Gami Ved
Deedo IDDP-THN-48JECompletion was pushed back 4 months, to Oct 2027; no MahaRERA orders on record; 31% of its units are booked.
Nerul, Thane 400706 · by Ambalal Bhanji Gami
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Oct 2027
- This projectRegistered 23 Jun 2023, completion promised 30 Jun 2027, revised to 30 Oct 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700051520
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700051520 | 23 Jun 2023 | 30 Jun 2027 | 30 Oct 2027 | Ambalal Bhanji Gami | Project page |
Documents126
1 document held by Deedo, 125 filings listed on MahaRERA's project page
Finance
- PAN Cardpan card Ambalal Gami.pdf · uploaded 10 May 2023Source
Legal
Migrated
- 1 PAN Cardpan card Ambalal Gami.pdf · uploaded 10 May 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCC_11zon.pdf · uploaded 10 May 2023Source
- 1 a Details of encumbrances concerned to FinanceNo ENCUMBRANCE LETTER -Dues.pdf · uploaded 11 May 2023Source
- 2 a Details of encumbrances concerned to FinanceNo ENCUMBRANCE LETTER Litigations.pdf · uploaded 11 May 2023Source
Show all 126 documentsShow fewer documents
Migrated
- 1 b Details of encumbrances concerned to LegalNo ENCUMBRANCE LETTER -Dues.pdf · uploaded 11 May 2023Source
- 2 b Details of encumbrances concerned to LegalNo ENCUMBRANCE LETTER Litigations.pdf · uploaded 11 May 2023Source
- 1 Copy of Layout Approval (in case of layout)1 Copy of Layout Approval (in case of layout).pdf · uploaded 11 May 2023Source
- 1 Building Plan Approval / NA Order for plotted development1 Copy of Layout Approval (in case of layout).pdf · uploaded 11 May 2023Source
- 2 Building Plan Approval / NA Order for plotted development2 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 11 May 2023Source
- 3 Building Plan Approval / NA Order for plotted development3 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 11 May 2023Source
- 1 Declaration about Commencement CertificateFORMAT D - For Single Building.pdf · uploaded 11 May 2023Source
- 1 Declaration in FORM BFORM -B (Promoter).pdf · uploaded 11 May 2023Source
- 1 CERSAI detailsDECLARATION of Cersai.pdf · uploaded 11 May 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A -AMBALAL BHANJI GAMI.pdf · uploaded 11 May 2023Source
- 1 Copy of the legal title reportShort Title - Gami Ved_11zon.pdf · uploaded 19 May 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation Report of Alloment_New Parth Developers_Gami Ved_17052023.pdf · uploaded 23 May 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final Form 3 Gami Ved_compressed.pdf · uploaded 25 May 2023Source
- 1 Proforma of Allotment letterAllotment letter as per RERA_New Parth Developers_Gami Ved_17052023 (1).pdf · uploaded 25 May 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A - Seperate Bank Account Details.pdf · uploaded 25 May 2023Source
- 1 Proforma of Agreement for saleAFS_New Parth Developers_Gami Ved_02062023.pdf · uploaded 5 Jun 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation-Gami Ved_compressed.pdf · uploaded 9 Jun 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Gami Ved as on June 2023.pdf · uploaded 1 Aug 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Gami Ved as on 30-06-2023.pdf · uploaded 1 Aug 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Gami Ved as on 17-08-2023.pdf · uploaded 18 Aug 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Gami Ved as on 30-09-2023.pdf · uploaded 4 Nov 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Gami Ved as on Sep 2023.pdf · uploaded 7 Nov 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Gami Ved as on 30-10-2023.pdf · uploaded 9 Nov 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Gami Ved as on June 2023.pdf · uploaded 10 Jan 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Gami Ved as on Sept 2023.pdf · uploaded 10 Jan 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Gami Ved as on Dec 2023.pdf · uploaded 10 Jan 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Gami Ved as on June 2023.pdf · uploaded 10 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Gami Ved as on Sept 2023.pdf · uploaded 10 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Gami Ved as on June 2023.pdf · uploaded 10 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Gami Ved as on Sept 2023.pdf · uploaded 10 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Gami Ved as on Dec 2023.pdf · uploaded 17 Jan 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Gami Ved as 31-12-2023.pdf · uploaded 17 Jan 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Gami Ved as on March 2024.pdf · uploaded 6 Apr 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Gami Ved as on March 2024.pdf · uploaded 12 Apr 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Gami Ved as 31-03-2024.pdf · uploaded 12 Apr 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 Architect’s Certificate of Percentage of Completion of Work (Form 1) (2).pdf · uploaded 20 Apr 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 Engineer’s Certificate on Cost Incurred on Project (Form 2) (4).pdf · uploaded 20 Apr 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)cz.pdf · uploaded 20 Apr 2024Source
- 1 Disclosure of sold/ booked inventoryCIRCULAR 29 Gami Ved as on March 2024.pdf · uploaded 15 May 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Gami Ved as 31-05-2024.pdf · uploaded 22 Jun 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Gami Ved as on May 2024.pdf · uploaded 24 Jun 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Gami Ved as on June 2024.pdf · uploaded 8 Jul 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Gami Ved as on June 2024.pdf · uploaded 13 Jul 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Gami Ved as on June 2024.pdf · uploaded 13 Jul 2024Source
- 1 a Details of encumbrances concerned to FinanceEncumbrance Letter.pdf · uploaded 7 Oct 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Gami Ved as 30-09-2024 final.pdf · uploaded 7 Oct 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Gami Ved as on Sept 2024.pdf · uploaded 7 Oct 2024Source
- 1 b Details of encumbrances concerned to LegalEncumbrance Letter.pdf · uploaded 7 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Gami Ved for FY 2023-24.pdf · uploaded 16 Oct 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Gami Ved for FY 2023-24 (SIGNED).pdf · uploaded 17 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 of Gami Ved as 30-09-2024 final.pdf · uploaded 26 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Gami Ved as on 31-10-2024.pdf · uploaded 16 Nov 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Gami Ved as on 31-10-2024.pdf · uploaded 16 Nov 2024Source
- 2 Disclosure of sold/ booked inventoryCIRCULAR 29 Gami Ved as on Sep 2024.pdf · uploaded 2 Dec 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Gami Ved as on 31st Oct 2024.pdf · uploaded 28 Dec 2024Source
- 3 Disclosure of sold/ booked inventoryCIRCULAR 29 as on 31st Oct 2024_organized.pdf · uploaded 28 Dec 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Gami Ved as on 31-10-2024 Certified.pdf · uploaded 31 Dec 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 2023-24.pdf · uploaded 3 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Gami Ved as on 31-12-2024.pdf · uploaded 13 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Gami Ved as on Dec 2024.pdf · uploaded 13 Jan 2025Source
- 1 Copy of Layout Approval (in case of layout)GAMI SANCTIONED PLAN 1.pdf · uploaded 22 Jan 2025Source
- 2 Copy of Layout Approval (in case of layout)1 Copy of Layout Approval (in case of layout).pdf · uploaded 22 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2024.pdf · uploaded 22 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Gami Ved as on Dec 2024.pdf · uploaded 22 Jan 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Gami Ved as on Dec 2024.pdf · uploaded 22 Jan 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentGAMI SANCTIONED PLAN 2.pdf · uploaded 22 Jan 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentGAMI SANCTIONED PLAN 3.pdf · uploaded 22 Jan 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentGAMI SANCTIONED PLAN 4.pdf · uploaded 22 Jan 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentGAMI SANCTIONED PLAN 5.pdf · uploaded 22 Jan 2025Source
- 5 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 22 Jan 2025Source
- 6 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 22 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryCIRCULAR 29 as on 31st Dec 2024_removed.pdf · uploaded 28 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Gami Ved as on March 2025.pdf · uploaded 12 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Gami Ved as on March 2025.pdf · uploaded 12 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - Gami Ved as on March 2025.pdf · uploaded 16 Apr 2025Source
- Form 1Form 1 - Gami Ved as on June 2025.pdf · uploaded 28 Aug 2025Source
- Form 2Form 2 - Gami Ved as on June 2025.pdf · uploaded 28 Aug 2025Source
- Form 3Form 3 - Gami Ved as on June 2025.pdf · uploaded 28 Aug 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 - Gami Ved Gami Ved as on June 2025.pdf · uploaded 28 Aug 2025Source
- Form 1Form 1 - Gami Ved as on Sept 2025.pdf · uploaded 18 Oct 2025Source
- Form 2Form 2 - Gami Ved as on Sept 2025.pdf · uploaded 18 Oct 2025Source
- Form 3Form 3 of Gami Ved as on Sept 2025.pdf · uploaded 18 Oct 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 - Gami Ved as on Sept 2025.pdf · uploaded 18 Oct 2025Source
- Form 1Form 1 - Gami Ved as on Dec 2025.pdf · uploaded 19 Jan 2026Source
- Form 2Form 2 - Gami Ved as on Dec 2025.pdf · uploaded 19 Jan 2026Source
- Form 3Form 3 - Gami Ved as on Dec 2025.pdf · uploaded 19 Jan 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - Gami Ved as on Dec 2025.pdf · uploaded 19 Jan 2026Source
- Form 1Form 1 - Gami Ved as on March 2026.pdf · uploaded 18 Apr 2026Source
- Form 2Form 2 - Gami Ved as on March 2026.pdf · uploaded 18 Apr 2026Source
- Form 3Form 3 - Gami Ved as on March 2026.pdf · uploaded 18 Apr 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - Gami Ved as on March 2026.pdf · uploaded 18 Apr 2026Source
- Form 5 (FY 2024-2025)Form 5 - Gami Ved for FY 2024-25_Final.pdf · uploaded 5 Jun 2026Source
- Form 1Form 1 - Gami Ved June 2026.pdf · uploaded 20 Jul 2026Source
- Form 2Form 2 - Gami Ved June 2026.pdf · uploaded 20 Jul 2026Source
- Form 3Form 3 - Gami Ved June 2026.pdf · uploaded 20 Jul 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - Gami Ved June 2026.pdf · uploaded 20 Jul 2026Source
Technical
- Document1 Copy of Layout Approval (in case of layout).pdf · uploaded 11 May 2023Source
- Document1 Copy of Layout Approval (in case of layout).pdf · uploaded 11 May 2023Source
- Document2 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 11 May 2023Source
- Document3 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 11 May 2023Source
- DocumentGAMI SANCTIONED PLAN 1.pdf · uploaded 22 Jan 2025Source
- Document1 Copy of Layout Approval (in case of layout).pdf · uploaded 22 Jan 2025Source
- DocumentGAMI SANCTIONED PLAN 2.pdf · uploaded 22 Jan 2025Source
- DocumentGAMI SANCTIONED PLAN 3.pdf · uploaded 22 Jan 2025Source
- DocumentGAMI SANCTIONED PLAN 4.pdf · uploaded 22 Jan 2025Source
- DocumentGAMI SANCTIONED PLAN 5.pdf · uploaded 22 Jan 2025Source
- Document2.pdf · uploaded 22 Jan 2025Source
- Document3.pdf · uploaded 22 Jan 2025Source
Technical (Architect)
Technical (Engineer)
- DocumentForm 2 - Gami Ved as on June 2024.pdf · uploaded 13 Jul 2024Source
- DocumentForm 2 - Gami Ved as on Sept 2024.pdf · uploaded 7 Oct 2024Source
- DocumentForm 2 - Gami Ved as on 31st Oct 2024.pdf · uploaded 28 Dec 2024Source
- DocumentForm 2 - Gami Ved as on Dec 2024.pdf · uploaded 13 Jan 2025Source
- DocumentForm 2 - Gami Ved as on Dec 2024.pdf · uploaded 22 Jan 2025Source
- DocumentForm 2 - Gami Ved as on March 2025.pdf · uploaded 12 Apr 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel Plot No 13, Sector No 18
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, CIDCO Share, NMMC Share, Rehab, Society Share173 units in all
- Address
- Plot No- 13, Sector No- 18, Sector No- 18, NerulPIN 400706
- Village
- Navi Mumbai (M Corp.), Thane taluka
- Location
- 19.03538, 73.00971
- Land area for this project
- 2,024 sq m (21,786 sq ft)
- Permissible built-up area
- 9,715 sq m (1,04,573 sq ft)
- Sanctioned built-up area
- 9,711 sq m (1,04,530 sq ft)
- Recreational open space
- 0 sq m (0 sq ft)
- Designated bank account
- 109
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Plot No- 13, Sector No- 18
Boundaries
- North
- 15 meters wide road
- South
- Plot No- 22
- East
- Plot No-14
- West
- Plot No-12
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking173 units
54 of 173 units booked (31%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 34.1 sq m · 367 sq ft | 6 | 6 |
| 1BHK | 34.59 sq m · 372 sq ft | 6 | 5 |
| 1BHK | 46.99 sq m · 506 sq ft | 2 | 0 |
| 2BHK | 56.75 sq m · 611 sq ft | 50 | 38 |
| 2BHK | 58.4 sq m · 629 sq ft | 6 | 5 |
| CIDCO Share | 22.24 sq m · 239 sq ft | 1 | 0 |
| NMMC Share | 9.34 sq m · 101 sq ft | 1 | 0 |
| Rehab | 28.65 sq m · 308 sq ft | 34 | 0 |
Show all 12 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Rehab | 28.66 sq m · 308 sq ft | 34 | 0 |
| Rehab | 32.51 sq m · 350 sq ft | 16 | 0 |
| Rehab | 32.55 sq m · 350 sq ft | 16 | 0 |
| Society Share | 18.96 sq m · 204 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.