Commercial · 2 buildings · 79 unitsRERA P51700033313

Shiv Heights

Deedo IDDP-THN-6WRP

Completion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 47% of its units are booked.

Thane (M Corp.), Thane 400601 · by Sarwangkripa Developers Llp

DeliveryExtended 4 moPromised Dec 2026 · now due Apr 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales47% booked37 of 79 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2027

  • This projectRegistered 15 Feb 2022, completion promised 31 Dec 2026, revised to 30 Apr 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700033313
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170003331315 Feb 202231 Dec 202630 Apr 2027Sarwangkripa Developers LLPProject page
Documents128

2 documents held by Deedo, 126 filings listed on MahaRERA's project page

Registration certificate

Other

  • OtherDate not statedView

Finance

  • PAN CardLLP PAN Card.pdf · uploaded 3 Feb 2022Source

Legal

  • Legal Title reportLegal Title Certificate.pdf · uploaded 3 Feb 2022Source
  • Declaration Form BForm B - Declaration - cum - Affidavit.pdf · uploaded 3 Feb 2022Source

Migrated

  • 1 PAN CardLLP PAN Card.pdf · uploaded 3 Feb 2022Source
  • 1 Copy of the legal title reportLegal Title Certificate.pdf · uploaded 3 Feb 2022Source
  • 1 Details of encumbrancesDetails of Encumbrances.pdf · uploaded 3 Feb 2022Source
Show all 128 documentsShow fewer documents

Migrated

  • 1 Copy of Layout Approval (in case of layout)Layout Approval.pdf · uploaded 3 Feb 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentBasement.pdf · uploaded 3 Feb 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentGround Floor.pdf · uploaded 3 Feb 2022Source
  • 3 Building Plan Approval / NA Order for plotted development1st to 3rd floor.pdf · uploaded 3 Feb 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentBalance.pdf · uploaded 3 Feb 2022Source
  • 5 Building Plan Approval / NA Order for plotted development4th to 6th Floor.pdf · uploaded 3 Feb 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentSarwangkripa - CC.pdf · uploaded 3 Feb 2022Source
  • 1 Declaration about Commencement CertificateDeclaration about commencement Certificate.pdf · uploaded 3 Feb 2022Source
  • 1 Declaration in FORM BForm B - Declaration - cum - Affidavit.pdf · uploaded 3 Feb 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 3 Feb 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate.pdf · uploaded 3 Feb 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report_200229027925_For_Debtor_Based_Search_29_01_2022_12_39_12_969.pdf · uploaded 3 Feb 2022Source
  • 2 CERSAI detailsCERSAI_Search_Report_200229027964_For_Debtor_Based_Search_29_01_2022_12_39_32_211.pdf · uploaded 3 Feb 2022Source
  • 3 CERSAI detailsCERSAI_Search_Report_200229027977_For_Debtor_Based_Search_29_01_2022_12_39_42_195.pdf · uploaded 3 Feb 2022Source
  • 4 CERSAI detailsCERSAI_Search_Report_200229028001_For_Debtor_Based_Search_29_01_2022_12_39_51_497.pdf · uploaded 3 Feb 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate1.pdf · uploaded 5 Feb 2022Source
  • 1 Proforma of Allotment letterAllotment Letter_Shiv Heights_Sarwangkripa_DRAFT.pdf · uploaded 5 Feb 2022Source
  • 2 Proforma of Allotment letterAgreement for Sale_Sarwangkripa_RERA Draft.pdf · uploaded 5 Feb 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sarwangkripa - Architect Certificate.pdf · uploaded 27 Apr 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Sarwangkripa - Engineer Certificate_compressed.pdf · uploaded 27 Apr 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sarwangkripa - CA Certificate_compressed.pdf · uploaded 27 Apr 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sarwangkripa - Architect Certificate.pdf · uploaded 10 Aug 2022Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Sarwangkripa - Engineer's Certificate.pdf · uploaded 10 Aug 2022Source
  • 1 Disclosure of sold/ booked inventorySarwangkripa Annexure A.pdf · uploaded 10 Aug 2022Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sarwangkripa - CA Certificate (1)_compressed.pdf · uploaded 10 Aug 2022Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Shiv Heights.pdf · uploaded 8 Nov 2022Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Shiv Heights as on September 2022.pdf · uploaded 8 Nov 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A- Shiv Heights (2021-22).pdf · uploaded 8 Nov 2022Source
  • 2 Disclosure of sold/ booked inventoryCircular 29- Shiv Heights.pdf · uploaded 8 Nov 2022Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Shiv Heights as on September 2022.pdf · uploaded 8 Nov 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5- Shiv Heights.pdf · uploaded 22 Feb 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameRera Format A.pdf · uploaded 8 Mar 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 as on 2022-23.pdf · uploaded 7 Apr 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 as on 2022-23.pdf · uploaded 7 Apr 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 as on 2022-23.pdf · uploaded 7 Apr 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 as on 2022-23.pdf · uploaded 25 Jul 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 as on 2023-24.pdf · uploaded 25 Jul 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 25 Jul 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 as on 2022-23.pdf · uploaded 25 Jul 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 as on 2023-24.pdf · uploaded 25 Jul 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 as on 2023-24.pdf · uploaded 26 Jul 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5- Shiv Heights as on 2022-23 (Sarwangkripa).pdf · uploaded 10 Nov 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Shiv Heights as on September 2023.pdf · uploaded 18 Nov 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Shiv Heights as on September 2023.pdf · uploaded 18 Nov 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Shiv Heights as on September 2023.pdf · uploaded 21 Nov 2023Source
  • 2 Copy of Layout Approval (in case of layout)1,2,3.pdf · uploaded 14 Dec 2023Source
  • 3 Copy of Layout Approval (in case of layout)4,5,6.pdf · uploaded 14 Dec 2023Source
  • 4 Copy of Layout Approval (in case of layout)7,8.pdf · uploaded 14 Dec 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentAmmended CC.pdf · uploaded 14 Dec 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Shiv Heights as on Dec 2023.pdf · uploaded 5 Feb 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Shiv Heights as on Dec 2023.pdf · uploaded 5 Feb 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Shiv Heights as on Dec 2023_compressed.pdf · uploaded 6 Feb 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Shiv Heights.pdf · uploaded 19 Jun 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 19 Jun 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 -_compressed.pdf · uploaded 19 Jun 2024Source
  • 5 Copy of Layout Approval (in case of layout)Plan_compressed-1.pdf · uploaded 16 Aug 2024Source
  • 6 Building Plan Approval / NA Order for plotted developmentPlan_compressed-2-5_compressed.pdf · uploaded 16 Aug 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 9 Nov 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 9 Nov 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 9 Nov 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 9 Nov 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 9 Nov 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 9 Nov 2024Source
  • 1 Copy of Layout Approval (in case of layout)1.pdf · uploaded 15 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Q3 2024-25.pdf · uploaded 15 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Q3 2024-25_compressed.pdf · uploaded 15 Feb 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 15 Feb 2025Source
  • 1 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 15 Feb 2025Source
  • 2 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 15 Feb 2025Source
  • 3 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 15 Feb 2025Source
  • 4 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 15 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Q3 2024-25.pdf · uploaded 3 Mar 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Q3 2024-25.pdf · uploaded 6 Mar 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Shiv Heights - FY 2023-24.pdf · uploaded 6 Mar 2025Source
  • Form 1Form 1 - Shiv Heights as on June 2025.pdf · uploaded 28 Nov 2025Source
  • Form 2Form 2 - Shiv Heights as on June 2025.pdf · uploaded 28 Nov 2025Source
  • Form 3Form 3 - Shiv Heights as on June 2025.pdf · uploaded 28 Nov 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Shiv Heights as on June 2025.pdf · uploaded 28 Nov 2025View
  • Form 1Form 1 - Shiv heights as on Sep 2025.pdf · uploaded 12 Dec 2025Source
  • Form 2Form 2 - Shiv heights as on Sep 2025.pdf · uploaded 12 Dec 2025Source
  • Form 3Form 3 - Shiv heights as on Sep 2025.pdf · uploaded 12 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Shiv heights as on Sep 2025.pdf · uploaded 12 Dec 2025View
  • Form 5 (FY 2024-2025)RERA Form 5_2024-25.pdf · uploaded 23 Dec 2025Source
  • Form 1Sarwangkripa - Form1 Q3 2025-26.pdf · uploaded 21 May 2026Source
  • Form 2Sarwangkripa - Form2 Q3 2025-26.pdf · uploaded 21 May 2026Source
  • Form 3Sarwangkripa - Form3 Q3 2025-26.pdf · uploaded 21 May 2026Source
  • Disclosure of Sold and Booked InventoryCircular 29 31-12-2025.pdf · uploaded 21 May 2026View
  • Form 1Sarwangkripa - Form1 Q4 2025-26.pdf · uploaded 21 May 2026Source
  • Form 2Sarwangkripa - Form2 Q4 2025-26.pdf · uploaded 21 May 2026Source
  • Form 3Sarwangkripa - Form3 Q4 2025-26.pdf · uploaded 21 May 2026Source
  • Disclosure of Sold and Booked InventoryCircular 29 31-03-2026.pdf · uploaded 21 May 2026View
  • Form 1Form-1 Shiv Heights As on June 2026.pdf · uploaded 20 Jul 2026Source
  • Form 2Form-2 Shiv Heights As on June 2026.pdf · uploaded 20 Jul 2026Source
  • Form 3Form-3 Shiv Heights As on June 2026.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryCircular-29 Shiv Heights As on June 2026.pdf · uploaded 20 Jul 2026View

Technical

  • DocumentLayout Approval.pdf · uploaded 3 Feb 2022Source
  • DocumentBasement.pdf · uploaded 3 Feb 2022Source
  • DocumentGround Floor.pdf · uploaded 3 Feb 2022Source
  • Document1st to 3rd floor.pdf · uploaded 3 Feb 2022Source
  • DocumentBalance.pdf · uploaded 3 Feb 2022Source
  • Document4th to 6th Floor.pdf · uploaded 3 Feb 2022Source
  • Document1,2,3.pdf · uploaded 14 Dec 2023Source
  • Document4,5,6.pdf · uploaded 14 Dec 2023Source
  • Document7,8.pdf · uploaded 14 Dec 2023Source
  • DocumentPlan_compressed-1.pdf · uploaded 16 Aug 2024Source
  • DocumentPlan_compressed-2-5_compressed.pdf · uploaded 16 Aug 2024Source
  • Document1.pdf · uploaded 15 Feb 2025Source
  • Document2.pdf · uploaded 15 Feb 2025Source
  • Document3.pdf · uploaded 15 Feb 2025Source
  • Document4.pdf · uploaded 15 Feb 2025Source
  • Document5.pdf · uploaded 15 Feb 2025Source

Technical (Architect)

  • DocumentForm 1 - Shiv Heights.pdf · uploaded 19 Jun 2024Source
  • DocumentForm 1.pdf · uploaded 9 Nov 2024Source
  • DocumentForm 1.pdf · uploaded 9 Nov 2024Source
  • DocumentArchitect Certificate Q3 2024-25.pdf · uploaded 15 Feb 2025Source

Technical (Engineer)

  • DocumentForm 2.pdf · uploaded 19 Jun 2024Source
  • DocumentForm 2.pdf · uploaded 9 Nov 2024Source
  • DocumentForm 2.pdf · uploaded 9 Nov 2024Source
  • DocumentEngineers Certificate Q3 2024-25.pdf · uploaded 3 Mar 2025Source
  • DocumentEngineers Certificate Q3 2024-25.pdf · uploaded 6 Mar 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel CTS312B, TIKA NO. 2

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Certificate Signed
Unit types
Office space, Restaurant, Shop79 units in all
Address
Cts312b, Tika No. 2, Shivaji Path, Ambedkar Chowk, Thane WestPIN 400601
Village
Thane (M Corp.), Thane taluka
Land area for this project
1,415 sq m (15,228 sq ft)
Permissible built-up area
5,594 sq m (60,218 sq ft)
Sanctioned built-up area
5,594 sq m (60,218 sq ft)
Designated bank account
76
Developed in phases
No

Survey, CTS, gat or plot numbers

CTS312BTIKA NO. 2

Land as published on MahaRERA's project page

CTS312B, TIKA NO. 2

Boundaries

North
Gokhale Road
South
Central Railway Booking Office
East
Paranjpe Property
West
Shivaji Path

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking79 units

37 of 79 units booked (47%), as the promoter reported to MahaRERA

Office space · 77 unitsRestaurant · 1 unitShop · 1 unit
TypeCarpet areaUnitsBooked
Office space6.68 sq m · 72 sq ft10
Office space7.17 sq m · 77 sq ft10
Office space7.57 sq m · 81 sq ft10
Office space8.42 sq m · 91 sq ft11
Office space9.67 sq m · 104 sq ft22
Office space11.08 sq m · 119 sq ft11
Office space12.45 sq m · 134 sq ft11
Office space14.15 sq m · 152 sq ft11
Show all 65 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Office space15.82 sq m · 170 sq ft11
Office space16.65 sq m · 179 sq ft11
Office space17.21 sq m · 185 sq ft11
Office space18.58 sq m · 200 sq ft11
Office space19.23 sq m · 207 sq ft11
Office space19.3 sq m · 208 sq ft10
Office space19.31 sq m · 208 sq ft11
Office space21.36 sq m · 230 sq ft11
Office space23.35 sq m · 251 sq ft10
Office space24.54 sq m · 264 sq ft11
Office space25.06 sq m · 270 sq ft11
Office space25.38 sq m · 273 sq ft10
Office space26.6 sq m · 286 sq ft11
Office space27.61 sq m · 297 sq ft10
Office space27.76 sq m · 299 sq ft11
Office space27.86 sq m · 300 sq ft10
Office space28.67 sq m · 309 sq ft10
Office space29.48 sq m · 317 sq ft11
Office space29.52 sq m · 318 sq ft10
Office space29.95 sq m · 322 sq ft61
Office space31.42 sq m · 338 sq ft10
Office space31.58 sq m · 340 sq ft11
Office space31.61 sq m · 340 sq ft11
Office space31.66 sq m · 341 sq ft11
Office space31.83 sq m · 343 sq ft11
Office space31.84 sq m · 343 sq ft10
Office space32.22 sq m · 347 sq ft10
Office space32.43 sq m · 349 sq ft21
Office space32.5 sq m · 350 sq ft11
Office space32.55 sq m · 350 sq ft11
Office space34.68 sq m · 373 sq ft10
Office space34.74 sq m · 374 sq ft20
Office space34.82 sq m · 375 sq ft11
Office space34.84 sq m · 375 sq ft20
Office space35.03 sq m · 377 sq ft10
Office space35.25 sq m · 379 sq ft11
Office space35.76 sq m · 385 sq ft11
Office space36.59 sq m · 394 sq ft31
Office space36.6 sq m · 394 sq ft10
Office space37.16 sq m · 400 sq ft20
Office space37.25 sq m · 401 sq ft11
Office space40.51 sq m · 436 sq ft11
Office space46.74 sq m · 503 sq ft20
Office space47.99 sq m · 517 sq ft10
Office space48 sq m · 517 sq ft10
Office space48.44 sq m · 521 sq ft11
Office space49.23 sq m · 530 sq ft11
Office space51.09 sq m · 550 sq ft20
Office space51.29 sq m · 552 sq ft11
Office space51.81 sq m · 558 sq ft10
Office space62.53 sq m · 673 sq ft10
Office space63.59 sq m · 684 sq ft11
Office space67.55 sq m · 727 sq ft10
Office space73.57 sq m · 792 sq ft10
Office space252.48 sq m · 2,718 sq ft10
Restaurant134.49 sq m · 1,448 sq ft10
Shop13 sq m · 140 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals6

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectTen Folds Architects And Consultants—
Chartered accountantAlok Srivastava And Associates—
Chartered accountantSubodh Goel And Company—
EngineerPentacon Structural Consultants Private Limited—
OtherBuild Mom—
OtherRERA Easy—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology