
- 1 b Details of encumbrances concerned to LegalNo ENC.pdf · uploaded 25 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form5 march 22.pdf · uploaded 25 Jan 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Form-1 Mar-23.pdf · uploaded 15 Mar 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 Form-1 Jun-23.pdf · uploaded 15 Mar 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 Form-1 Sep-23.pdf · uploaded 15 Mar 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)4 Form-1 Dec-23.pdf · uploaded 15 Mar 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)5 Form-2 Mar-23.pdf · uploaded 15 Mar 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 Form-2 Jun-23.pdf · uploaded 15 Mar 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)7 Form-2 Sep-23.pdf · uploaded 15 Mar 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)8 Form-2 Dec-23.pdf · uploaded 15 Mar 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)13 Form 2A Mar-23.pdf · uploaded 15 Mar 2024Source
- 5 Disclosure of sold/ booked inventory14 Disc of Booking Mar-23.pdf · uploaded 15 Mar 2024Source
- 6 Disclosure of sold/ booked inventory17 Dis of Booking Dec-23.pdf · uploaded 15 Mar 2024Source
- 3 Certificates of CA (Form 3)9 Form-3 Declaration Mar-23.pdf · uploaded 15 Mar 2024Source
- 4 Certificates of CA (Form 3)10 Form-3 Declaration Jun-23.pdf · uploaded 15 Mar 2024Source
- 5 Certificates of CA (Form 3)11 Form-3 Declaration Sep-23.pdf · uploaded 15 Mar 2024Source
- 6 Certificates of CA (Form 3)12 Form-3 Declaration Dec-23.pdf · uploaded 15 Mar 2024Source
- 1 Declaration in FORM BForm- B Manoj Kala.pdf · uploaded 12 Apr 2025Source
- 1 Declaration in FORM BForm- B Manoj Kala.pdf · uploaded 12 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1Mar 2024.pdf · uploaded 14 Apr 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 2024.pdf · uploaded 14 Apr 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1Sep 2024 .pdf · uploaded 14 Apr 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1Dec 2024.pdf · uploaded 14 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 2024.pdf · uploaded 14 Apr 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Jun 2024.pdf · uploaded 14 Apr 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sep 2024.pdf · uploaded 14 Apr 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec 2024.pdf · uploaded 14 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 2023-2024.pdf · uploaded 14 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1Mar 2024.pdf · uploaded 14 Apr 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 2024.pdf · uploaded 14 Apr 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1Sep 2024 .pdf · uploaded 14 Apr 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1Dec 2024.pdf · uploaded 14 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 2024.pdf · uploaded 14 Apr 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Jun 2024.pdf · uploaded 14 Apr 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sep 2024.pdf · uploaded 14 Apr 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec 2024.pdf · uploaded 14 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 2023-2024.pdf · uploaded 14 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Form 1 Mar 25.pdf · uploaded 1 May 2025Source
- 1 Certificates of CA (Form 3)4 Form 3 Mar 25.pdf · uploaded 1 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Form 2 Mar 25.pdf · uploaded 1 May 2025Source
- Form 1Form-1 Dec 25.pdf · uploaded 1 Apr 2026Source
- Form 2Form-2 Dec 25.pdf · uploaded 1 Apr 2026Source
- Form 3Form-3 Dec 25.pdf · uploaded 1 Apr 2026Source
- Disclosure of Sold and Booked InventorySOLD DEC 25.pdf · uploaded 1 Apr 2026View
- Form 11 Form-1 June 25.pdf · uploaded 1 Apr 2026Source
- Form 22 Form-2 June 25.pdf · uploaded 1 Apr 2026Source
- Form 33 Form-3 Jun 25.pdf · uploaded 1 Apr 2026Source
- Disclosure of Sold and Booked Inventory4 Sold Jun 25.pdf · uploaded 1 Apr 2026View
- Form 11 Form 1 SEP 25.pdf · uploaded 6 May 2026Source
- Form 22 Form 2 SEP 25.pdf · uploaded 6 May 2026Source
- Form 33 Form 3 - Sep 25.pdf · uploaded 6 May 2026Source
- Disclosure of Sold and Booked Inventory4 Sold Sep 25.pdf · uploaded 6 May 2026View
- Form 2A (FY 2019-2020)1 Form 2A 2019-20.pdf · uploaded 26 May 2026Source
- Form 2A (FY 2020-2021)2 Form 2A 2020-21.pdf · uploaded 26 May 2026Source
- Form 2A (FY 2021-2022)3 Form 2A 2021-22.pdf · uploaded 26 May 2026Source
- Form 2A (FY 2022-2023)4 Form 2A 2022-23.pdf · uploaded 26 May 2026Source
- Form 2A (FY 2023-2024)5 Form 2A 2023-24.pdf · uploaded 26 May 2026Source
- Form 2A (FY 2024-2025)6 Form 2A 2024-25.pdf · uploaded 26 May 2026Source
- Form 2A (FY 2025-2026)7 Form 2A 2025-26.pdf · uploaded 26 May 2026Source
- Form 1Form-1 Mar 26.pdf · uploaded 28 May 2026Source
- Form 2Form-2 Mar 26.pdf · uploaded 28 May 2026Source
- Form 3Form-3 Mar 26.pdf · uploaded 28 May 2026Source
- Disclosure of Sold and Booked InventorySold Mar 26.pdf · uploaded 28 May 2026View
Technical
Technical (Architect)
- Document4 Form-1 Dec-23.pdf · uploaded 15 Mar 2024Source
- DocumentForm 1Mar 2024.pdf · uploaded 14 Apr 2025Source
- DocumentForm 1 June 2024.pdf · uploaded 14 Apr 2025Source
- DocumentForm 1Sep 2024 .pdf · uploaded 14 Apr 2025Source
- DocumentForm 1Dec 2024.pdf · uploaded 14 Apr 2025Source
- DocumentForm 1Mar 2024.pdf · uploaded 14 Apr 2025Source
- DocumentForm 1 June 2024.pdf · uploaded 14 Apr 2025Source
- DocumentForm 1Sep 2024 .pdf · uploaded 14 Apr 2025Source
- DocumentForm 1Dec 2024.pdf · uploaded 14 Apr 2025Source
- Document1 Form 1 Mar 25.pdf · uploaded 1 May 2025Source
Technical (Engineer)
- Document8 Form-2 Dec-23.pdf · uploaded 15 Mar 2024Source
- DocumentForm 2 March 2024.pdf · uploaded 14 Apr 2025Source
- DocumentForm 2 Jun 2024.pdf · uploaded 14 Apr 2025Source
- DocumentForm 2 Sep 2024.pdf · uploaded 14 Apr 2025Source
- DocumentForm 2 Dec 2024.pdf · uploaded 14 Apr 2025Source
- DocumentForm 2 March 2024.pdf · uploaded 14 Apr 2025Source
- DocumentForm 2 Jun 2024.pdf · uploaded 14 Apr 2025Source
- DocumentForm 2 Sep 2024.pdf · uploaded 14 Apr 2025Source
- DocumentForm 2 Dec 2024.pdf · uploaded 14 Apr 2025Source
- Document2 Form 2 Mar 25.pdf · uploaded 1 May 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel Gut No 103
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2 BHK, 3 BHK84 units in all
- Address
- Gut No 103, Beed Bypass, Satara ParisarPIN 431001
- Village
- Devlai, Aurangabad taluka
- Location
- 19.85251, 75.35981
- Land area for this project
- 3,840 sq m (41,333 sq ft)
- Permissible built-up area
- 6,471 sq m (69,648 sq ft)
- Sanctioned built-up area
- 6,471 sq m (69,648 sq ft)
- Recreational open space
- 535 sq m (5,759 sq ft)
- Designated bank account
- 171
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Gut No 103
Boundaries
- North
- Phase 2
- South
- Part of Open Land and Phase 3
- East
- Sara Siddhi Residency
- West
- School
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking84 units
28 of 84 units booked (33%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | 2 BHK | 65.01 sq m · 700 sq ft | 14 | 10 |
| A Wing | 3 BHK | 77.99 sq m · 839 sq ft | 14 | 5 |
| B Wing | 2 BHK | 65.01 sq m · 700 sq ft | 14 | 6 |
| B Wing | 3 BHK | 77.99 sq m · 839 sq ft | 14 | 5 |
| C Wing | 2 BHK | 65.01 sq m · 700 sq ft | 14 | 2 |
| C Wing | 3 BHK | 77.99 sq m · 839 sq ft | 14 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Saurabh Deshmukh | — |
| Chartered accountant | Amol Kapurchandji Kala | — |
| Engineer | Er Shripad Deshmukh | — |
| Engineer | rajesh kala | — |
| Other | Vishnu Tambe | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Devlai
- Shri Balaji EmpireRERA PR1040002602473
- Adinath AanganRERA P51500077736
- Umrao-SuvarnaneelRERA P51500056471
- Aurum Shubhalaya Phase IIRERA P51500056292
- Shri SanskrutiRERA P51500049833
- Silver LeafRERA P51500049731
- My Home AnnexRERA P51500047356
- Venkatesh ResidencyRERA P51500046928
All 31 projects in Devlai · Compare Aurum Subhalaya with another project