Others · 9 buildings · 737 unitsRERA P51700033998 +3

Rusttagi Aarambha

Deedo IDDP-THN-00G2

Completion was pushed back 4 months to Jul 2026, and that date has passed too; no MahaRERA orders on record; 84% of its units are booked.

Titwala, Thane 421605 · by Rustagi Estates Private Limited

Delivery-1 yr -3 mo latePromised Feb 2027 · revised Jul 2026 · that date has passed tooRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales84% booked618 of 737 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months to Jul 2026, and that date has passed too

  • P51700033998Registered 17 Mar 2022, completion promised 22 Feb 2027.
  • P51700034078Registered 24 Mar 2022, completion promised 22 Feb 2026, and still not shown completed today.
  • P51700034204Registered 25 Mar 2022, completion promised 31 Mar 2026, revised to 31 Jul 2026, and still not shown completed today.
  • P51700076932Registered 9 Jul 2024, completion promised 30 Nov 2026.

No extension certificate on record.

4 registrations · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

9 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page. Construction % is the average of the developer's own declared activity progress to MahaRERA, not an inspection.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrations4
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170003399817 Mar 202222 Feb 202722 Feb 2027Rustagi Estates Private LimitedProject page
P5170003407824 Mar 202222 Feb 202622 Feb 2026Rustagi Estates Private LimitedProject page
P5170003420425 Mar 202231 Mar 202631 Jul 2026Rustagi Estates Private LimitedProject page
P517000769329 Jul 202430 Nov 2026—Rustagi Estates Private LimitedProject page
Documents573

62 documents held by Deedo, 511 filings listed on MahaRERA's project page

Title report

Encumbrance details (5)

  • Encumbrance detailsP51700076932 · 4 May 2024ViewSource
  • Encumbrance detailsP51700076932 · 4 May 2024ViewSource
  • Encumbrance detailsP51700076932 · 4 May 2024ViewSource
  • Encumbrance detailsP51700076932 · 9 Nov 2024ViewSource
  • Encumbrance detailsP51700076932 · 18 Feb 2025ViewSource

Commencement certificate (4)

  • Commencement certificateP51700076932 · 4 May 2024ViewSource
  • Commencement certificateP51700076932 · 4 May 2024ViewSource
Show all 573 documentsShow fewer documents

Commencement certificate (4)

  • Commencement certificateP51700076932 · 27 Dec 2024ViewSource
  • Commencement certificateP51700076932 · 2 May 2025ViewSource

Form B

Form 1 (8)

Form 2 (8)

Other (18)

Allotment letter (2)

  • Allotment letterP51700076932 · 4 May 2024ViewSource
  • Allotment letterP51700076932 · Date not statedViewSource

Registration certificate (4)

  • Registration certificateP51700034078 · 22 May 2024ViewSource
  • Registration certificateP51700033998 · 22 May 2024ViewSource
  • Registration certificateP51700076932 · 6 Mar 2025ViewSource
  • Registration certificateP51700034204 · 12 Aug 2026ViewSource

Form 2A

Form 5

Layout plan (4)

Building plan (5)

  • Building planP51700076932 · Date not statedViewSource
  • Building planP51700076932 · Date not statedViewSource
  • Building planP51700076932 · Date not statedViewSource
  • Building planP51700076932 · Date not statedViewSource
  • Building planP51700076932 · Date not statedViewSource

Document library

  • Copy of the legal title reportP51700076932 · 02 TITLE (1).pdf · uploaded 4 May 2024View
  • a Details of encumbrances concerned to FinanceP51700076932 · 18 No Financial encumbrances.pdf · uploaded 4 May 2024View
  • a Details of encumbrances concerned to FinanceP51700076932 · 19 No Legal encumbrances.pdf · uploaded 4 May 2024View
  • b Details of encumbrances concerned to LegalP51700076932 · 18 No Financial encumbrances.pdf · uploaded 4 May 2024View
  • b Details of encumbrances concerned to LegalP51700076932 · 19 No Legal encumbrances.pdf · uploaded 4 May 2024View
  • Commencement Certificates / NA Order for plotted developmentP51700076932 · 09 COMMENCEMENT CERTIFICATE.PDF · uploaded 4 May 2024View
  • Declaration about Commencement CertificateP51700076932 · 10 DECLARATION OF CC.pdf · uploaded 4 May 2024View
  • Declaration in FORM BP51700076932 · 05 DECLARATIO FORM B_compressed.pdf · uploaded 4 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700076932 · 06 TITWALA 2 - Form 1-by architects.pdf · uploaded 4 May 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700076932 · 08 FORM 2 FOR RUSTAGI AARAMBHA 2.pdf · uploaded 4 May 2024View
  • CERSAI detailsP51700076932 · 16 CERSAI DECLARATION.pdf · uploaded 4 May 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsP51700076932 · 17 Disclosure of interest of partner.pdf · uploaded 4 May 2024View
  • Proforma of Agreement for saleP51700076932 · 13 Model Agreement for Sales-as it is.pdf · uploaded 4 May 2024View
  • Proforma of Allotment letterP51700076932 · 14 Allotment letter 04-07-2022.pdf · uploaded 4 May 2024View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP51700076932 · 20 Declaration about Separate Bank Account for real estate projects.pdf · uploaded 4 May 2024View
  • Deviation Report with respect to Allotment letterP51700076932 · 21 no deviation to alltoment.pdf · uploaded 4 May 2024View
  • Deviation Report with respect to model copy of AgreementP51700076932 · 22 no deviation to model agreement.pdf · uploaded 4 May 2024View
  • Building Plan Approval / NA Order for plotted developmentP51700076932 · 11building PLAN-1.pdf · uploaded 4 May 2024View
  • Building Plan Approval / NA Order for plotted developmentP51700076932 · 11building PLAN-2.pdf · uploaded 4 May 2024View
  • Building Plan Approval / NA Order for plotted developmentP51700076932 · 11building PLAN-3.pdf · uploaded 4 May 2024View
  • Building Plan Approval / NA Order for plotted developmentP51700076932 · 11building PLAN-4.pdf · uploaded 4 May 2024View
  • Other – TechnicalP51700076932 · DECLARATION-Annexure A.pdf · uploaded 8 May 2024View
  • Copy of Layout Approval (in case of layout)P51700076932 · 12 APPROVED LAYOUT 8-5-24.pdf · uploaded 8 May 2024View
  • Copy of Layout Approval (in case of layout)P51700076932 · APPROVED PARKING LAYOUT 8-5-24 (1).pdf · uploaded 8 May 2024View
  • Other – LegalP51700076932 · Development agreement.pdf · uploaded 6 Jun 2024View
  • Other – LegalP51700076932 · DECLARATION-Annexure A.pdf · uploaded 6 Jun 2024View
  • a Details of encumbrances concerned to FinanceP51700076932 · ENCUMBERENCE DECLARATION.pdf · uploaded 9 Nov 2024View
  • b Details of encumbrances concerned to LegalP51700076932 · ENCUMBERENCE DECLARATION.pdf · uploaded 9 Nov 2024View
  • Other – FinanceP51700076932 · INDEX 2.pdf · uploaded 9 Nov 2024View
  • Other – FinanceP51700076932 · SANCTION LETTER MOHFL final.pdf · uploaded 9 Nov 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700076932 · FORM 1 ARCHITECT.pdf · uploaded 26 Dec 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700076932 · FORM 2- ENGINEER.pdf · uploaded 26 Dec 2024View
  • Commencement Certificates / NA Order for plotted developmentP51700076932 · FULL CC RUSTAGI AARAMBHA 2.pdf · uploaded 27 Dec 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700076932 · 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 11 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700076932 · 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 11 Feb 2025View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP51700076932 · Old Declaration - Separate Bank Account for real estate projects.pdf · uploaded 18 Feb 2025View
  • Disclosure of sold/ booked inventoryP51700076932 · Declaration_0001.pdf · uploaded 26 Feb 2025View
  • Copy of Layout Approval (in case of layout)P51700076932 · Layout.pdf · uploaded 2 May 2025View
  • Copy of Layout Approval (in case of layout)P51700076932 · Layout 2.pdf · uploaded 2 May 2025View
  • Building Plan Approval / NA Order for plotted developmentP51700076932 · Bldg Plan.pdf · uploaded 2 May 2025View
  • Commencement Certificates / NA Order for plotted developmentP51700076932 · Amended IOA noc.pdf · uploaded 2 May 2025View
  • Form 1P51700076932 · FORM 1 ARCHITECT.pdf · uploaded 5 Jul 2025View
  • Form 2P51700076932 · FORM 2- ENGINEER.pdf · uploaded 5 Jul 2025View
  • Disclosure of Sold and Booked InventoryP51700076932 · SOLD UNSOLD INVENTORY.pdf · uploaded 5 Jul 2025View
  • Form 1P51700076932 · 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 5 Jul 2025View
  • Form 2P51700076932 · 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 5 Jul 2025View
  • Disclosure of Sold and Booked InventoryP51700076932 · SOLD UNSOLD INVENTORY.pdf · uploaded 5 Jul 2025View
  • Form 1P51700076932 · FORM 1 Q4 24-25.pdf · uploaded 18 Jul 2025View
  • Form 2P51700076932 · FORM 2 Q4 24-25.pdf · uploaded 18 Jul 2025View
  • Disclosure of Sold and Booked InventoryP51700076932 · SOLD UNSOLD INVENTOY.pdf · uploaded 18 Jul 2025View
  • Withdrawal Update Form 1P51700076932 · Signed Form 1.pdf · uploaded 20 Jul 2025View
  • Withdrawal Update Form 2P51700076932 · Signed Form 2.pdf · uploaded 20 Jul 2025View
  • Form 2A (FY 2024-2025)P51700076932 · FORM 2A 2.0.PDF · uploaded 10 Sep 2025View
  • Form 5 (FY 2024-2025)P51700076932 · FORM 5 PROJECT.pdf · uploaded 11 Sep 2025View
  • Withdrawal Update Form 1P51700076932 · Form 1.pdf · uploaded 2 Dec 2025View
  • Withdrawal Update Form 2P51700076932 · Form 2.pdf · uploaded 2 Dec 2025View
  • Withdrawal Update Form 1P51700076932 · Form 1 Dec 2025 QPR.pdf · uploaded 10 Jun 2026View
  • Withdrawal Update Form 2P51700076932 · Form 2 Dec 2025 QPR.pdf · uploaded 10 Jun 2026View
  • Withdrawal Update Form 1P51700076932 · Form 1 March 2026 QPR.pdf · uploaded 11 Jun 2026View
  • Withdrawal Update Form 2P51700076932 · Form 2 March 2026 QPR.pdf · uploaded 11 Jun 2026View

Promoter documents

  • Legal Title reportP51700076932 · 02 TITLE (1).pdf · uploaded 4 May 2024View
  • Declaration Form BP51700076932 · 05 DECLARATIO FORM B_compressed.pdf · uploaded 4 May 2024View

Technical documents

  • Building Plan ApprovalP51700076932 · 11building PLAN-1.pdfView
  • Building Plan ApprovalP51700076932 · 11building PLAN-2.pdfView
  • Building Plan ApprovalP51700076932 · 11building PLAN-3.pdfView
  • Building Plan ApprovalP51700076932 · 11building PLAN-4.pdfView
  • Layout ApprovalP51700076932 · 12 APPROVED LAYOUT 8-5-24.pdfView
  • Layout ApprovalP51700076932 · APPROVED PARKING LAYOUT 8-5-24 (1).pdfView
  • Layout ApprovalP51700076932 · Layout.pdfView
  • Layout ApprovalP51700076932 · Layout 2.pdfView
  • Building Plan ApprovalP51700076932 · Bldg Plan.pdfView

Other legal documents

  • Other – LegalP51700076932 · DECLARATION-Annexure A.pdfView
  • Other – LegalP51700076932 · Development agreement.pdfView

Financial documents

  • Other – FinanceP51700076932 · INDEX 2.pdf · uploaded 9 Nov 2024View
  • Other – FinanceP51700076932 · SANCTION LETTER MOHFL final.pdf · uploaded 9 Nov 2024View

Proforma allotment letter

  • Proforma allotment letterP51700076932 · 14 Allotment letter 04-07-2022.pdfView

Finance

  • PAN CardP51700033998 · PAN.pdf · uploaded 11 Mar 2022Source
  • PAN CardP51700034204 · PAN.pdf · uploaded 11 Mar 2022Source
  • PAN CardP51700034078 · PAN.pdf · uploaded 11 Mar 2022Source

Legal

  • OtherP51700033998 · SCOOTER PARKING STATEMENT.pdf · uploaded 11 Mar 2022Source
  • Legal Title reportP51700033998 · Title Report_Flow of Title latest.pdf · uploaded 11 Mar 2022Source
  • Declaration Form BP51700033998 · Form B Affidavit Phase III_compressed.pdf · uploaded 11 Mar 2022Source
  • OtherP51700034204 · SCOOTER PARKING STATEMENT.pdf · uploaded 11 Mar 2022Source
  • Legal Title reportP51700034204 · Title Report_Flow of Title latest.pdf · uploaded 11 Mar 2022Source
  • Declaration Form BP51700034204 · Form B Declaration_Affidavit.pdf · uploaded 11 Mar 2022Source
  • OtherP51700034078 · SCOOTER PARKING STATEMENT.pdf · uploaded 11 Mar 2022Source
  • Legal Title reportP51700034078 · Title Report_Flow of Title latest.pdf · uploaded 11 Mar 2022Source
  • Declaration Form BP51700034078 · Form B Affidavit Phase II.pdf · uploaded 11 Mar 2022Source
  • OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-1.pdf · uploaded 16 Mar 2022Source
  • OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-2.pdf · uploaded 16 Mar 2022Source
  • OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-3.pdf · uploaded 16 Mar 2022Source
  • OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-4.pdf · uploaded 16 Mar 2022Source
  • OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-5.pdf · uploaded 16 Mar 2022Source
  • OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-6.pdf · uploaded 16 Mar 2022Source
  • OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-7.pdf · uploaded 16 Mar 2022Source
  • OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-8.pdf · uploaded 16 Mar 2022Source
  • OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-9.pdf · uploaded 16 Mar 2022Source
  • OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-10.pdf · uploaded 16 Mar 2022Source
  • OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-11.pdf · uploaded 16 Mar 2022Source
  • OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-12.pdf · uploaded 16 Mar 2022Source
  • OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-13.pdf · uploaded 16 Mar 2022Source
  • OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-14.pdf · uploaded 16 Mar 2022Source
  • OtherP51700034204 · Declaration_Land Ownership of company.pdf · uploaded 19 Mar 2022Source
  • Legal Title reportP51700034204 · Declaration_Land Ownership of company.pdf · uploaded 19 Mar 2022Source
  • OtherP51700033998 · Payment Schedule Phase III.PDF · uploaded 1 Nov 2022Source
  • OtherP51700034078 · Payment Schedule Phase II.PDF · uploaded 1 Nov 2022Source
  • OtherP51700033998 · Parking Letter.pdf · uploaded 18 Mar 2024Source
  • OtherP51700034204 · Parking Letter.pdf · uploaded 18 Mar 2024Source
  • OtherP51700034078 · Parking Letter.pdf · uploaded 18 Mar 2024Source
  • Declaration Form BP51700034204 · Form B_AFFIDAVIT for Extension till 21-2-2025_Phase 1.PDF · uploaded 19 Mar 2024Source

Migrated

  • 1 PAN CardP51700033998 · PAN.pdf · uploaded 11 Mar 2022Source
  • 1 Copy of the legal title reportP51700033998 · Title Report_Flow of Title latest.pdf · uploaded 11 Mar 2022Source
  • 1 Details of encumbrancesP51700033998 · DECLARATIONS_ENCUMBRANCES.pdf · uploaded 11 Mar 2022Source
  • 1 Copy of Layout Approval (in case of layout)P51700033998 · Approved Layout.pdf · uploaded 11 Mar 2022Source
  • 2 Copy of Layout Approval (in case of layout)P51700033998 · Common Area Certificate_Architect.pdf · uploaded 11 Mar 2022Source
  • 3 Copy of Layout Approval (in case of layout)P51700033998 · Layout Full Approved_Mhada (2).pdf · uploaded 11 Mar 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentP51700033998 · Building Plan Approval.pdf · uploaded 11 Mar 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentP51700033998 · LOI.pdf · uploaded 11 Mar 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentP51700033998 · CC_Plinth 23022022.pdf · uploaded 11 Mar 2022Source
  • 1 Declaration about Commencement CertificateP51700033998 · Declaration About CC.pdf · uploaded 11 Mar 2022Source
  • 1 Declaration in FORM BP51700033998 · Form B Affidavit Phase III_compressed.pdf · uploaded 11 Mar 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700033998 · form 1Architect certificate_signed PhaseIII_compressed.pdf · uploaded 11 Mar 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700033998 · Form 2_engineer_phase III.pdf · uploaded 11 Mar 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51700033998 · Form 2A_engineer.pdf · uploaded 11 Mar 2022Source
  • 1 CERSAI detailsP51700033998 · CERSAI_Search_Report_200231360951_For_Debtor_Based_Search_01_03_2022_13_30_10_880.pdf · uploaded 11 Mar 2022Source
  • 1 Disclosure of sold/ booked inventoryP51700033998 · sold unsold phase_III_compressed.pdf · uploaded 11 Mar 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700033998 · Form 3 CA_CERTIFICATE_phase III.pdf · uploaded 11 Mar 2022Source
  • 1 Proforma of Allotment letterP51700033998 · DECLARATION_ALLOTMENT_AGREEMENT_PHASE III.pdf · uploaded 11 Mar 2022Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51700033998 · DECLARATIONS_SOCIETY FORMATIOH.pdf · uploaded 11 Mar 2022Source
  • 1 Status of ConveyanceP51700033998 · DECLARATIONS_CONVEYANCE.pdf · uploaded 11 Mar 2022Source
  • 1 OtherP51700033998 · SCOOTER PARKING STATEMENT.pdf · uploaded 11 Mar 2022Source
  • 1 PAN CardP51700034204 · PAN.pdf · uploaded 11 Mar 2022Source
  • 1 Copy of the legal title reportP51700034204 · Title Report_Flow of Title latest.pdf · uploaded 11 Mar 2022Source
  • 1 Details of encumbrancesP51700034204 · DECLARATIONS_ENCUMBRANCES.pdf · uploaded 11 Mar 2022Source
  • 1 Copy of Layout Approval (in case of layout)P51700034204 · Approved Layout.pdf · uploaded 11 Mar 2022Source
  • 2 Copy of Layout Approval (in case of layout)P51700034204 · Common Area Certificate_Architect.pdf · uploaded 11 Mar 2022Source
  • 3 Copy of Layout Approval (in case of layout)P51700034204 · Layout Full Approved_Mhada (2).pdf · uploaded 11 Mar 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentP51700034204 · Building Plan Approval.pdf · uploaded 11 Mar 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentP51700034204 · LOI.pdf · uploaded 11 Mar 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentP51700034204 · CC_Plinth 23022022.pdf · uploaded 11 Mar 2022Source
  • 1 Declaration about Commencement CertificateP51700034204 · Declaration About CC.pdf · uploaded 11 Mar 2022Source
  • 1 Declaration in FORM BP51700034204 · Form B Declaration_Affidavit.pdf · uploaded 11 Mar 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · Form 1 Architect certificate.pdf · uploaded 11 Mar 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034204 · Form 2 Engineers Certificate.pdf · uploaded 11 Mar 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51700034204 · Form 2A_engineer.pdf · uploaded 11 Mar 2022Source
  • 1 CERSAI detailsP51700034204 · CERSAI_Search_Report_200231360951_For_Debtor_Based_Search_01_03_2022_13_30_10_880.pdf · uploaded 11 Mar 2022Source
  • 1 Disclosure of sold/ booked inventoryP51700034204 · Sold Unsold Inventory.pdf · uploaded 11 Mar 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034204 · Form 3 CA Certificate.pdf · uploaded 11 Mar 2022Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51700034204 · DECLARATIONS_SOCIETY FORMATIOH.pdf · uploaded 11 Mar 2022Source
  • 1 Status of ConveyanceP51700034204 · DECLARATIONS_CONVEYANCE.pdf · uploaded 11 Mar 2022Source
  • 1 OtherP51700034204 · SCOOTER PARKING STATEMENT.pdf · uploaded 11 Mar 2022Source
  • 1 PAN CardP51700034078 · PAN.pdf · uploaded 11 Mar 2022Source
  • 1 Copy of the legal title reportP51700034078 · Title Report_Flow of Title latest.pdf · uploaded 11 Mar 2022Source
  • 1 Details of encumbrancesP51700034078 · DECLARATIONS_ENCUMBRANCES.pdf · uploaded 11 Mar 2022Source
  • 1 Copy of Layout Approval (in case of layout)P51700034078 · Layout Full Approved_Mhada (2).pdf · uploaded 11 Mar 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentP51700034078 · Building Plan Approval.pdf · uploaded 11 Mar 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentP51700034078 · LOI.pdf · uploaded 11 Mar 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentP51700034078 · CC_Plinth 23022022.pdf · uploaded 11 Mar 2022Source
  • 1 Declaration about Commencement CertificateP51700034078 · Declaration About CC.pdf · uploaded 11 Mar 2022Source
  • 1 Declaration in FORM BP51700034078 · Form B Affidavit Phase II.pdf · uploaded 11 Mar 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034078 · Form 1 architect certificate PhaseII.pdf · uploaded 11 Mar 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034078 · Form 2_engineer_phase II.pdf · uploaded 11 Mar 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51700034078 · Form 2A_engineer.pdf · uploaded 11 Mar 2022Source
  • 1 CERSAI detailsP51700034078 · CERSAI_Search_Report_200231360951_For_Debtor_Based_Search_01_03_2022_13_30_10_880.pdf · uploaded 11 Mar 2022Source
  • 1 Disclosure of sold/ booked inventoryP51700034078 · sold unsold phase_II.pdf · uploaded 11 Mar 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034078 · Form 3 CA_CERTIFICATE_phase II.pdf · uploaded 11 Mar 2022Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51700034078 · DECLARATIONS_SOCIETY FORMATIOH.pdf · uploaded 11 Mar 2022Source
  • 1 Status of ConveyanceP51700034078 · DECLARATIONS_CONVEYANCE.pdf · uploaded 11 Mar 2022Source
  • 1 OtherP51700034078 · SCOOTER PARKING STATEMENT.pdf · uploaded 11 Mar 2022Source
  • 1 Proforma of Allotment letterP51700034078 · Draft Agreement of Sale Titwala EWS phase 2.pdf · uploaded 15 Mar 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentP51700034204 · Plinth CC 23022022.pdf · uploaded 16 Mar 2022Source
  • 1 Proforma of Allotment letterP51700034204 · Agreement of Sale Titwala EWS phase 1.pdf · uploaded 16 Mar 2022Source
  • 2 Proforma of Allotment letterP51700034204 · Allotment letter.pdf · uploaded 16 Mar 2022Source
  • 2 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-1.pdf · uploaded 16 Mar 2022Source
  • 3 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-2.pdf · uploaded 16 Mar 2022Source
  • 4 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-3.pdf · uploaded 16 Mar 2022Source
  • 5 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-4.pdf · uploaded 16 Mar 2022Source
  • 6 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-5.pdf · uploaded 16 Mar 2022Source
  • 7 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-6.pdf · uploaded 16 Mar 2022Source
  • 8 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-7.pdf · uploaded 16 Mar 2022Source
  • 9 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-8.pdf · uploaded 16 Mar 2022Source
  • 10 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-9.pdf · uploaded 16 Mar 2022Source
  • 11 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-10.pdf · uploaded 16 Mar 2022Source
  • 12 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-11.pdf · uploaded 16 Mar 2022Source
  • 13 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-12.pdf · uploaded 16 Mar 2022Source
  • 14 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-13.pdf · uploaded 16 Mar 2022Source
  • 15 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-14.pdf · uploaded 16 Mar 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentP51700034078 · Plinth CC 23022022.pdf · uploaded 16 Mar 2022Source
  • 2 Proforma of Allotment letterP51700034078 · Allotment letter.pdf · uploaded 16 Mar 2022Source
  • 2 Copy of the legal title reportP51700034204 · Declaration_Land Ownership of company.pdf · uploaded 19 Mar 2022Source
  • 16 OtherP51700034204 · Declaration_Land Ownership of company.pdf · uploaded 19 Mar 2022Source
  • 2 Disclosure of sold/ booked inventoryP51700033998 · BLDG 03_compressed.pdf · uploaded 7 Jun 2022Source
  • 3 Disclosure of sold/ booked inventoryP51700033998 · BLDG 05 _compressed.pdf · uploaded 7 Jun 2022Source
  • 2 Disclosure of sold/ booked inventoryP51700034204 · BLDG 02 PH I.pdf · uploaded 7 Jun 2022Source
  • 3 Disclosure of sold/ booked inventoryP51700034204 · BLDG 01 PH I.pdf · uploaded 7 Jun 2022Source
  • 4 Disclosure of sold/ booked inventoryP51700034204 · Phase I bldg 02.pdf · uploaded 7 Jun 2022Source
  • 2 Disclosure of sold/ booked inventoryP51700034078 · BLDG 01 RESIDENTIAL_compressed.pdf · uploaded 7 Jun 2022Source
  • 3 Disclosure of sold/ booked inventoryP51700034078 · BLDG 02 RESIDENTIAL_0001_compressed.pdf · uploaded 7 Jun 2022Source
  • 4 Disclosure of sold/ booked inventoryP51700034078 · BLDG 04_compressed.pdf · uploaded 7 Jun 2022Source
  • 2 OtherP51700033998 · Payment Schedule Phase III.PDF · uploaded 1 Nov 2022Source
  • 2 OtherP51700034078 · Payment Schedule Phase II.PDF · uploaded 1 Nov 2022Source
  • 2 Details of encumbrancesP51700033998 · ENCUMBRANCE CERTIFICATE.PDF · uploaded 2 Nov 2022Source
  • 2 Details of encumbrancesP51700034204 · ENCUMBRANCE CERTIFICATE.PDF · uploaded 2 Nov 2022Source
  • 2 Details of encumbrancesP51700034078 · ENCUMBRANCE CERTIFICATE.PDF · uploaded 2 Nov 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700033998 · form 1 Phase III_compressed.pdf · uploaded 2 Feb 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700033998 · form 2 Phase III_compressed.pdf · uploaded 2 Feb 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700033998 · form 3 Phase III_compressed.pdf · uploaded 2 Feb 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · form 1 Phase I_compressed.pdf · uploaded 2 Feb 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · form 1 Phase I_compressed.pdf · uploaded 2 Feb 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034204 · form 2 Phase II.PDF · uploaded 2 Feb 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034204 · form 3 Phase I_compressed.pdf · uploaded 2 Feb 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034078 · form 1 Phase II_compressed.pdf · uploaded 2 Feb 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034078 · form 2 Phase II.PDF · uploaded 2 Feb 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034078 · form 3 Phase II_compressed.pdf · uploaded 2 Feb 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700033998 · form I Phase III_compressed.pdf · uploaded 30 Jun 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700033998 · form 2 Phase III_compressed.pdf · uploaded 30 Jun 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · form I Phase I_compressed.pdf · uploaded 30 Jun 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034204 · form 2 Phase I_compressed.pdf · uploaded 30 Jun 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034078 · form I Phase II_compressed.pdf · uploaded 30 Jun 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034078 · form 2 Phase II_compressed.pdf · uploaded 30 Jun 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700033998 · Form III Phase III_compressed.pdf · uploaded 1 Jul 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034204 · Form III Phase I_compressed.pdf · uploaded 1 Jul 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034204 · Form III Phase I_compressed.pdf · uploaded 1 Jul 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034078 · Form III Phase II_compressed.pdf · uploaded 1 Jul 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51700033998 · FORM 5 PHASE III final.pdf · uploaded 30 Nov 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51700034204 · FORM 5 PHASE I final.pdf · uploaded 30 Nov 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51700034078 · FORM 5 PHASE II final.pdf · uploaded 30 Nov 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700033998 · SIGNED FORM 1 PHASE 3.pdf · uploaded 4 Jan 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700033998 · SIGNED FORM 1 PHASE 3.pdf · uploaded 4 Jan 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700033998 · SIGNED FORM 2 PHASE 3.pdf · uploaded 4 Jan 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700033998 · SIGNED FORM 2 PHASE 3 .PDF · uploaded 4 Jan 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700033998 · SIGNED FORM 3 PHASE 3_compressed.pdf · uploaded 4 Jan 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700033998 · SIGNED FORM 3 PHASE3_compressed.pdf · uploaded 4 Jan 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · SIGNED FORM 1 PHASE 1.pdf · uploaded 4 Jan 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · SIGNED FORM 1 PHASE 1.pdf · uploaded 4 Jan 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034204 · SIGNED FORM 2 PHASE 1.pdf · uploaded 4 Jan 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034204 · SIGNED FORM 2 PHASE 1.pdf · uploaded 4 Jan 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034204 · SIGNED FORM 3 PHASE 1_compressed.pdf · uploaded 4 Jan 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034204 · SIGNED FORM 3 PHASE 1_compressed.pdf · uploaded 4 Jan 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034078 · SIGNED FORM 1 PHASE 2.pdf · uploaded 4 Jan 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034078 · SIGNED FORM 1 PHASE 2.pdf · uploaded 4 Jan 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034078 · SIGNED FORM 2 PHASE 2.pdf · uploaded 4 Jan 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034078 · SIGNED FORM 2 PHASE 2.pdf · uploaded 4 Jan 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034078 · SIGNED FORM 3 PHASE 2_compressed.pdf · uploaded 4 Jan 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034078 · SIGNED FORM 3 PHASE 2_compressed.pdf · uploaded 4 Jan 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700033998 · Form 1 Phase III.PDF · uploaded 14 Mar 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700033998 · Form 2 Phase II.PDF · uploaded 14 Mar 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700033998 · Form 3 Phase III.PDF · uploaded 14 Mar 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · Form 1 Phase I.PDF · uploaded 14 Mar 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034204 · Form 1 Phase I.PDF · uploaded 14 Mar 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034204 · Form 2 Phase I.PDF · uploaded 14 Mar 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034204 · Form 3 Phase I.PDF · uploaded 14 Mar 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034078 · Form 1 Phase II.PDF · uploaded 14 Mar 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034078 · Form 2 Phase II.PDF · uploaded 14 Mar 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034078 · Form 3 Phase II.PDF · uploaded 14 Mar 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P51700033998 · Phase III FORM 2A.PDF · uploaded 15 Mar 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700033998 · Phase III Form 3.PDF · uploaded 15 Mar 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P51700034204 · Phase I FORM 2A.PDF · uploaded 15 Mar 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034204 · Phase I Form 3.PDF · uploaded 15 Mar 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P51700034078 · Phase II FORM 2A.PDF · uploaded 15 Mar 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034078 · Phase II Form 3.PDF · uploaded 15 Mar 2024Source
  • 3 OtherP51700033998 · Parking Letter.pdf · uploaded 18 Mar 2024Source
  • 17 OtherP51700034204 · Parking Letter.pdf · uploaded 18 Mar 2024Source
  • 3 OtherP51700034078 · Parking Letter.pdf · uploaded 18 Mar 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentP51700033998 · further CC project 3 10-1-23.pdf · uploaded 19 Mar 2024Source
  • 3 Commencement Certificates / NA Order for plotted developmentP51700033998 · TP3_ Bldg 3_Further CC.pdf · uploaded 19 Mar 2024Source
  • 4 Copy of Layout Approval (in case of layout)P51700034204 · Layout plan Phase I-compressed.pdf · uploaded 19 Mar 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentP51700034204 · further CC project 3 10-1-23.pdf · uploaded 19 Mar 2024Source
  • 3 Commencement Certificates / NA Order for plotted developmentP51700034204 · project 3 further CC bldg 2,4,5 28-2-24_0001.pdf · uploaded 19 Mar 2024Source
  • 2 Declaration in FORM BP51700034204 · Form B_AFFIDAVIT for Extension till 21-2-2025_Phase 1.PDF · uploaded 19 Mar 2024Source
  • 2 Copy of Layout Approval (in case of layout)P51700034078 · Rusttagi Aarambha layout phase 2 FINAL 18-3-24R-compressed.pdf · uploaded 19 Mar 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentP51700034078 · further CC project 3 10-1-23.pdf · uploaded 19 Mar 2024Source
  • 3 Commencement Certificates / NA Order for plotted developmentP51700034078 · Building 1 CC.pdf · uploaded 19 Mar 2024Source
  • 4 Commencement Certificates / NA Order for plotted developmentP51700034078 · project 3 further CC bldg 2,4,5 28-2-24_0001.pdf · uploaded 19 Mar 2024Source
  • 2 Declaration about Commencement CertificateP51700034204 · Declaration About Further CC_Phase-1.PDF · uploaded 20 Mar 2024Source
  • 5 Disclosure of sold/ booked inventoryP51700034204 · Phase I Sold unsold.PDF · uploaded 20 Mar 2024Source
  • 4 Copy of Layout Approval (in case of layout)P51700033998 · Rusttagi Aarambha layout phase 3 FINAL 18-3-24R-compressed.pdf · uploaded 21 Mar 2024Source
  • 4 Commencement Certificates / NA Order for plotted developmentP51700033998 · project 3 further CC bldg 2,4,5 28-2-24_0001.pdf · uploaded 21 Mar 2024Source
  • 2 Declaration about Commencement CertificateP51700033998 · Declaratiobn for CC.pdf · uploaded 21 Mar 2024Source
  • 4 Disclosure of sold/ booked inventoryP51700033998 · Sold unsold p3 (1).pdf · uploaded 21 Mar 2024Source
  • 2 Declaration about Commencement CertificateP51700034078 · Declaratiobn for CC.pdf · uploaded 21 Mar 2024Source
  • 5 Disclosure of sold/ booked inventoryP51700034078 · Sold unsold p2 (1).pdf · uploaded 21 Mar 2024Source
  • 3 Copy of Layout Approval (in case of layout)P51700034078 · Building layout _Phase I II III.pdf · uploaded 29 Mar 2024Source
  • 5 Copy of Layout Approval (in case of layout)P51700033998 · Building layout _Phase I II III.pdf · uploaded 30 Mar 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700033998 · Phase III form 3_compressed (1).pdf · uploaded 30 Mar 2024Source
  • 5 Copy of Layout Approval (in case of layout)P51700034204 · Building layout _Phase I II III.pdf · uploaded 30 Mar 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034204 · Phase I Form 3.pdf · uploaded 30 Mar 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034078 · Phase II Form 3_compressed.pdf · uploaded 30 Mar 2024Source
  • 6 Copy of Layout Approval (in case of layout)P51700033998 · PHASEWISE LAND AREA 23-4-24 phase 3R.pdf · uploaded 25 Apr 2024Source
  • 6 Copy of Layout Approval (in case of layout)P51700034204 · PHASEWISE LAND AREA 23-4-24 phase 1.pdf · uploaded 25 Apr 2024Source
  • 4 Copy of Layout Approval (in case of layout)P51700034078 · PHASEWISE LAND AREA 23-4-24 phase 2.pdf · uploaded 25 Apr 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700033998 · form 1phase3_0001_compressed.pdf · uploaded 25 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700033998 · form 2phase3_0001_compressed.pdf · uploaded 25 Dec 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · form 1phase1_0001_compressed.pdf · uploaded 25 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034204 · form 2 phase 1_0001_compressed.pdf · uploaded 25 Dec 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034078 · form 1phase2_0001_compressed.pdf · uploaded 25 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034078 · form 2phase2_0001_compressed.pdf · uploaded 25 Dec 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700033998 · form 3phase3_0001_compressed.pdf · uploaded 1 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034204 · form 3 phase 1_0001_compressed.pdf · uploaded 1 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034078 · form 3phase2_0001_compressed.pdf · uploaded 1 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700033998 · Form 1 Phase III_0001.pdf · uploaded 5 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700033998 · Form 2 Phase III_0001.pdf · uploaded 5 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · Form 1 Phase II_0001.pdf · uploaded 5 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · Form 1 Phase I_0001.pdf · uploaded 5 Feb 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · form 1phase1_0001_compressed.pdf · uploaded 5 Feb 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · Form 1 Phase I_0001.pdf · uploaded 5 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51700034204 · Form 2 Phase I_0001.pdf · uploaded 5 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034078 · Form 2 Phase II_0001.pdf · uploaded 5 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034078 · Form 2 Phase II_0001.pdf · uploaded 5 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700033998 · FROM-3 PHASE-III _compressed2.pdf · uploaded 10 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51700033998 · Form 2A Phase III.PDF · uploaded 10 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034204 · Form3_Phase I_compressed.pdf · uploaded 10 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034204 · Form2_phase I.pdf · uploaded 10 Feb 2025Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51700034204 · Form 2A_Phase 1.PDF · uploaded 10 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034078 · Form 1 Phase II_0001.pdf · uploaded 10 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034078 · Form 3 Phase II_upload.pdf · uploaded 10 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51700034078 · Form 2A-Phase II.PDF · uploaded 10 Feb 2025Source
  • Form 1P51700034204 · Form 1 Architect certificate_Mar 22.pdf · uploaded 2 Jul 2025Source
  • Form 2P51700034204 · Form 2_engineer_phase I_Mar22.pdf · uploaded 2 Jul 2025Source
  • Form 3P51700034204 · Form 3 CA_Signed_phase I_Mar22.pdf · uploaded 2 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034204 · sold unsold phase_I Mar 22.pdf · uploaded 2 Jul 2025Source
  • Form 1P51700034204 · Form 1_ Phase 1_Dec 22.pdf · uploaded 2 Jul 2025Source
  • Form 2P51700034204 · Form 2 Phase1_Dec22.pdf · uploaded 2 Jul 2025Source
  • Form 3P51700034204 · Form 3 Dec22.pdf · uploaded 2 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034204 · Sold_Unsold Dec 22.pdf · uploaded 2 Jul 2025Source
  • Form 1P51700034204 · form I Phase I_Mar23.pdf · uploaded 2 Jul 2025Source
  • Form 2P51700034204 · form 2 Phase I_mar23.pdf · uploaded 2 Jul 2025Source
  • Form 3P51700034204 · Form 3 Mar 23_Phase I.pdf · uploaded 2 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034204 · Sold_Unsold Mar 23.pdf · uploaded 2 Jul 2025Source
  • Form 1P51700034204 · Form 1 June 23 Phase I june23.pdf · uploaded 2 Jul 2025Source
  • Form 2P51700034204 · Form 2 phase i june 2023.pdf · uploaded 2 Jul 2025Source
  • Form 3P51700034204 · FORM 3 PHASE 1_June23.pdf · uploaded 2 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034204 · Sold_Unsold June_23.pdf · uploaded 2 Jul 2025Source
  • Form 1P51700034204 · SIGNED FORM 1 PHASE 1 Sep23.pdf · uploaded 2 Jul 2025Source
  • Form 2P51700034204 · SIGNED FORM 2 PHASE 1 Sep 23.pdf · uploaded 2 Jul 2025Source
  • Form 3P51700034204 · SIGNED FORM 3 PHASE 1_Sep23.pdf · uploaded 2 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034204 · Sold_Unsold Sep_23.pdf · uploaded 2 Jul 2025Source
  • Form 1P51700034204 · Form 1 Phase I Dec 23.PDF · uploaded 2 Jul 2025Source
  • Form 2P51700034204 · Form 2 Phase I Dec 23.PDF · uploaded 2 Jul 2025Source
  • Form 3P51700034204 · Phase I Form 3 Dec 23.pdf · uploaded 2 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034204 · Sold_unsold_dec 23.pdf · uploaded 2 Jul 2025Source
  • Form 1P51700034204 · form 1phase1_0001_Sep24.pdf · uploaded 2 Jul 2025Source
  • Form 2P51700034204 · form 2 phase 1_0001_sep24.pdf · uploaded 2 Jul 2025Source
  • Form 3P51700034204 · form 3 phase 1_Sep 24.pdf · uploaded 2 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034204 · Sold_Unsold Sep_24.pdf · uploaded 2 Jul 2025Source
  • Form 1P51700034204 · Form1_phase I Dec24.pdf · uploaded 2 Jul 2025Source
  • Form 2P51700034204 · Form2_phase I Dec 24.pdf · uploaded 2 Jul 2025Source
  • Form 3P51700034204 · FROM-3 PHASE-I Dec 24.PDF · uploaded 2 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034204 · Sold_unsold_dec 24.pdf · uploaded 2 Jul 2025Source
  • Form 1P51700034204 · Qpr Phase I June 22.pdf · uploaded 2 Jul 2025Source
  • Form 2P51700034204 · Qpr Phase I June 22.pdf · uploaded 2 Jul 2025Source
  • Form 3P51700034204 · Qpr Phase I June 22.pdf · uploaded 2 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034204 · Qpr Phase I June 22.pdf · uploaded 2 Jul 2025Source
  • Form 1P51700034204 · Form 1 Phase I Dec 23.PDF · uploaded 2 Jul 2025Source
  • Form 2P51700034204 · Form 2 Phase I Dec 23.PDF · uploaded 2 Jul 2025Source
  • Form 3P51700034204 · Phase I Form 3 Dec 23.pdf · uploaded 2 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034204 · Sold_unsold_dec 23.pdf · uploaded 2 Jul 2025Source
  • Self-declaration of Quarterly ProgressP51700034204 · Qpr Phase 1 mar 24.pdf · uploaded 2 Jul 2025Source
  • Form 1P51700034204 · Form 1 Phase I Dec 23.PDF · uploaded 2 Jul 2025Source
  • Form 2P51700034204 · Form 2 Phase I Dec 23.PDF · uploaded 2 Jul 2025Source
  • Form 3P51700034204 · Phase I Form 3.pdf · uploaded 2 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034204 · Sold_unsold_dec 23.pdf · uploaded 2 Jul 2025Source
  • Self-declaration of Quarterly ProgressP51700034204 · Qpr Phase I June 24.pdf · uploaded 2 Jul 2025Source
  • Form 1P51700033998 · PhaseIII Form 1_0001.pdf · uploaded 19 Jul 2025Source
  • Form 2P51700033998 · PhaseIII Form 2_0001.pdf · uploaded 19 Jul 2025Source
  • Form 3P51700033998 · Phase 3 Form 3.pdf · uploaded 19 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700033998 · PhaseIII Sold Unsold_0001.pdf · uploaded 19 Jul 2025Source
  • Form 1P51700034204 · PHASE-1 FORM - 1.pdf · uploaded 19 Jul 2025Source
  • Form 2P51700034204 · PHASE-1 FORM - 2.pdf · uploaded 19 Jul 2025Source
  • Form 3P51700034204 · PHASE-1 FORM - 3_merged.pdf · uploaded 19 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034204 · Phase I Sold_Unsold.pdf · uploaded 19 Jul 2025Source
  • Form 1P51700034078 · PhaseII Form 1_0001.pdf · uploaded 19 Jul 2025Source
  • Form 2P51700034078 · PhaseII Form 2_0001.pdf · uploaded 19 Jul 2025Source
  • Form 3P51700034078 · phase 2 Form 3.pdf · uploaded 19 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034078 · Phase II Sold_Unsold.pdf · uploaded 19 Jul 2025Source
  • Form 1P51700033998 · PHASE-3 FORM-1.pdf · uploaded 21 Jul 2025Source
  • Form 2P51700033998 · PHASE-3 FORM-2.pdf · uploaded 21 Jul 2025Source
  • Form 3P51700033998 · PHASE-3 FORM-3.pdf · uploaded 21 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700033998 · Sold Unsold Phase 3 June 25.pdf · uploaded 21 Jul 2025Source
  • Form 1P51700034078 · form 1 Phase II.PDF · uploaded 21 Jul 2025Source
  • Form 2P51700034078 · form 2 Phase II.PDF · uploaded 21 Jul 2025Source
  • Form 3P51700034078 · form 3 Phase II.PDF · uploaded 21 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034078 · Phase 2 Sold Unsold Dec 22.pdf · uploaded 21 Jul 2025Source
  • Form 1P51700034078 · form 2 Phase I_compressed.pdf · uploaded 21 Jul 2025Source
  • Form 2P51700034078 · form 2 Phase II_compressed.pdf · uploaded 21 Jul 2025Source
  • Form 3P51700034078 · form 2 Phase III_compressed.pdf · uploaded 21 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034078 · Phase 2 Sold_unsold.pdf · uploaded 21 Jul 2025Source
  • Form 1P51700034078 · SIGNED FORM 1 PHASE 2.pdf · uploaded 21 Jul 2025Source
  • Form 2P51700034078 · SIGNED FORM 2 PHASE 2.pdf · uploaded 21 Jul 2025Source
  • Form 3P51700034078 · SIGNED FORM 3 PHASE 2.PDF · uploaded 21 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034078 · Phase 2 Sold Unsold June 23.pdf · uploaded 21 Jul 2025Source
  • Form 1P51700034078 · SIGNED FORM 1 PHASE 2.pdf · uploaded 21 Jul 2025Source
  • Form 2P51700034078 · SIGNED FORM 2 PHASE 2.pdf · uploaded 21 Jul 2025Source
  • Form 3P51700034078 · SIGNED FORM 3 PHASE 2.PDF · uploaded 21 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034078 · Phase 2 Sold Unsold.pdf · uploaded 21 Jul 2025Source
  • Form 1P51700034078 · Form 1 Phase II.PDF · uploaded 21 Jul 2025Source
  • Form 2P51700034078 · Form 2 Phase II.PDF · uploaded 21 Jul 2025Source
  • Form 3P51700034078 · Phase II Form 3_compressed.pdf · uploaded 21 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034078 · Phase 2 Sold Unsold Dec 23.pdf · uploaded 21 Jul 2025Source
  • Form 1P51700034078 · form 1phase2_0001.pdf · uploaded 21 Jul 2025Source
  • Form 2P51700034078 · form 2phase2_0001.pdf · uploaded 21 Jul 2025Source
  • Form 3P51700034078 · form 3phase2_0001.pdf · uploaded 21 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034078 · Sold Unsold Phase 2 Sep 24.pdf · uploaded 21 Jul 2025Source
  • Form 1P51700034078 · Form 1 Phase II_0001.pdf · uploaded 21 Jul 2025Source
  • Form 2P51700034078 · Form 2 Phase II_0001.pdf · uploaded 21 Jul 2025Source
  • Form 3P51700034078 · Form 3 Phase II_upload.pdf · uploaded 21 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034078 · Sold Unsold Phase 2.pdf · uploaded 21 Jul 2025Source
  • Form 1P51700034078 · PHASE-2 FORM 1.pdf · uploaded 21 Jul 2025Source
  • Form 2P51700034078 · PHASE-2 FORM 2.pdf · uploaded 21 Jul 2025Source
  • Form 3P51700034078 · PHASE-2 FORM 3.pdf · uploaded 21 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034078 · Sold Unsold Phase 2.pdf · uploaded 21 Jul 2025Source
  • Form 1P51700034078 · PHASE-2 FORM 1.pdf · uploaded 21 Jul 2025Source
  • Form 2P51700034078 · PHASE-2 FORM 2.pdf · uploaded 21 Jul 2025Source
  • Form 3P51700034078 · PHASE-2 FORM 3.pdf · uploaded 21 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034078 · Sold Unsold Phase 2.pdf · uploaded 21 Jul 2025Source
  • Form 1P51700034204 · Form 1.pdf · uploaded 23 Jul 2025Source
  • Form 2P51700034204 · Form 2.pdf · uploaded 23 Jul 2025Source
  • Form 3P51700034204 · Form 3.pdf · uploaded 23 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP51700034204 · Sold unsold.pdf · uploaded 23 Jul 2025Source
  • Form 2A (FY 2024-2025)P51700034204 · Form 2A Phase I_0001.pdf · uploaded 11 Sep 2025Source
  • Form 5 (FY 2024-2025)P51700033998 · FORM 5 PHASE 3.PDF · uploaded 29 Sep 2025Source
  • Form 5 (FY 2024-2025)P51700034078 · FORM 5 PHASE 2.PDF · uploaded 29 Sep 2025Source
  • Form 1P51700033998 · FORM-1 PHASE-3.PDF · uploaded 10 Dec 2025Source
  • Form 2P51700033998 · FORM-2 PHASE-3.PDF · uploaded 10 Dec 2025Source
  • Form 3P51700033998 · FORM-3 PHASE-3_compressed.pdf · uploaded 10 Dec 2025Source
  • Disclosure of Sold and Booked InventoryP51700033998 · PHASE III_Sold_Unsold.pdf · uploaded 10 Dec 2025Source
  • Withdrawal Update Form 1P51700034204 · PHASE-1 FORM-1_0001.pdf · uploaded 10 Dec 2025Source
  • Withdrawal Update Form 1P51700034204 · PHASE-1 FORM-1_0001.pdf · uploaded 10 Dec 2025Source
  • Withdrawal Update Form 1P51700034204 · FORM-1 PHASE-1.PDF · uploaded 10 Dec 2025Source
  • Withdrawal Update Form 2P51700034204 · PHASE-1 FORM-2_0001.pdf · uploaded 10 Dec 2025Source
  • Withdrawal Update Form 2P51700034204 · PHASE-1 FORM-2_0001.pdf · uploaded 10 Dec 2025Source
  • Withdrawal Update Form 2P51700034204 · FORM-2 PHASE-1.PDF · uploaded 10 Dec 2025Source
  • Withdrawal Update Form 3P51700034204 · PHASE-1 FORM-3_0001.pdf · uploaded 10 Dec 2025Source
  • Withdrawal Update Form 3P51700034204 · PHASE-1 FORM-3_0001.pdf · uploaded 10 Dec 2025Source
  • Withdrawal Update Form 3P51700034204 · FORM-3 PHASE-1.PDF · uploaded 10 Dec 2025Source
  • Form 1P51700034078 · FORM-1 PHASE-2.PDF · uploaded 10 Dec 2025Source
  • Form 2P51700034078 · FORM-2 PHASE-2.PDF · uploaded 10 Dec 2025Source
  • Disclosure of Sold and Booked InventoryP51700034078 · PHASE II_Sold_Unsold.pdf · uploaded 10 Dec 2025Source
  • Form 3P51700034078 · FORM-3 PHASE-2_compressed.pdf · uploaded 10 Dec 2025Source
  • Form 1P51700033998 · FORM-1PHASE-3.PDF · uploaded 29 Mar 2026Source
  • Form 2P51700033998 · FORM-2PHASE-3.PDF · uploaded 29 Mar 2026Source
  • Form 3P51700033998 · FORM-3 PHASE-3 (1).pdf · uploaded 29 Mar 2026Source
  • Disclosure of Sold and Booked InventoryP51700033998 · Phase 3_Sold_Unsold.pdf · uploaded 29 Mar 2026Source
  • Form 1P51700033998 · Form 1 Phase III_0001.pdf · uploaded 29 Mar 2026Source
  • Form 2P51700033998 · Form 2 Phase III.pdf · uploaded 29 Mar 2026Source
  • Disclosure of Sold and Booked InventoryP51700033998 · Sold Unsold Dec 24.pdf · uploaded 29 Mar 2026Source
  • Form 3P51700033998 · FROM-3 PHASE-III _compressed2.pdf · uploaded 29 Mar 2026Source
  • Form 1P51700033998 · form 1phase3_0001_compressed.pdf · uploaded 29 Mar 2026Source
  • Form 2P51700033998 · form 2phase3_0001_compressed.pdf · uploaded 29 Mar 2026Source
  • Form 3P51700033998 · form 3phase3_0001_compressed.pdf · uploaded 29 Mar 2026Source
  • Disclosure of Sold and Booked InventoryP51700033998 · Sold Unsold Phase 3.pdf · uploaded 29 Mar 2026Source
  • Occupational CertificateP51700033998 · OC 04-03-2026.pdf · uploaded 29 Mar 2026Source
  • Withdrawal Update Form 1P51700034204 · FORM-1 PHASE-1.PDF · uploaded 29 Mar 2026Source
  • Withdrawal Update Form 2P51700034204 · FORM-2 PHASE-1.PDF · uploaded 29 Mar 2026Source
  • Withdrawal Update Form 3P51700034204 · FORM-3 PHASE-1.PDF · uploaded 29 Mar 2026Source
  • Form 1P51700034078 · Form1_Phase2_0001.pdf · uploaded 29 Mar 2026Source
  • Form 2P51700034078 · Form2_Phase2_0001.pdf · uploaded 29 Mar 2026Source
  • Form 3P51700034078 · Form 3_Phase 2_Merged_compressed.pdf · uploaded 29 Mar 2026Source
  • Disclosure of Sold and Booked InventoryP51700034078 · Phase II_Sold_Unsold.pdf · uploaded 29 Mar 2026Source
  • Withdrawal Update Form 1P51700034204 · FORM-1 PHASE-1.PDF · uploaded 30 Mar 2026Source
  • Withdrawal Update Form 1P51700034204 · FORM-1 PHASE-1.PDF · uploaded 30 Mar 2026Source
  • Withdrawal Update Form 2P51700034204 · FORM-2 PHASE-1.PDF · uploaded 30 Mar 2026Source
  • Withdrawal Update Form 2P51700034204 · FORM-2 PHASE-1.PDF · uploaded 30 Mar 2026Source
  • Withdrawal Update Form 3P51700034204 · FORM-3 PHASE-1.PDF · uploaded 30 Mar 2026Source
  • Withdrawal Update Form 3P51700034204 · FORM-3 PHASE-1.PDF · uploaded 30 Mar 2026Source

Technical

  • DocumentP51700033998 · Building Plan Approval.pdf · uploaded 11 Mar 2022Source
  • DocumentP51700033998 · Layout Full Approved_Mhada (2).pdf · uploaded 11 Mar 2022Source
  • DocumentP51700033998 · Approved Layout.pdf · uploaded 11 Mar 2022Source
  • DocumentP51700033998 · LOI.pdf · uploaded 11 Mar 2022Source
  • DocumentP51700033998 · Common Area Certificate_Architect.pdf · uploaded 11 Mar 2022Source
  • DocumentP51700034204 · Approved Layout.pdf · uploaded 11 Mar 2022Source
  • DocumentP51700034204 · Common Area Certificate_Architect.pdf · uploaded 11 Mar 2022Source
  • DocumentP51700034204 · Layout Full Approved_Mhada (2).pdf · uploaded 11 Mar 2022Source
  • DocumentP51700034204 · LOI.pdf · uploaded 11 Mar 2022Source
  • DocumentP51700034204 · Building Plan Approval.pdf · uploaded 11 Mar 2022Source
  • DocumentP51700034078 · Layout Full Approved_Mhada (2).pdf · uploaded 11 Mar 2022Source
  • DocumentP51700034078 · Building Plan Approval.pdf · uploaded 11 Mar 2022Source
  • DocumentP51700034078 · LOI.pdf · uploaded 11 Mar 2022Source
  • DocumentP51700034204 · Plinth CC 23022022.pdf · uploaded 16 Mar 2022Source
  • DocumentP51700034078 · Plinth CC 23022022.pdf · uploaded 16 Mar 2022Source
  • DocumentP51700034204 · Layout plan Phase I-compressed.pdf · uploaded 19 Mar 2024Source
  • DocumentP51700034078 · Rusttagi Aarambha layout phase 2 FINAL 18-3-24R-compressed.pdf · uploaded 19 Mar 2024Source
  • DocumentP51700033998 · Rusttagi Aarambha layout phase 3 FINAL 18-3-24R-compressed.pdf · uploaded 21 Mar 2024Source
  • DocumentP51700034078 · Building layout _Phase I II III.pdf · uploaded 29 Mar 2024Source
  • DocumentP51700033998 · Building layout _Phase I II III.pdf · uploaded 30 Mar 2024Source
  • DocumentP51700034204 · Building layout _Phase I II III.pdf · uploaded 30 Mar 2024Source
  • DocumentP51700033998 · PHASEWISE LAND AREA 23-4-24 phase 3R.pdf · uploaded 25 Apr 2024Source
  • DocumentP51700034204 · PHASEWISE LAND AREA 23-4-24 phase 1.pdf · uploaded 25 Apr 2024Source
  • DocumentP51700034078 · PHASEWISE LAND AREA 23-4-24 phase 2.pdf · uploaded 25 Apr 2024Source

Technical (Architect)

  • DocumentP51700033998 · Form 1 Phase III.PDF · uploaded 14 Mar 2024Source
  • DocumentP51700034078 · Form 1 Phase II.PDF · uploaded 14 Mar 2024Source
  • DocumentP51700033998 · form 1phase3_0001_compressed.pdf · uploaded 25 Dec 2024Source
  • DocumentP51700034204 · form 1phase1_0001_compressed.pdf · uploaded 25 Dec 2024Source
  • DocumentP51700034078 · form 1phase2_0001_compressed.pdf · uploaded 25 Dec 2024Source
  • DocumentP51700033998 · Form 1 Phase III_0001.pdf · uploaded 5 Feb 2025Source
  • DocumentP51700034204 · Form 1 Phase II_0001.pdf · uploaded 5 Feb 2025Source
  • DocumentP51700034204 · Form 1 Phase I_0001.pdf · uploaded 5 Feb 2025Source
  • DocumentP51700034204 · form 1phase1_0001_compressed.pdf · uploaded 5 Feb 2025Source
  • DocumentP51700034204 · Form 1 Phase I_0001.pdf · uploaded 5 Feb 2025Source
  • DocumentP51700034078 · Form 2 Phase II_0001.pdf · uploaded 5 Feb 2025Source
  • DocumentP51700034078 · Form 1 Phase II_0001.pdf · uploaded 10 Feb 2025Source
  • DocumentP51700034204 · FORM-1 PHASE-1.PDF · uploaded 30 Mar 2026Source

Technical (Engineer)

  • DocumentP51700033998 · Form 2 Phase II.PDF · uploaded 14 Mar 2024Source
  • DocumentP51700034078 · Form 2 Phase II.PDF · uploaded 14 Mar 2024Source
  • DocumentP51700033998 · form 2phase3_0001_compressed.pdf · uploaded 25 Dec 2024Source
  • DocumentP51700034204 · form 2 phase 1_0001_compressed.pdf · uploaded 25 Dec 2024Source
  • DocumentP51700034078 · form 2phase2_0001_compressed.pdf · uploaded 25 Dec 2024Source
  • DocumentP51700033998 · Form 2 Phase III_0001.pdf · uploaded 5 Feb 2025Source
  • DocumentP51700034078 · Form 2 Phase II_0001.pdf · uploaded 5 Feb 2025Source
  • DocumentP51700034204 · Form2_phase I.pdf · uploaded 10 Feb 2025Source
  • DocumentP51700034204 · FORM-2 PHASE-1.PDF · uploaded 29 Mar 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 101/1/D, 77/4/A/78/2/A

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Phases
4
Unit types
Shop, 1BHK, Shifted in phase2737 units in all
Address
83/1/B/2, 77/4/C/78/2/C, 77/4/A/78/2/A, 77/4/P/78/2/D, 77/4/B/78/2/B, 77/4/E/78/2/E, 77/4/L/78/2/L, 77/4/P/78/2/P, 77/4/J/78/2/J, 77/4/F/78/2/F Situated And Lying At Village Titwala, Tal-Kalyan, Dist- Thane., Ganesh Mandir, TitwalaPIN 421605
Village
Titwala, Kalyan taluka
Land area for this project
15,375 sq m (1,65,493 sq ft)
Permissible built-up area
20,472 sq m (2,20,359 sq ft)
Sanctioned built-up area
20,472 sq m (2,20,359 sq ft)
Designated bank account
76
Developed in phases
Yes
Also registered as
Rusttagi Aarambha Phase- I, Rusttagi Aarambha Phase-II, Rusttagi Aarambha Phase-III, Rusttagi Aarambha 2.0

Survey, CTS, gat or plot numbers

101/1/D77/4/A/78/2/A77/4/B/78/2/B77/4/C/78/2/C77/4/E/78/2/E77/4/F/78/2/F SITUATED77/4/J/78/2/J77/4/L/78/2/L77/4/P/78/2/D77/4/P/78/2/P83/1/B/2

Land as published on MahaRERA's project page

83/1/B/2, 77/4/C/78/2/C, 77/4/A/78/2/A, 77/4/P/78/2/D, 77/4/B/78/2/B, 77/4/E/78/2/E, 77/4/L/78/2/L, 77/4/P/78/2/P, 77/4/J/78/2/J, 77/4/F/78/2/F SITUATED AND LYING AT VILLAGE TITWALA, TAL-KALYAN, DIST- THANE.

Boundaries

North
Survey No 77 24 Meter Wide Road
South
Survey No 82 83
East
Survey No 66
West
Survey No 80 81

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking737 units · 122 parking spaces

618 of 737 units booked (84%), as the promoter reported to MahaRERA

Shop · 40 units1BHK · 679 unitsShifted in phase2 · 18 units
RERABuildingTypeCarpet areaUnitsBooked
P51700034078Building 1Shop76.71 sq m · 826 sq ft10
P51700034078Building 1Shop848.63 sq m · 9,135 sq ft10
P51700034078Building 1Shop906.85 sq m · 9,761 sq ft10
P51700034078Building 1Shop968.31 sq m · 10,423 sq ft10
P51700034078Building 21BHK29.48 sq m · 317 sq ft141136
P51700034078Building 41BHK29.48 sq m · 317 sq ft153117
P51700034204Building No 1Shifted in phase2225.06 sq m · 2,423 sq ft180
P51700034204Building No 2Shop9.12 sq m · 98 sq ft66
Show all 23 unit rowsShow fewer unit rows
RERABuildingTypeCarpet areaUnitsBooked
P51700034204Building No 2Shop12.5 sq m · 135 sq ft64
P51700034204Building No 2Shop15.89 sq m · 171 sq ft62
P51700033998Building No 3 A And B1BHK29.35 sq m · 316 sq ft7974
P51700033998Building No 3 A And B1BHK29.35 sq m · 316 sq ft3023
P51700033998Building No 3 A And B1BHK29.48 sq m · 317 sq ft8888
P51700033998Building No 3 A And BShop12.85 sq m · 138 sq ft10
P51700033998Building No 3 A And BShop13.5 sq m · 145 sq ft20
P51700033998Building No 3 A And BShop17.35 sq m · 187 sq ft20
P51700033998Building No 3 A And BShop17.63 sq m · 190 sq ft10
P51700033998Building No 5 And B1BHK29.48 sq m · 317 sq ft9489
P51700033998Building No 5 And B1BHK29.48 sq m · 317 sq ft9479
P51700033998Building No 5 And BShop12.85 sq m · 138 sq ft20
P51700033998Building No 5 And BShop13.5 sq m · 145 sq ft40
P51700033998Building No 5 And BShop17.35 sq m · 187 sq ft40
P51700033998Building No 5 And BShop17.63 sq m · 190 sq ft20

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered08008
Open Space114000114

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress2 buildings and areas

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building N0 4

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure90%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Common areas and amenities

  • Internal Roads & Footpaths065%
  • Water Supply00%
  • Sewerage (Chamber, Lines, Septic Tank , STP)025%
  • Storm Water Drains00%
  • Landscaping & Tree Planting00%
  • Street Lighting050%
Show all 15 activitiesShow fewer activities
  • Community Buildings00%
  • Treatment And Disposal Of Sewage And Sullage Water00%
  • Solid Waste Management And Disposal00%
  • Water conservation /Rain water harvesting040%
  • Energy managemcnt00%
  • Fire protection and fire safety requirements00%
  • Electrical meter room, sub-station, receiving station00%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Professionals29

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectUB Architects—P51700076932
ArchitectUb Architects—P51700034078
ArchitectUb Architects—P51700033998
ArchitectUb Architects—P51700034204
Chartered accountantForam Bhanushali—P51700034078
Chartered accountantForam Bhanushali—P51700033998
Chartered accountantForam Bhanushali—P51700076932
Chartered accountantK B Bhat—P51700034204
Show all 29 professionalsShow fewer professionals
RoleNameRegistration no.RERA
Chartered accountantK B Bhat—P51700034078
Chartered accountantK B Bhat—P51700033998
Chartered accountantK.V. Bhat & Co—P51700076932
Chartered accountantRD Bhatia & Associates—P51700033998
Chartered accountantRD Bhatia & Associates—P51700034204
Chartered accountantRD Bhatia & Associates—P51700076932
Chartered accountantRD Bhatia & Associates—P51700034078
EngineerAjay Mahale & Associates—P51700033998
EngineerAjay Mahale & Associates—P51700034078
EngineerAjay Mahale & Associates—P51700034204
EngineerAJAY Mahale Consulting Engineer—P51700034078
EngineerAJAY Mahale Consulting Engineer—P51700076932
OtherAjay Mahale & Associates—P51700033998
OtherAjay Mahale & Associates,—P51700034204
OtherAjay Mahale & Associates—P51700034078
OtherELCON Engineers—P51700034078
OtherELCON Engineers—P51700033998
OtherELCON Engineers,—P51700034204
OtherUltra Tech—P51700033998
OtherUltra Tech—P51700034078
OtherUltratech—P51700034204

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology