Deedo IDDP-THN-SGHSCompletion was pushed back 4 months, to Apr 2032; no MahaRERA orders on record; 0% of its units are booked.
Mumbra, Thane 400612 · by Elite Builders
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2032
- This projectRegistered 21 Mar 2025, completion promised 31 Dec 2031, revised to 30 Apr 2032.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700079719
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700079719 | 21 Mar 2025 | 31 Dec 2031 | 30 Apr 2032 | Elite Builders | Project page |
Documents168
1 document held by Deedo, 167 filings listed on MahaRERA's project page
Finance
- PAN CardPan Card.pdf · uploaded 22 Jan 2025Source
- PAN CardPan Card.pdf · uploaded 22 Jan 2025Source
- Other – FinanceCC Mail.pdf · uploaded 11 Feb 2025Source
- Other – FinanceCC Mail.pdf · uploaded 11 Feb 2025Source
- Other – FinanceBuilding Plan D2- 5-7.pdf · uploaded 26 Feb 2025Source
- Other – FinanceBuilding Plan D2- 6-7.pdf · uploaded 26 Feb 2025Source
- Other – FinanceBuilding Plan D2- 7-7.pdf · uploaded 26 Feb 2025Source
Show all 168 documentsShow fewer documents
Finance
Legal
- Other – LegalPage No 1 to 6.pdf · uploaded 22 Jan 2025Source
- Other – LegalPage No 7 to 12 Upload.pdf · uploaded 22 Jan 2025Source
- Other – LegalPage No 13 to 18 Upload.pdf · uploaded 22 Jan 2025Source
- Other – LegalPage No 19 to 24 Upload.pdf · uploaded 22 Jan 2025Source
- Other – LegalPage No 25 to 30 Upload.pdf · uploaded 22 Jan 2025Source
- Other – LegalPage No 31 to 36 Upload.pdf · uploaded 22 Jan 2025Source
- Other – LegalPage No 37 to 42 Upload.pdf · uploaded 22 Jan 2025Source
- Other – LegalPage No 43 to 48 Upload.pdf · uploaded 22 Jan 2025Source
- Other – Legal7-12 Extract.pdf · uploaded 22 Jan 2025Source
- Other – LegalPartnership Deed.pdf · uploaded 22 Jan 2025Source
- Other – LegalAnnexure A.pdf · uploaded 22 Jan 2025Source
- Other – LegalPage No 1 to 6.pdf · uploaded 22 Jan 2025Source
- Other – LegalPage No 7 to 12 Upload.pdf · uploaded 22 Jan 2025Source
- Other – LegalPage No 13 to 18 Upload.pdf · uploaded 22 Jan 2025Source
- Other – LegalPage No 19 to 24 Upload.pdf · uploaded 22 Jan 2025Source
- Other – LegalPage No 25 to 30 Upload.pdf · uploaded 22 Jan 2025Source
- Other – LegalPage No 31 to 36 Upload.pdf · uploaded 22 Jan 2025Source
- Other – LegalPage No 37 to 42 Upload.pdf · uploaded 22 Jan 2025Source
- Other – LegalPage No 43 to 48 Upload.pdf · uploaded 22 Jan 2025Source
- Other – Legal7-12 Extract.pdf · uploaded 22 Jan 2025Source
- Other – LegalPartnership Deed.pdf · uploaded 22 Jan 2025Source
- Other – LegalAnnexure A.pdf · uploaded 22 Jan 2025Source
- Legal Title reportTitle Certificate.pdf · uploaded 22 Jan 2025Source
- Legal Title reportTitle Certificate.pdf · uploaded 22 Jan 2025Source
- Declaration Form BForm B Elite Builders.pdf · uploaded 22 Jan 2025Source
- Declaration Form BForm B Elite Builders.pdf · uploaded 22 Jan 2025Source
- Other – LegalCC Mail.pdf · uploaded 11 Feb 2025Source
- Other – LegalCC Mail.pdf · uploaded 11 Feb 2025Source
Migrated
- 1 PAN CardPan Card.pdf · uploaded 22 Jan 2025Source
- 1 Copy of the legal title reportTitle Certificate.pdf · uploaded 22 Jan 2025Source
- 1 a Details of encumbrances concerned to FinanceNon Encumbrance.pdf · uploaded 22 Jan 2025Source
- 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 22 Jan 2025Source
- 1 Declaration in FORM BForm B Elite Builders.pdf · uploaded 22 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Upload.pdf · uploaded 22 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 22 Jan 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 22 Jan 2025Source
- 11 Other – LegalAnnexure A.pdf · uploaded 22 Jan 2025Source
- 10 Other – LegalPartnership Deed.pdf · uploaded 22 Jan 2025Source
- 9 Other – Legal7-12 Extract.pdf · uploaded 22 Jan 2025Source
- 8 Other – LegalPage No 43 to 48 Upload.pdf · uploaded 22 Jan 2025Source
- 7 Other – LegalPage No 37 to 42 Upload.pdf · uploaded 22 Jan 2025Source
- 5 Other – LegalPage No 25 to 30 Upload.pdf · uploaded 22 Jan 2025Source
- 4 Other – LegalPage No 19 to 24 Upload.pdf · uploaded 22 Jan 2025Source
- 3 Other – LegalPage No 13 to 18 Upload.pdf · uploaded 22 Jan 2025Source
- 2 Other – LegalPage No 7 to 12 Upload.pdf · uploaded 22 Jan 2025Source
- 1 Other – LegalPage No 1 to 6.pdf · uploaded 22 Jan 2025Source
- 6 Other – LegalPage No 31 to 36 Upload.pdf · uploaded 22 Jan 2025Source
- 1 Declaration about Commencement CertificateCC Declaration.pdf · uploaded 22 Jan 2025Source
- 1 CERSAI detailsCersai.pdf · uploaded 22 Jan 2025Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)Bank Declaration.pdf · uploaded 22 Jan 2025Source
- 1 Deviation Report with respect to Allotment letterDeviation Allotment Letter.pdf · uploaded 22 Jan 2025Source
- 1 b Details of encumbrances concerned to LegalNon Encumbrance.pdf · uploaded 22 Jan 2025Source
- 1 Other – TechnicalAnnexure A.pdf · uploaded 22 Jan 2025Source
- 2 Other – TechnicalDeclaration Promoter.pdf · uploaded 22 Jan 2025Source
- 3 Other – TechnicalPartnership Deed.pdf · uploaded 22 Jan 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest.pdf · uploaded 22 Jan 2025Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Letter from Bank Upload.pdf · uploaded 22 Jan 2025Source
- 1 Disclosure for secured/unsecured finance availed for the projectSecured Unsecured.pdf · uploaded 22 Jan 2025Source
- 1 PAN CardPan Card.pdf · uploaded 22 Jan 2025Source
- 1 Copy of the legal title reportTitle Certificate.pdf · uploaded 22 Jan 2025Source
- 1 a Details of encumbrances concerned to FinanceNon Encumbrance.pdf · uploaded 22 Jan 2025Source
- 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 22 Jan 2025Source
- 1 Declaration in FORM BForm B Elite Builders.pdf · uploaded 22 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Upload.pdf · uploaded 22 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 22 Jan 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 22 Jan 2025Source
- 11 Other – LegalAnnexure A.pdf · uploaded 22 Jan 2025Source
- 10 Other – LegalPartnership Deed.pdf · uploaded 22 Jan 2025Source
- 9 Other – Legal7-12 Extract.pdf · uploaded 22 Jan 2025Source
- 8 Other – LegalPage No 43 to 48 Upload.pdf · uploaded 22 Jan 2025Source
- 7 Other – LegalPage No 37 to 42 Upload.pdf · uploaded 22 Jan 2025Source
- 5 Other – LegalPage No 25 to 30 Upload.pdf · uploaded 22 Jan 2025Source
- 4 Other – LegalPage No 19 to 24 Upload.pdf · uploaded 22 Jan 2025Source
- 3 Other – LegalPage No 13 to 18 Upload.pdf · uploaded 22 Jan 2025Source
- 2 Other – LegalPage No 7 to 12 Upload.pdf · uploaded 22 Jan 2025Source
- 1 Other – LegalPage No 1 to 6.pdf · uploaded 22 Jan 2025Source
- 6 Other – LegalPage No 31 to 36 Upload.pdf · uploaded 22 Jan 2025Source
- 1 Declaration about Commencement CertificateCC Declaration.pdf · uploaded 22 Jan 2025Source
- 1 CERSAI detailsCersai.pdf · uploaded 22 Jan 2025Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)Bank Declaration.pdf · uploaded 22 Jan 2025Source
- 1 Deviation Report with respect to Allotment letterDeviation Allotment Letter.pdf · uploaded 22 Jan 2025Source
- 1 b Details of encumbrances concerned to LegalNon Encumbrance.pdf · uploaded 22 Jan 2025Source
- 1 Other – TechnicalAnnexure A.pdf · uploaded 22 Jan 2025Source
- 2 Other – TechnicalDeclaration Promoter.pdf · uploaded 22 Jan 2025Source
- 3 Other – TechnicalPartnership Deed.pdf · uploaded 22 Jan 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest.pdf · uploaded 22 Jan 2025Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Letter from Bank Upload.pdf · uploaded 22 Jan 2025Source
- 1 Disclosure for secured/unsecured finance availed for the projectSecured Unsecured.pdf · uploaded 22 Jan 2025Source
- 12 Other – LegalCC Mail.pdf · uploaded 11 Feb 2025Source
- 1 Other – FinanceCC Mail.pdf · uploaded 11 Feb 2025Source
- 12 Other – LegalCC Mail.pdf · uploaded 11 Feb 2025Source
- 1 Other – FinanceCC Mail.pdf · uploaded 11 Feb 2025Source
- 1 Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 12 Feb 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan D1- 2-7.pdf · uploaded 12 Feb 2025Source
- 1 Deviation Report with respect to model copy of AgreementAgreement for Sale.pdf · uploaded 12 Feb 2025Source
- 1 Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 12 Feb 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan D1- 2-7.pdf · uploaded 12 Feb 2025Source
- 1 Deviation Report with respect to model copy of AgreementAgreement for Sale.pdf · uploaded 12 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Upload.pdf · uploaded 26 Feb 2025Source
- 4 Other – FinanceBuilding Plan D2- 7-7.pdf · uploaded 26 Feb 2025Source
- 3 Other – FinanceBuilding Plan D2- 6-7.pdf · uploaded 26 Feb 2025Source
- 2 Other – FinanceBuilding Plan D2- 5-7.pdf · uploaded 26 Feb 2025Source
- 1 Proforma of Agreement for saleAgreement for Sale.pdf · uploaded 26 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Upload.pdf · uploaded 26 Feb 2025Source
- 4 Other – FinanceBuilding Plan D2- 7-7.pdf · uploaded 26 Feb 2025Source
- 3 Other – FinanceBuilding Plan D2- 6-7.pdf · uploaded 26 Feb 2025Source
- 2 Other – FinanceBuilding Plan D2- 5-7.pdf · uploaded 26 Feb 2025Source
- 1 Proforma of Agreement for saleAgreement for Sale.pdf · uploaded 26 Feb 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentBuilding Plan D1- 3-7.pdf · uploaded 11 Mar 2025Source
- 6 Building Plan Approval / NA Order for plotted developmentBuilding Plan D2- 7-7.pdf · uploaded 11 Mar 2025Source
- 5 Building Plan Approval / NA Order for plotted developmentBuilding Plan D2- 6-7.pdf · uploaded 11 Mar 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentBuilding Plan D2- 5-7.pdf · uploaded 11 Mar 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentBuilding Plan D1- 4-7.pdf · uploaded 11 Mar 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentBuilding Plan D1- 3-7.pdf · uploaded 11 Mar 2025Source
- 6 Building Plan Approval / NA Order for plotted developmentBuilding Plan D2- 7-7.pdf · uploaded 11 Mar 2025Source
- 5 Building Plan Approval / NA Order for plotted developmentBuilding Plan D2- 6-7.pdf · uploaded 11 Mar 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentBuilding Plan D2- 5-7.pdf · uploaded 11 Mar 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentBuilding Plan D1- 4-7.pdf · uploaded 11 Mar 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate FY 24-25-Q4.pdf · uploaded 7 May 2025Source
- 1 Disclosure of sold/ booked inventorySold Booked Invenotry FY 24-25-Q4.pdf · uploaded 7 May 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate FY 24-25-Q4.pdf · uploaded 7 May 2025Source
- 1 Disclosure of sold/ booked inventorySold Booked Invenotry FY 24-25-Q4.pdf · uploaded 7 May 2025Source
- Form 5 (FY 2024-2025)Form 5 Audit Report FY 2024-25.pdf · uploaded 23 Dec 2025Source
- Withdrawal Update Form 1Architect Certificate FY 2025-26 Q3.pdf · uploaded 5 Mar 2026Source
- Withdrawal Update Form 2Engineer Certificate FY 2025-26 Q3.pdf · uploaded 5 Mar 2026Source
- Withdrawal Update Form 3CA Certificate FY 2025-26 Q3.pdf · uploaded 5 Mar 2026Source
- Form 2A (FY 2024-2025)Quality Assurance FY 2024-25.pdf · uploaded 3 Apr 2026Source
- Withdrawal Update Form 1Architect Certificate FY 2025-26 Q4.pdf · uploaded 8 Jun 2026Source
- Withdrawal Update Form 2Engineer Certificate FY 2025-26 Q4.pdf · uploaded 8 Jun 2026Source
- Withdrawal Update Form 3CA Certificate FY 2025-26 Q4.pdf · uploaded 8 Jun 2026Source
- Withdrawal Update Form 1Architect Certificate FY 2026-27 Q1.pdf · uploaded 19 Aug 2026Source
- Withdrawal Update Form 2Engineer Certificate FY 2026-27 Q1.pdf · uploaded 19 Aug 2026Source
- Withdrawal Update Form 3CA Certificate FY 2026-27 Q1.pdf · uploaded 19 Aug 2026Source
Technical
- Other – TechnicalAnnexure A.pdf · uploaded 22 Jan 2025Source
- Other – TechnicalDeclaration Promoter.pdf · uploaded 22 Jan 2025Source
- Other – TechnicalPartnership Deed.pdf · uploaded 22 Jan 2025Source
- Other – TechnicalAnnexure A.pdf · uploaded 22 Jan 2025Source
- Other – TechnicalDeclaration Promoter.pdf · uploaded 22 Jan 2025Source
- Other – TechnicalPartnership Deed.pdf · uploaded 22 Jan 2025Source
- DocumentLayout Plan.pdf · uploaded 12 Feb 2025Source
- DocumentLayout Plan.pdf · uploaded 12 Feb 2025Source
- DocumentBuilding Plan D1- 2-7.pdf · uploaded 12 Feb 2025Source
- DocumentBuilding Plan D1- 2-7.pdf · uploaded 12 Feb 2025Source
- DocumentBuilding Plan D1- 3-7.pdf · uploaded 11 Mar 2025Source
- DocumentBuilding Plan D1- 4-7.pdf · uploaded 11 Mar 2025Source
- DocumentBuilding Plan D2- 5-7.pdf · uploaded 11 Mar 2025Source
- DocumentBuilding Plan D2- 6-7.pdf · uploaded 11 Mar 2025Source
- DocumentBuilding Plan D2- 7-7.pdf · uploaded 11 Mar 2025Source
- DocumentBuilding Plan D1- 3-7.pdf · uploaded 11 Mar 2025Source
- DocumentBuilding Plan D1- 4-7.pdf · uploaded 11 Mar 2025Source
- DocumentBuilding Plan D2- 5-7.pdf · uploaded 11 Mar 2025Source
- DocumentBuilding Plan D2- 6-7.pdf · uploaded 11 Mar 2025Source
- DocumentBuilding Plan D2- 7-7.pdf · uploaded 11 Mar 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel S. NO 118B/1/C, S. NO. 51/B/1B
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, 3BHK, Shop, 1BHK MHADA, 1RK MHADA, 2BHK MHADA141 units in all
- Address
- S. No 118b/1/C & S. No. 51/B/1b, S No 118b/1/C & S No 51b/1b Sector No 9, MumbraPIN 400612
- Village
- Thane (M Corp.), Thane taluka
- Location
- 19.17629, 73.02869
- Land area for this project
- 5,702 sq m (61,376 sq ft)
- Permissible built-up area
- 27,338 sq m (2,94,263 sq ft)
- Sanctioned built-up area
- 9,699 sq m (1,04,397 sq ft)
- Recreational open space
- 609 sq m (6,558 sq ft)
- Designated bank account
- 87
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S. NO 118B/1/C & S. NO. 51/B/1B
Boundaries
- North
- S No 51-B-1-A
- South
- S No 51-B-1-C
- East
- 30 Mtrs Dp Road
- West
- S No 107-B
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking141 units
0 of 141 units booked (0%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Bldg D1 | 1BHK | 43.45 sq m · 468 sq ft | 18 | 0 |
| Bldg D1 | 2BHK | 56.11 sq m · 604 sq ft | 20 | 0 |
| Bldg D1 | 3BHK | 72.87 sq m · 784 sq ft | 20 | 0 |
| Bldg D1 | Shop | 25.54 sq m · 275 sq ft | 2 | 0 |
| Bldg D1 | Shop | 30.28 sq m · 326 sq ft | 2 | 0 |
| Bldg D1 | Shop | 30.56 sq m · 329 sq ft | 1 | 0 |
| Bldg D1 | Shop | 31.58 sq m · 340 sq ft | 1 | 0 |
| Bldg D1 | Shop | 31.86 sq m · 343 sq ft | 2 | 0 |
Show all 13 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Bldg D2 | 1BHK MHADA | 46.04 sq m · 496 sq ft | 12 | 0 |
| Bldg D2 | 1RK MHADA | 33.18 sq m · 357 sq ft | 4 | 0 |
| Bldg D2 | 2BHK | 55.09 sq m · 593 sq ft | 41 | 0 |
| Bldg D2 | 2BHK MHADA | 49.71 sq m · 535 sq ft | 4 | 0 |
| Bldg D2 | 3BHK | 74.19 sq m · 799 sq ft | 14 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Joshi Deshaware & Associates | — |
| Chartered accountant | As Suterwala & Co | — |
| Engineer | Ss Cons | — |
Source: MahaRERA project page. Contact details are not shown.