Completion was pushed back 4 months, to Apr 2029; no MahaRERA orders on record; 6% of its units are booked.

Vashi, Thane 400703 · by Arihant Estates

DeliveryExtended 4 moPromised Dec 2028 · now due Apr 2029RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales6% booked32 of 518 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2029

  • This projectRegistered 18 May 2021, completion promised 31 Dec 2028, revised to 30 Apr 2029.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

3 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700029348
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170002934818 May 202131 Dec 202830 Apr 2029Arihant EstatesProject page
Documents195

1 document held by Deedo, 194 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardArihant Estates_PAN Card.pdf · uploaded 18 Mar 2021Source

Legal

  • Declaration Form BForm B_Arihant Aleenta.pdf · uploaded 18 Mar 2021Source
  • Legal Title reportRevised Title Certificate_Aleenta_140421_RERA.pdf · uploaded 11 May 2021Source

Migrated

  • 1 PAN CardArihant Estates_PAN Card.pdf · uploaded 18 Mar 2021Source
  • 1 Details of encumbrancesDeclaration for encumebrance1.pdf · uploaded 18 Mar 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 18 Mar 2021Source
  • 1 Declaration in FORM BForm B_Arihant Aleenta.pdf · uploaded 18 Mar 2021Source
Show all 195 documentsShow fewer documents

Migrated

  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2_Arrihant Aleenta_compressed.pdf · uploaded 18 Mar 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3_Arihant Aleenta.pdf · uploaded 18 Mar 2021Source
  • 1 Copy of the legal title reportRevised Title Certificate_Aleenta_140421_RERA.pdf · uploaded 11 May 2021Source
  • 1 Copy of Layout Approval (in case of layout)Layout Plan_Arihant Aleenta.pdf · uploaded 11 May 2021Source
  • 2 Copy of Layout Approval (in case of layout)Layout Plan_Arihant Aleenta2.pdf · uploaded 11 May 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan.pdf · uploaded 11 May 2021Source
  • 2 Building Plan Approval / NA Order for plotted developmentBuilding Plan2.pdf · uploaded 11 May 2021Source
  • 3 Building Plan Approval / NA Order for plotted developmentBuilding Plan3.pdf · uploaded 11 May 2021Source
  • 4 Building Plan Approval / NA Order for plotted developmentBuilding Plan4.pdf · uploaded 11 May 2021Source
  • 5 Building Plan Approval / NA Order for plotted developmentBuilding Plan5.PDF · uploaded 11 May 2021Source
  • 6 Building Plan Approval / NA Order for plotted developmentBuilding Plan6.pdf · uploaded 11 May 2021Source
  • 7 Building Plan Approval / NA Order for plotted developmentBuilding Plan7.pdf · uploaded 11 May 2021Source
  • 8 Building Plan Approval / NA Order for plotted developmentBuilding Plan8.pdf · uploaded 11 May 2021Source
  • 9 Building Plan Approval / NA Order for plotted developmentBuilding Plan9.pdf · uploaded 11 May 2021Source
  • 10 Building Plan Approval / NA Order for plotted developmentBuilding Plan10.pdf · uploaded 11 May 2021Source
  • 11 Building Plan Approval / NA Order for plotted developmentBuilding Plan12.pdf · uploaded 11 May 2021Source
  • 12 Building Plan Approval / NA Order for plotted developmentBuilding Plan13.pdf · uploaded 11 May 2021Source
  • 13 Building Plan Approval / NA Order for plotted developmentBuilding Plan13.pdf · uploaded 11 May 2021Source
  • 14 Building Plan Approval / NA Order for plotted developmentBuilding Plan14.pdf · uploaded 11 May 2021Source
  • 15 Building Plan Approval / NA Order for plotted developmentBuilding Plan15.pdf · uploaded 11 May 2021Source
  • 16 Building Plan Approval / NA Order for plotted developmentBuilding Plan16.pdf · uploaded 11 May 2021Source
  • 17 Building Plan Approval / NA Order for plotted developmentBuilding Plan17.pdf · uploaded 11 May 2021Source
  • 18 Building Plan Approval / NA Order for plotted developmentBuilding Plan18.pdf · uploaded 11 May 2021Source
  • 19 Building Plan Approval / NA Order for plotted developmentBuilding Plan19.pdf · uploaded 11 May 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE - ALLENTA PROJECT.PDF · uploaded 11 May 2021Source
  • 1 Proforma of Allotment letterAgreement for Sale - Aleenta - Draft.pdf · uploaded 11 May 2021Source
  • 2 Proforma of Allotment letterPerforma of the allotement letter_Aleenta.pdf · uploaded 11 May 2021Source
  • 2 Commencement Certificates / NA Order for plotted developmentARIHANT ALEENTA CC.pdf · uploaded 8 Aug 2022Source
  • 3 Copy of Layout Approval (in case of layout)layout1_2.pdf · uploaded 28 Feb 2023Source
  • 4 Copy of Layout Approval (in case of layout)layout3_6.pdf · uploaded 28 Feb 2023Source
  • 5 Copy of Layout Approval (in case of layout)Layout8_10.pdf · uploaded 28 Feb 2023Source
  • 20 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 28 Feb 2023Source
  • 21 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 28 Feb 2023Source
  • 22 Building Plan Approval / NA Order for plotted development12.pdf · uploaded 28 Feb 2023Source
  • 23 Building Plan Approval / NA Order for plotted development13.pdf · uploaded 28 Feb 2023Source
  • 24 Building Plan Approval / NA Order for plotted development14.pdf · uploaded 28 Feb 2023Source
  • 25 Building Plan Approval / NA Order for plotted development15.pdf · uploaded 28 Feb 2023Source
  • 26 Building Plan Approval / NA Order for plotted development16.pdf · uploaded 28 Feb 2023Source
  • 27 Building Plan Approval / NA Order for plotted development17.pdf · uploaded 28 Feb 2023Source
  • 28 Building Plan Approval / NA Order for plotted development18.pdf · uploaded 28 Feb 2023Source
  • 29 Building Plan Approval / NA Order for plotted development19.pdf · uploaded 28 Feb 2023Source
  • 30 Building Plan Approval / NA Order for plotted development20.pdf · uploaded 28 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Aleenat_Form 5_2021-22[46400].pdf · uploaded 15 Mar 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ALEENTA FORM 1 31 DEC 2021.PDF · uploaded 29 Mar 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ALEENTA FORM 1 30 JUNE 2022.PDF · uploaded 29 Mar 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)ALEENTA FORM 1 31 MARCH 2022.PDF · uploaded 29 Mar 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)ALEENTA FORM 1 30 SEPTEMBER 2022.PDF · uploaded 29 Mar 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)ALEENTA FORM 1 31 DEC 2022.PDF · uploaded 29 Mar 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 RERA ALEENTA DEC21.PDF · uploaded 29 Mar 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 RERA ALEENTA MARCH22.pdf · uploaded 29 Mar 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 RERA ALEENTA JUNE22.pdf · uploaded 29 Mar 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 RERA ALEENTA SEPT22.pdf · uploaded 29 Mar 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3march22.pdf · uploaded 29 Mar 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3June22.pdf · uploaded 29 Mar 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3Dec22.pdf · uploaded 29 Mar 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3Dec21.pdf · uploaded 29 Mar 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3Sep22.pdf · uploaded 29 Mar 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM2 RERA ALEENTA DEC22.pdf · uploaded 29 Mar 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARIHANT ALEENTA 31 MARCH 23 .PDF · uploaded 18 Apr 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Aleenta_11zon.pdf · uploaded 18 Apr 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 RERA ALEENTA MARCH2023.pdf · uploaded 19 Apr 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARIHANT ALEENTA -FORM 1 - ARCHITECT CERTIFICATE 30TH JUNE 2023.PDF · uploaded 20 Jul 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 RERA Aleenta June 2023.pdf · uploaded 20 Jul 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Aleenta 30-06-2023.pdf · uploaded 20 Jul 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM I - ARIHANT ALEENTA 30 SEPTEMBER 2023 .PDF · uploaded 19 Oct 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 RERA Aleenta Sept 2023.pdf · uploaded 19 Oct 2023Source
  • 1 Disclosure of sold/ booked inventoryArihant Aleenta-Estates.pdf · uploaded 19 Oct 2023Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Arihant Aleenta.pdf · uploaded 19 Oct 2023Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 - architect certificate - aleenta project.PDF · uploaded 20 Apr 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Aleenta Dec 23 SIGN.pdf · uploaded 2 May 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)31032024 Aleenta SIGN.pdf · uploaded 2 May 2024Source
  • 2 Disclosure of sold/ booked inventoryAleenta Dec 23.pdf · uploaded 30 May 2024Source
  • 3 Disclosure of sold/ booked inventoryAleenta Mar 24.pdf · uploaded 30 May 2024Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Aleenta Dec 23.pdf · uploaded 31 May 2024Source
  • 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Aleenta Mar 24.pdf · uploaded 31 May 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Aleenta Dec 23.pdf · uploaded 3 Jun 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Aleenta Mar 24.pdf · uploaded 3 Jun 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5_Aleenta_FY 22-23.pdf · uploaded 7 Jun 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARIHANT ALEENTA.PDF · uploaded 20 Jul 2024Source
  • 4 Disclosure of sold/ booked inventoryDisclosure SIGNED.pdf · uploaded 20 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A ALEENTA FY 22-23.pdf · uploaded 23 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A ALEENTA FY 23-24.pdf · uploaded 23 Jul 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ALEENTA.pdf · uploaded 31 Jul 2024Source
  • 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 30-06-2024 Aleenta.pdf · uploaded 31 Jul 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM I - ALEENTA PROJECT_SIGNED.pdf · uploaded 19 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Aleenta_SIGNED.pdf · uploaded 19 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryDISCLOSURE_signed.pdf · uploaded 19 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Aleenta.pdf · uploaded 21 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Aleenta.pdf · uploaded 7 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Aleenta.pdf · uploaded 19 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Aleenta.pdf · uploaded 19 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Aleenta.pdf · uploaded 19 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDISCLSOURE SIGNED.pdf · uploaded 19 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Aleenta_310325_SIGNED.pdf · uploaded 18 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryDISCLOSURE signed.pdf · uploaded 18 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Aleenta_310325.pdf · uploaded 19 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2-Aleenta_310325.pdf · uploaded 19 Apr 2025Source
  • Form 2A (FY 2024-2025)Arihant Aleenta.pdf · uploaded 4 Oct 2025Source
  • Form 5 (FY 2024-2025)ArihantAleenta_Form5_FY2425.pdf · uploaded 16 Oct 2025Source
  • Withdrawal Update Form 1Withdrawal Update Form 1 · uploaded 24 Oct 2025Source
  • Withdrawal Update Form 2Withdrawal Update Form 2 · uploaded 24 Oct 2025Source
  • Withdrawal Update Form 3Withdrawal Update Form 3 · uploaded 24 Oct 2025Source
  • Withdrawal Update Form 1Form 1_Aleenta_31122025.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2Form 2 _Aleenta_31122205.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3Form 3_Aleenta_31122025.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1Form 1_Aleenta_31122025.pdf · uploaded 26 Feb 2026Source
  • Withdrawal Update Form 2Form 2 - dec 2025 (Arihant ALeenta) (1).pdf · uploaded 26 Feb 2026Source
  • Withdrawal Update Form 3Form 3_Aleenta_31122025-V1 Final V1_revised with stamp (1).pdf · uploaded 26 Feb 2026Source
  • Withdrawal Update Form 1Form 1_Aleenta_31122025.pdf · uploaded 27 Feb 2026Source
  • Withdrawal Update Form 2Form 2 - dec 2025 (Arihant ALeenta) (1).pdf · uploaded 27 Feb 2026Source
  • Withdrawal Update Form 3Form 3_Aleenta_31122025-V1 Final V1_revised with stamp (1).pdf · uploaded 27 Feb 2026Source
  • Withdrawal Update Form 122 Form 1_ALEENTA_310326.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 2Form 2_Aleenta_250326.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 322 Form 3_Aleenta_250326.pdf · uploaded 16 Apr 2026Source
  • Form 2A (FY 2025-2026)Form 2A_Aleenta_FY 25-26.pdf · uploaded 6 Oct 2026Source

Technical

  • DocumentLayout Plan_Arihant Aleenta.pdf · uploaded 11 May 2021Source
  • DocumentLayout Plan_Arihant Aleenta2.pdf · uploaded 11 May 2021Source
  • DocumentBuilding Plan.pdf · uploaded 11 May 2021Source
  • DocumentBuilding Plan2.pdf · uploaded 11 May 2021Source
  • DocumentBuilding Plan3.pdf · uploaded 11 May 2021Source
  • DocumentBuilding Plan4.pdf · uploaded 11 May 2021Source
  • DocumentBuilding Plan5.PDF · uploaded 11 May 2021Source
  • DocumentBuilding Plan6.pdf · uploaded 11 May 2021Source
  • DocumentBuilding Plan7.pdf · uploaded 11 May 2021Source
  • DocumentBuilding Plan8.pdf · uploaded 11 May 2021Source
  • DocumentBuilding Plan9.pdf · uploaded 11 May 2021Source
  • DocumentBuilding Plan10.pdf · uploaded 11 May 2021Source
  • DocumentBuilding Plan12.pdf · uploaded 11 May 2021Source
  • DocumentBuilding Plan13.pdf · uploaded 11 May 2021Source
  • DocumentBuilding Plan13.pdf · uploaded 11 May 2021Source
  • DocumentBuilding Plan14.pdf · uploaded 11 May 2021Source
  • DocumentBuilding Plan15.pdf · uploaded 11 May 2021Source
  • DocumentBuilding Plan16.pdf · uploaded 11 May 2021Source
  • DocumentBuilding Plan17.pdf · uploaded 11 May 2021Source
  • DocumentBuilding Plan18.pdf · uploaded 11 May 2021Source
  • DocumentBuilding Plan19.pdf · uploaded 11 May 2021Source
  • Documentlayout1_2.pdf · uploaded 28 Feb 2023Source
  • Documentlayout3_6.pdf · uploaded 28 Feb 2023Source
  • DocumentLayout8_10.pdf · uploaded 28 Feb 2023Source
  • Document7.pdf · uploaded 28 Feb 2023Source
  • Document11.pdf · uploaded 28 Feb 2023Source
  • Document12.pdf · uploaded 28 Feb 2023Source
  • Document13.pdf · uploaded 28 Feb 2023Source
  • Document14.pdf · uploaded 28 Feb 2023Source
  • Document15.pdf · uploaded 28 Feb 2023Source
  • Document16.pdf · uploaded 28 Feb 2023Source
  • Document17.pdf · uploaded 28 Feb 2023Source
  • Document18.pdf · uploaded 28 Feb 2023Source
  • Document19.pdf · uploaded 28 Feb 2023Source
  • Document20.pdf · uploaded 28 Feb 2023Source
  • Document2 Commencement Certificates _ NA Order for plotted development (3).pdf · uploaded 18 Jul 2025Source
  • OthersForm 1_Aleenta_30062025.pdf · uploaded 19 Jul 2025Source
  • OthersForm 1_Aleenta_30062025.pdf · uploaded 19 Jul 2025Source
  • OthersForm 2_Aleenta_30062025.pdf · uploaded 19 Jul 2025Source
  • OthersDisclsoure_Signed.pdf · uploaded 19 Jul 2025Source
  • OthersAleenta_Sold Booked Disclsoure_30092025.pdf · uploaded 30 Sep 2025Source
  • DocumentPage 1.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 1 (1).pdf · uploaded 27 Feb 2026Source
  • DocumentPage 1A.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 1B.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 2.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 3.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 4.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 5.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 6.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 7.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 8.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 9.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 10.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 11.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 12.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 13.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 14.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 15.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 16.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 17.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 18.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 19.pdf · uploaded 27 Feb 2026Source
  • DocumentPage 20.pdf · uploaded 27 Feb 2026Source

Technical (Architect)

  • DocumentFORM I - ALEENTA PROJECT_SIGNED.pdf · uploaded 19 Oct 2024Source
  • DocumentForm 1 - Aleenta.pdf · uploaded 19 Jan 2025Source
  • DocumentForm 1 - Aleenta_310325.pdf · uploaded 19 Apr 2025Source
  • DocumentForm 1_Aleenta_30062026.pdf · uploaded 6 Aug 2026Source

Technical (Engineer)

  • DocumentForm 2 - Aleenta.pdf · uploaded 21 Oct 2024Source
  • DocumentForm 2 - Aleenta.pdf · uploaded 19 Jan 2025Source
  • DocumentForm 2-Aleenta_310325.pdf · uploaded 19 Apr 2025Source
  • DocumentForm 2_Aleenta_250626.pdf · uploaded 8 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel Plot No 05

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
3BHK, 5BHK & more, 5BHK & more, 1BHK518 units in all
Address
Plot No 05, SECTOR 09, VASHI, VashiPIN 400703
Village
Navi Mumbai (M Corp.), Thane taluka
Land area for this project
8,760 sq m (94,295 sq ft)
Permissible built-up area
43,854 sq m (4,72,044 sq ft)
Sanctioned built-up area
43,853 sq m (4,72,028 sq ft)
Recreational open space
1,454 sq m (15,650 sq ft)
Designated bank account
85
Developed in phases
Yes

Survey, CTS, gat or plot numbers

Plot No 05

Land as published on MahaRERA's project page

Plot No 05

Boundaries

North
Suyog Association
South
Shivprerana Association
East
9 Meters DP Road
West
12 Meters DP Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking518 units

32 of 518 units booked (6%), as the promoter reported to MahaRERA

3BHK · 40 units5BHK & more · 6 units5BHK & more · 40 units1BHK · 432 units
BuildingTypeCarpet areaUnitsBooked
Wing A Incentive Free Sale3BHK116.42 sq m · 1,253 sq ft4018
Wing A Incentive Free Sale5BHK & more337.39 sq m · 3,632 sq ft30
Wing A Incentive Free Sale5BHK & more342.74 sq m · 3,689 sq ft30
Wing A Incentive Free Sale5BHK & more200.73 sq m · 2,161 sq ft207
Wing A Incentive Free Sale5BHK & more205.58 sq m · 2,213 sq ft207
Wing B Rehab Building1BHK29.38 sq m · 316 sq ft2160
Wing C Rehab Building1BHK29.38 sq m · 316 sq ft2160

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals37

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectYogita Bhndarkar—
Chartered accountantAnjani Kumar Goyal—
Chartered accountantK C Jain Kala & Co—
EngineerKaleem Sayyad—
EngineerNagraj Naragund—
EngineerSaurabh Purohit—
EngineerVinay Yashwant Pagare—
Registered real estate agentAman Jyoti Deka—
Show all 37 professionalsShow fewer professionals
RoleNameRegistration no.
Registered real estate agentAmrik Singh Lakhbir Singh Grover—
Registered real estate agentAndromeda Sales And Distribution Private Limited—
Registered real estate agentAnil Choudhary—
Registered real estate agentAnish Vijay Vichare—
Registered real estate agentAppasaheb Bhimrao Birajdar—
Registered real estate agentAristo Real Estate Consultants—
Registered real estate agentAwadhesh Kumar Veerbahadur Singh—
Registered real estate agentCasafy Realty LLP—
Registered real estate agentGlobal Homes—
Registered real estate agentInvestoxpert Advisors Private Limited—
Registered real estate agentJitendra Suresh Vithalani—
Registered real estate agentMithilesh Kumar Singh—
Registered real estate agentMohammad Sharifullah—
Registered real estate agentOwn At First Private Limited—
Registered real estate agentPanorama Properties—
Registered real estate agentPropertypistol Realty Private Limited—
Registered real estate agentPropsolutions4u Private Limited—
Registered real estate agentPropweb Realty Services Pvt Ltd—
Registered real estate agentRakesh Kumar—
Registered real estate agentRakesh Narahari Bandi—
Registered real estate agentRitesh Kailash Rai—
Registered real estate agentSantosh Ganpat Shinde—
Registered real estate agentShraddha Sumesh Ingle—
Registered real estate agentShrikrishna Manohar Shendge—
Registered real estate agentSquare Yards Consulting Private Limited—
Registered real estate agentS. V. Incorporation—
Registered real estate agentUdayraj Janba Mhatre—
Registered real estate agentVijay Mulchand Hingorani—
Registered real estate agentVikas Ravindra Pathak—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology