It is due for completion in Aug 2028, with no extension on record; no MahaRERA orders on record; 92% of its units are booked.

Dombivli, Thane 421202 · by Radhika Construction Company

DeliveryDue Aug 2028No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales92% booked94 of 102 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

It is due for completion in Aug 2028, with no extension on record

  • This projectRegistered 14 Mar 2024, completion promised 31 Aug 2028.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page. Construction % is the average of the developer's own declared activity progress to MahaRERA, not an inspection.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700055300
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170005530014 Mar 202431 Aug 2028—Radhika Construction CompanyProject page
Documents205

93 documents held by Deedo, 112 filings listed on MahaRERA's project page

Commencement certificate (2)

Form 1 (11)

Show all 205 documentsShow fewer documents

Form 1 (11)

Title report (2)

Other (45)

Allotment letter (2)

Encumbrance details (6)

Form 2 (17)

Form B

Form 2A (3)

Form 5

Registration certificate

Layout plan (2)

Document library

  • Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 trinity 29nov23.pdf · uploaded 5 Dec 2023View
  • Commencement Certificates / NA Order for plotted developmentShashank Saptshrung CC.pdf · uploaded 5 Dec 2023View
  • Copy of Layout Approval (in case of layout)Shashank Saptshrung Sanction plan 1.pdf · uploaded 5 Dec 2023View
  • Copy of Layout Approval (in case of layout)Shashank Saptshrung Sanction plan 2.pdf · uploaded 5 Dec 2023View
  • Building Plan Approval / NA Order for plotted developmentShashank Saptshrung Sanction plan 1.pdf · uploaded 5 Dec 2023View
  • a Details of encumbrances concerned to FinanceDeclaration Regarding Encumbrances_Legal.pdf · uploaded 13 Dec 2023View
  • b Details of encumbrances concerned to LegalDeclaration Regarding Encumbrances_Legal.pdf · uploaded 13 Dec 2023View
  • Disclosure of sold/ booked inventoryTrinity ( Shashank Saptshrung ) Allotment Inventory.pdf · uploaded 13 Dec 2023View
  • Other – TechnicalTrinity ( Shashank Saptshrung ) Allotment Inventory.pdf · uploaded 13 Dec 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsS R Marathe Annexure A - Discloure Of Interest in Other real estate.pdf · uploaded 13 Dec 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsGirish Marathe Annexure A - Discloure Of Interest in Other real estate.pdf · uploaded 13 Dec 2023View
  • Copy of the legal title reportFINAL Title Report Saptshrung.pdf · uploaded 13 Dec 2023View
  • Declaration about Commencement CertificateDeclaration for Commencement TRINITY.pdf · uploaded 15 Dec 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexture A R S Marathe TRINITY.pdf · uploaded 15 Dec 2023View
  • Other – TechnicalDeclaration.pdf · uploaded 15 Dec 2023View
  • Proforma of Allotment lettertrinity rera allotment letter.pdf · uploaded 29 Jan 2024View
  • Deviation Report with respect to Allotment lettertrinity allotment no deviation.pdf · uploaded 29 Jan 2024View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A -RERA Bank Account Details.pdf · uploaded 2 Feb 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ( COST FOR SALEABLE AREA).pdf · uploaded 3 Feb 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ( COST FOR ALLOTTED FLATS).pdf · uploaded 3 Feb 2024View
  • Copy of the legal title reportTitle ReporT SHASHANK NEW.pdf · uploaded 22 Feb 2024View
  • Proforma of Agreement for saleTRNITY SALE AGREEMENT.pdf · uploaded 22 Feb 2024View
  • Deviation Report with respect to model copy of AgreementDAVIATION AFFIDAVIT FINAL.pdf · uploaded 22 Feb 2024View
  • Declaration in FORM BFORM B OF TRINITY.pdf · uploaded 22 Feb 2024View
  • Other – Technicaltrinity Declaration Cum Undertaking as per order 50-2024.pdf · uploaded 22 Feb 2024View
  • a Details of encumbrances concerned to FinanceDeclaration Regarding Encumbrances_Finance.pdf · uploaded 22 Feb 2024View
  • a Details of encumbrances concerned to FinanceDeclaration Regarding Encumbrances_Legal.pdf · uploaded 22 Feb 2024View
  • b Details of encumbrances concerned to LegalDeclaration Regarding Encumbrances_Finance.pdf · uploaded 22 Feb 2024View
  • b Details of encumbrances concerned to LegalDeclaration Regarding Encumbrances_Legal.pdf · uploaded 22 Feb 2024View
  • CERSAI detailsCERSAI UNDERTAKING.pdf · uploaded 22 Feb 2024View
  • Other – LegalRadhika Construction Co Partnership Deed.pdf · uploaded 22 Feb 2024View
  • CERSAI detailsAsset Based Search trinity 22 feb 2024.pdf · uploaded 22 Feb 2024View
  • CERSAI detailscersai mail extract.pdf · uploaded 22 Feb 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM -2A TRINITY 31 MARCH 2024.pdf · uploaded 11 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)fORM 2 TRINITY FOR FLAT ALLOTED TO OLDMEMBERS FOR MARCH 2024.pdf · uploaded 11 Oct 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)tRINITYFORM 1 FOR MARCH 2024.pdf · uploaded 11 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)tRINITY fORM 2 fOR SALEABLE AREA TO TRINITY FOR mARCH 2024.pdf · uploaded 11 Oct 2024View
  • Disclosure of sold/ booked inventoryDISCLOSURE OF UNSOLD INVENTORY TRINITY.pdf · uploaded 11 Oct 2024View
  • Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD BOOKED INVENTORY AS ON 30 JUNE 2024.pdf · uploaded 11 Oct 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)tRINITY Architect's Certificate FOR 30 JUNE 2024.pdf · uploaded 11 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)fORM 2 FOR SALEABLE AREA AVAILABLE FOR TRINITY.pdf · uploaded 11 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)fORM 2 FOR OLD SCTY MEMBERS TRINITY.pdf · uploaded 11 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2 TRINITY Society Member 30SEPT 2024.pdf · uploaded 6 Nov 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form - 2 TRINITY Saleable Area 30 SEPT 24.pdf · uploaded 6 Nov 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM -1 TRINITY 30 SEPT 24.pdf · uploaded 6 Nov 2024View
  • Deviation Report with respect to model copy of AgreementRERA DRAFT OF TRINITY PROJECT.pdf · uploaded 9 Nov 2024View
  • Deviation Report with respect to model copy of Agreementtrinity RERA AGREEMENT daviation.pdf · uploaded 9 Nov 2024View
  • Proforma of Agreement for saleRERA DRAFT OF TRINITY PROJECT.pdf · uploaded 9 Nov 2024View
  • Disclosure for secured/unsecured finance availed for the projectfinal Disclosure for Secured finance aviled for Trinity.pdf · uploaded 9 Nov 2024View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat -A Bank Declaration.pdf · uploaded 9 Nov 2024View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)ICICI Format B.pdf · uploaded 9 Nov 2024View
  • CERSAI detailsCERSAI_Search_Report_200327050394_For_Debtor_Based_Search_09_11_2024_15_48_55_637.pdf · uploaded 9 Nov 2024View
  • Disclosure of sold/ booked inventoryTrinity Inventary certificate on 30sept 2024.pdf · uploaded 9 Nov 2024View
  • a Details of encumbrances concerned to Financefinal Encumbrance Regarding Finance trinity.pdf · uploaded 9 Nov 2024View
  • b Details of encumbrances concerned to Legalfinal Encumbrance Regarding Finance trinity.pdf · uploaded 9 Nov 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 TRINITY FOR MARCH 2024.pdf · uploaded 5 Dec 2024View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat 'A' Trinity.pdf · uploaded 7 Dec 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Society - trinity dec 24.pdf · uploaded 3 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 trinity Dec 24.pdf · uploaded 3 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Saleble area Trinity dec24.pdf · uploaded 3 Feb 2025View
  • Disclosure of sold/ booked inventoryTRINITY SOLD INVENTORY AS ON DEC24.pdf · uploaded 3 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)11 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 18 Apr 2025Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)12 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 18 Apr 2025Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)6 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 18 Apr 2025Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)1 Engineers Certificate on Quality Assurance (Form 2A FY 2024-25).pdf · uploaded 18 Apr 2025View
  • Disclosure of sold/ booked inventory6 Disclosure of sold booked inventory_compressed.pdf · uploaded 18 Apr 2025View
  • Form 1Trinity Architect Certificate 30sept 2025.pdf · uploaded 8 Nov 2025View
  • Form 2trinity Engineer Certificate Saleable Area 30 sept 2025.pdf · uploaded 8 Nov 2025View
  • OthersTrinity Form 2 Society Members 30 sept 2025.pdf · uploaded 8 Nov 2025View
  • Disclosure of Sold and Booked InventoryFinal Trinity Sold Inventory 30 sept 2025.pdf · uploaded 8 Nov 2025View
  • Form 1Architect's Certificate FOR 30 JUNE 2024.pdf · uploaded 20 Nov 2025View
  • Form 2ENGINEERS CERTIFICATE 15-07-24.pdf · uploaded 20 Nov 2025View
  • OthersENGINEERS CERTIFICATE F-2 15-07-24.pdf · uploaded 20 Nov 2025View
  • Disclosure of Sold and Booked InventorySold and Unsold_merged.pdf · uploaded 20 Nov 2025View
  • Form 1FORM -1 TRINITY 30 SEPT 24.pdf · uploaded 20 Nov 2025View
  • Form 2Form 2 merged.pdf · uploaded 20 Nov 2025View
  • Disclosure of Sold and Booked InventorySold unsold Merged.pdf · uploaded 20 Nov 2025View
  • OthersTrinity Society member new flat allotment1 (1).pdf · uploaded 20 Nov 2025View
  • Form 1Form 1 Architect's Certificate.pdf · uploaded 20 Nov 2025View
  • Form 2Form 2Merged.pdf · uploaded 20 Nov 2025View
  • Disclosure of Sold and Booked Inventorysold unsold Merged.pdf · uploaded 20 Nov 2025View
  • Form 1Form -1 as on 31-3-25.pdf · uploaded 20 Nov 2025View
  • Disclosure of Sold and Booked InventorySold Booked Inventory as on 31-3-25.pdf · uploaded 20 Nov 2025View
  • OthersForm 2A as on 31-3-25.pdf · uploaded 20 Nov 2025View
  • Form 2Form 2 Merged.pdf · uploaded 20 Nov 2025View
  • Form 1(Form 1)_Architect Certificate_Trinity_31 Dec 2025.pdf · uploaded 2 May 2026View
  • Form 2Form 2 Engimeer Certificate_Merged for Soc and Salable.pdf · uploaded 2 May 2026View
  • Disclosure of Sold and Booked InventorySold Booked Inventory as on 31 Dec 2025.pdf · uploaded 2 May 2026View
  • OthersUnsold Inventory as on 31 Dec 2025.pdf · uploaded 2 May 2026View
  • Form 1(Form 1)_Architect Certificate_Trinity_31-03-2024.pdf · uploaded 6 Aug 2026View
  • Form 2(Form 2)_Engineers Certificate_Trinity_31-03-2024.pdf · uploaded 6 Aug 2026View
  • Disclosure of Sold and Booked InventoryDisclosure of Unsold Inventory_31-03-2024.pdf · uploaded 6 Aug 2026View
  • Form 5 (FY 2023-2024)(Form 5)_CA Audit Report_Trinity_FY 2023-24.pdf · uploaded 6 Aug 2026View
  • Form 2A (FY 2023-2024)(Form 2A)_Quality Assurance Certificate_Trinity_31-03-2024.pdf · uploaded 7 Aug 2026View
  • Form 2A (FY 2024-2025)(Form 2A)_Q4_31-03-2025.pdf · uploaded 7 Aug 2026View
  • Form 2A (FY 2025-2026)Trinity Form 2A as on March 2026.pdf · uploaded 7 Aug 2026View
  • Withdrawal Update Form 1Form_1_Architech Certificate_Space_as on March 2026.pdf · uploaded 19 Sep 2026View
  • Withdrawal Update Form 2Form 2_March 2026_Merged.pdf · uploaded 19 Sep 2026View
  • Withdrawal Update Form 1Form_1_Architech Certificate_Space_as on March 2026.pdf · uploaded 19 Sep 2026View
  • Withdrawal Update Form 2Form 2_March 2026_Merged.pdf · uploaded 19 Sep 2026View
  • Withdrawal Update Form 1(Form 1)_Architect Certificate_Trinity_June 2026.pdf · uploaded 19 Sep 2026View
  • Withdrawal Update Form 2(Form 2)_Engineers Certificate_June 2026_Merged.pdf · uploaded 19 Sep 2026View
  • Withdrawal Update Form 1(Form 1)_Trinity_Architecture Certificate_June 2026.pdf · uploaded 19 Sep 2026View
  • Withdrawal Update Form 2(Form 2)_Trinity Merged_June 2026.pdf · uploaded 19 Sep 2026View

Promoter documents

  • Legal Title reportFINAL Title Report Saptshrung.pdf · uploaded 13 Dec 2023View
  • Legal Title reportTitle ReporT SHASHANK NEW.pdf · uploaded 22 Feb 2024View
  • Declaration Form BFORM B OF TRINITY.pdf · uploaded 22 Feb 2024View

Technical documents

  • Layout ApprovalShashank Saptshrung Sanction plan 1.pdfView
  • Layout ApprovalShashank Saptshrung Sanction plan 2.pdfView
  • Building Plan ApprovalShashank Saptshrung Sanction plan 1.pdfView

Other legal documents

  • Other – LegalRadhika Construction Co Partnership Deed.pdfView

Proforma allotment letter

  • Proforma allotment lettertrinity rera allotment letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsCTS 3084, cts no 3084 · KALYAN DOMBIVLI MUNICIPAL CORPORATION

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Active
Address
cts no 3084, s no 65, hissa no 5, DEVI CHOWK SHASHTRI NAGAR, dombivli westPIN 421202
Village
Dombivli, Kalyan taluka
Land area for this project
2,000 sq m (21,523 sq ft)
Permissible built-up area
9,667 sq m (1,04,058 sq ft)
Sanctioned built-up area
5,845 sq m (62,918 sq ft)
Recreational open space
0 sq m (0 sq ft)
Planning authority
KALYAN DOMBIVLI MUNICIPAL CORPORATION
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Survey, CTS, gat or plot numbers

3084cts no 3084hissa no 5s no 65

Land as published on MahaRERA's project page

cts no 3084, s no 65, hissa no 5

Boundaries

North
15 Mtr Road
South
Datta Smruti And 15 Mtr Approach Road Upto Pathak
East
Raj Mahal Chs And Shri Anand Joshis Property
West
Radha Niwas And Ganesh Kripa Building

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking1 parking space

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress2 buildings and areas

Work completed, as the promoter reported it to MahaRERA (Form 1)

Trinity - Shashank Saptashrung

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure75%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water Supply0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)0%
  • Storm Water Drains0%
  • Landscaping & Tree Planting0%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And Disposal0%
  • Water conservation /Rain water harvesting0%
  • Energy managemcnt0%
  • Fire protection and fire safety requirements0%
  • Electrical meter room, sub-station, receiving station0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Professionals9

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSpace Enviro Architects—
ArchitectSpace Enviro Architects—
Chartered accountantankur sangoi & associates—
Chartered accountantankur sangoi & associates—
Chartered accountantNikita—
Engineerentech engineers—
EngineerEntech Engineers—
EngineerGirish Shrikrishna Marathe—
OtherSomnath Avhad—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology