Skip to content
Others · 4 buildings · 488 unitsRERA P51700016394

Samrin Heritage

Deedo IDDP-THN-SB12

Completion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 48% of its units are booked.

Panchpakhadi, Thane 400602 · by Samrin Infra Private Limited

DeliveryExtended 4 moPromised Dec 2026 · now due Apr 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales48% booked232 of 488 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2027

  • This projectRegistered 10 May 2018, completion promised 31 Dec 2026, revised to 30 Apr 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

4 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700016394
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170001639410 May 201831 Dec 202630 Apr 2027Samrin Infra Private LimitedProject page
Documents464

1 document held by Deedo, 463 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN CARD.pdf · uploaded 28 Apr 2018Source
  • PAN Card10 Pan of SAMRIN INFRA PRIVATE LIMITED.pdf · uploaded 14 Dec 2024Source

Legal

  • Other01.pdf · uploaded 28 Apr 2018Source
  • Other02.pdf · uploaded 28 Apr 2018Source
  • Other03.pdf · uploaded 28 Apr 2018Source
  • Other04.pdf · uploaded 28 Apr 2018Source
  • Other05.pdf · uploaded 28 Apr 2018Source
Show all 464 documentsShow fewer documents

Legal

  • Other06.pdf · uploaded 28 Apr 2018Source
  • Legal Title reportTitle Certificate samrin Infrastructure.pdf · uploaded 28 Apr 2018Source
  • Declaration Form BMustak Shaikh.pdf · uploaded 28 Apr 2018Source
  • Otherarea declaration.pdf · uploaded 30 Apr 2018Source
  • OtherNO OF FLOOR DECLARATION.pdf · uploaded 4 May 2018Source
  • OtherLOI.pdf · uploaded 15 Jun 2018Source
  • OtherSCALE.pdf · uploaded 27 Jun 2018Source
  • Other3RD FLOOR.pdf · uploaded 27 Jun 2018Source
  • Other11 FLOOR, ELEVATED RG.pdf · uploaded 27 Jun 2018Source
  • OtherGROUND FLOOR.pdf · uploaded 27 Jun 2018Source
  • OtherEnvironment Clearance.pdf · uploaded 6 Aug 2020Source
  • Declaration Form BForm B - Developer Revised.pdf · uploaded 29 Jul 2023Source
  • Declaration Form BFORM B Affidavit on Stamp Paper of Rs 100_With Deponent Sign.pdf · uploaded 16 Dec 2024Source

Migrated

  • 1 PAN CardPAN CARD.pdf · uploaded 28 Apr 2018Source
  • 1 Copy of the legal title reportTitle Certificate samrin Infrastructure.pdf · uploaded 28 Apr 2018Source
  • 1 Details of encumbrancesNO encumberance.pdf · uploaded 28 Apr 2018Source
  • 1 Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 28 Apr 2018Source
  • 2 Copy of Layout Approval (in case of layout)LAYOUT 1-min.pdf · uploaded 28 Apr 2018Source
  • 3 Copy of Layout Approval (in case of layout)LAYOUT 2.pdf · uploaded 28 Apr 2018Source
  • 4 Copy of Layout Approval (in case of layout)LAYOUT 3.pdf · uploaded 28 Apr 2018Source
  • 1 Building Plan Approval (IOD)IOD.pdf · uploaded 28 Apr 2018Source
  • 2 Building Plan Approval (IOD)IOD.pdf · uploaded 28 Apr 2018Source
  • 3 Building Plan Approval (IOD)S1 S2 1 FLR A.pdf · uploaded 28 Apr 2018Source
  • 4 Building Plan Approval (IOD)S1 S2 1 FLR B.pdf · uploaded 28 Apr 2018Source
  • 5 Building Plan Approval (IOD)S1 S2 2 FLR A.pdf · uploaded 28 Apr 2018Source
  • 6 Building Plan Approval (IOD)S1 S2 2 FLR B.pdf · uploaded 28 Apr 2018Source
  • 7 Building Plan Approval (IOD)S1 S2 3 and 4 FLR.pdf · uploaded 28 Apr 2018Source
  • 8 Building Plan Approval (IOD)S1 S2 6 TO 10 FLR.pdf · uploaded 28 Apr 2018Source
  • 9 Building Plan Approval (IOD)S1 S2 7 TO 11 FLR.pdf · uploaded 28 Apr 2018Source
  • 10 Building Plan Approval (IOD)S1 S2 12 FLR.pdf · uploaded 28 Apr 2018Source
  • 11 Building Plan Approval (IOD)S1 S2 18 FLR PART.pdf · uploaded 28 Apr 2018Source
  • 12 Building Plan Approval (IOD)S1 S2 S3 5 FLR.pdf · uploaded 28 Apr 2018Source
  • 13 Building Plan Approval (IOD)S1 S2 13 TO 17 FLR.pdf · uploaded 28 Apr 2018Source
  • 1 Commencement Certificates / NA Order for plotted developmentLOI.pdf · uploaded 28 Apr 2018Source
  • 2 Commencement Certificates / NA Order for plotted developmentIOD.pdf · uploaded 28 Apr 2018Source
  • 3 Commencement Certificates / NA Order for plotted developmentIOD SALE.pdf · uploaded 28 Apr 2018Source
  • 1 Declaration in FORM BMustak Shaikh.pdf · uploaded 28 Apr 2018Source
  • 1 Proforma of Allotment letterDraft Allotement letter.pdf · uploaded 28 Apr 2018Source
  • 2 Proforma of Allotment letter01.pdf · uploaded 28 Apr 2018Source
  • 3 Proforma of Allotment letter02.pdf · uploaded 28 Apr 2018Source
  • 4 Proforma of Allotment letter03.pdf · uploaded 28 Apr 2018Source
  • 5 Proforma of Allotment letter05.pdf · uploaded 28 Apr 2018Source
  • 6 Proforma of Allotment letter06.pdf · uploaded 28 Apr 2018Source
  • 7 Proforma of Allotment letter07.pdf · uploaded 28 Apr 2018Source
  • 8 Proforma of Allotment letter08.pdf · uploaded 28 Apr 2018Source
  • 9 Proforma of Allotment letter09.pdf · uploaded 28 Apr 2018Source
  • 10 Proforma of Allotment letter10.pdf · uploaded 28 Apr 2018Source
  • 11 Proforma of Allotment letter11.pdf · uploaded 28 Apr 2018Source
  • 12 Proforma of Allotment letter12.pdf · uploaded 28 Apr 2018Source
  • 13 Proforma of Allotment letter13.pdf · uploaded 28 Apr 2018Source
  • 14 Proforma of Allotment letter14.pdf · uploaded 28 Apr 2018Source
  • 15 Proforma of Allotment letter15.pdf · uploaded 28 Apr 2018Source
  • 16 Proforma of Allotment letter16.pdf · uploaded 28 Apr 2018Source
  • 1 Other01.pdf · uploaded 28 Apr 2018Source
  • 2 Other02.pdf · uploaded 28 Apr 2018Source
  • 3 Other03.pdf · uploaded 28 Apr 2018Source
  • 4 Other04.pdf · uploaded 28 Apr 2018Source
  • 5 Other05.pdf · uploaded 28 Apr 2018Source
  • 6 Other06.pdf · uploaded 28 Apr 2018Source
  • 7 Otherarea declaration.pdf · uploaded 30 Apr 2018Source
  • 1 Certificates of CA (Form 3)CA CERTIFICATE.pdf · uploaded 4 May 2018Source
  • 17 Proforma of Allotment letter4.pdf · uploaded 4 May 2018Source
  • 8 OtherNO OF FLOOR DECLARATION.pdf · uploaded 4 May 2018Source
  • 9 OtherLOI.pdf · uploaded 15 Jun 2018Source
  • 5 Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 27 Jun 2018Source
  • 14 Building Plan Approval (IOD)BUILT UP AREA FOR BASEMENT.pdf · uploaded 27 Jun 2018Source
  • 15 Building Plan Approval (IOD)BASEMENT - S1, S2, S3.pdf · uploaded 27 Jun 2018Source
  • 16 Building Plan Approval (IOD)3RD FLOOR - S1, S2, S3.pdf · uploaded 27 Jun 2018Source
  • 17 Building Plan Approval (IOD)4-6, 8-10, 12-15 FLOOR.pdf · uploaded 27 Jun 2018Source
  • 18 Building Plan Approval (IOD)7TH, 11TH FLOOR.pdf · uploaded 27 Jun 2018Source
  • 19 Building Plan Approval (IOD)GROUND, 1ST FLOOR.pdf · uploaded 27 Jun 2018Source
  • 20 Building Plan Approval (IOD)LAYOUT.pdf · uploaded 27 Jun 2018Source
  • 21 Building Plan Approval (IOD)2, 3, 4 FLOOR.pdf · uploaded 27 Jun 2018Source
  • 22 Building Plan Approval (IOD)4,5, 8-10, 13-15 FLOOR.pdf · uploaded 27 Jun 2018Source
  • 23 Building Plan Approval (IOD)7TH, 11TH FLOOR.pdf · uploaded 27 Jun 2018Source
  • 24 Building Plan Approval (IOD)GROUND, 1ST FLOOR.pdf · uploaded 27 Jun 2018Source
  • 25 Building Plan Approval (IOD)SCALE.pdf · uploaded 27 Jun 2018Source
  • 26 Building Plan Approval (IOD)7TH, 11TH FLOOR.pdf · uploaded 27 Jun 2018Source
  • 27 Building Plan Approval (IOD)BALCONY AREA.pdf · uploaded 27 Jun 2018Source
  • 28 Building Plan Approval (IOD)GROUND, 1ST FLOOR.pdf · uploaded 27 Jun 2018Source
  • 10 OtherSCALE.pdf · uploaded 27 Jun 2018Source
  • 11 Other3RD FLOOR.pdf · uploaded 27 Jun 2018Source
  • 12 Other11 FLOOR, ELEVATED RG.pdf · uploaded 27 Jun 2018Source
  • 13 OtherGROUND FLOOR.pdf · uploaded 27 Jun 2018Source
  • 4 Commencement Certificates / NA Order for plotted developmentSamrin Heritage CC-Plinth-ilovepdf-compressed.pdf · uploaded 1 Nov 2018Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Samrin Heritage_FORM 5_2018-19_Scan.pdf · uploaded 8 Nov 2019Source
  • 14 OtherEnvironment Clearance.pdf · uploaded 6 Aug 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5-SILLP-2019-20.pdf · uploaded 2 Nov 2020Source
  • 1 Disclosure of sold/ booked inventorySamrin Heritage_Page _1 and 2.pdf · uploaded 21 Jun 2021Source
  • 2 Disclosure of sold/ booked inventorySamrin Heritage_Page_3andd4.pdf · uploaded 21 Jun 2021Source
  • 3 Disclosure of sold/ booked inventorySamrin Heritage_Page_5and6.pdf · uploaded 21 Jun 2021Source
  • 4 Disclosure of sold/ booked inventorySamrin Heritage_Page_7and8.pdf · uploaded 21 Jun 2021Source
  • 5 Disclosure of sold/ booked inventorySamrin Heritage_Page_9and10.pdf · uploaded 21 Jun 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 -03-09-2021_compressed (1)_compressed.pdf · uploaded 5 Oct 2021Source
  • 2 Details of encumbrancesMortgage Deed Index.pdf · uploaded 14 Oct 2021Source
  • 5 Commencement Certificates / NA Order for plotted developmentRevised CC_compressed (1).pdf · uploaded 14 Oct 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A Ajay Mahale (2).pdf · uploaded 14 Oct 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Ajay Mahale (2).pdf · uploaded 14 Oct 2021Source
  • 18 Proforma of Allotment letterDraft Agreement Sep-21 part 1.pdf · uploaded 14 Oct 2021Source
  • 19 Proforma of Allotment letterDraft Agreement Sep-21 part 2.pdf · uploaded 14 Oct 2021Source
  • 1 Details of Restarting of Construction work post lockdownDelay in work of Samrin Heritage.pdf · uploaded 14 Oct 2021Source
  • 1 Declaration about Commencement CertificateCC Declaration SIPL.pdf · uploaded 8 Nov 2021Source
  • 1 CERSAI detailssamrin infra cersai.pdf · uploaded 21 Dec 2021Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)SIPL Society Formation.pdf · uploaded 21 Dec 2021Source
  • 1 Status of ConveyanceSIPL Conveyance.pdf · uploaded 21 Dec 2021Source
  • 2 CERSAI detailsCERSAI_Search_Report_200227446616_For_Debtor_Based_Search_05_01_2022_15_11_38_024.pdf · uploaded 5 Jan 2022Source
  • 6 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 1 Nov 2022Source
  • 6 Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 4 Nov 2022Source
  • 29 Building Plan Approval (IOD)1- S1-Ground Floor.pdf · uploaded 4 Nov 2022Source
  • 30 Building Plan Approval (IOD)2- S1-First Floor.pdf · uploaded 4 Nov 2022Source
  • 31 Building Plan Approval (IOD)3- S1-2nd Floor.pdf · uploaded 4 Nov 2022Source
  • 32 Building Plan Approval (IOD)4- S1- 3rd to 6th, 8th to 11th, 13th to 16th, 18th to 21st, 23rd to 26th, 28th to 30th Floor.pdf · uploaded 4 Nov 2022Source
  • 33 Building Plan Approval (IOD)5- S1-7th, 12th, 17th, 22nd, 27th Floor - Refuge Floor Plan.pdf · uploaded 4 Nov 2022Source
  • 34 Building Plan Approval (IOD)6- S1.pdf · uploaded 4 Nov 2022Source
  • 35 Building Plan Approval (IOD)4- S2.pdf · uploaded 4 Nov 2022Source
  • 36 Building Plan Approval (IOD)S3-4.pdf · uploaded 4 Nov 2022Source
  • 37 Building Plan Approval (IOD)Revised - 7TH 12TH 17TH 22ND 27TH REFUGE FLOOR.pdf · uploaded 26 Nov 2022Source
  • 38 Building Plan Approval (IOD)S1 _8TH 13TH 18TH 23RD 28TH FLOOR.pdf · uploaded 26 Nov 2022Source
  • 39 Building Plan Approval (IOD)S2 -7TH 12TH 17TH 22ND 27TH REFUGE FLOOR PLAN.pdf · uploaded 26 Nov 2022Source
  • 40 Building Plan Approval (IOD)S2 _8TH 13TH 18TH 23RD 28TH FLOOR PLAN.pdf · uploaded 26 Nov 2022Source
  • 1 Proforma of Agreement for saleDraft Agreement - Nov-22.pdf · uploaded 26 Nov 2022Source
  • 3 a Details of encumbrances concerned to FinanceDeclaration of No Encumbrances - Legal.pdf · uploaded 17 Feb 2023Source
  • 1 b Details of encumbrances concerned to LegalDeclaration of No Encumbrances - Legal.pdf · uploaded 17 Feb 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration about Separate Bank Account for Real Estate.pdf · uploaded 17 Feb 2023Source
  • 1 Deviation Report with respect to Allotment letterNo Deviation Report for Allotment Letter.pdf · uploaded 17 Feb 2023Source
  • 1 Deviation Report with respect to model copy of AgreementNo Deviation Report for Agreement for Sale.pdf · uploaded 17 Feb 2023Source
  • 4 Details of encumbrancesilovepdf_merged (2).pdf · uploaded 28 Mar 2023Source
  • 5 a Details of encumbrances concerned to Financeilovepdf_merged (2).pdf · uploaded 28 Mar 2023Source
  • 2 b Details of encumbrances concerned to Legalilovepdf_merged (2).pdf · uploaded 28 Mar 2023Source
  • 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSIPL Declaration about Seperate Bank Account for Real Estate.pdf · uploaded 31 Mar 2023Source
  • 6 Disclosure of sold/ booked inventorySamrin Infra Pvt Ltd (list of Sold_Unsold_Refuge_Flats).pdf · uploaded 10 Apr 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)form 5 - 20-21.pdf · uploaded 17 Apr 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)form 5 21-22.pdf · uploaded 17 Apr 2023Source
  • 2 Proforma of Agreement for saleSale Agreement Draft S1 S2.pdf · uploaded 10 May 2023Source
  • 3 Proforma of Agreement for saleSale Agreement Draft S3.pdf · uploaded 10 May 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)SIPL Form 1.pdf · uploaded 27 Jul 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)SIPL Form 1.pdf · uploaded 28 Jul 2023Source
  • 7 Disclosure of sold/ booked inventoryDisclosure of sold and Unsold.pdf · uploaded 28 Jul 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Declaration Form 5 FY 22-23.pdf · uploaded 28 Jul 2023Source
  • 2 Declaration in FORM BForm B - Developer Revised.pdf · uploaded 29 Jul 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A FY22.pdf · uploaded 29 Jul 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A FY 23.pdf · uploaded 29 Jul 2023Source
  • 41 Building Plan Approval (IOD)31ST 34TH FLR PLAN.pdf · uploaded 3 Aug 2023Source
  • 42 Building Plan Approval (IOD)S1 RERA PLAN 2ND FLR.pdf · uploaded 3 Aug 2023Source
  • 43 Building Plan Approval (IOD)S1 RERA PLAN 3RD TO 6TH 9TH TO 11TH FLR.pdf · uploaded 3 Aug 2023Source
  • 44 Building Plan Approval (IOD)S1 RERA PLAN 7TH 12TH17TH 22ND FLR.pdf · uploaded 3 Aug 2023Source
  • 45 Building Plan Approval (IOD)S1 RERA PLAN 31ST 34TH FLR.pdf · uploaded 3 Aug 2023Source
  • 46 Building Plan Approval (IOD)S1 RERA PLAN 32ND REFUGE FLR.pdf · uploaded 3 Aug 2023Source
  • 47 Building Plan Approval (IOD)S1 RERA PLAN 33RD FLR.pdf · uploaded 3 Aug 2023Source
  • 48 Building Plan Approval (IOD)S1 RERA PLAN 35TH FLR.pdf · uploaded 3 Aug 2023Source
  • 49 Building Plan Approval (IOD)S1 RERA PLAN 36TH FLR.pdf · uploaded 3 Aug 2023Source
  • 50 Building Plan Approval (IOD)S1 RERA PLAN8TH 13TH 18TH 23RD 28TH FLR.pdf · uploaded 3 Aug 2023Source
  • 51 Building Plan Approval (IOD)S2 RERA PLAN 36TH FLR.pdf · uploaded 3 Aug 2023Source
  • 52 Building Plan Approval (IOD)S2 RERA PLAN 32ND FLR.pdf · uploaded 3 Aug 2023Source
  • 53 Building Plan Approval (IOD)S2 RERA PLAN 33RD FLR.pdf · uploaded 3 Aug 2023Source
  • 54 Building Plan Approval (IOD)S2 RERA PLAN 35TH FLR.pdf · uploaded 3 Aug 2023Source
  • 55 Building Plan Approval (IOD)S2 RERA PLAN 37TH FLR.pdf · uploaded 3 Aug 2023Source
  • 56 Building Plan Approval (IOD)S1 _RERA PLAN_37TH FLR.pdf · uploaded 18 Aug 2023Source
  • 4 Proforma of Agreement for saleAgreement S1 S2 Sale Upto 30th Floor.pdf · uploaded 21 Aug 2023Source
  • 5 Proforma of Agreement for saleAgreement S1 S2 Sale For 31st Floor to 37th.pdf · uploaded 21 Aug 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate ( Form 1 )_compressed.pdf · uploaded 6 Dec 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 3 Final_compressed.pdf · uploaded 6 Dec 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 REVISED.pdf · uploaded 6 Dec 2023Source
  • 2 Certificates of CA (Form 3)Form 3 Final_compressed.pdf · uploaded 6 Dec 2023Source
  • 20 Proforma of Allotment letterSIPL Form 5 FY 22-23 Sign.pdf · uploaded 7 Dec 2023Source
  • 57 Building Plan Approval (IOD)Copy.pdf · uploaded 3 Jan 2024Source
  • 58 Building Plan Approval (IOD)4th floor Plan.pdf · uploaded 3 Jan 2024Source
  • 59 Building Plan Approval (IOD)7 12 17 22 27 32 Refuge Floor Plan.pdf · uploaded 3 Jan 2024Source
  • 60 Building Plan Approval (IOD)8 13 18 23 28 33 Floor Plan.pdf · uploaded 3 Jan 2024Source
  • 61 Building Plan Approval (IOD)8 13 18 23 28 33 Floor Plan.pdf · uploaded 3 Jan 2024Source
  • 62 Building Plan Approval (IOD)8 13 18 23 28th Floor Plan.pdf · uploaded 3 Jan 2024Source
  • 63 Building Plan Approval (IOD)35 36 th Terrace Floor Plan.pdf · uploaded 3 Jan 2024Source
  • 64 Building Plan Approval (IOD)36 Floor Plan.pdf · uploaded 3 Jan 2024Source
  • 65 Building Plan Approval (IOD)37 Floor- Refugee Plan.pdf · uploaded 3 Jan 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Rera Certificate Form 2 04-01-2024.pdf · uploaded 6 Jan 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Rera Engineer Certifiacte Form 2 04-01-2024.pdf · uploaded 6 Jan 2024Source
  • 3 Certificates of CA (Form 3)Form 3 31-03-2023.pdf · uploaded 6 Jan 2024Source
  • 4 Certificates of CA (Form 3)Form 3 30-06-2023.pdf · uploaded 6 Jan 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30-09-2023.pdf · uploaded 23 Feb 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 31-12-2023.pdf · uploaded 23 Feb 2024Source
  • 5 Certificates of CA (Form 3)Form 3 30-09-2023.pdf · uploaded 23 Feb 2024Source
  • 6 Certificates of CA (Form 3)Form 3 31-12-2023.pdf · uploaded 23 Feb 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30th sep 23.pdf · uploaded 18 Mar 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31st Dec 23.pdf · uploaded 18 Mar 2024Source
  • 8 Disclosure of sold/ booked inventoryDisclosure of sold Unsold as on 30th sep.pdf · uploaded 18 Mar 2024Source
  • 9 Disclosure of sold/ booked inventoryDisclosure of sold Unsold as on 31st Dec.pdf · uploaded 18 Mar 2024Source
  • 2 a Details of encumbrances concerned to FinanceEncumbrance Concerned to Finance and legal_revised.pdf · uploaded 21 Nov 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Revised.pdf · uploaded 21 Nov 2024Source
  • 4 CERSAI detailsAnnexure L- Debtor Based Declaration.pdf · uploaded 21 Nov 2024Source
  • 3 CERSAI detailsAnnexure G-Asset Based Declaration.pdf · uploaded 21 Nov 2024Source
  • 2 b Details of encumbrances concerned to LegalEncumbrance Concerned to Finance and legal_revised.pdf · uploaded 21 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 mar 23 sipl.pdf · uploaded 30 Nov 2024Source
  • 1 PAN Card10 Pan of SAMRIN INFRA PRIVATE LIMITED.pdf · uploaded 14 Dec 2024Source
  • 3 Certificates of CA (Form 3)Form 3 Q1_FY24-25.pdf · uploaded 14 Dec 2024Source
  • 4 Certificates of CA (Form 3)Form 3 Q2_FY24-25.pdf · uploaded 14 Dec 2024Source
  • 2 Certificates of CA (Form 3)Form 3 Q4_FY23-24.pdf · uploaded 14 Dec 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 for FY 2023-24.pdf · uploaded 14 Dec 2024Source
  • 3 a Details of encumbrances concerned to FinanceEncumbrance Concerned to Finance and Legal Revised.pdf · uploaded 16 Dec 2024Source
  • 1 Declaration in FORM BFORM B Affidavit on Stamp Paper of Rs 100_With Deponent Sign.pdf · uploaded 16 Dec 2024Source
  • 2 Disclosure of sold/ booked inventoryAnnexure B-Disclosure of Sold or Unsold Inventory Revised.pdf · uploaded 16 Dec 2024Source
  • 6 CERSAI detailsAnnexure L- Debtor Based Declaration Revised.pdf · uploaded 16 Dec 2024Source
  • 5 CERSAI detailsAnnexure G-Asset Based Declaration Revised.pdf · uploaded 16 Dec 2024Source
  • 3 b Details of encumbrances concerned to LegalEncumbrance Concerned to Finance and Legal Revised.pdf · uploaded 16 Dec 2024Source
  • 4 a Details of encumbrances concerned to FinanceEncumbrance Concerned to Finance and Legal Revised edited.pdf · uploaded 17 Dec 2024Source
  • 5 Certificates of CA (Form 3)Final Form 3.pdf · uploaded 17 Dec 2024Source
  • 4 b Details of encumbrances concerned to LegalEncumbrance Concerned to Finance and Legal Revised edited.pdf · uploaded 17 Dec 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form-2A Signed.pdf · uploaded 17 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 2024 sign.pdf · uploaded 18 Dec 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 June 2024 sign.pdf · uploaded 18 Dec 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sep 2024 sign.pdf · uploaded 18 Dec 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Nov 2024 sign.pdf · uploaded 18 Dec 2024Source
  • 8 CERSAI detailsCersai 32 Crore.pdf · uploaded 18 Dec 2024Source
  • 7 CERSAI detailsCERSAI.pdf · uploaded 18 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 for FY 2023-24.pdf · uploaded 18 Dec 2024Source
  • 22 Copy of Layout Approval (in case of layout)24.pdf · uploaded 19 Dec 2024Source
  • 38 Copy of Layout Approval (in case of layout)14 scan 016.pdf · uploaded 19 Dec 2024Source
  • 23 Copy of Layout Approval (in case of layout)25.pdf · uploaded 19 Dec 2024Source
  • 24 Copy of Layout Approval (in case of layout)25A.pdf · uploaded 19 Dec 2024Source
  • 25 Copy of Layout Approval (in case of layout)1.pdf · uploaded 19 Dec 2024Source
  • 26 Copy of Layout Approval (in case of layout)2 scan 004.pdf · uploaded 19 Dec 2024Source
  • 27 Copy of Layout Approval (in case of layout)3 scan 005.pdf · uploaded 19 Dec 2024Source
  • 28 Copy of Layout Approval (in case of layout)4 scan 006.pdf · uploaded 19 Dec 2024Source
  • 29 Copy of Layout Approval (in case of layout)5 scan 007.pdf · uploaded 19 Dec 2024Source
  • 30 Copy of Layout Approval (in case of layout)6 scan 008.pdf · uploaded 19 Dec 2024Source
  • 31 Copy of Layout Approval (in case of layout)7 scan 009.pdf · uploaded 19 Dec 2024Source
  • 32 Copy of Layout Approval (in case of layout)8 scan 010.pdf · uploaded 19 Dec 2024Source
  • 33 Copy of Layout Approval (in case of layout)9 scan 011.pdf · uploaded 19 Dec 2024Source
  • 34 Copy of Layout Approval (in case of layout)10 scan 012.pdf · uploaded 19 Dec 2024Source
  • 35 Copy of Layout Approval (in case of layout)11 scan 013.pdf · uploaded 19 Dec 2024Source
  • 36 Copy of Layout Approval (in case of layout)12 scan 014.pdf · uploaded 19 Dec 2024Source
  • 37 Copy of Layout Approval (in case of layout)13 scan 015.pdf · uploaded 19 Dec 2024Source
  • 39 Copy of Layout Approval (in case of layout)15 scan 017.pdf · uploaded 19 Dec 2024Source
  • 40 Copy of Layout Approval (in case of layout)16 scan 018.pdf · uploaded 19 Dec 2024Source
  • 41 Copy of Layout Approval (in case of layout)17 scan 019.pdf · uploaded 19 Dec 2024Source
  • 6 Copy of Layout Approval (in case of layout)6 S1 2nd Floor.pdf · uploaded 19 Dec 2024Source
  • 21 Copy of Layout Approval (in case of layout)23.pdf · uploaded 19 Dec 2024Source
  • 1 Copy of Layout Approval (in case of layout)1 Layout.pdf · uploaded 19 Dec 2024Source
  • 2 Copy of Layout Approval (in case of layout)2 Basement S1 S2 S3 S4.pdf · uploaded 19 Dec 2024Source
  • 3 Copy of Layout Approval (in case of layout)3 Plot Area Calculation.pdf · uploaded 19 Dec 2024Source
  • 4 Copy of Layout Approval (in case of layout)4 S1 Gr Floor.pdf · uploaded 19 Dec 2024Source
  • 5 Copy of Layout Approval (in case of layout)5 S1 First Floor.pdf · uploaded 19 Dec 2024Source
  • 7 Copy of Layout Approval (in case of layout)7 S1.pdf · uploaded 19 Dec 2024Source
  • 8 Copy of Layout Approval (in case of layout)8.pdf · uploaded 19 Dec 2024Source
  • 9 Copy of Layout Approval (in case of layout)10.pdf · uploaded 19 Dec 2024Source
  • 10 Copy of Layout Approval (in case of layout)11.pdf · uploaded 19 Dec 2024Source
  • 12 Copy of Layout Approval (in case of layout)14.pdf · uploaded 19 Dec 2024Source
  • 20 Copy of Layout Approval (in case of layout)22.pdf · uploaded 19 Dec 2024Source
  • 19 Copy of Layout Approval (in case of layout)21.pdf · uploaded 19 Dec 2024Source
  • 18 Copy of Layout Approval (in case of layout)20.pdf · uploaded 19 Dec 2024Source
  • 17 Copy of Layout Approval (in case of layout)19.pdf · uploaded 19 Dec 2024Source
  • 16 Copy of Layout Approval (in case of layout)18.pdf · uploaded 19 Dec 2024Source
  • 15 Copy of Layout Approval (in case of layout)17.pdf · uploaded 19 Dec 2024Source
  • 14 Copy of Layout Approval (in case of layout)16.pdf · uploaded 19 Dec 2024Source
  • 13 Copy of Layout Approval (in case of layout)15.pdf · uploaded 19 Dec 2024Source
  • 11 Copy of Layout Approval (in case of layout)12.pdf · uploaded 19 Dec 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 24.pdf · uploaded 19 Dec 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 24.pdf · uploaded 19 Dec 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 sep 24.pdf · uploaded 19 Dec 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Nov 24.pdf · uploaded 19 Dec 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC-S4 (13-05-24).pdf · uploaded 19 Dec 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC - S1 S2 Dated 29-10-2024 (Final).pdf · uploaded 19 Dec 2024Source
  • 3 Disclosure of sold/ booked inventoryAnnexure B-Disclosure of Sold or Unsold Inventory Revised final.pdf · uploaded 19 Dec 2024Source
  • 1 Declaration about Commencement CertificateDeclaration about CC.pdf · uploaded 19 Dec 2024Source
  • 1 a Details of encumbrances concerned to FinanceAnnexure K-Non-Encumbrance Concerned to Finance and Legal.pdf · uploaded 11 Jan 2025Source
  • 2 CERSAI detailsAnnexure L- Debtor Based Declaration.pdf · uploaded 11 Jan 2025Source
  • 1 CERSAI detailsAnnexure L- Assets Based Declaration.pdf · uploaded 11 Jan 2025Source
  • 1 b Details of encumbrances concerned to LegalAnnexure K-Non-Encumbrance Concerned to Finance and Legal.pdf · uploaded 11 Jan 2025Source
  • 1 Certificates of CA (Form 3)Form 3_Q3_FY24-25_SIPL.pdf · uploaded 16 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryAnnexure B-Disclosure of Sold or Unsold Inventory.pdf · uploaded 16 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31-12-2024.pdf · uploaded 25 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Q3_FY 23-24.pdf · uploaded 12 Feb 2025Source
  • 1 Certificates of CA (Form 3)Form-3_Q4_FY 24-25_SIPL.pdf · uploaded 29 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryAnnexure B-Disclosure of Sold or Unsold Inventory.pdf · uploaded 29 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 2025.pdf · uploaded 5 May 2025Source
  • Form 1Form 1 June 2025.pdf · uploaded 31 Jul 2025Source
  • Form 2Form 2-June 2025.pdf · uploaded 31 Jul 2025Source
  • Form 3Form 3 Samrin Heritage Q-1 (30-06-2025).pdf · uploaded 31 Jul 2025Source
  • Disclosure of Sold and Booked InventoryForm 3 Samrin Heritage Q-1 (30-06-2025).pdf · uploaded 31 Jul 2025Source
  • Form 5 (FY 2024-2025)Form 5_2024-2025.pdf · uploaded 10 Nov 2025Source
  • Form 1Form 1 June 2025.pdf · uploaded 17 Nov 2025Source
  • Form 1Form 1 March 2025.pdf · uploaded 17 Nov 2025Source
  • Form 2Form 2-June 2025.pdf · uploaded 17 Nov 2025Source
  • Form 2Form 2 March 2025.pdf · uploaded 17 Nov 2025Source
  • Form 3Form 3-June 2025.pdf · uploaded 17 Nov 2025Source
  • Form 3Form 3 March 2025.pdf · uploaded 17 Nov 2025Source
  • Disclosure of Sold and Booked InventoryAnnexure B-Disclosure if Sold or Unsold Inventory.pdf · uploaded 17 Nov 2025Source
  • Disclosure of Sold and Booked InventoryAnnexure B-Disclosure if Sold or Unsold Inventory.pdf · uploaded 17 Nov 2025Source
  • Form 5 (FY 2023-2024)Form5 2023-24.pdf · uploaded 18 Nov 2025Source
  • Form 1Form 1 Architect Heritage.pdf · uploaded 19 Nov 2025Source
  • Form 1Form 1 Nov 2024.pdf · uploaded 19 Nov 2025Source
  • Form 1Form1.pdf · uploaded 19 Nov 2025Source
  • Form 1Form1mar24.pdf · uploaded 19 Nov 2025Source
  • Form 1form 1 (Q-1).pdf · uploaded 19 Nov 2025Source
  • Form 2Form 2-Samrin Heritage 2025-26 (Q2).pdf · uploaded 19 Nov 2025Source
  • Form 2Form 2 Nov 2024 sign.pdf · uploaded 19 Nov 2025Source
  • Form 2Form2.pdf · uploaded 19 Nov 2025Source
  • Form 2Form2mar24.pdf · uploaded 19 Nov 2025Source
  • Form 2Form 2 (Q-1).pdf · uploaded 19 Nov 2025Source
  • Form 3Form 3 Samrin Heritage 30-09-25.pdf · uploaded 19 Nov 2025Source
  • Form 3Form3.pdf · uploaded 19 Nov 2025Source
  • Form 3Form3..pdf · uploaded 19 Nov 2025Source
  • Form 3Form3mar24.pdf · uploaded 19 Nov 2025Source
  • Form 3Form 3 (Q-1).pdf · uploaded 19 Nov 2025Source
  • Disclosure of Sold and Booked InventoryAnnexure B-Disclosure if Sold or Unsold Inventory.pdf · uploaded 19 Nov 2025Source
  • Disclosure of Sold and Booked InventoryAnnexure B-Disclosure if Sold or Unsold Inventory.pdf · uploaded 19 Nov 2025Source
  • Disclosure of Sold and Booked InventoryAnnexure B-Disclosure if Sold or Unsold Inventory.pdf · uploaded 19 Nov 2025Source
  • Disclosure of Sold and Booked InventoryAnnexure B-Disclosure if Sold or Unsold Inventory.pdf · uploaded 19 Nov 2025Source
  • Disclosure of Sold and Booked InventoryForm 3 (Q-1).pdf · uploaded 19 Nov 2025Source
  • Self-declaration of Quarterly ProgressAnnexure K-Non-Encumbrance Concerned to Finance & Legal.pdf · uploaded 19 Nov 2025Source
  • Self-declaration of Quarterly ProgressAnnexure K-Non-Encumbrance Concerned to Finance & Legal.pdf · uploaded 19 Nov 2025Source
  • Self-declaration of Quarterly ProgressAnnexure K-Non-Encumbrance Concerned to Finance & Legal.pdf · uploaded 19 Nov 2025Source
  • Form 2A (FY 2023-2024)Form-2A 2023-2024.pdf · uploaded 20 Nov 2025Source
  • Form 2A (FY 2024-2025)Form 2A _2024-2025.pdf · uploaded 20 Nov 2025Source
  • Withdrawal Update Form 1Form 1 Q3_2025-2026 (1).pdf · uploaded 23 Feb 2026Source
  • Withdrawal Update Form 2Form 2_31-12-2025.pdf · uploaded 23 Feb 2026Source
  • Withdrawal Update Form 3Form 3 Q3_2025-2026.pdf · uploaded 23 Feb 2026Source
  • Withdrawal Update Form 1Form 1 (1-1-2026 to 31-03-2026)_compressed.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2Form 2 (1-1-2026 to 31-03-2026)_compressed.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3Form 3 (1-1-2026 to 31-03-2026)_compressed.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 1Form 1 (30-06-2026).pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 2Form 2 (30-06-2026).pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 3Form 3 (1-1-2026 to 31-03-2026)_compressed.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 1Form 1 (30-06-2026).pdf · uploaded 23 Jul 2026Source
  • Withdrawal Update Form 1Form 1 (30-06-2026).pdf · uploaded 23 Jul 2026Source
  • Withdrawal Update Form 2Form 2 (30-06-2026).pdf · uploaded 23 Jul 2026Source
  • Withdrawal Update Form 2Form 2 (30-06-2026).pdf · uploaded 23 Jul 2026Source
  • Withdrawal Update Form 3Form 3 (30-06-2026).pdf · uploaded 23 Jul 2026Source
  • Withdrawal Update Form 3Form 3 (30-06-2026).pdf · uploaded 23 Jul 2026Source
  • Form 2A (FY 2025-2026)Form 2A (2025-26).pdf · uploaded 23 Jul 2026Source
  • Form 5 (FY 2025-2026)FORM 5 ( 2025-26).pdf · uploaded 23 Jul 2026Source

Technical

  • DocumentLAYOUT.pdf · uploaded 28 Apr 2018Source
  • DocumentLAYOUT 1-min.pdf · uploaded 28 Apr 2018Source
  • DocumentLAYOUT 2.pdf · uploaded 28 Apr 2018Source
  • DocumentLAYOUT 3.pdf · uploaded 28 Apr 2018Source
  • DocumentIOD.pdf · uploaded 28 Apr 2018Source
  • DocumentIOD.pdf · uploaded 28 Apr 2018Source
  • DocumentS1 S2 1 FLR A.pdf · uploaded 28 Apr 2018Source
  • DocumentS1 S2 1 FLR B.pdf · uploaded 28 Apr 2018Source
  • DocumentS1 S2 2 FLR A.pdf · uploaded 28 Apr 2018Source
  • DocumentS1 S2 2 FLR B.pdf · uploaded 28 Apr 2018Source
  • DocumentS1 S2 3 and 4 FLR.pdf · uploaded 28 Apr 2018Source
  • DocumentS1 S2 6 TO 10 FLR.pdf · uploaded 28 Apr 2018Source
  • DocumentS1 S2 7 TO 11 FLR.pdf · uploaded 28 Apr 2018Source
  • DocumentS1 S2 12 FLR.pdf · uploaded 28 Apr 2018Source
  • DocumentS1 S2 18 FLR PART.pdf · uploaded 28 Apr 2018Source
  • DocumentS1 S2 S3 5 FLR.pdf · uploaded 28 Apr 2018Source
  • DocumentS1 S2 13 TO 17 FLR.pdf · uploaded 28 Apr 2018Source
  • DocumentLAYOUT.pdf · uploaded 27 Jun 2018Source
  • DocumentBUILT UP AREA FOR BASEMENT.pdf · uploaded 27 Jun 2018Source
  • DocumentBASEMENT - S1, S2, S3.pdf · uploaded 27 Jun 2018Source
  • Document3RD FLOOR - S1, S2, S3.pdf · uploaded 27 Jun 2018Source
  • Document4-6, 8-10, 12-15 FLOOR.pdf · uploaded 27 Jun 2018Source
  • Document7TH, 11TH FLOOR.pdf · uploaded 27 Jun 2018Source
  • DocumentGROUND, 1ST FLOOR.pdf · uploaded 27 Jun 2018Source
  • DocumentLAYOUT.pdf · uploaded 27 Jun 2018Source
  • Document2, 3, 4 FLOOR.pdf · uploaded 27 Jun 2018Source
  • Document4,5, 8-10, 13-15 FLOOR.pdf · uploaded 27 Jun 2018Source
  • Document7TH, 11TH FLOOR.pdf · uploaded 27 Jun 2018Source
  • DocumentGROUND, 1ST FLOOR.pdf · uploaded 27 Jun 2018Source
  • DocumentSCALE.pdf · uploaded 27 Jun 2018Source
  • Document7TH, 11TH FLOOR.pdf · uploaded 27 Jun 2018Source
  • DocumentBALCONY AREA.pdf · uploaded 27 Jun 2018Source
  • DocumentGROUND, 1ST FLOOR.pdf · uploaded 27 Jun 2018Source
  • DocumentLayout Plan.pdf · uploaded 4 Nov 2022Source
  • Document1- S1-Ground Floor.pdf · uploaded 4 Nov 2022Source
  • Document2- S1-First Floor.pdf · uploaded 4 Nov 2022Source
  • Document3- S1-2nd Floor.pdf · uploaded 4 Nov 2022Source
  • Document4- S1- 3rd to 6th, 8th to 11th, 13th to 16th, 18th to 21st, 23rd to 26th, 28th to 30th Floor.pdf · uploaded 4 Nov 2022Source
  • Document5- S1-7th, 12th, 17th, 22nd, 27th Floor - Refuge Floor Plan.pdf · uploaded 4 Nov 2022Source
  • Document6- S1.pdf · uploaded 4 Nov 2022Source
  • Document4- S2.pdf · uploaded 4 Nov 2022Source
  • DocumentS3-4.pdf · uploaded 4 Nov 2022Source
  • DocumentRevised - 7TH 12TH 17TH 22ND 27TH REFUGE FLOOR.pdf · uploaded 26 Nov 2022Source
  • DocumentS1 _8TH 13TH 18TH 23RD 28TH FLOOR.pdf · uploaded 26 Nov 2022Source
  • DocumentS2 -7TH 12TH 17TH 22ND 27TH REFUGE FLOOR PLAN.pdf · uploaded 26 Nov 2022Source
  • DocumentS2 _8TH 13TH 18TH 23RD 28TH FLOOR PLAN.pdf · uploaded 26 Nov 2022Source
  • Document31ST 34TH FLR PLAN.pdf · uploaded 3 Aug 2023Source
  • DocumentS1 RERA PLAN 2ND FLR.pdf · uploaded 3 Aug 2023Source
  • DocumentS1 RERA PLAN 3RD TO 6TH 9TH TO 11TH FLR.pdf · uploaded 3 Aug 2023Source
  • DocumentS1 RERA PLAN 7TH 12TH17TH 22ND FLR.pdf · uploaded 3 Aug 2023Source
  • DocumentS1 RERA PLAN 31ST 34TH FLR.pdf · uploaded 3 Aug 2023Source
  • DocumentS1 RERA PLAN 32ND REFUGE FLR.pdf · uploaded 3 Aug 2023Source
  • DocumentS1 RERA PLAN 33RD FLR.pdf · uploaded 3 Aug 2023Source
  • DocumentS1 RERA PLAN 35TH FLR.pdf · uploaded 3 Aug 2023Source
  • DocumentS1 RERA PLAN 36TH FLR.pdf · uploaded 3 Aug 2023Source
  • DocumentS1 RERA PLAN8TH 13TH 18TH 23RD 28TH FLR.pdf · uploaded 3 Aug 2023Source
  • DocumentS2 RERA PLAN 36TH FLR.pdf · uploaded 3 Aug 2023Source
  • DocumentS2 RERA PLAN 32ND FLR.pdf · uploaded 3 Aug 2023Source
  • DocumentS2 RERA PLAN 33RD FLR.pdf · uploaded 3 Aug 2023Source
  • DocumentS2 RERA PLAN 35TH FLR.pdf · uploaded 3 Aug 2023Source
  • DocumentS2 RERA PLAN 37TH FLR.pdf · uploaded 3 Aug 2023Source
  • DocumentS1 _RERA PLAN_37TH FLR.pdf · uploaded 18 Aug 2023Source
  • DocumentCopy.pdf · uploaded 3 Jan 2024Source
  • Document4th floor Plan.pdf · uploaded 3 Jan 2024Source
  • Document7 12 17 22 27 32 Refuge Floor Plan.pdf · uploaded 3 Jan 2024Source
  • Document8 13 18 23 28 33 Floor Plan.pdf · uploaded 3 Jan 2024Source
  • Document8 13 18 23 28 33 Floor Plan.pdf · uploaded 3 Jan 2024Source
  • Document8 13 18 23 28th Floor Plan.pdf · uploaded 3 Jan 2024Source
  • Document35 36 th Terrace Floor Plan.pdf · uploaded 3 Jan 2024Source
  • Document36 Floor Plan.pdf · uploaded 3 Jan 2024Source
  • Document37 Floor- Refugee Plan.pdf · uploaded 3 Jan 2024Source
  • Document1 Layout.pdf · uploaded 19 Dec 2024Source
  • Document2 Basement S1 S2 S3 S4.pdf · uploaded 19 Dec 2024Source
  • Document3 Plot Area Calculation.pdf · uploaded 19 Dec 2024Source
  • Document4 S1 Gr Floor.pdf · uploaded 19 Dec 2024Source
  • Document5 S1 First Floor.pdf · uploaded 19 Dec 2024Source
  • Document6 S1 2nd Floor.pdf · uploaded 19 Dec 2024Source
  • Document7 S1.pdf · uploaded 19 Dec 2024Source
  • Document8.pdf · uploaded 19 Dec 2024Source
  • Document10.pdf · uploaded 19 Dec 2024Source
  • Document11.pdf · uploaded 19 Dec 2024Source
  • Document12.pdf · uploaded 19 Dec 2024Source
  • Document14.pdf · uploaded 19 Dec 2024Source
  • Document15.pdf · uploaded 19 Dec 2024Source
  • Document16.pdf · uploaded 19 Dec 2024Source
  • Document17.pdf · uploaded 19 Dec 2024Source
  • Document18.pdf · uploaded 19 Dec 2024Source
  • Document19.pdf · uploaded 19 Dec 2024Source
  • Document20.pdf · uploaded 19 Dec 2024Source
  • Document21.pdf · uploaded 19 Dec 2024Source
  • Document22.pdf · uploaded 19 Dec 2024Source
  • Document23.pdf · uploaded 19 Dec 2024Source
  • Document24.pdf · uploaded 19 Dec 2024Source
  • Document25.pdf · uploaded 19 Dec 2024Source
  • Document25A.pdf · uploaded 19 Dec 2024Source
  • Document1.pdf · uploaded 19 Dec 2024Source
  • Document2 scan 004.pdf · uploaded 19 Dec 2024Source
  • Document3 scan 005.pdf · uploaded 19 Dec 2024Source
  • Document4 scan 006.pdf · uploaded 19 Dec 2024Source
  • Document5 scan 007.pdf · uploaded 19 Dec 2024Source
  • Document6 scan 008.pdf · uploaded 19 Dec 2024Source
  • Document7 scan 009.pdf · uploaded 19 Dec 2024Source
  • Document8 scan 010.pdf · uploaded 19 Dec 2024Source
  • Document9 scan 011.pdf · uploaded 19 Dec 2024Source
  • Document10 scan 012.pdf · uploaded 19 Dec 2024Source
  • Document11 scan 013.pdf · uploaded 19 Dec 2024Source
  • Document12 scan 014.pdf · uploaded 19 Dec 2024Source
  • Document13 scan 015.pdf · uploaded 19 Dec 2024Source
  • Document14 scan 016.pdf · uploaded 19 Dec 2024Source
  • Document15 scan 017.pdf · uploaded 19 Dec 2024Source
  • Document16 scan 018.pdf · uploaded 19 Dec 2024Source
  • Document17 scan 019.pdf · uploaded 19 Dec 2024Source

Technical (Architect)

  • DocumentForm 1 Revised.pdf · uploaded 21 Nov 2024Source
  • DocumentForm 1 March 24.pdf · uploaded 19 Dec 2024Source
  • DocumentForm 1 June 24.pdf · uploaded 19 Dec 2024Source
  • DocumentForm 1 sep 24.pdf · uploaded 19 Dec 2024Source
  • DocumentForm 1 Nov 24.pdf · uploaded 19 Dec 2024Source
  • DocumentForm 1 31-12-2024.pdf · uploaded 25 Jan 2025Source
  • DocumentForm 1 (30-06-2026).pdf · uploaded 21 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 March 2024 sign.pdf · uploaded 18 Dec 2024Source
  • DocumentForm 2 June 2024 sign.pdf · uploaded 18 Dec 2024Source
  • DocumentForm 2 Sep 2024 sign.pdf · uploaded 18 Dec 2024Source
  • DocumentForm 2 Nov 2024 sign.pdf · uploaded 18 Dec 2024Source
  • DocumentForm 2_Q3_FY 23-24.pdf · uploaded 12 Feb 2025Source
  • DocumentForm 2 March 2025.pdf · uploaded 5 May 2025Source
  • DocumentForm 2 (30-06-2026).pdf · uploaded 21 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 377

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
2BHK, 2BHK LANDOWNER, 2BHK TENANT, 3BHK, 3BHK TENANT, Office space, Shop, Shop tenant, 1.5 BHK, 1BHK, Multipurpose room, 1BHK LANDOWNER, Duplex, Office landowner, Shop existing tenant, Shop landowner488 units in all
Address
377, Almeda Road, PanchpakhadiPIN 400602
Village
Thane (M Corp.), Thane taluka
Land area for this project
8,423 sq m (90,665 sq ft)
Permissible built-up area
33,896 sq m (3,64,853 sq ft)
Sanctioned built-up area
33,896 sq m (3,64,858 sq ft)
Recreational open space
796 sq m (8,566 sq ft)
Designated bank account
76
Developed in phases
Yes

Survey, CTS, gat or plot numbers

377

Land as published on MahaRERA's project page

377

Boundaries

North
12Pt20mt wide TP Road
South
24Pt40mt wide Almeda Road
East
Patil Compound
West
12Pt20mt wide TP Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking488 units

232 of 488 units booked (48%), as the promoter reported to MahaRERA

2BHK · 229 units2BHK LANDOWNER · 4 units2BHK TENANT · 1 unit3BHK · 65 units3BHK TENANT · 1 unitOffice space · 40 unitsShop · 18 unitsShop tenant · 5 units1.5 BHK · 3 units1BHK · 81 unitsMultipurpose room · 3 units1BHK LANDOWNER · 22 unitsDuplex · 2 unitsOffice landowner · 4 unitsShop existing tenant · 9 unitsShop landowner · 1 unit
BuildingTypeCarpet areaUnitsBooked
S12BHK66.98 sq m · 721 sq ft40
S12BHK67.01 sq m · 721 sq ft3010
S12BHK67.14 sq m · 723 sq ft2913
S12BHK67.17 sq m · 723 sq ft71
S12BHK69.03 sq m · 743 sq ft70
S12BHK LANDOWNER67.01 sq m · 721 sq ft10
S12BHK TENANT67.01 sq m · 721 sq ft10
S13BHK99.65 sq m · 1,073 sq ft5128
Show all 116 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
S13BHK99.68 sq m · 1,073 sq ft121
S13BHK104.61 sq m · 1,126 sq ft10
S13BHK TENANT99.65 sq m · 1,073 sq ft10
S1Office space14.36 sq m · 155 sq ft11
S1Office space14.66 sq m · 158 sq ft11
S1Office space14.98 sq m · 161 sq ft10
S1Office space15.52 sq m · 167 sq ft10
S1Office space17.29 sq m · 186 sq ft10
S1Office space17.59 sq m · 189 sq ft11
S1Office space17.7 sq m · 191 sq ft10
S1Office space18.35 sq m · 198 sq ft11
S1Office space18.96 sq m · 204 sq ft11
S1Office space19.74 sq m · 212 sq ft11
S1Office space27.83 sq m · 300 sq ft11
S1Office space30.45 sq m · 328 sq ft11
S1Office space42.45 sq m · 457 sq ft11
S1Office space48.3 sq m · 520 sq ft11
S1Office space61.59 sq m · 663 sq ft10
S1Shop16.66 sq m · 179 sq ft11
S1Shop16.95 sq m · 182 sq ft10
S1Shop18.02 sq m · 194 sq ft10
S1Shop18.12 sq m · 195 sq ft10
S1Shop18.82 sq m · 203 sq ft11
S1Shop20.36 sq m · 219 sq ft11
S1Shop44.26 sq m · 476 sq ft11
S1Shop45.57 sq m · 491 sq ft11
S1Shop86.83 sq m · 935 sq ft11
S22BHK53.23 sq m · 573 sq ft11
S22BHK55.7 sq m · 600 sq ft44
S22BHK55.74 sq m · 600 sq ft22
S22BHK65.19 sq m · 702 sq ft2910
S22BHK65.22 sq m · 702 sq ft70
S22BHK65.68 sq m · 707 sq ft75
S22BHK65.72 sq m · 707 sq ft2922
S22BHK71.07 sq m · 765 sq ft62
S22BHK74.31 sq m · 800 sq ft2416
S22BHK74.32 sq m · 800 sq ft61
S22BHK74.68 sq m · 804 sq ft2418
S22BHK74.69 sq m · 804 sq ft54
S2Office space14.24 sq m · 153 sq ft11
S2Office space14.99 sq m · 161 sq ft11
S2Office space16.37 sq m · 176 sq ft10
S2Office space16.8 sq m · 181 sq ft10
S2Office space16.82 sq m · 181 sq ft10
S2Office space18.09 sq m · 195 sq ft11
S2Office space18.81 sq m · 202 sq ft10
S2Office space19.38 sq m · 209 sq ft21
S2Office space19.83 sq m · 213 sq ft11
S2Office space27.89 sq m · 300 sq ft21
S2Shop14.09 sq m · 152 sq ft11
S2Shop17.16 sq m · 185 sq ft11
S2Shop21.39 sq m · 230 sq ft11
S2Shop tenant6.87 sq m · 74 sq ft10
S2Shop tenant16.61 sq m · 179 sq ft10
S2Shop tenant17.16 sq m · 185 sq ft10
S2Shop tenant17.82 sq m · 192 sq ft10
S31.5 BHK47.59 sq m · 512 sq ft32
S31BHK34.06 sq m · 367 sq ft1917
S31BHK36.35 sq m · 391 sq ft1917
S31BHK39.02 sq m · 420 sq ft1514
S31BHK39.12 sq m · 421 sq ft1615
S31BHK51.15 sq m · 551 sq ft10
S33BHK148.87 sq m · 1,602 sq ft10
S3Multipurpose room21.83 sq m · 235 sq ft11
S3Multipurpose room32.56 sq m · 350 sq ft11
S3Multipurpose room33.79 sq m · 364 sq ft11
S3Office space15.86 sq m · 171 sq ft10
S3Office space42.73 sq m · 460 sq ft10
S3Office space51.59 sq m · 555 sq ft10
S3Office space116.74 sq m · 1,257 sq ft11
S3Shop15.45 sq m · 166 sq ft10
S3Shop16.69 sq m · 180 sq ft10
S3Shop21.58 sq m · 232 sq ft10
S3Shop46.55 sq m · 501 sq ft10
S3Shop72.03 sq m · 775 sq ft10
S3Shop72.15 sq m · 777 sq ft10
S3Shop tenant8.19 sq m · 88 sq ft10
S41BHK36.96 sq m · 398 sq ft20
S41BHK37.23 sq m · 401 sq ft30
S41BHK38.98 sq m · 420 sq ft40
S41BHK39.08 sq m · 421 sq ft20
S41BHK LANDOWNER36.96 sq m · 398 sq ft80
S41BHK LANDOWNER37.23 sq m · 401 sq ft30
S41BHK LANDOWNER38.98 sq m · 420 sq ft70
S41BHK LANDOWNER39.08 sq m · 421 sq ft40
S42BHK52.36 sq m · 564 sq ft10
S42BHK54.19 sq m · 583 sq ft70
S42BHK LANDOWNER54.19 sq m · 583 sq ft30
S4Duplex68.82 sq m · 741 sq ft10
S4Duplex79.51 sq m · 856 sq ft10
S4Office landowner34.74 sq m · 374 sq ft10
S4Office landowner41.09 sq m · 442 sq ft10
S4Office landowner75.81 sq m · 816 sq ft20
S4Office space15.44 sq m · 166 sq ft10
S4Office space17.77 sq m · 191 sq ft10
S4Office space17.86 sq m · 192 sq ft10
S4Office space20 sq m · 215 sq ft10
S4Office space20.23 sq m · 218 sq ft10
S4Office space22.27 sq m · 240 sq ft10
S4Office space27.18 sq m · 293 sq ft10
S4Office space27.9 sq m · 300 sq ft10
S4Office space166.09 sq m · 1,788 sq ft10
S4Shop existing tenant10.73 sq m · 115 sq ft10
S4Shop existing tenant11.76 sq m · 127 sq ft10
S4Shop existing tenant16.12 sq m · 174 sq ft50
S4Shop existing tenant22.01 sq m · 237 sq ft10
S4Shop existing tenant36.85 sq m · 397 sq ft10
S4Shop landowner22.68 sq m · 244 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals2

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
Chartered accountantNilesh G Palande—
EngineerAjay Mahale—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology