Skip to content
Others · 1 building · 47 unitsRERA P51700049841

Pride Park

Deedo IDDP-THN-4FQR

Its promised completion date, Dec 2025, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 53% of its units are booked.

Ulhasnagar (M Corp.), Thane 421002 · by Nikhil Rajesh Sukhramani

Delivery11 mo past duePromised Dec 2025 · no extension on record · not shown completedRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales53% booked25 of 47 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Its promised completion date, Dec 2025, has passed and MahaRERA does not show it completed

  • This projectRegistered 6 Mar 2023, completion promised 31 Dec 2025, and still not shown completed today.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700049841
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000498416 Mar 202331 Dec 202531 Dec 2025Nikhil Rajesh SukhramaniProject page
Documents145

1 document held by Deedo, 144 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Cardnikhil_pancard.pdf · uploaded 23 Jan 2023Source

Legal

  • Legal Title reportLegal Title Report.pdf · uploaded 28 Jan 2023Source
  • Legal Title reportTitle A Search Report.pdf · uploaded 28 Jan 2023Source
  • Declaration Form BNOTARY.pdf · uploaded 28 Jan 2023Source

Migrated

  • 1 PAN Cardnikhil_pancard.pdf · uploaded 23 Jan 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentcommencement certificate.pdf · uploaded 23 Jan 2023Source
  • 1 Copy of the legal title reportLegal Title Report.pdf · uploaded 28 Jan 2023Source
Show all 145 documentsShow fewer documents

Migrated

  • 2 Copy of the legal title reportTitle A Search Report.pdf · uploaded 28 Jan 2023Source
  • 1 Declaration in FORM BNOTARY.pdf · uploaded 28 Jan 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Organisation.pdf · uploaded 28 Jan 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDeviatation to Model Agreement.pdf · uploaded 28 Jan 2023Source
  • 1 Copy of Layout Approval (in case of layout)pride_park_plan_clear.pdf · uploaded 2 Feb 2023Source
  • 1 Declaration about Commencement CertificateFormat D.pdf · uploaded 2 Feb 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER_S_CERTIFICATE_-NIKHIL.pdf · uploaded 2 Feb 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT_S_CERTIFICATE.pdf · uploaded 3 Feb 2023Source
  • 1 a Details of encumbrances concerned to FinanceNon Enc to Finance.pdf · uploaded 7 Feb 2023Source
  • 2 a Details of encumbrances concerned to FinanceNon Enc to Legal.pdf · uploaded 7 Feb 2023Source
  • 1 b Details of encumbrances concerned to LegalNon Enc to Finance.pdf · uploaded 7 Feb 2023Source
  • 2 b Details of encumbrances concerned to LegalNon Enc to Legal.pdf · uploaded 7 Feb 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Letter.pdf · uploaded 7 Feb 2023Source
  • 1 CERSAI detailsCersai Report.pdf · uploaded 25 Feb 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 25 Feb 2023Source
  • 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 25 Feb 2023Source
  • 1 Proforma of Agreement for saleAgreement Draft.pdf · uploaded 25 Feb 2023Source
  • 1 Deviation Report with respect to Allotment letterDeviation Report with respect to Allotment letter.pdf · uploaded 25 Feb 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentPlan.pdf · uploaded 2 Mar 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT_S__CERTIFICATE.pdf · uploaded 5 Dec 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA__CERTIFICATE.pdf · uploaded 5 Dec 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng Certf.pdf · uploaded 6 Dec 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Cert.pdf · uploaded 6 Dec 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 june.pdf · uploaded 25 Jan 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 sep.pdf · uploaded 25 Jan 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 dec.pdf · uploaded 25 Jan 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 june.pdf · uploaded 25 Jan 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 sep.pdf · uploaded 25 Jan 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 dec.pdf · uploaded 25 Jan 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 June compressed.pdf · uploaded 25 Jan 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 sep compressed.pdf · uploaded 25 Jan 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 dec compressed.pdf · uploaded 25 Jan 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentbr const new commence certificate (1).pdf · uploaded 23 Feb 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 23 Feb 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 23 Feb 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 COMPRESSED.pdf · uploaded 23 Feb 2024Source
  • 2 Copy of Layout Approval (in case of layout)Plan 1.pdf · uploaded 24 Feb 2024Source
  • 3 Copy of Layout Approval (in case of layout)Plan 2.pdf · uploaded 24 Feb 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentPlan 1.pdf · uploaded 24 Feb 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentPlan 2.pdf · uploaded 24 Feb 2024Source
  • 2 Declaration about Commencement CertificateDeclaration CC New.pdf · uploaded 24 Feb 2024Source
  • 4 Copy of Layout Approval (in case of layout)Plan 1 highlighted.pdf · uploaded 4 Mar 2024Source
  • 5 Copy of Layout Approval (in case of layout)Plan 2 Highlighted.pdf · uploaded 4 Mar 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentPlan 1 highlighted.pdf · uploaded 4 Mar 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentPlan 2 Highlighted.pdf · uploaded 4 Mar 2024Source
  • 3 Commencement Certificates / NA Order for plotted developmentCC New highlighted.pdf · uploaded 4 Mar 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 4 Mar 2024Source
  • 1 Disclosure of sold/ booked inventorySold unsold signed.pdf · uploaded 9 Mar 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 signed.pdf · uploaded 9 Mar 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 compressed 28-3-24.pdf · uploaded 29 Mar 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FROM_1_as_on_31032024.pdf · uploaded 20 Jul 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)from_2_as_on_31032024.pdf · uploaded 20 Jul 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)FROM_3_as_on_31032024_compressed.pdf · uploaded 20 Jul 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30 Jun.pdf · uploaded 11 Oct 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30 jun.pdf · uploaded 11 Oct 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30 Jun.pdf · uploaded 11 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)BR Construction.pdf · uploaded 7 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1__30092024_.pdf · uploaded 17 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1__31122024_.pdf · uploaded 17 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3__30092024_.pdf · uploaded 17 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3__31122024_.pdf · uploaded 17 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2__30092024_.pdf · uploaded 17 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2__31122024_.pdf · uploaded 17 Feb 2025Source
  • 1 Disclosure of sold/ booked inventorysold and unsold Inventories.pdf · uploaded 1 Mar 2025Source
  • Form 1Form 1 Jun 24.pdf · uploaded 31 Jul 2026Source
  • Form 2Form 2 jun 24.pdf · uploaded 31 Jul 2026Source
  • Form 3Form 3 Jun 24.pdf · uploaded 31 Jul 2026Source
  • Disclosure of Sold and Booked Inventorysold unsold feb 25.pdf · uploaded 31 Jul 2026Source
  • Form 1Form 1 Sep 24.pdf · uploaded 31 Jul 2026Source
  • Form 2Form 2 sep 24.pdf · uploaded 31 Jul 2026Source
  • Form 3Form 3 Sep 24.pdf · uploaded 31 Jul 2026Source
  • Disclosure of Sold and Booked Inventorysold unsold feb 25.pdf · uploaded 31 Jul 2026Source
  • Form 1Form 1 Dec 24.pdf · uploaded 31 Jul 2026Source
  • Form 2Form 2 dec 24.pdf · uploaded 31 Jul 2026Source
  • Form 3Form 3 dec 24.pdf · uploaded 31 Jul 2026Source
  • Disclosure of Sold and Booked Inventorysold unsold feb 25.pdf · uploaded 31 Jul 2026Source
  • Form 1Form 1 June 23.pdf · uploaded 31 Jul 2026Source
  • Form 2Form 2 Jun 23.pdf · uploaded 31 Jul 2026Source
  • Form 3Form 3 Jun 23.pdf · uploaded 31 Jul 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Feb 24.pdf · uploaded 31 Jul 2026Source
  • Form 1Form 1 Sep 23.pdf · uploaded 31 Jul 2026Source
  • Form 2Form 2 Sep 23.pdf · uploaded 31 Jul 2026Source
  • Form 3Form 3 sep 23.pdf · uploaded 31 Jul 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Feb 24.pdf · uploaded 31 Jul 2026Source
  • Form 1Form 1 dec 23.pdf · uploaded 31 Jul 2026Source
  • Form 2Form 2 Dec 23.pdf · uploaded 31 Jul 2026Source
  • Form 3form 3 dec 23.pdf · uploaded 31 Jul 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Feb 24.pdf · uploaded 31 Jul 2026Source
  • Form 1Form 1 mar 24.pdf · uploaded 31 Jul 2026Source
  • Form 2Form 2 mar 24.pdf · uploaded 31 Jul 2026Source
  • Form 3form 3 mar 24.pdf · uploaded 31 Jul 2026Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 31 Jul 2026Source
  • Form 1Form 1 Mar 23.pdf · uploaded 31 Jul 2026Source
  • Form 2Form 2 Mar 23.pdf · uploaded 31 Jul 2026Source
  • Form 3Form 3 mar 23.pdf · uploaded 31 Jul 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Feb 24.pdf · uploaded 31 Jul 2026Source
  • Form 1Form 1 Dec 24.pdf · uploaded 31 Jul 2026Source
  • Form 2Form 2 dec 24.pdf · uploaded 31 Jul 2026Source
  • Form 3Form 3 dec 24.pdf · uploaded 31 Jul 2026Source
  • Disclosure of Sold and Booked Inventorysold unsold feb 25.pdf · uploaded 31 Jul 2026Source
  • Form 1Form 1 Dec 24.pdf · uploaded 31 Jul 2026Source
  • Form 2Form 2 dec 24.pdf · uploaded 31 Jul 2026Source
  • Form 3Form 3 dec 24.pdf · uploaded 31 Jul 2026Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 31 Jul 2026Source
  • Form 1Form 1 Dec 24.pdf · uploaded 31 Jul 2026Source
  • Form 2Form 2 dec 24.pdf · uploaded 31 Jul 2026Source
  • Form 3Form 3 dec 24.pdf · uploaded 31 Jul 2026Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 31 Jul 2026Source
  • Form 1Form 1.pdf · uploaded 31 Jul 2026Source
  • Form 2Form 2.pdf · uploaded 31 Jul 2026Source
  • Form 3Form 3.pdf · uploaded 31 Jul 2026Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 31 Jul 2026Source
  • Form 2A (FY 2022-2023)Form 2A 22-23.pdf · uploaded 31 Jul 2026Source
  • Form 2A (FY 2023-2024)Form 2A.pdf · uploaded 31 Jul 2026Source
  • Form 2A (FY 2024-2025)Form 2A.pdf · uploaded 31 Jul 2026Source
  • Form 2A (FY 2025-2026)Form 2A.pdf · uploaded 31 Jul 2026Source
  • Form 5 (FY 2022-2023)Form 5 22-23.pdf · uploaded 31 Jul 2026Source
  • Form 5 (FY 2023-2024)Form 5 23-24.pdf · uploaded 31 Jul 2026Source
  • Form 5 (FY 2024-2025)Form 5.pdf · uploaded 3 Aug 2026Source

Technical

  • Documentpride_park_plan_clear.pdf · uploaded 2 Feb 2023Source
  • DocumentPlan.pdf · uploaded 2 Mar 2023Source
  • DocumentPlan 1.pdf · uploaded 24 Feb 2024Source
  • DocumentPlan 2.pdf · uploaded 24 Feb 2024Source
  • DocumentPlan 1.pdf · uploaded 24 Feb 2024Source
  • DocumentPlan 2.pdf · uploaded 24 Feb 2024Source
  • DocumentPlan 1 highlighted.pdf · uploaded 4 Mar 2024Source
  • DocumentPlan 2 Highlighted.pdf · uploaded 4 Mar 2024Source
  • DocumentPlan 1 highlighted.pdf · uploaded 4 Mar 2024Source
  • DocumentPlan 2 Highlighted.pdf · uploaded 4 Mar 2024Source

Technical (Architect)

  • DocumentFROM_1_as_on_31032024.pdf · uploaded 20 Jul 2024Source
  • DocumentForm 1 30 Jun.pdf · uploaded 11 Oct 2024Source
  • DocumentFORM-1__30092024_.pdf · uploaded 17 Feb 2025Source
  • DocumentFORM-1__31122024_.pdf · uploaded 17 Feb 2025Source

Technical (Engineer)

  • Documentfrom_2_as_on_31032024.pdf · uploaded 20 Jul 2024Source
  • DocumentForm 2 30 Jun.pdf · uploaded 11 Oct 2024Source
  • DocumentFORM-2__30092024_.pdf · uploaded 17 Feb 2025Source
  • DocumentFORM-2__31122024_.pdf · uploaded 17 Feb 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 10401, 10430

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, Shop47 units in all
Address
Cts No 10429, 10430, 10431, 10401, 10432, 10438, 30971, 31064, 30969, 30744, Near Jhulela Trust School, UlhasnagarPIN 421002
Village
Ulhasnagar (M Corp.), Ulhasnagar taluka
Land area for this project
853 sq m (9,183 sq ft)
Permissible built-up area
2,941 sq m (31,655 sq ft)
Sanctioned built-up area
2,941 sq m (31,655 sq ft)
Designated bank account
85
Developed in phases
No

Survey, CTS, gat or plot numbers

104011043010431104321043830744309693097131064CTS NO 10429

Land as published on MahaRERA's project page

CTS NO 10429, 10430, 10431, 10401, 10432, 10438, 30971, 31064, 30969, 30744

Boundaries

North
19-14-01
South
73-10-02
East
Ulhasnagar Village
West
Ulhasnagar Village

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking47 units

25 of 47 units booked (53%), as the promoter reported to MahaRERA

1BHK · 7 units2BHK · 35 unitsShop · 5 units
TypeCarpet areaUnitsBooked
1BHK42.05 sq m · 453 sq ft73
2BHK41.71 sq m · 449 sq ft74
2BHK58.51 sq m · 630 sq ft72
2BHK59.6 sq m · 642 sq ft73
2BHK65.05 sq m · 700 sq ft74
2BHK65.56 sq m · 706 sq ft75
Shop18.08 sq m · 195 sq ft22
Shop26.44 sq m · 285 sq ft11
Shop27.49 sq m · 296 sq ft11
Shop64.04 sq m · 689 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals5

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDurgesh Shrivastav—
Chartered accountantGirish Tarwani—
Chartered accountantMahek K Panjabi—
Chartered accountantVinesh Ahuja—
EngineerM Nandwani—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology