Completion was pushed back 4 months, to Apr 2030; no MahaRERA orders on record; 67% of its units are booked.

Vartaknagar, Thane 400606 · by Sai Shiva Infra Developers

DeliveryExtended 4 moPromised Dec 2029 · now due Apr 2030RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales67% booked202 of 302 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2030

  • This projectRegistered 11 Apr 2022, completion promised 31 Dec 2029, revised to 30 Apr 2030.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700034467
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170003446711 Apr 202231 Dec 202930 Apr 2030M/s. Sai Shiva Infra DevelopersProject page
Documents110

1 document held by Deedo, 109 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPan Card- Sai Shiva Infra developers.PDF · uploaded 23 Mar 2022Source

Legal

  • Legal Title reportTitle 22 final 24032022.pdf · uploaded 24 Mar 2022Source
  • OtherTypical Floor plan for sanctioned and proposed07 Apr 2022.pdf · uploaded 7 Apr 2022Source
  • Othersanctioned and Proposed layout of Ground floor 07 Apr 2022.pdf · uploaded 7 Apr 2022Source
  • Declaration Form BDeclaration 44 07042022.pdf · uploaded 7 Apr 2022Source
  • Declaration Form BAppt letter.pdf · uploaded 7 Apr 2022Source

Migrated

  • 1 PAN CardPan Card- Sai Shiva Infra developers.PDF · uploaded 23 Mar 2022Source
Show all 110 documentsShow fewer documents

Migrated

  • 1 Details of encumbrancesEncumbrance Certificate.pdf · uploaded 23 Mar 2022Source
  • 1 Copy of Layout Approval (in case of layout)Sheet 1.pdf · uploaded 23 Mar 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentSheet 1.pdf · uploaded 23 Mar 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentSheet 2.pdf · uploaded 23 Mar 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentSheet 3.pdf · uploaded 23 Mar 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentPermission CC.pdf · uploaded 23 Mar 2022Source
  • 1 Declaration about Commencement CertificateDeclaration about CC.pdf · uploaded 23 Mar 2022Source
  • 1 CERSAI detailsCERSAI Report.pdf · uploaded 23 Mar 2022Source
  • 1 Proforma of Allotment letterAllotment Letter - Royale.pdf · uploaded 23 Mar 2022Source
  • 1 Copy of the legal title reportTitle 22 final 24032022.pdf · uploaded 24 Mar 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE.pdf · uploaded 24 Mar 2022Source
  • 2 Proforma of Allotment letterDraft agreement for Sale final.pdf · uploaded 24 Mar 2022Source
  • 1 Declaration in FORM BDeclaration 44 07042022.pdf · uploaded 7 Apr 2022Source
  • 2 Declaration in FORM BAppt letter.pdf · uploaded 7 Apr 2022Source
  • 1 OtherTypical Floor plan for sanctioned and proposed07 Apr 2022.pdf · uploaded 7 Apr 2022Source
  • 2 Othersanctioned and Proposed layout of Ground floor 07 Apr 2022.pdf · uploaded 7 Apr 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ROYALE.pdf · uploaded 26 Oct 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate 44 royale.pdf · uploaded 26 Oct 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Royale.pdf · uploaded 26 Oct 2022Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)ROYAL GRAND CENTRAL.pdf · uploaded 12 Jan 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Royale-Certificate 31122022.PDF · uploaded 21 Feb 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate 44 royal 31122022.pdf · uploaded 21 Feb 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Royale GC Dec 2022.pdf · uploaded 21 Feb 2023Source
  • 4 Building Plan Approval / NA Order for plotted developmentRoyale - Ceritificate - 30062023.pdf · uploaded 11 Aug 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Royale - Ceritificate 31032023.pdf · uploaded 11 Aug 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Royale - Ceritificate - 30062023.pdf · uploaded 11 Aug 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Royale - Ceritificate 31032023.pdf · uploaded 11 Aug 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate 44 royal 31032023.pdf · uploaded 11 Aug 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate 44 royal 30062023.pdf · uploaded 11 Aug 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A- Royale 44.pdf · uploaded 11 Aug 2023Source
  • 1 Disclosure of sold/ booked inventoryRoyale-44.PDF · uploaded 11 Aug 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Royale grand central_compressed (1).pdf · uploaded 11 Aug 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Royale Grand Central.pdf · uploaded 11 Aug 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Rera Form 5 Royale - sign.pdf · uploaded 30 Sep 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)2023_09_30 VN24 ROYALE GRAND CENTRAL.pdf · uploaded 3 Nov 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate 44 royal 30092023.pdf · uploaded 3 Nov 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Royale.pdf · uploaded 3 Nov 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentAmended Permission Certificate 44 Vartak Nagar 16112022.pdf · uploaded 5 Dec 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)NEW ROYALE-FORM 1.pdf · uploaded 20 Jan 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate 44 royal.pdf · uploaded 20 Jan 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Royale.pdf · uploaded 20 Jan 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)ROYALE GRAND CENTRAL ARCHITECT CERTIFICATE.pdf · uploaded 24 Apr 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate 44 royal.pdf · uploaded 24 Apr 2024Source
  • 2 Disclosure of sold/ booked inventoryRoyale (44) Grand Central.PDF · uploaded 24 Apr 2024Source
  • 3 Disclosure of sold/ booked inventoryRoyale Grand Central -44.PDF · uploaded 24 Apr 2024Source
  • 4 Disclosure of sold/ booked inventoryRoyale Grand Central -44.PDF · uploaded 24 Apr 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Royale_compressed (1).pdf · uploaded 24 Apr 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)30062024 Architects Certificate FORM-1 ROYALE.pdf · uploaded 20 Jul 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate VN - 44 300624.pdf · uploaded 20 Jul 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Royale Grand Central (44).pdf · uploaded 20 Jul 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Royale Grand Central_Singed.pdf · uploaded 7 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)NEW ROYALE-FORM 1 - 01102024.pdf · uploaded 20 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)VN 44 CA Certificates30092024.pdf · uploaded 20 Oct 2024Source
  • 1 Details of encumbrancesEncumbrance Certificate 44 2024.pdf · uploaded 3 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate 44.pdf · uploaded 10 Dec 2024Source
  • 2 Disclosure of sold/ booked inventoryRoyale Grand Central -44.PDF · uploaded 10 Dec 2024Source
  • 3 Disclosure of sold/ booked inventoryRoyale Grand Central -44_page-0001.pdf · uploaded 10 Dec 2024Source
  • 4 Disclosure of sold/ booked inventoryRoyale Grand Center- 44.PDF · uploaded 10 Dec 2024Source
  • 5 Disclosure of sold/ booked inventoryRoyale Grand Central-44.pdf · uploaded 10 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate for 01st oct 24 to 31st dec 24 (VN 44).pdf · uploaded 23 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)VN 44 CA Certificates_31122024_compressed.pdf · uploaded 23 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate 44_31122024.pdf · uploaded 23 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryRoyal Grand Central.pdf · uploaded 7 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)BLDG 44NEW ROYALE-FORM 1.pdf · uploaded 21 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)VN 44 CA Certificates.pdf · uploaded 21 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate 44.pdf · uploaded 21 Apr 2025Source
  • Form 120250630_BLDG 44.pdf · uploaded 12 Aug 2025Source
  • Form 2Form 2 Engineers Certificate 44_300725.pdf · uploaded 12 Aug 2025Source
  • Form 3VN 44 CA Certificates 30062025.pdf · uploaded 12 Aug 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Inventory - Royale Grand Central - 44.pdf · uploaded 12 Aug 2025Source
  • Form 5 (FY 2024-2025)Rera Form 5 - Royale - sign.pdf · uploaded 29 Sep 2025Source
  • Form 1Glorio Grand Central-FORM 1 - 20250930.pdf · uploaded 16 Nov 2025Source
  • Form 2Form 2 Engineers Certificate 44_30092025.pdf · uploaded 16 Nov 2025Source
  • Form 3VN 44 CA Certificates_39092025.pdf · uploaded 16 Nov 2025Source
  • Disclosure of Sold and Booked InventoryGC Phase II Royale_0001.pdf · uploaded 16 Nov 2025Source
  • Form 1NEW ROYALE-FORM 1.pdf · uploaded 21 Jan 2026Source
  • Form 2Form 2 Engineers Certificate 44 31122025.pdf · uploaded 21 Jan 2026Source
  • Form 3VN 44 CA Certificates 31122025.pdf · uploaded 21 Jan 2026Source
  • Disclosure of Sold and Booked InventoryGC Royale - 44_0001.pdf · uploaded 21 Jan 2026Source
  • Form 1FORM 1 Royale.pdf · uploaded 20 Apr 2026Source
  • Form 2Form 2.pdf · uploaded 20 Apr 2026Source
  • Form 3Form 3.pdf · uploaded 20 Apr 2026Source
  • Disclosure of Sold and Booked InventorySales data.pdf · uploaded 20 Apr 2026Source
  • Form 1Form 1 Architect Certificate.pdf · uploaded 20 Jul 2026Source
  • Form 2Form 2 Engineers Certificate 44.pdf · uploaded 20 Jul 2026Source
  • Form 3Form 3 CA Certificates.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryRoyale 44.pdf · uploaded 20 Jul 2026Source
  • Form 2A (FY 2025-2026)Form 2A 2025-2026.pdf · uploaded 9 Sep 2026Source
  • Form 5 (FY 2025-2026)Form 5 Royale GC.pdf · uploaded 28 Sep 2026Source

Technical

  • DocumentSheet 1.pdf · uploaded 23 Mar 2022Source
  • DocumentSheet 1.pdf · uploaded 23 Mar 2022Source
  • DocumentSheet 2.pdf · uploaded 23 Mar 2022Source
  • DocumentSheet 3.pdf · uploaded 23 Mar 2022Source
  • DocumentRoyale - Ceritificate - 30062023.pdf · uploaded 11 Aug 2023Source

Technical (Architect)

  • Document30062024 Architects Certificate FORM-1 ROYALE.pdf · uploaded 20 Jul 2024Source
  • DocumentNEW ROYALE-FORM 1 - 01102024.pdf · uploaded 20 Oct 2024Source
  • DocumentArchitect Certificate for 01st oct 24 to 31st dec 24 (VN 44).pdf · uploaded 23 Jan 2025Source
  • DocumentBLDG 44NEW ROYALE-FORM 1.pdf · uploaded 21 Apr 2025Source

Technical (Engineer)

  • DocumentForm 2 Engineers Certificate VN - 44 300624.pdf · uploaded 20 Jul 2024Source
  • DocumentForm 2 Engineers Certificate 44.pdf · uploaded 10 Dec 2024Source
  • DocumentForm 2 Engineers Certificate 44_31122024.pdf · uploaded 23 Jan 2025Source
  • DocumentForm 2 Engineers Certificate 44.pdf · uploaded 21 Apr 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 212, 213

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
1 BHK A, 1 BHK B, 1 BHK C, 1 BHK D, 1 BHK E, 2 BHK A, 2 BHK B, 2 BHK C, 2 BHK D, 2 BHK E, 2 BHK F, 2 BHK G, 2 BHK H, Shop No. 10, Shop No. 11, Shop No. 12, Shop No. 13, Shop No. 14, Shop No. 15, Shop No. 16, Shop No. 17, Shop No. 18, Shop No. 19, Shop No. 2, Shop No. 20, Shop No. 3, Shop No. 4, Shop No. 5, Shop No. 6, Shop No. 7, Shop No. 8, Shop No. 9302 units in all
Address
212 and 213, Vartak Nagar, Near Sai Baba MandirPIN 400606
Village
Vartaknagar, Thane taluka
Designated bank account
76
Developed in phases
No

Survey, CTS, gat or plot numbers

212213

Boundaries

North
Proposed 12 M Wide Road
South
Bldg No 41 and 42
East
Proposed 12 M Wide Road
West
Proposed RG Area

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking302 units

202 of 302 units booked (67%), as the promoter reported to MahaRERA

1 BHK A · 41 units1 BHK B · 34 units1 BHK C · 41 units1 BHK D · 32 units1 BHK E · 1 unit2 BHK A · 41 units2 BHK B · 41 units2 BHK C · 41 units2 BHK D · 7 units2 BHK E · 1 unit2 BHK F · 1 unit2 BHK G · 1 unit2 BHK H · 1 unitShop No. 10 · 1 unitShop No. 11 · 1 unitShop No. 12 · 1 unitShop No. 13 · 1 unitShop No. 14 · 1 unitShop No. 15 · 1 unitShop No. 16 · 1 unitShop No. 17 · 1 unitShop No. 18 · 1 unitShop No. 19 · 1 unitShop No. 2 · 1 unitShop No. 20 · 1 unitShop No. 3 · 1 unitShop No. 4 · 1 unitShop No. 5 · 1 unitShop No. 6 · 1 unitShop No. 7 · 1 unitShop No. 8 · 1 unitShop No. 9 · 1 unit
TypeCarpet areaUnitsBooked
1 BHK A34.57 sq m · 372 sq ft4131
1 BHK B34.15 sq m · 368 sq ft3425
1 BHK C33.96 sq m · 366 sq ft4111
1 BHK D34.57 sq m · 372 sq ft3219
1 BHK E34.15 sq m · 368 sq ft10
2 BHK A46.05 sq m · 496 sq ft4132
2 BHK B46.72 sq m · 503 sq ft4132
2 BHK C47.05 sq m · 506 sq ft4130
Show all 32 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
2 BHK D47.2 sq m · 508 sq ft73
2 BHK E46.05 sq m · 496 sq ft10
2 BHK F46.72 sq m · 503 sq ft10
2 BHK G47.05 sq m · 506 sq ft10
2 BHK H47.2 sq m · 508 sq ft10
Shop No. 106.21 sq m · 67 sq ft11
Shop No. 117.49 sq m · 81 sq ft11
Shop No. 123.81 sq m · 41 sq ft11
Shop No. 137.34 sq m · 79 sq ft11
Shop No. 1413.55 sq m · 146 sq ft11
Shop No. 155.58 sq m · 60 sq ft11
Shop No. 166.24 sq m · 67 sq ft11
Shop No. 177.87 sq m · 85 sq ft11
Shop No. 187.87 sq m · 85 sq ft11
Shop No. 196.24 sq m · 67 sq ft11
Shop No. 211.9 sq m · 128 sq ft11
Shop No. 205.36 sq m · 58 sq ft11
Shop No. 318.95 sq m · 204 sq ft11
Shop No. 428.38 sq m · 305 sq ft11
Shop No. 523.22 sq m · 250 sq ft11
Shop No. 65.36 sq m · 58 sq ft11
Shop No. 713.65 sq m · 147 sq ft11
Shop No. 813.64 sq m · 147 sq ft11
Shop No. 913.1 sq m · 141 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals6

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDesign Consortium – Architects And Planning—
ArchitectVastushilpa Associates—
Chartered accountantH D O & Associates—
EngineerKedar Yernalkar—
EngineerSterling Engineering Services Pvt. Ltd.—
OtherClancy global consulting engineers—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology