Rusttagi Aarambha
Deedo IDDP-THN-00G2Completion was pushed back 4 months to Jul 2026, and that date has passed too; no MahaRERA orders on record; 84% of its units are booked.
Titwala, Thane 421605 · by Rustagi Estates Private Limited
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months to Jul 2026, and that date has passed too
- P51700033998Registered 17 Mar 2022, completion promised 22 Feb 2027.
- P51700034078Registered 24 Mar 2022, completion promised 22 Feb 2026, and still not shown completed today.
- P51700034204Registered 25 Mar 2022, completion promised 31 Mar 2026, revised to 31 Jul 2026, and still not shown completed today.
- P51700076932Registered 9 Jul 2024, completion promised 30 Nov 2026.
No extension certificate on record.
4 registrations · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
9 buildings
Open a building to see every flat, floor by floor.
- Building 13 floors · 4 units0% booked
- Building 213 floors · 141 units96% booked
- Building 414 floors · 153 units76% booked
- Building N0 461% built8 floors66% booked
- Building No 12 floors · 18 units0% booked
- Building No 21 floor · 18 units67% booked
- Building No 3 A And B12 floors · 203 units91% booked
- Building No 5 And B13 floors · 200 units84% booked
- Building (P51700076932)Size not on record31% booked
Floors and units from the registration certificate annexures and MahaRERA's project page. Construction % is the average of the developer's own declared activity progress to MahaRERA, not an inspection.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrations4
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700033998 | 17 Mar 2022 | 22 Feb 2027 | 22 Feb 2027 | Rustagi Estates Private Limited | Project page |
| P51700034078 | 24 Mar 2022 | 22 Feb 2026 | 22 Feb 2026 | Rustagi Estates Private Limited | Project page |
| P51700034204 | 25 Mar 2022 | 31 Mar 2026 | 31 Jul 2026 | Rustagi Estates Private Limited | Project page |
| P51700076932 | 9 Jul 2024 | 30 Nov 2026 | — | Rustagi Estates Private Limited | Project page |
Documents573
62 documents held by Deedo, 511 filings listed on MahaRERA's project page
Encumbrance details (5)
Show all 573 documentsShow fewer documents
Commencement certificate (4)
Form 1 (8)
- Form 1P51700076932 · 4 May 2024ViewSource
- Form 1P51700076932 · 5 Jul 2025ViewSource
- Form 1P51700076932 · 5 Jul 2025ViewSource
- Form 1P51700076932 · 18 Jul 2025ViewSource
- Form 1P51700076932 · 20 Jul 2025ViewSource
- Form 1P51700076932 · 2 Dec 2025ViewSource
- Form 1P51700076932 · 10 Jun 2026ViewSource
- Form 1P51700076932 · 11 Jun 2026ViewSource
Form 2 (8)
- Form 2P51700076932 · 4 May 2024ViewSource
- Form 2P51700076932 · 5 Jul 2025ViewSource
- Form 2P51700076932 · 5 Jul 2025ViewSource
- Form 2P51700076932 · 18 Jul 2025ViewSource
- Form 2P51700076932 · 20 Jul 2025ViewSource
- Form 2P51700076932 · 2 Dec 2025ViewSource
- Form 2P51700076932 · 10 Jun 2026ViewSource
- Form 2P51700076932 · 11 Jun 2026ViewSource
Other (18)
- OtherP51700076932 · 4 May 2024ViewSource
- OtherP51700076932 · 4 May 2024ViewSource
- OtherP51700076932 · 4 May 2024ViewSource
- OtherP51700076932 · 4 May 2024ViewSource
- OtherP51700076932 · 9 Nov 2024ViewSource
- OtherP51700076932 · 9 Nov 2024ViewSource
- OtherP51700076932 · 26 Feb 2025ViewSource
- OtherP51700076932 · 5 Jul 2025ViewSource
- OtherP51700076932 · 18 Jul 2025ViewSource
- OtherP51700076932 · Date not statedViewSource
- OtherP51700076932 · Date not statedViewSource
- OtherP51700076932 · Date not statedViewSource
- OtherP51700076932 · Date not statedViewSource
- OtherP51700076932 · Date not statedViewSource
- OtherP51700076932 · Date not statedViewSource
- OtherP51700076932 · Date not statedViewSource
- OtherP51700076932 · Date not statedViewSource
- OtherP51700076932 · Date not statedViewSource
Allotment letter (2)
Registration certificate (4)
Layout plan (4)
Building plan (5)
Document library
- Copy of the legal title reportP51700076932 · 02 TITLE (1).pdf · uploaded 4 May 2024View
- a Details of encumbrances concerned to FinanceP51700076932 · 18 No Financial encumbrances.pdf · uploaded 4 May 2024View
- a Details of encumbrances concerned to FinanceP51700076932 · 19 No Legal encumbrances.pdf · uploaded 4 May 2024View
- b Details of encumbrances concerned to LegalP51700076932 · 18 No Financial encumbrances.pdf · uploaded 4 May 2024View
- b Details of encumbrances concerned to LegalP51700076932 · 19 No Legal encumbrances.pdf · uploaded 4 May 2024View
- Commencement Certificates / NA Order for plotted developmentP51700076932 · 09 COMMENCEMENT CERTIFICATE.PDF · uploaded 4 May 2024View
- Declaration about Commencement CertificateP51700076932 · 10 DECLARATION OF CC.pdf · uploaded 4 May 2024View
- Declaration in FORM BP51700076932 · 05 DECLARATIO FORM B_compressed.pdf · uploaded 4 May 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700076932 · 06 TITWALA 2 - Form 1-by architects.pdf · uploaded 4 May 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700076932 · 08 FORM 2 FOR RUSTAGI AARAMBHA 2.pdf · uploaded 4 May 2024View
- CERSAI detailsP51700076932 · 16 CERSAI DECLARATION.pdf · uploaded 4 May 2024View
- Disclosure of Interest in Other Real Estate OrganizationsP51700076932 · 17 Disclosure of interest of partner.pdf · uploaded 4 May 2024View
- Proforma of Agreement for saleP51700076932 · 13 Model Agreement for Sales-as it is.pdf · uploaded 4 May 2024View
- Proforma of Allotment letterP51700076932 · 14 Allotment letter 04-07-2022.pdf · uploaded 4 May 2024View
- Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP51700076932 · 20 Declaration about Separate Bank Account for real estate projects.pdf · uploaded 4 May 2024View
- Deviation Report with respect to Allotment letterP51700076932 · 21 no deviation to alltoment.pdf · uploaded 4 May 2024View
- Deviation Report with respect to model copy of AgreementP51700076932 · 22 no deviation to model agreement.pdf · uploaded 4 May 2024View
- Building Plan Approval / NA Order for plotted developmentP51700076932 · 11building PLAN-1.pdf · uploaded 4 May 2024View
- Building Plan Approval / NA Order for plotted developmentP51700076932 · 11building PLAN-2.pdf · uploaded 4 May 2024View
- Building Plan Approval / NA Order for plotted developmentP51700076932 · 11building PLAN-3.pdf · uploaded 4 May 2024View
- Building Plan Approval / NA Order for plotted developmentP51700076932 · 11building PLAN-4.pdf · uploaded 4 May 2024View
- Other – TechnicalP51700076932 · DECLARATION-Annexure A.pdf · uploaded 8 May 2024View
- Copy of Layout Approval (in case of layout)P51700076932 · 12 APPROVED LAYOUT 8-5-24.pdf · uploaded 8 May 2024View
- Copy of Layout Approval (in case of layout)P51700076932 · APPROVED PARKING LAYOUT 8-5-24 (1).pdf · uploaded 8 May 2024View
- Other – LegalP51700076932 · Development agreement.pdf · uploaded 6 Jun 2024View
- Other – LegalP51700076932 · DECLARATION-Annexure A.pdf · uploaded 6 Jun 2024View
- a Details of encumbrances concerned to FinanceP51700076932 · ENCUMBERENCE DECLARATION.pdf · uploaded 9 Nov 2024View
- b Details of encumbrances concerned to LegalP51700076932 · ENCUMBERENCE DECLARATION.pdf · uploaded 9 Nov 2024View
- Other – FinanceP51700076932 · INDEX 2.pdf · uploaded 9 Nov 2024View
- Other – FinanceP51700076932 · SANCTION LETTER MOHFL final.pdf · uploaded 9 Nov 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700076932 · FORM 1 ARCHITECT.pdf · uploaded 26 Dec 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700076932 · FORM 2- ENGINEER.pdf · uploaded 26 Dec 2024View
- Commencement Certificates / NA Order for plotted developmentP51700076932 · FULL CC RUSTAGI AARAMBHA 2.pdf · uploaded 27 Dec 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700076932 · 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 11 Feb 2025View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700076932 · 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 11 Feb 2025View
- Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP51700076932 · Old Declaration - Separate Bank Account for real estate projects.pdf · uploaded 18 Feb 2025View
- Disclosure of sold/ booked inventoryP51700076932 · Declaration_0001.pdf · uploaded 26 Feb 2025View
- Copy of Layout Approval (in case of layout)P51700076932 · Layout.pdf · uploaded 2 May 2025View
- Copy of Layout Approval (in case of layout)P51700076932 · Layout 2.pdf · uploaded 2 May 2025View
- Building Plan Approval / NA Order for plotted developmentP51700076932 · Bldg Plan.pdf · uploaded 2 May 2025View
- Commencement Certificates / NA Order for plotted developmentP51700076932 · Amended IOA noc.pdf · uploaded 2 May 2025View
- Form 1P51700076932 · FORM 1 ARCHITECT.pdf · uploaded 5 Jul 2025View
- Form 2P51700076932 · FORM 2- ENGINEER.pdf · uploaded 5 Jul 2025View
- Disclosure of Sold and Booked InventoryP51700076932 · SOLD UNSOLD INVENTORY.pdf · uploaded 5 Jul 2025View
- Form 1P51700076932 · 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 5 Jul 2025View
- Form 2P51700076932 · 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 5 Jul 2025View
- Disclosure of Sold and Booked InventoryP51700076932 · SOLD UNSOLD INVENTORY.pdf · uploaded 5 Jul 2025View
- Form 1P51700076932 · FORM 1 Q4 24-25.pdf · uploaded 18 Jul 2025View
- Form 2P51700076932 · FORM 2 Q4 24-25.pdf · uploaded 18 Jul 2025View
- Disclosure of Sold and Booked InventoryP51700076932 · SOLD UNSOLD INVENTOY.pdf · uploaded 18 Jul 2025View
- Withdrawal Update Form 1P51700076932 · Signed Form 1.pdf · uploaded 20 Jul 2025View
- Withdrawal Update Form 2P51700076932 · Signed Form 2.pdf · uploaded 20 Jul 2025View
- Form 2A (FY 2024-2025)P51700076932 · FORM 2A 2.0.PDF · uploaded 10 Sep 2025View
- Form 5 (FY 2024-2025)P51700076932 · FORM 5 PROJECT.pdf · uploaded 11 Sep 2025View
- Withdrawal Update Form 1P51700076932 · Form 1.pdf · uploaded 2 Dec 2025View
- Withdrawal Update Form 2P51700076932 · Form 2.pdf · uploaded 2 Dec 2025View
- Withdrawal Update Form 1P51700076932 · Form 1 Dec 2025 QPR.pdf · uploaded 10 Jun 2026View
- Withdrawal Update Form 2P51700076932 · Form 2 Dec 2025 QPR.pdf · uploaded 10 Jun 2026View
- Withdrawal Update Form 1P51700076932 · Form 1 March 2026 QPR.pdf · uploaded 11 Jun 2026View
- Withdrawal Update Form 2P51700076932 · Form 2 March 2026 QPR.pdf · uploaded 11 Jun 2026View
Promoter documents
Technical documents
- Building Plan ApprovalP51700076932 · 11building PLAN-1.pdfView
- Building Plan ApprovalP51700076932 · 11building PLAN-2.pdfView
- Building Plan ApprovalP51700076932 · 11building PLAN-3.pdfView
- Building Plan ApprovalP51700076932 · 11building PLAN-4.pdfView
- Layout ApprovalP51700076932 · 12 APPROVED LAYOUT 8-5-24.pdfView
- Layout ApprovalP51700076932 · APPROVED PARKING LAYOUT 8-5-24 (1).pdfView
- Layout ApprovalP51700076932 · Layout.pdfView
- Layout ApprovalP51700076932 · Layout 2.pdfView
- Building Plan ApprovalP51700076932 · Bldg Plan.pdfView
Other legal documents
Financial documents
Proforma allotment letter
- Proforma allotment letterP51700076932 · 14 Allotment letter 04-07-2022.pdfView
Finance
Legal
- OtherP51700033998 · SCOOTER PARKING STATEMENT.pdf · uploaded 11 Mar 2022Source
- Legal Title reportP51700033998 · Title Report_Flow of Title latest.pdf · uploaded 11 Mar 2022Source
- Declaration Form BP51700033998 · Form B Affidavit Phase III_compressed.pdf · uploaded 11 Mar 2022Source
- OtherP51700034204 · SCOOTER PARKING STATEMENT.pdf · uploaded 11 Mar 2022Source
- Legal Title reportP51700034204 · Title Report_Flow of Title latest.pdf · uploaded 11 Mar 2022Source
- Declaration Form BP51700034204 · Form B Declaration_Affidavit.pdf · uploaded 11 Mar 2022Source
- OtherP51700034078 · SCOOTER PARKING STATEMENT.pdf · uploaded 11 Mar 2022Source
- Legal Title reportP51700034078 · Title Report_Flow of Title latest.pdf · uploaded 11 Mar 2022Source
- Declaration Form BP51700034078 · Form B Affidavit Phase II.pdf · uploaded 11 Mar 2022Source
- OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-1.pdf · uploaded 16 Mar 2022Source
- OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-2.pdf · uploaded 16 Mar 2022Source
- OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-3.pdf · uploaded 16 Mar 2022Source
- OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-4.pdf · uploaded 16 Mar 2022Source
- OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-5.pdf · uploaded 16 Mar 2022Source
- OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-6.pdf · uploaded 16 Mar 2022Source
- OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-7.pdf · uploaded 16 Mar 2022Source
- OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-8.pdf · uploaded 16 Mar 2022Source
- OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-9.pdf · uploaded 16 Mar 2022Source
- OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-10.pdf · uploaded 16 Mar 2022Source
- OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-11.pdf · uploaded 16 Mar 2022Source
- OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-12.pdf · uploaded 16 Mar 2022Source
- OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-13.pdf · uploaded 16 Mar 2022Source
- OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-14.pdf · uploaded 16 Mar 2022Source
- OtherP51700034204 · Declaration_Land Ownership of company.pdf · uploaded 19 Mar 2022Source
- Legal Title reportP51700034204 · Declaration_Land Ownership of company.pdf · uploaded 19 Mar 2022Source
- OtherP51700033998 · Payment Schedule Phase III.PDF · uploaded 1 Nov 2022Source
- OtherP51700034078 · Payment Schedule Phase II.PDF · uploaded 1 Nov 2022Source
- OtherP51700033998 · Parking Letter.pdf · uploaded 18 Mar 2024Source
- OtherP51700034204 · Parking Letter.pdf · uploaded 18 Mar 2024Source
- OtherP51700034078 · Parking Letter.pdf · uploaded 18 Mar 2024Source
- Declaration Form BP51700034204 · Form B_AFFIDAVIT for Extension till 21-2-2025_Phase 1.PDF · uploaded 19 Mar 2024Source
Migrated
- 1 PAN CardP51700033998 · PAN.pdf · uploaded 11 Mar 2022Source
- 1 Copy of the legal title reportP51700033998 · Title Report_Flow of Title latest.pdf · uploaded 11 Mar 2022Source
- 1 Details of encumbrancesP51700033998 · DECLARATIONS_ENCUMBRANCES.pdf · uploaded 11 Mar 2022Source
- 1 Copy of Layout Approval (in case of layout)P51700033998 · Approved Layout.pdf · uploaded 11 Mar 2022Source
- 2 Copy of Layout Approval (in case of layout)P51700033998 · Common Area Certificate_Architect.pdf · uploaded 11 Mar 2022Source
- 3 Copy of Layout Approval (in case of layout)P51700033998 · Layout Full Approved_Mhada (2).pdf · uploaded 11 Mar 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP51700033998 · Building Plan Approval.pdf · uploaded 11 Mar 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentP51700033998 · LOI.pdf · uploaded 11 Mar 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700033998 · CC_Plinth 23022022.pdf · uploaded 11 Mar 2022Source
- 1 Declaration about Commencement CertificateP51700033998 · Declaration About CC.pdf · uploaded 11 Mar 2022Source
- 1 Declaration in FORM BP51700033998 · Form B Affidavit Phase III_compressed.pdf · uploaded 11 Mar 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700033998 · form 1Architect certificate_signed PhaseIII_compressed.pdf · uploaded 11 Mar 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700033998 · Form 2_engineer_phase III.pdf · uploaded 11 Mar 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51700033998 · Form 2A_engineer.pdf · uploaded 11 Mar 2022Source
- 1 CERSAI detailsP51700033998 · CERSAI_Search_Report_200231360951_For_Debtor_Based_Search_01_03_2022_13_30_10_880.pdf · uploaded 11 Mar 2022Source
- 1 Disclosure of sold/ booked inventoryP51700033998 · sold unsold phase_III_compressed.pdf · uploaded 11 Mar 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700033998 · Form 3 CA_CERTIFICATE_phase III.pdf · uploaded 11 Mar 2022Source
- 1 Proforma of Allotment letterP51700033998 · DECLARATION_ALLOTMENT_AGREEMENT_PHASE III.pdf · uploaded 11 Mar 2022Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51700033998 · DECLARATIONS_SOCIETY FORMATIOH.pdf · uploaded 11 Mar 2022Source
- 1 Status of ConveyanceP51700033998 · DECLARATIONS_CONVEYANCE.pdf · uploaded 11 Mar 2022Source
- 1 OtherP51700033998 · SCOOTER PARKING STATEMENT.pdf · uploaded 11 Mar 2022Source
- 1 PAN CardP51700034204 · PAN.pdf · uploaded 11 Mar 2022Source
- 1 Copy of the legal title reportP51700034204 · Title Report_Flow of Title latest.pdf · uploaded 11 Mar 2022Source
- 1 Details of encumbrancesP51700034204 · DECLARATIONS_ENCUMBRANCES.pdf · uploaded 11 Mar 2022Source
- 1 Copy of Layout Approval (in case of layout)P51700034204 · Approved Layout.pdf · uploaded 11 Mar 2022Source
- 2 Copy of Layout Approval (in case of layout)P51700034204 · Common Area Certificate_Architect.pdf · uploaded 11 Mar 2022Source
- 3 Copy of Layout Approval (in case of layout)P51700034204 · Layout Full Approved_Mhada (2).pdf · uploaded 11 Mar 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP51700034204 · Building Plan Approval.pdf · uploaded 11 Mar 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentP51700034204 · LOI.pdf · uploaded 11 Mar 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700034204 · CC_Plinth 23022022.pdf · uploaded 11 Mar 2022Source
- 1 Declaration about Commencement CertificateP51700034204 · Declaration About CC.pdf · uploaded 11 Mar 2022Source
- 1 Declaration in FORM BP51700034204 · Form B Declaration_Affidavit.pdf · uploaded 11 Mar 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · Form 1 Architect certificate.pdf · uploaded 11 Mar 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034204 · Form 2 Engineers Certificate.pdf · uploaded 11 Mar 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51700034204 · Form 2A_engineer.pdf · uploaded 11 Mar 2022Source
- 1 CERSAI detailsP51700034204 · CERSAI_Search_Report_200231360951_For_Debtor_Based_Search_01_03_2022_13_30_10_880.pdf · uploaded 11 Mar 2022Source
- 1 Disclosure of sold/ booked inventoryP51700034204 · Sold Unsold Inventory.pdf · uploaded 11 Mar 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034204 · Form 3 CA Certificate.pdf · uploaded 11 Mar 2022Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51700034204 · DECLARATIONS_SOCIETY FORMATIOH.pdf · uploaded 11 Mar 2022Source
- 1 Status of ConveyanceP51700034204 · DECLARATIONS_CONVEYANCE.pdf · uploaded 11 Mar 2022Source
- 1 OtherP51700034204 · SCOOTER PARKING STATEMENT.pdf · uploaded 11 Mar 2022Source
- 1 PAN CardP51700034078 · PAN.pdf · uploaded 11 Mar 2022Source
- 1 Copy of the legal title reportP51700034078 · Title Report_Flow of Title latest.pdf · uploaded 11 Mar 2022Source
- 1 Details of encumbrancesP51700034078 · DECLARATIONS_ENCUMBRANCES.pdf · uploaded 11 Mar 2022Source
- 1 Copy of Layout Approval (in case of layout)P51700034078 · Layout Full Approved_Mhada (2).pdf · uploaded 11 Mar 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP51700034078 · Building Plan Approval.pdf · uploaded 11 Mar 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentP51700034078 · LOI.pdf · uploaded 11 Mar 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700034078 · CC_Plinth 23022022.pdf · uploaded 11 Mar 2022Source
- 1 Declaration about Commencement CertificateP51700034078 · Declaration About CC.pdf · uploaded 11 Mar 2022Source
- 1 Declaration in FORM BP51700034078 · Form B Affidavit Phase II.pdf · uploaded 11 Mar 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034078 · Form 1 architect certificate PhaseII.pdf · uploaded 11 Mar 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034078 · Form 2_engineer_phase II.pdf · uploaded 11 Mar 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51700034078 · Form 2A_engineer.pdf · uploaded 11 Mar 2022Source
- 1 CERSAI detailsP51700034078 · CERSAI_Search_Report_200231360951_For_Debtor_Based_Search_01_03_2022_13_30_10_880.pdf · uploaded 11 Mar 2022Source
- 1 Disclosure of sold/ booked inventoryP51700034078 · sold unsold phase_II.pdf · uploaded 11 Mar 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034078 · Form 3 CA_CERTIFICATE_phase II.pdf · uploaded 11 Mar 2022Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51700034078 · DECLARATIONS_SOCIETY FORMATIOH.pdf · uploaded 11 Mar 2022Source
- 1 Status of ConveyanceP51700034078 · DECLARATIONS_CONVEYANCE.pdf · uploaded 11 Mar 2022Source
- 1 OtherP51700034078 · SCOOTER PARKING STATEMENT.pdf · uploaded 11 Mar 2022Source
- 1 Proforma of Allotment letterP51700034078 · Draft Agreement of Sale Titwala EWS phase 2.pdf · uploaded 15 Mar 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentP51700034204 · Plinth CC 23022022.pdf · uploaded 16 Mar 2022Source
- 1 Proforma of Allotment letterP51700034204 · Agreement of Sale Titwala EWS phase 1.pdf · uploaded 16 Mar 2022Source
- 2 Proforma of Allotment letterP51700034204 · Allotment letter.pdf · uploaded 16 Mar 2022Source
- 2 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-1.pdf · uploaded 16 Mar 2022Source
- 3 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-2.pdf · uploaded 16 Mar 2022Source
- 4 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-3.pdf · uploaded 16 Mar 2022Source
- 5 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-4.pdf · uploaded 16 Mar 2022Source
- 6 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-5.pdf · uploaded 16 Mar 2022Source
- 7 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-6.pdf · uploaded 16 Mar 2022Source
- 8 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-7.pdf · uploaded 16 Mar 2022Source
- 9 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-8.pdf · uploaded 16 Mar 2022Source
- 10 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-9.pdf · uploaded 16 Mar 2022Source
- 11 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-10.pdf · uploaded 16 Mar 2022Source
- 12 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-11.pdf · uploaded 16 Mar 2022Source
- 13 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-12.pdf · uploaded 16 Mar 2022Source
- 14 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-13.pdf · uploaded 16 Mar 2022Source
- 15 OtherP51700034204 · Titwala Proj 3 _ I-O-A_compressed-14.pdf · uploaded 16 Mar 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentP51700034078 · Plinth CC 23022022.pdf · uploaded 16 Mar 2022Source
- 2 Proforma of Allotment letterP51700034078 · Allotment letter.pdf · uploaded 16 Mar 2022Source
- 2 Copy of the legal title reportP51700034204 · Declaration_Land Ownership of company.pdf · uploaded 19 Mar 2022Source
- 16 OtherP51700034204 · Declaration_Land Ownership of company.pdf · uploaded 19 Mar 2022Source
- 2 Disclosure of sold/ booked inventoryP51700033998 · BLDG 03_compressed.pdf · uploaded 7 Jun 2022Source
- 3 Disclosure of sold/ booked inventoryP51700033998 · BLDG 05 _compressed.pdf · uploaded 7 Jun 2022Source
- 2 Disclosure of sold/ booked inventoryP51700034204 · BLDG 02 PH I.pdf · uploaded 7 Jun 2022Source
- 3 Disclosure of sold/ booked inventoryP51700034204 · BLDG 01 PH I.pdf · uploaded 7 Jun 2022Source
- 4 Disclosure of sold/ booked inventoryP51700034204 · Phase I bldg 02.pdf · uploaded 7 Jun 2022Source
- 2 Disclosure of sold/ booked inventoryP51700034078 · BLDG 01 RESIDENTIAL_compressed.pdf · uploaded 7 Jun 2022Source
- 3 Disclosure of sold/ booked inventoryP51700034078 · BLDG 02 RESIDENTIAL_0001_compressed.pdf · uploaded 7 Jun 2022Source
- 4 Disclosure of sold/ booked inventoryP51700034078 · BLDG 04_compressed.pdf · uploaded 7 Jun 2022Source
- 2 OtherP51700033998 · Payment Schedule Phase III.PDF · uploaded 1 Nov 2022Source
- 2 OtherP51700034078 · Payment Schedule Phase II.PDF · uploaded 1 Nov 2022Source
- 2 Details of encumbrancesP51700033998 · ENCUMBRANCE CERTIFICATE.PDF · uploaded 2 Nov 2022Source
- 2 Details of encumbrancesP51700034204 · ENCUMBRANCE CERTIFICATE.PDF · uploaded 2 Nov 2022Source
- 2 Details of encumbrancesP51700034078 · ENCUMBRANCE CERTIFICATE.PDF · uploaded 2 Nov 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700033998 · form 1 Phase III_compressed.pdf · uploaded 2 Feb 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700033998 · form 2 Phase III_compressed.pdf · uploaded 2 Feb 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700033998 · form 3 Phase III_compressed.pdf · uploaded 2 Feb 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · form 1 Phase I_compressed.pdf · uploaded 2 Feb 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · form 1 Phase I_compressed.pdf · uploaded 2 Feb 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034204 · form 2 Phase II.PDF · uploaded 2 Feb 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034204 · form 3 Phase I_compressed.pdf · uploaded 2 Feb 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034078 · form 1 Phase II_compressed.pdf · uploaded 2 Feb 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034078 · form 2 Phase II.PDF · uploaded 2 Feb 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034078 · form 3 Phase II_compressed.pdf · uploaded 2 Feb 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700033998 · form I Phase III_compressed.pdf · uploaded 30 Jun 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700033998 · form 2 Phase III_compressed.pdf · uploaded 30 Jun 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · form I Phase I_compressed.pdf · uploaded 30 Jun 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034204 · form 2 Phase I_compressed.pdf · uploaded 30 Jun 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034078 · form I Phase II_compressed.pdf · uploaded 30 Jun 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034078 · form 2 Phase II_compressed.pdf · uploaded 30 Jun 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700033998 · Form III Phase III_compressed.pdf · uploaded 1 Jul 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034204 · Form III Phase I_compressed.pdf · uploaded 1 Jul 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034204 · Form III Phase I_compressed.pdf · uploaded 1 Jul 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034078 · Form III Phase II_compressed.pdf · uploaded 1 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51700033998 · FORM 5 PHASE III final.pdf · uploaded 30 Nov 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51700034204 · FORM 5 PHASE I final.pdf · uploaded 30 Nov 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51700034078 · FORM 5 PHASE II final.pdf · uploaded 30 Nov 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700033998 · SIGNED FORM 1 PHASE 3.pdf · uploaded 4 Jan 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700033998 · SIGNED FORM 1 PHASE 3.pdf · uploaded 4 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700033998 · SIGNED FORM 2 PHASE 3.pdf · uploaded 4 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700033998 · SIGNED FORM 2 PHASE 3 .PDF · uploaded 4 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700033998 · SIGNED FORM 3 PHASE 3_compressed.pdf · uploaded 4 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700033998 · SIGNED FORM 3 PHASE3_compressed.pdf · uploaded 4 Jan 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · SIGNED FORM 1 PHASE 1.pdf · uploaded 4 Jan 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · SIGNED FORM 1 PHASE 1.pdf · uploaded 4 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034204 · SIGNED FORM 2 PHASE 1.pdf · uploaded 4 Jan 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034204 · SIGNED FORM 2 PHASE 1.pdf · uploaded 4 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034204 · SIGNED FORM 3 PHASE 1_compressed.pdf · uploaded 4 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034204 · SIGNED FORM 3 PHASE 1_compressed.pdf · uploaded 4 Jan 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034078 · SIGNED FORM 1 PHASE 2.pdf · uploaded 4 Jan 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034078 · SIGNED FORM 1 PHASE 2.pdf · uploaded 4 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034078 · SIGNED FORM 2 PHASE 2.pdf · uploaded 4 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034078 · SIGNED FORM 2 PHASE 2.pdf · uploaded 4 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034078 · SIGNED FORM 3 PHASE 2_compressed.pdf · uploaded 4 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034078 · SIGNED FORM 3 PHASE 2_compressed.pdf · uploaded 4 Jan 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700033998 · Form 1 Phase III.PDF · uploaded 14 Mar 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700033998 · Form 2 Phase II.PDF · uploaded 14 Mar 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700033998 · Form 3 Phase III.PDF · uploaded 14 Mar 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · Form 1 Phase I.PDF · uploaded 14 Mar 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034204 · Form 1 Phase I.PDF · uploaded 14 Mar 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034204 · Form 2 Phase I.PDF · uploaded 14 Mar 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034204 · Form 3 Phase I.PDF · uploaded 14 Mar 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034078 · Form 1 Phase II.PDF · uploaded 14 Mar 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034078 · Form 2 Phase II.PDF · uploaded 14 Mar 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034078 · Form 3 Phase II.PDF · uploaded 14 Mar 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P51700033998 · Phase III FORM 2A.PDF · uploaded 15 Mar 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700033998 · Phase III Form 3.PDF · uploaded 15 Mar 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P51700034204 · Phase I FORM 2A.PDF · uploaded 15 Mar 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034204 · Phase I Form 3.PDF · uploaded 15 Mar 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P51700034078 · Phase II FORM 2A.PDF · uploaded 15 Mar 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034078 · Phase II Form 3.PDF · uploaded 15 Mar 2024Source
- 3 OtherP51700033998 · Parking Letter.pdf · uploaded 18 Mar 2024Source
- 17 OtherP51700034204 · Parking Letter.pdf · uploaded 18 Mar 2024Source
- 3 OtherP51700034078 · Parking Letter.pdf · uploaded 18 Mar 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentP51700033998 · further CC project 3 10-1-23.pdf · uploaded 19 Mar 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentP51700033998 · TP3_ Bldg 3_Further CC.pdf · uploaded 19 Mar 2024Source
- 4 Copy of Layout Approval (in case of layout)P51700034204 · Layout plan Phase I-compressed.pdf · uploaded 19 Mar 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentP51700034204 · further CC project 3 10-1-23.pdf · uploaded 19 Mar 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentP51700034204 · project 3 further CC bldg 2,4,5 28-2-24_0001.pdf · uploaded 19 Mar 2024Source
- 2 Declaration in FORM BP51700034204 · Form B_AFFIDAVIT for Extension till 21-2-2025_Phase 1.PDF · uploaded 19 Mar 2024Source
- 2 Copy of Layout Approval (in case of layout)P51700034078 · Rusttagi Aarambha layout phase 2 FINAL 18-3-24R-compressed.pdf · uploaded 19 Mar 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentP51700034078 · further CC project 3 10-1-23.pdf · uploaded 19 Mar 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentP51700034078 · Building 1 CC.pdf · uploaded 19 Mar 2024Source
- 4 Commencement Certificates / NA Order for plotted developmentP51700034078 · project 3 further CC bldg 2,4,5 28-2-24_0001.pdf · uploaded 19 Mar 2024Source
- 2 Declaration about Commencement CertificateP51700034204 · Declaration About Further CC_Phase-1.PDF · uploaded 20 Mar 2024Source
- 5 Disclosure of sold/ booked inventoryP51700034204 · Phase I Sold unsold.PDF · uploaded 20 Mar 2024Source
- 4 Copy of Layout Approval (in case of layout)P51700033998 · Rusttagi Aarambha layout phase 3 FINAL 18-3-24R-compressed.pdf · uploaded 21 Mar 2024Source
- 4 Commencement Certificates / NA Order for plotted developmentP51700033998 · project 3 further CC bldg 2,4,5 28-2-24_0001.pdf · uploaded 21 Mar 2024Source
- 2 Declaration about Commencement CertificateP51700033998 · Declaratiobn for CC.pdf · uploaded 21 Mar 2024Source
- 4 Disclosure of sold/ booked inventoryP51700033998 · Sold unsold p3 (1).pdf · uploaded 21 Mar 2024Source
- 2 Declaration about Commencement CertificateP51700034078 · Declaratiobn for CC.pdf · uploaded 21 Mar 2024Source
- 5 Disclosure of sold/ booked inventoryP51700034078 · Sold unsold p2 (1).pdf · uploaded 21 Mar 2024Source
- 3 Copy of Layout Approval (in case of layout)P51700034078 · Building layout _Phase I II III.pdf · uploaded 29 Mar 2024Source
- 5 Copy of Layout Approval (in case of layout)P51700033998 · Building layout _Phase I II III.pdf · uploaded 30 Mar 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700033998 · Phase III form 3_compressed (1).pdf · uploaded 30 Mar 2024Source
- 5 Copy of Layout Approval (in case of layout)P51700034204 · Building layout _Phase I II III.pdf · uploaded 30 Mar 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034204 · Phase I Form 3.pdf · uploaded 30 Mar 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034078 · Phase II Form 3_compressed.pdf · uploaded 30 Mar 2024Source
- 6 Copy of Layout Approval (in case of layout)P51700033998 · PHASEWISE LAND AREA 23-4-24 phase 3R.pdf · uploaded 25 Apr 2024Source
- 6 Copy of Layout Approval (in case of layout)P51700034204 · PHASEWISE LAND AREA 23-4-24 phase 1.pdf · uploaded 25 Apr 2024Source
- 4 Copy of Layout Approval (in case of layout)P51700034078 · PHASEWISE LAND AREA 23-4-24 phase 2.pdf · uploaded 25 Apr 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700033998 · form 1phase3_0001_compressed.pdf · uploaded 25 Dec 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700033998 · form 2phase3_0001_compressed.pdf · uploaded 25 Dec 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · form 1phase1_0001_compressed.pdf · uploaded 25 Dec 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034204 · form 2 phase 1_0001_compressed.pdf · uploaded 25 Dec 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034078 · form 1phase2_0001_compressed.pdf · uploaded 25 Dec 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034078 · form 2phase2_0001_compressed.pdf · uploaded 25 Dec 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700033998 · form 3phase3_0001_compressed.pdf · uploaded 1 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034204 · form 3 phase 1_0001_compressed.pdf · uploaded 1 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034078 · form 3phase2_0001_compressed.pdf · uploaded 1 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700033998 · Form 1 Phase III_0001.pdf · uploaded 5 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700033998 · Form 2 Phase III_0001.pdf · uploaded 5 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · Form 1 Phase II_0001.pdf · uploaded 5 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · Form 1 Phase I_0001.pdf · uploaded 5 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · form 1phase1_0001_compressed.pdf · uploaded 5 Feb 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034204 · Form 1 Phase I_0001.pdf · uploaded 5 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51700034204 · Form 2 Phase I_0001.pdf · uploaded 5 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034078 · Form 2 Phase II_0001.pdf · uploaded 5 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034078 · Form 2 Phase II_0001.pdf · uploaded 5 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700033998 · FROM-3 PHASE-III _compressed2.pdf · uploaded 10 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51700033998 · Form 2A Phase III.PDF · uploaded 10 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034204 · Form3_Phase I_compressed.pdf · uploaded 10 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034204 · Form2_phase I.pdf · uploaded 10 Feb 2025Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51700034204 · Form 2A_Phase 1.PDF · uploaded 10 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034078 · Form 1 Phase II_0001.pdf · uploaded 10 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034078 · Form 3 Phase II_upload.pdf · uploaded 10 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51700034078 · Form 2A-Phase II.PDF · uploaded 10 Feb 2025Source
- Form 1P51700034204 · Form 1 Architect certificate_Mar 22.pdf · uploaded 2 Jul 2025Source
- Form 2P51700034204 · Form 2_engineer_phase I_Mar22.pdf · uploaded 2 Jul 2025Source
- Form 3P51700034204 · Form 3 CA_Signed_phase I_Mar22.pdf · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034204 · sold unsold phase_I Mar 22.pdf · uploaded 2 Jul 2025Source
- Form 1P51700034204 · Form 1_ Phase 1_Dec 22.pdf · uploaded 2 Jul 2025Source
- Form 2P51700034204 · Form 2 Phase1_Dec22.pdf · uploaded 2 Jul 2025Source
- Form 3P51700034204 · Form 3 Dec22.pdf · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034204 · Sold_Unsold Dec 22.pdf · uploaded 2 Jul 2025Source
- Form 1P51700034204 · form I Phase I_Mar23.pdf · uploaded 2 Jul 2025Source
- Form 2P51700034204 · form 2 Phase I_mar23.pdf · uploaded 2 Jul 2025Source
- Form 3P51700034204 · Form 3 Mar 23_Phase I.pdf · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034204 · Sold_Unsold Mar 23.pdf · uploaded 2 Jul 2025Source
- Form 1P51700034204 · Form 1 June 23 Phase I june23.pdf · uploaded 2 Jul 2025Source
- Form 2P51700034204 · Form 2 phase i june 2023.pdf · uploaded 2 Jul 2025Source
- Form 3P51700034204 · FORM 3 PHASE 1_June23.pdf · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034204 · Sold_Unsold June_23.pdf · uploaded 2 Jul 2025Source
- Form 1P51700034204 · SIGNED FORM 1 PHASE 1 Sep23.pdf · uploaded 2 Jul 2025Source
- Form 2P51700034204 · SIGNED FORM 2 PHASE 1 Sep 23.pdf · uploaded 2 Jul 2025Source
- Form 3P51700034204 · SIGNED FORM 3 PHASE 1_Sep23.pdf · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034204 · Sold_Unsold Sep_23.pdf · uploaded 2 Jul 2025Source
- Form 1P51700034204 · Form 1 Phase I Dec 23.PDF · uploaded 2 Jul 2025Source
- Form 2P51700034204 · Form 2 Phase I Dec 23.PDF · uploaded 2 Jul 2025Source
- Form 3P51700034204 · Phase I Form 3 Dec 23.pdf · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034204 · Sold_unsold_dec 23.pdf · uploaded 2 Jul 2025Source
- Form 1P51700034204 · form 1phase1_0001_Sep24.pdf · uploaded 2 Jul 2025Source
- Form 2P51700034204 · form 2 phase 1_0001_sep24.pdf · uploaded 2 Jul 2025Source
- Form 3P51700034204 · form 3 phase 1_Sep 24.pdf · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034204 · Sold_Unsold Sep_24.pdf · uploaded 2 Jul 2025Source
- Form 1P51700034204 · Form1_phase I Dec24.pdf · uploaded 2 Jul 2025Source
- Form 2P51700034204 · Form2_phase I Dec 24.pdf · uploaded 2 Jul 2025Source
- Form 3P51700034204 · FROM-3 PHASE-I Dec 24.PDF · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034204 · Sold_unsold_dec 24.pdf · uploaded 2 Jul 2025Source
- Form 1P51700034204 · Qpr Phase I June 22.pdf · uploaded 2 Jul 2025Source
- Form 2P51700034204 · Qpr Phase I June 22.pdf · uploaded 2 Jul 2025Source
- Form 3P51700034204 · Qpr Phase I June 22.pdf · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034204 · Qpr Phase I June 22.pdf · uploaded 2 Jul 2025Source
- Form 1P51700034204 · Form 1 Phase I Dec 23.PDF · uploaded 2 Jul 2025Source
- Form 2P51700034204 · Form 2 Phase I Dec 23.PDF · uploaded 2 Jul 2025Source
- Form 3P51700034204 · Phase I Form 3 Dec 23.pdf · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034204 · Sold_unsold_dec 23.pdf · uploaded 2 Jul 2025Source
- Self-declaration of Quarterly ProgressP51700034204 · Qpr Phase 1 mar 24.pdf · uploaded 2 Jul 2025Source
- Form 1P51700034204 · Form 1 Phase I Dec 23.PDF · uploaded 2 Jul 2025Source
- Form 2P51700034204 · Form 2 Phase I Dec 23.PDF · uploaded 2 Jul 2025Source
- Form 3P51700034204 · Phase I Form 3.pdf · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034204 · Sold_unsold_dec 23.pdf · uploaded 2 Jul 2025Source
- Self-declaration of Quarterly ProgressP51700034204 · Qpr Phase I June 24.pdf · uploaded 2 Jul 2025Source
- Form 1P51700033998 · PhaseIII Form 1_0001.pdf · uploaded 19 Jul 2025Source
- Form 2P51700033998 · PhaseIII Form 2_0001.pdf · uploaded 19 Jul 2025Source
- Form 3P51700033998 · Phase 3 Form 3.pdf · uploaded 19 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700033998 · PhaseIII Sold Unsold_0001.pdf · uploaded 19 Jul 2025Source
- Form 1P51700034204 · PHASE-1 FORM - 1.pdf · uploaded 19 Jul 2025Source
- Form 2P51700034204 · PHASE-1 FORM - 2.pdf · uploaded 19 Jul 2025Source
- Form 3P51700034204 · PHASE-1 FORM - 3_merged.pdf · uploaded 19 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034204 · Phase I Sold_Unsold.pdf · uploaded 19 Jul 2025Source
- Form 1P51700034078 · PhaseII Form 1_0001.pdf · uploaded 19 Jul 2025Source
- Form 2P51700034078 · PhaseII Form 2_0001.pdf · uploaded 19 Jul 2025Source
- Form 3P51700034078 · phase 2 Form 3.pdf · uploaded 19 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034078 · Phase II Sold_Unsold.pdf · uploaded 19 Jul 2025Source
- Form 1P51700033998 · PHASE-3 FORM-1.pdf · uploaded 21 Jul 2025Source
- Form 2P51700033998 · PHASE-3 FORM-2.pdf · uploaded 21 Jul 2025Source
- Form 3P51700033998 · PHASE-3 FORM-3.pdf · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700033998 · Sold Unsold Phase 3 June 25.pdf · uploaded 21 Jul 2025Source
- Form 1P51700034078 · form 1 Phase II.PDF · uploaded 21 Jul 2025Source
- Form 2P51700034078 · form 2 Phase II.PDF · uploaded 21 Jul 2025Source
- Form 3P51700034078 · form 3 Phase II.PDF · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034078 · Phase 2 Sold Unsold Dec 22.pdf · uploaded 21 Jul 2025Source
- Form 1P51700034078 · form 2 Phase I_compressed.pdf · uploaded 21 Jul 2025Source
- Form 2P51700034078 · form 2 Phase II_compressed.pdf · uploaded 21 Jul 2025Source
- Form 3P51700034078 · form 2 Phase III_compressed.pdf · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034078 · Phase 2 Sold_unsold.pdf · uploaded 21 Jul 2025Source
- Form 1P51700034078 · SIGNED FORM 1 PHASE 2.pdf · uploaded 21 Jul 2025Source
- Form 2P51700034078 · SIGNED FORM 2 PHASE 2.pdf · uploaded 21 Jul 2025Source
- Form 3P51700034078 · SIGNED FORM 3 PHASE 2.PDF · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034078 · Phase 2 Sold Unsold June 23.pdf · uploaded 21 Jul 2025Source
- Form 1P51700034078 · SIGNED FORM 1 PHASE 2.pdf · uploaded 21 Jul 2025Source
- Form 2P51700034078 · SIGNED FORM 2 PHASE 2.pdf · uploaded 21 Jul 2025Source
- Form 3P51700034078 · SIGNED FORM 3 PHASE 2.PDF · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034078 · Phase 2 Sold Unsold.pdf · uploaded 21 Jul 2025Source
- Form 1P51700034078 · Form 1 Phase II.PDF · uploaded 21 Jul 2025Source
- Form 2P51700034078 · Form 2 Phase II.PDF · uploaded 21 Jul 2025Source
- Form 3P51700034078 · Phase II Form 3_compressed.pdf · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034078 · Phase 2 Sold Unsold Dec 23.pdf · uploaded 21 Jul 2025Source
- Form 1P51700034078 · form 1phase2_0001.pdf · uploaded 21 Jul 2025Source
- Form 2P51700034078 · form 2phase2_0001.pdf · uploaded 21 Jul 2025Source
- Form 3P51700034078 · form 3phase2_0001.pdf · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034078 · Sold Unsold Phase 2 Sep 24.pdf · uploaded 21 Jul 2025Source
- Form 1P51700034078 · Form 1 Phase II_0001.pdf · uploaded 21 Jul 2025Source
- Form 2P51700034078 · Form 2 Phase II_0001.pdf · uploaded 21 Jul 2025Source
- Form 3P51700034078 · Form 3 Phase II_upload.pdf · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034078 · Sold Unsold Phase 2.pdf · uploaded 21 Jul 2025Source
- Form 1P51700034078 · PHASE-2 FORM 1.pdf · uploaded 21 Jul 2025Source
- Form 2P51700034078 · PHASE-2 FORM 2.pdf · uploaded 21 Jul 2025Source
- Form 3P51700034078 · PHASE-2 FORM 3.pdf · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034078 · Sold Unsold Phase 2.pdf · uploaded 21 Jul 2025Source
- Form 1P51700034078 · PHASE-2 FORM 1.pdf · uploaded 21 Jul 2025Source
- Form 2P51700034078 · PHASE-2 FORM 2.pdf · uploaded 21 Jul 2025Source
- Form 3P51700034078 · PHASE-2 FORM 3.pdf · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034078 · Sold Unsold Phase 2.pdf · uploaded 21 Jul 2025Source
- Form 1P51700034204 · Form 1.pdf · uploaded 23 Jul 2025Source
- Form 2P51700034204 · Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3P51700034204 · Form 3.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034204 · Sold unsold.pdf · uploaded 23 Jul 2025Source
- Form 2A (FY 2024-2025)P51700034204 · Form 2A Phase I_0001.pdf · uploaded 11 Sep 2025Source
- Form 5 (FY 2024-2025)P51700033998 · FORM 5 PHASE 3.PDF · uploaded 29 Sep 2025Source
- Form 5 (FY 2024-2025)P51700034078 · FORM 5 PHASE 2.PDF · uploaded 29 Sep 2025Source
- Form 1P51700033998 · FORM-1 PHASE-3.PDF · uploaded 10 Dec 2025Source
- Form 2P51700033998 · FORM-2 PHASE-3.PDF · uploaded 10 Dec 2025Source
- Form 3P51700033998 · FORM-3 PHASE-3_compressed.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryP51700033998 · PHASE III_Sold_Unsold.pdf · uploaded 10 Dec 2025Source
- Withdrawal Update Form 1P51700034204 · PHASE-1 FORM-1_0001.pdf · uploaded 10 Dec 2025Source
- Withdrawal Update Form 1P51700034204 · PHASE-1 FORM-1_0001.pdf · uploaded 10 Dec 2025Source
- Withdrawal Update Form 1P51700034204 · FORM-1 PHASE-1.PDF · uploaded 10 Dec 2025Source
- Withdrawal Update Form 2P51700034204 · PHASE-1 FORM-2_0001.pdf · uploaded 10 Dec 2025Source
- Withdrawal Update Form 2P51700034204 · PHASE-1 FORM-2_0001.pdf · uploaded 10 Dec 2025Source
- Withdrawal Update Form 2P51700034204 · FORM-2 PHASE-1.PDF · uploaded 10 Dec 2025Source
- Withdrawal Update Form 3P51700034204 · PHASE-1 FORM-3_0001.pdf · uploaded 10 Dec 2025Source
- Withdrawal Update Form 3P51700034204 · PHASE-1 FORM-3_0001.pdf · uploaded 10 Dec 2025Source
- Withdrawal Update Form 3P51700034204 · FORM-3 PHASE-1.PDF · uploaded 10 Dec 2025Source
- Form 1P51700034078 · FORM-1 PHASE-2.PDF · uploaded 10 Dec 2025Source
- Form 2P51700034078 · FORM-2 PHASE-2.PDF · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryP51700034078 · PHASE II_Sold_Unsold.pdf · uploaded 10 Dec 2025Source
- Form 3P51700034078 · FORM-3 PHASE-2_compressed.pdf · uploaded 10 Dec 2025Source
- Form 1P51700033998 · FORM-1PHASE-3.PDF · uploaded 29 Mar 2026Source
- Form 2P51700033998 · FORM-2PHASE-3.PDF · uploaded 29 Mar 2026Source
- Form 3P51700033998 · FORM-3 PHASE-3 (1).pdf · uploaded 29 Mar 2026Source
- Disclosure of Sold and Booked InventoryP51700033998 · Phase 3_Sold_Unsold.pdf · uploaded 29 Mar 2026Source
- Form 1P51700033998 · Form 1 Phase III_0001.pdf · uploaded 29 Mar 2026Source
- Form 2P51700033998 · Form 2 Phase III.pdf · uploaded 29 Mar 2026Source
- Disclosure of Sold and Booked InventoryP51700033998 · Sold Unsold Dec 24.pdf · uploaded 29 Mar 2026Source
- Form 3P51700033998 · FROM-3 PHASE-III _compressed2.pdf · uploaded 29 Mar 2026Source
- Form 1P51700033998 · form 1phase3_0001_compressed.pdf · uploaded 29 Mar 2026Source
- Form 2P51700033998 · form 2phase3_0001_compressed.pdf · uploaded 29 Mar 2026Source
- Form 3P51700033998 · form 3phase3_0001_compressed.pdf · uploaded 29 Mar 2026Source
- Disclosure of Sold and Booked InventoryP51700033998 · Sold Unsold Phase 3.pdf · uploaded 29 Mar 2026Source
- Occupational CertificateP51700033998 · OC 04-03-2026.pdf · uploaded 29 Mar 2026Source
- Withdrawal Update Form 1P51700034204 · FORM-1 PHASE-1.PDF · uploaded 29 Mar 2026Source
- Withdrawal Update Form 2P51700034204 · FORM-2 PHASE-1.PDF · uploaded 29 Mar 2026Source
- Withdrawal Update Form 3P51700034204 · FORM-3 PHASE-1.PDF · uploaded 29 Mar 2026Source
- Form 1P51700034078 · Form1_Phase2_0001.pdf · uploaded 29 Mar 2026Source
- Form 2P51700034078 · Form2_Phase2_0001.pdf · uploaded 29 Mar 2026Source
- Form 3P51700034078 · Form 3_Phase 2_Merged_compressed.pdf · uploaded 29 Mar 2026Source
- Disclosure of Sold and Booked InventoryP51700034078 · Phase II_Sold_Unsold.pdf · uploaded 29 Mar 2026Source
- Withdrawal Update Form 1P51700034204 · FORM-1 PHASE-1.PDF · uploaded 30 Mar 2026Source
- Withdrawal Update Form 1P51700034204 · FORM-1 PHASE-1.PDF · uploaded 30 Mar 2026Source
- Withdrawal Update Form 2P51700034204 · FORM-2 PHASE-1.PDF · uploaded 30 Mar 2026Source
- Withdrawal Update Form 2P51700034204 · FORM-2 PHASE-1.PDF · uploaded 30 Mar 2026Source
- Withdrawal Update Form 3P51700034204 · FORM-3 PHASE-1.PDF · uploaded 30 Mar 2026Source
- Withdrawal Update Form 3P51700034204 · FORM-3 PHASE-1.PDF · uploaded 30 Mar 2026Source
Technical
- DocumentP51700033998 · Building Plan Approval.pdf · uploaded 11 Mar 2022Source
- DocumentP51700033998 · Layout Full Approved_Mhada (2).pdf · uploaded 11 Mar 2022Source
- DocumentP51700033998 · Approved Layout.pdf · uploaded 11 Mar 2022Source
- DocumentP51700033998 · LOI.pdf · uploaded 11 Mar 2022Source
- DocumentP51700033998 · Common Area Certificate_Architect.pdf · uploaded 11 Mar 2022Source
- DocumentP51700034204 · Approved Layout.pdf · uploaded 11 Mar 2022Source
- DocumentP51700034204 · Common Area Certificate_Architect.pdf · uploaded 11 Mar 2022Source
- DocumentP51700034204 · Layout Full Approved_Mhada (2).pdf · uploaded 11 Mar 2022Source
- DocumentP51700034204 · LOI.pdf · uploaded 11 Mar 2022Source
- DocumentP51700034204 · Building Plan Approval.pdf · uploaded 11 Mar 2022Source
- DocumentP51700034078 · Layout Full Approved_Mhada (2).pdf · uploaded 11 Mar 2022Source
- DocumentP51700034078 · Building Plan Approval.pdf · uploaded 11 Mar 2022Source
- DocumentP51700034078 · LOI.pdf · uploaded 11 Mar 2022Source
- DocumentP51700034204 · Plinth CC 23022022.pdf · uploaded 16 Mar 2022Source
- DocumentP51700034078 · Plinth CC 23022022.pdf · uploaded 16 Mar 2022Source
- DocumentP51700034204 · Layout plan Phase I-compressed.pdf · uploaded 19 Mar 2024Source
- DocumentP51700034078 · Rusttagi Aarambha layout phase 2 FINAL 18-3-24R-compressed.pdf · uploaded 19 Mar 2024Source
- DocumentP51700033998 · Rusttagi Aarambha layout phase 3 FINAL 18-3-24R-compressed.pdf · uploaded 21 Mar 2024Source
- DocumentP51700034078 · Building layout _Phase I II III.pdf · uploaded 29 Mar 2024Source
- DocumentP51700033998 · Building layout _Phase I II III.pdf · uploaded 30 Mar 2024Source
- DocumentP51700034204 · Building layout _Phase I II III.pdf · uploaded 30 Mar 2024Source
- DocumentP51700033998 · PHASEWISE LAND AREA 23-4-24 phase 3R.pdf · uploaded 25 Apr 2024Source
- DocumentP51700034204 · PHASEWISE LAND AREA 23-4-24 phase 1.pdf · uploaded 25 Apr 2024Source
- DocumentP51700034078 · PHASEWISE LAND AREA 23-4-24 phase 2.pdf · uploaded 25 Apr 2024Source
Technical (Architect)
- DocumentP51700033998 · Form 1 Phase III.PDF · uploaded 14 Mar 2024Source
- DocumentP51700034078 · Form 1 Phase II.PDF · uploaded 14 Mar 2024Source
- DocumentP51700033998 · form 1phase3_0001_compressed.pdf · uploaded 25 Dec 2024Source
- DocumentP51700034204 · form 1phase1_0001_compressed.pdf · uploaded 25 Dec 2024Source
- DocumentP51700034078 · form 1phase2_0001_compressed.pdf · uploaded 25 Dec 2024Source
- DocumentP51700033998 · Form 1 Phase III_0001.pdf · uploaded 5 Feb 2025Source
- DocumentP51700034204 · Form 1 Phase II_0001.pdf · uploaded 5 Feb 2025Source
- DocumentP51700034204 · Form 1 Phase I_0001.pdf · uploaded 5 Feb 2025Source
- DocumentP51700034204 · form 1phase1_0001_compressed.pdf · uploaded 5 Feb 2025Source
- DocumentP51700034204 · Form 1 Phase I_0001.pdf · uploaded 5 Feb 2025Source
- DocumentP51700034078 · Form 2 Phase II_0001.pdf · uploaded 5 Feb 2025Source
- DocumentP51700034078 · Form 1 Phase II_0001.pdf · uploaded 10 Feb 2025Source
- DocumentP51700034204 · FORM-1 PHASE-1.PDF · uploaded 30 Mar 2026Source
Technical (Engineer)
- DocumentP51700033998 · Form 2 Phase II.PDF · uploaded 14 Mar 2024Source
- DocumentP51700034078 · Form 2 Phase II.PDF · uploaded 14 Mar 2024Source
- DocumentP51700033998 · form 2phase3_0001_compressed.pdf · uploaded 25 Dec 2024Source
- DocumentP51700034204 · form 2 phase 1_0001_compressed.pdf · uploaded 25 Dec 2024Source
- DocumentP51700034078 · form 2phase2_0001_compressed.pdf · uploaded 25 Dec 2024Source
- DocumentP51700033998 · Form 2 Phase III_0001.pdf · uploaded 5 Feb 2025Source
- DocumentP51700034078 · Form 2 Phase II_0001.pdf · uploaded 5 Feb 2025Source
- DocumentP51700034204 · Form2_phase I.pdf · uploaded 10 Feb 2025Source
- DocumentP51700034204 · FORM-2 PHASE-1.PDF · uploaded 29 Mar 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 101/1/D, 77/4/A/78/2/A
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Phases
- 4
- Unit types
- Shop, 1BHK, Shifted in phase2737 units in all
- Address
- 83/1/B/2, 77/4/C/78/2/C, 77/4/A/78/2/A, 77/4/P/78/2/D, 77/4/B/78/2/B, 77/4/E/78/2/E, 77/4/L/78/2/L, 77/4/P/78/2/P, 77/4/J/78/2/J, 77/4/F/78/2/F Situated And Lying At Village Titwala, Tal-Kalyan, Dist- Thane., Ganesh Mandir, TitwalaPIN 421605
- Village
- Titwala, Kalyan taluka
- Location
- 19.29572, 73.23069
- Land area for this project
- 15,375 sq m (1,65,493 sq ft)
- Permissible built-up area
- 20,472 sq m (2,20,359 sq ft)
- Sanctioned built-up area
- 20,472 sq m (2,20,359 sq ft)
- Designated bank account
- 76
- Developed in phases
- Yes
- Also registered as
- Rusttagi Aarambha Phase- I, Rusttagi Aarambha Phase-II, Rusttagi Aarambha Phase-III, Rusttagi Aarambha 2.0
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
83/1/B/2, 77/4/C/78/2/C, 77/4/A/78/2/A, 77/4/P/78/2/D, 77/4/B/78/2/B, 77/4/E/78/2/E, 77/4/L/78/2/L, 77/4/P/78/2/P, 77/4/J/78/2/J, 77/4/F/78/2/F SITUATED AND LYING AT VILLAGE TITWALA, TAL-KALYAN, DIST- THANE.
Boundaries
- North
- Survey No 77 24 Meter Wide Road
- South
- Survey No 82 83
- East
- Survey No 66
- West
- Survey No 80 81
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking737 units · 122 parking spaces
618 of 737 units booked (84%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P51700034078 | Building 1 | Shop | 76.71 sq m · 826 sq ft | 1 | 0 |
| P51700034078 | Building 1 | Shop | 848.63 sq m · 9,135 sq ft | 1 | 0 |
| P51700034078 | Building 1 | Shop | 906.85 sq m · 9,761 sq ft | 1 | 0 |
| P51700034078 | Building 1 | Shop | 968.31 sq m · 10,423 sq ft | 1 | 0 |
| P51700034078 | Building 2 | 1BHK | 29.48 sq m · 317 sq ft | 141 | 136 |
| P51700034078 | Building 4 | 1BHK | 29.48 sq m · 317 sq ft | 153 | 117 |
| P51700034204 | Building No 1 | Shifted in phase2 | 225.06 sq m · 2,423 sq ft | 18 | 0 |
| P51700034204 | Building No 2 | Shop | 9.12 sq m · 98 sq ft | 6 | 6 |
Show all 23 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P51700034204 | Building No 2 | Shop | 12.5 sq m · 135 sq ft | 6 | 4 |
| P51700034204 | Building No 2 | Shop | 15.89 sq m · 171 sq ft | 6 | 2 |
| P51700033998 | Building No 3 A And B | 1BHK | 29.35 sq m · 316 sq ft | 79 | 74 |
| P51700033998 | Building No 3 A And B | 1BHK | 29.35 sq m · 316 sq ft | 30 | 23 |
| P51700033998 | Building No 3 A And B | 1BHK | 29.48 sq m · 317 sq ft | 88 | 88 |
| P51700033998 | Building No 3 A And B | Shop | 12.85 sq m · 138 sq ft | 1 | 0 |
| P51700033998 | Building No 3 A And B | Shop | 13.5 sq m · 145 sq ft | 2 | 0 |
| P51700033998 | Building No 3 A And B | Shop | 17.35 sq m · 187 sq ft | 2 | 0 |
| P51700033998 | Building No 3 A And B | Shop | 17.63 sq m · 190 sq ft | 1 | 0 |
| P51700033998 | Building No 5 And B | 1BHK | 29.48 sq m · 317 sq ft | 94 | 89 |
| P51700033998 | Building No 5 And B | 1BHK | 29.48 sq m · 317 sq ft | 94 | 79 |
| P51700033998 | Building No 5 And B | Shop | 12.85 sq m · 138 sq ft | 2 | 0 |
| P51700033998 | Building No 5 And B | Shop | 13.5 sq m · 145 sq ft | 4 | 0 |
| P51700033998 | Building No 5 And B | Shop | 17.35 sq m · 187 sq ft | 4 | 0 |
| P51700033998 | Building No 5 And B | Shop | 17.63 sq m · 190 sq ft | 2 | 0 |
Parking
| Type | Two-wheeler | Four-wheeler | Bus | Visitor | Total |
|---|---|---|---|---|---|
| Closed/Covered | 0 | 8 | 0 | 0 | 8 |
| Open Space | 114 | 0 | 0 | 0 | 114 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Construction progress2 buildings and areas
Work completed, as the promoter reported it to MahaRERA (Form 1)
Building N0 4
Show all 11 activitiesShow fewer activities
Common areas and amenities
Show all 15 activitiesShow fewer activities
Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.
Professionals29
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | UB Architects | — | P51700076932 |
| Architect | Ub Architects | — | P51700034078 |
| Architect | Ub Architects | — | P51700033998 |
| Architect | Ub Architects | — | P51700034204 |
| Chartered accountant | Foram Bhanushali | — | P51700034078 |
| Chartered accountant | Foram Bhanushali | — | P51700033998 |
| Chartered accountant | Foram Bhanushali | — | P51700076932 |
| Chartered accountant | K B Bhat | — | P51700034204 |
Show all 29 professionalsShow fewer professionals
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Chartered accountant | K B Bhat | — | P51700034078 |
| Chartered accountant | K B Bhat | — | P51700033998 |
| Chartered accountant | K.V. Bhat & Co | — | P51700076932 |
| Chartered accountant | RD Bhatia & Associates | — | P51700033998 |
| Chartered accountant | RD Bhatia & Associates | — | P51700034204 |
| Chartered accountant | RD Bhatia & Associates | — | P51700076932 |
| Chartered accountant | RD Bhatia & Associates | — | P51700034078 |
| Engineer | Ajay Mahale & Associates | — | P51700033998 |
| Engineer | Ajay Mahale & Associates | — | P51700034078 |
| Engineer | Ajay Mahale & Associates | — | P51700034204 |
| Engineer | AJAY Mahale Consulting Engineer | — | P51700034078 |
| Engineer | AJAY Mahale Consulting Engineer | — | P51700076932 |
| Other | Ajay Mahale & Associates | — | P51700033998 |
| Other | Ajay Mahale & Associates, | — | P51700034204 |
| Other | Ajay Mahale & Associates | — | P51700034078 |
| Other | ELCON Engineers | — | P51700034078 |
| Other | ELCON Engineers | — | P51700033998 |
| Other | ELCON Engineers, | — | P51700034204 |
| Other | Ultra Tech | — | P51700033998 |
| Other | Ultra Tech | — | P51700034078 |
| Other | Ultratech | — | P51700034204 |
Source: MahaRERA project page. Contact details are not shown.