Jvms Corner Stone
Deedo IDDP-THN-V0NMMahaRERA shows it completed, after its date was pushed back 1 year and 6 months; no MahaRERA orders on record; 76% of its units are booked.
Thane (M Corp.), Thane 400602 · by Maharashtra Developers
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed, after its date was pushed back 1 year and 6 months
- This projectRegistered 7 Feb 2020, completion promised 30 Nov 2023, revised to 29 May 2025.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700024350
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700024350 | 7 Feb 2020 | 30 Nov 2023 | 29 May 2025 | Maharashtra Developers | Project page |
Documents156
2 documents held by Deedo, 154 filings listed on MahaRERA's project page
Finance
- PAN CardMD - Pan.pdf · uploaded 27 Jan 2020Source
Legal
- Legal Title reportTitle Certificate.pdf · uploaded 28 Jan 2020Source
- Declaration Form BForm B.pdf · uploaded 28 Jan 2020Source
- Legal Title reportTital 1.pdf · uploaded 4 Feb 2020Source
- Legal Title reportTital 2.pdf · uploaded 4 Feb 2020Source
- Legal Title reportTital Report_compressed (1).pdf · uploaded 9 Mar 2022Source
Show all 156 documentsShow fewer documents
Migrated
- 1 PAN CardMD - Pan.pdf · uploaded 27 Jan 2020Source
- 1 Details of encumbrancesNo Encumbrance MD.pdf · uploaded 27 Jan 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentCC dated 16-01-2020.pdf · uploaded 27 Jan 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 MD.pdf · uploaded 27 Jan 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)MD Form 2.pdf · uploaded 27 Jan 2020Source
- 1 Copy of the legal title reportTitle Certificate.pdf · uploaded 28 Jan 2020Source
- 1 Copy of Layout Approval (in case of layout)1.pdf · uploaded 28 Jan 2020Source
- 1 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 28 Jan 2020Source
- 2 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 28 Jan 2020Source
- 3 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 28 Jan 2020Source
- 4 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 28 Jan 2020Source
- 5 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 28 Jan 2020Source
- 6 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 28 Jan 2020Source
- 7 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 28 Jan 2020Source
- 8 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 28 Jan 2020Source
- 9 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 28 Jan 2020Source
- 10 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 28 Jan 2020Source
- 1 Declaration in FORM BForm B.pdf · uploaded 28 Jan 2020Source
- 1 Proforma of Allotment letterAllotment Letter- md1.pdf · uploaded 28 Jan 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)MD Form 3.pdf · uploaded 29 Jan 2020Source
- 2 Copy of the legal title reportTital 1.pdf · uploaded 4 Feb 2020Source
- 3 Copy of the legal title reportTital 2.pdf · uploaded 4 Feb 2020Source
- 11 Building Plan Approval / NA Order for plotted developmentPlan 7 JVMS Corner.pdf · uploaded 11 Nov 2020Source
- 12 Building Plan Approval / NA Order for plotted developmentPlan 12 JVMS Corner.pdf · uploaded 11 Nov 2020Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sept 2020 JVMS Corner Stone_compressed.pdf · uploaded 29 Dec 2020Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Corner Stone Sept 2020.pdf · uploaded 29 Dec 2020Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 JVMS Corner Stone Dec 2020.pdf · uploaded 18 Feb 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Corner Stone Dec 2020.pdf · uploaded 18 Feb 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 FY 19-20 JVMS Corner Stone.pdf · uploaded 18 Feb 2021Source
- 2 Copy of Layout Approval (in case of layout)PLAN 1 OF 7_compressed.pdf · uploaded 30 Apr 2021Source
- 13 Building Plan Approval / NA Order for plotted developmentPLAN 2 OF 7_compressed.pdf · uploaded 30 Apr 2021Source
- 14 Building Plan Approval / NA Order for plotted developmentPLAN 3 OF 7 compressed.pdf · uploaded 30 Apr 2021Source
- 15 Building Plan Approval / NA Order for plotted developmentPLAN 4 OF 7_compressed.pdf · uploaded 30 Apr 2021Source
- 16 Building Plan Approval / NA Order for plotted developmentPLAN 5 OF 7_compressed.pdf · uploaded 30 Apr 2021Source
- 17 Building Plan Approval / NA Order for plotted developmentPLAN - 6 OF 7_compressed.pdf · uploaded 30 Apr 2021Source
- 18 Building Plan Approval / NA Order for plotted developmentPLAN 7 OF 7_compressed.pdf · uploaded 30 Apr 2021Source
- 2 Commencement Certificates / NA Order for plotted developmentCC 26042021.pdf · uploaded 30 Apr 2021Source
- 2 Details of encumbrancesEncumbrance of Project.pdf · uploaded 3 Jun 2021Source
- 3 Details of encumbrancesRERA Encumbrance Maharashtra Developers.pdf · uploaded 3 Jun 2021Source
- 2 Proforma of Allotment letteragreement 16062021.pdf · uploaded 19 Jun 2021Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 JVMS Corner Stone.pdf · uploaded 26 Aug 2021Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 JVMS Corner Stone June 21.pdf · uploaded 26 Aug 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Corner Stone Mar 2021_compressed.pdf · uploaded 26 Aug 2021Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Corner Stone June 2021_compressed.pdf · uploaded 26 Aug 2021Source
- 19 Building Plan Approval / NA Order for plotted developmentPage 1 and 2.pdf · uploaded 27 Oct 2021Source
- 20 Building Plan Approval / NA Order for plotted developmentPage 3 and 4.pdf · uploaded 27 Oct 2021Source
- 21 Building Plan Approval / NA Order for plotted developmentPage 5 and 6.pdf · uploaded 27 Oct 2021Source
- 22 Building Plan Approval / NA Order for plotted development7 (2).pdf · uploaded 27 Oct 2021Source
- 3 Commencement Certificates / NA Order for plotted developmentCC dated 22 nd Oct 2021.pdf · uploaded 27 Oct 2021Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 JVMS Corner Stone September 2021.pdf · uploaded 20 Dec 2021Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Corner Stone September 2021 (1)_compressed.pdf · uploaded 20 Dec 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Signed_maharashtra_Rera_Certificate_04_Dec_22 (1)_compressed.pdf · uploaded 14 Jan 2022Source
- 3 Copy of Layout Approval (in case of layout)page 1 to 2.pdf · uploaded 15 Feb 2022Source
- 23 Building Plan Approval / NA Order for plotted developmentpage 3 to 5.pdf · uploaded 15 Feb 2022Source
- 24 Building Plan Approval / NA Order for plotted developmentpage 6 to 8.pdf · uploaded 15 Feb 2022Source
- 4 Commencement Certificates / NA Order for plotted developmentCC DTD 03rd Feb 2022.pdf · uploaded 15 Feb 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Signed_Maharashtra_Developers_Rera_16_Feb_22_compressed.pdf · uploaded 23 Feb 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 JVMS Corner Stone Dec 2021_compressed.pdf · uploaded 23 Feb 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Corner Stone 31st December 2021_compressed.pdf · uploaded 23 Feb 2022Source
- 4 Copy of the legal title reportTital Report_compressed (1).pdf · uploaded 9 Mar 2022Source
- 1 Declaration about Commencement CertificateFormat D Jvm corner stone.pdf · uploaded 9 Mar 2022Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 JVMS Corner Stone March 2022.pdf · uploaded 2 Jun 2022Source
- 1 CERSAI detailsJVMS Corner Stone.pdf · uploaded 2 Jun 2022Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Corner Stone 31st March 2022_compressed.pdf · uploaded 2 Jun 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form_1_JVMS_Corner_Stone_26_May_2022 (1)_compressed.pdf · uploaded 25 Jun 2022Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 JVMS Corner Stone- June 2022.pdf · uploaded 20 Sep 2022Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Final JVMS Corner Stone 30th June 2022.pdf · uploaded 20 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Certificate 136.pdf · uploaded 30 Sep 2022Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPart OC- JVMS Cornerstone.pdf · uploaded 30 Nov 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 FY 20-21 JVMS Corner Stone.pdf · uploaded 20 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5- JVMS Corner Stone as on 2022-23.pdf · uploaded 30 Sep 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- JVMS Cornerstone as on 30-09-2023.pdf · uploaded 5 Oct 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- JVMS Corner Stone as on 30-09-2022.pdf · uploaded 12 Oct 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- JVMS Corner Stone as on 31-12-2022.pdf · uploaded 12 Oct 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- JVMS Corner Stone as on 31-03-2023.pdf · uploaded 12 Oct 2023Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- JVMS Corner Stone as on 30-06-2023.pdf · uploaded 12 Oct 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - JVMS Corner Stone as on September 2022.pdf · uploaded 16 Oct 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - JVMS Corner Stone as on December 2022.pdf · uploaded 16 Oct 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - JVMS Corner Stone as on March 2023.pdf · uploaded 16 Oct 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- JVMS Corner Stone as on June 2023.pdf · uploaded 16 Oct 2023Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Corner Stone 30th September 2023.pdf · uploaded 4 Nov 2023Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- JVMS Corner Stone as on Sep 2023.pdf · uploaded 7 Nov 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - JVMS Corner Stone as on Dec 2023.pdf · uploaded 8 Jan 2024Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- JVMS Corner Stone as on Dec 2023.pdf · uploaded 20 Jan 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Corner Stone 31st December 2023.pdf · uploaded 20 Jan 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Corner Stone Form -1.pdf · uploaded 2 Apr 2024Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPart OC - JVMS Corner Stone.pdf · uploaded 16 Apr 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- JVMS Corner Stone as on March 2024.pdf · uploaded 20 Apr 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Corner Stone 31st March 2024- Final.pdf · uploaded 20 Apr 2024Source
- 1 Home Buyer /Allottee Grievance Redressal CellJVMS Corner Stone Rera Declaration.pdf · uploaded 27 Jun 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - JVMS Cornerstone as on June 2024.pdf · uploaded 10 Jul 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- JVMS Corner Stone as on June 2024.pdf · uploaded 18 Jul 2024Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Corner Stone 30th June 2024.pdf · uploaded 18 Jul 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentffffffffff.pdf · uploaded 19 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Corner Stone 30th September 2024.pdf · uploaded 20 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 JVMS Corner Stone 31-12-2024.pdf · uploaded 20 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- JVMS Corner Stone as on 30th September 2024.pdf · uploaded 20 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- JVMS Corner Stone as on Dec 2024.pdf · uploaded 20 Feb 2025Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentdddddddddddw.pdf · uploaded 15 Mar 2025Source
- 1 Copy of Layout Approval (in case of layout)1_11zon.pdf · uploaded 13 May 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 13 May 2025Source
- 1 Building Plan Approval / NA Order for plotted development2_11zon.pdf · uploaded 13 May 2025Source
- 2 Building Plan Approval / NA Order for plotted development3_11zon.pdf · uploaded 13 May 2025Source
- 3 Building Plan Approval / NA Order for plotted development4_11zon.pdf · uploaded 13 May 2025Source
- 4 Building Plan Approval / NA Order for plotted development5_11zon.pdf · uploaded 13 May 2025Source
- 5 Building Plan Approval / NA Order for plotted development6_11zon.pdf · uploaded 13 May 2025Source
- 6 Building Plan Approval / NA Order for plotted development7_11zon.pdf · uploaded 13 May 2025Source
- 7 Building Plan Approval / NA Order for plotted development8_11zon.pdf · uploaded 13 May 2025Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development4 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for plotted development (6).pdf · uploaded 7 Jun 2025Source
Technical
- Document1.pdf · uploaded 28 Jan 2020Source
- Document2.pdf · uploaded 28 Jan 2020Source
- Document3.pdf · uploaded 28 Jan 2020Source
- Document4.pdf · uploaded 28 Jan 2020Source
- Document5.pdf · uploaded 28 Jan 2020Source
- Document6.pdf · uploaded 28 Jan 2020Source
- Document7.pdf · uploaded 28 Jan 2020Source
- Document8.pdf · uploaded 28 Jan 2020Source
- Document9.pdf · uploaded 28 Jan 2020Source
- Document10.pdf · uploaded 28 Jan 2020Source
- Document11.pdf · uploaded 28 Jan 2020Source
- DocumentPlan 7 JVMS Corner.pdf · uploaded 11 Nov 2020Source
- DocumentPlan 12 JVMS Corner.pdf · uploaded 11 Nov 2020Source
- DocumentPLAN 1 OF 7_compressed.pdf · uploaded 30 Apr 2021Source
- DocumentPLAN 2 OF 7_compressed.pdf · uploaded 30 Apr 2021Source
- DocumentPLAN 3 OF 7 compressed.pdf · uploaded 30 Apr 2021Source
- DocumentPLAN 4 OF 7_compressed.pdf · uploaded 30 Apr 2021Source
- DocumentPLAN 5 OF 7_compressed.pdf · uploaded 30 Apr 2021Source
- DocumentPLAN - 6 OF 7_compressed.pdf · uploaded 30 Apr 2021Source
- DocumentPLAN 7 OF 7_compressed.pdf · uploaded 30 Apr 2021Source
- DocumentPage 1 and 2.pdf · uploaded 27 Oct 2021Source
- DocumentPage 3 and 4.pdf · uploaded 27 Oct 2021Source
- DocumentPage 5 and 6.pdf · uploaded 27 Oct 2021Source
- Document7 (2).pdf · uploaded 27 Oct 2021Source
- Documentpage 1 to 2.pdf · uploaded 15 Feb 2022Source
- Documentpage 3 to 5.pdf · uploaded 15 Feb 2022Source
- Documentpage 6 to 8.pdf · uploaded 15 Feb 2022Source
- Document1_11zon.pdf · uploaded 13 May 2025Source
- Document2_11zon.pdf · uploaded 13 May 2025Source
- Document3_11zon.pdf · uploaded 13 May 2025Source
- Document4_11zon.pdf · uploaded 13 May 2025Source
- Document5_11zon.pdf · uploaded 13 May 2025Source
- Document6_11zon.pdf · uploaded 13 May 2025Source
- Document7_11zon.pdf · uploaded 13 May 2025Source
- Document8_11zon.pdf · uploaded 13 May 2025Source
Technical (Architect)
- DocumentForm 1 - JVMS Cornerstone as on June 2024.pdf · uploaded 10 Jul 2024Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel CTS 75 PT TIKKA NO 18
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, Landowner 1BHK, Office space, Shop, Store235 units in all
- Address
- Cts 75 Pt Tikka No 18, M G Road, Hari Niwas CirclePIN 400602
- Village
- Thane (M Corp.), Thane taluka
- Land area for this project
- 2,358 sq m (25,380 sq ft)
- Permissible built-up area
- 7,711 sq m (82,999 sq ft)
- Sanctioned built-up area
- 4,017 sq m (43,238 sq ft)
- Recreational open space
- 331 sq m (3,564 sq ft)
- Designated bank account
- 17
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
CTS 75 PT TIKKA NO 18
Boundaries
- North
- 25 50 Mtr Wide Road
- South
- Cts No 78 And 80
- East
- Cts No 76 And 77
- West
- 18 Mtr Wide Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking235 units
178 of 235 units booked (76%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 27.93 sq m · 301 sq ft | 31 | 24 |
| 1BHK | 27.96 sq m · 301 sq ft | 35 | 32 |
| 1BHK | 37.19 sq m · 400 sq ft | 17 | 15 |
| 1BHK | 42.24 sq m · 455 sq ft | 34 | 29 |
| 2BHK | 62.76 sq m · 676 sq ft | 38 | 31 |
| Landowner 1BHK | 27.93 sq m · 301 sq ft | 3 | 0 |
| Landowner 1BHK | 27.96 sq m · 301 sq ft | 3 | 0 |
| Landowner 1BHK | 37.19 sq m · 400 sq ft | 2 | 0 |
Show all 69 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Landowner 1BHK | 42.24 sq m · 455 sq ft | 4 | 0 |
| Office space | 11.9 sq m · 128 sq ft | 3 | 2 |
| Office space | 15.92 sq m · 171 sq ft | 1 | 0 |
| Office space | 16.44 sq m · 177 sq ft | 1 | 0 |
| Office space | 16.84 sq m · 181 sq ft | 2 | 1 |
| Office space | 19.03 sq m · 205 sq ft | 2 | 2 |
| Office space | 19.4 sq m · 209 sq ft | 1 | 0 |
| Office space | 20.36 sq m · 219 sq ft | 2 | 2 |
| Office space | 21.24 sq m · 229 sq ft | 1 | 1 |
| Office space | 21.35 sq m · 230 sq ft | 1 | 0 |
| Office space | 22.76 sq m · 245 sq ft | 2 | 1 |
| Office space | 23.72 sq m · 255 sq ft | 1 | 0 |
| Office space | 28.17 sq m · 303 sq ft | 1 | 1 |
| Office space | 28.18 sq m · 303 sq ft | 1 | 1 |
| Office space | 29.16 sq m · 314 sq ft | 2 | 1 |
| Office space | 32.2 sq m · 347 sq ft | 1 | 0 |
| Office space | 33.08 sq m · 356 sq ft | 1 | 1 |
| Office space | 34.26 sq m · 369 sq ft | 1 | 1 |
| Office space | 41.6 sq m · 448 sq ft | 1 | 0 |
| Office space | 44.33 sq m · 477 sq ft | 2 | 1 |
| Office space | 63.73 sq m · 686 sq ft | 1 | 1 |
| Office space | 67.75 sq m · 729 sq ft | 1 | 1 |
| Office space | 68.61 sq m · 739 sq ft | 1 | 1 |
| Office space | 76.28 sq m · 821 sq ft | 1 | 1 |
| Office space | 81.17 sq m · 874 sq ft | 1 | 1 |
| Office space | 104.46 sq m · 1,124 sq ft | 1 | 0 |
| Shop | 12.98 sq m · 140 sq ft | 1 | 1 |
| Shop | 14.65 sq m · 158 sq ft | 1 | 1 |
| Shop | 17.26 sq m · 186 sq ft | 1 | 1 |
| Shop | 20.02 sq m · 215 sq ft | 1 | 1 |
| Shop | 22.28 sq m · 240 sq ft | 1 | 1 |
| Shop | 22.49 sq m · 242 sq ft | 1 | 1 |
| Shop | 22.54 sq m · 243 sq ft | 1 | 1 |
| Shop | 24.23 sq m · 261 sq ft | 1 | 1 |
| Shop | 37.59 sq m · 405 sq ft | 1 | 1 |
| Shop | 37.99 sq m · 409 sq ft | 1 | 0 |
| Shop | 38.63 sq m · 416 sq ft | 1 | 1 |
| Shop | 39.48 sq m · 425 sq ft | 1 | 1 |
| Shop | 40.19 sq m · 433 sq ft | 1 | 0 |
| Shop | 42.78 sq m · 460 sq ft | 1 | 1 |
| Shop | 43.5 sq m · 468 sq ft | 1 | 1 |
| Shop | 43.8 sq m · 471 sq ft | 1 | 1 |
| Shop | 44.64 sq m · 481 sq ft | 1 | 1 |
| Shop | 46.64 sq m · 502 sq ft | 1 | 1 |
| Shop | 46.99 sq m · 506 sq ft | 1 | 1 |
| Shop | 47.43 sq m · 511 sq ft | 1 | 1 |
| Shop | 49.33 sq m · 531 sq ft | 1 | 1 |
| Shop | 50.84 sq m · 547 sq ft | 1 | 1 |
| Shop | 56.46 sq m · 608 sq ft | 1 | 1 |
| Shop | 65.68 sq m · 707 sq ft | 1 | 1 |
| Shop | 70.66 sq m · 761 sq ft | 1 | 0 |
| Shop | 90.85 sq m · 978 sq ft | 1 | 0 |
| Store | 10.07 sq m · 108 sq ft | 1 | 1 |
| Store | 19.1 sq m · 206 sq ft | 1 | 1 |
| Store | 30.28 sq m · 326 sq ft | 1 | 0 |
| Store | 39.38 sq m · 424 sq ft | 1 | 0 |
| Store | 47.75 sq m · 514 sq ft | 1 | 1 |
| Store | 49.05 sq m · 528 sq ft | 1 | 1 |
| Store | 52.83 sq m · 569 sq ft | 1 | 1 |
| Store | 56.79 sq m · 611 sq ft | 1 | 0 |
| Store | 63.56 sq m · 684 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.