Heena Ashish
Deedo IDDP-THN-EHRBCompletion was pushed back 4 months, to Apr 2029; no MahaRERA orders on record; 0% of its units are booked.
Chikanghar, Thane 421301 · by Built Charms Corporation
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2029
- This projectRegistered 27 Jul 2023, completion promised 31 Dec 2028, revised to 30 Apr 2029.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700052193
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700052193 | 27 Jul 2023 | 31 Dec 2028 | 30 Apr 2029 | Built Charms Corporation | Project page |
Documents133
1 document held by Deedo, 132 filings listed on MahaRERA's project page
Finance
- PAN CardBCC pan card (1).pdf · uploaded 14 Jun 2023Source
Legal
Show all 133 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 14 Jun 2023Source
- 1 Building Plan Approval / NA Order for plotted development2_compressed.pdf · uploaded 14 Jun 2023Source
- 2 Building Plan Approval / NA Order for plotted development3 (3)_compressed.pdf · uploaded 14 Jun 2023Source
- 3 Building Plan Approval / NA Order for plotted development4 (3)_compressed.pdf · uploaded 14 Jun 2023Source
- 4 Building Plan Approval / NA Order for plotted development5 (2)_compressed.pdf · uploaded 14 Jun 2023Source
- 5 Building Plan Approval / NA Order for plotted development6 (3)_compressed.pdf · uploaded 14 Jun 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentHeena ashish CC.pdf · uploaded 14 Jun 2023Source
- 1 Declaration about Commencement CertificateForm D - Declaration about commencement certificate.pdf · uploaded 14 Jun 2023Source
- 1 CERSAI detailsNo encumbrance certificate.pdf · uploaded 14 Jun 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_compressed.pdf · uploaded 14 Jun 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnesure A-Kiran mahajan.pdf · uploaded 14 Jun 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A-Akash Patil.pdf · uploaded 14 Jun 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A-Amit Adekar.pdf · uploaded 14 Jun 2023Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A-BCC.pdf · uploaded 14 Jun 2023Source
- 5 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A-Rajendra Borgaonkar.pdf · uploaded 14 Jun 2023Source
- 6 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A-Umesh Borgaonkar.pdf · uploaded 14 Jun 2023Source
- 7 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest - Ashish D.pdf · uploaded 14 Jun 2023Source
- 8 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest - John Mathew.pdf · uploaded 14 Jun 2023Source
- 9 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest - Sanjay B.pdf · uploaded 14 Jun 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeparate Bank Account.pdf · uploaded 14 Jun 2023Source
- 1 Copy of the legal title reportTitle certificate Heena Ashish Jun 19, 2023 4-17 PM (1).pdf · uploaded 24 Jun 2023Source
- 1 Other – LegalAdobe Scan Jun 29, 2023 (1).pdf · uploaded 2 Jul 2023Source
- 1 Declaration in FORM BForm B-SB- Notarised.pdf · uploaded 12 Jul 2023Source
- 1 Proforma of Agreement for saleAgreement for sale- proforma new.pdf · uploaded 12 Jul 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation- Agreement for sale_compressed.pdf · uploaded 12 Jul 2023Source
- 1 Proforma of Allotment letterorder no 30_compressed.pdf · uploaded 20 Jul 2023Source
- 1 Deviation Report with respect to Allotment letter1 Deviation Report with respect to Allotment letter (2).pdf · uploaded 20 Jul 2023Source
- 2 Copy of Layout Approval (in case of layout)Heena Ashish Saction Plan Revised 23 Floor-1.pdf · uploaded 8 Sep 2023Source
- 3 Copy of Layout Approval (in case of layout)Heena Ashish Saction Plan Revised 23 Floor-2.pdf · uploaded 8 Sep 2023Source
- 4 Copy of Layout Approval (in case of layout)Heena Ashish Saction Plan Revised 23 Floor-3.pdf · uploaded 8 Sep 2023Source
- 5 Copy of Layout Approval (in case of layout)Heena Ashish Saction Plan Revised 23 Floor-4.pdf · uploaded 8 Sep 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentHeena Ashish CC letter REVISED 23 FLOOR.pdf · uploaded 8 Sep 2023Source
- 2 Declaration about Commencement CertificateHeena Ashish CC letter REVISED 23 FLOOR.pdf · uploaded 8 Sep 2023Source
- 3 Declaration about Commencement Certificateformat D REVISED.pdf · uploaded 8 Sep 2023Source
- 2 a Details of encumbrances concerned to Financeencumbrance certificate.pdf · uploaded 4 Dec 2023Source
- 2 b Details of encumbrances concerned to Legalencumbrance certificate.pdf · uploaded 4 Dec 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-Architect certificate.pdf · uploaded 29 Apr 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q2 2023-24.pdf · uploaded 29 Apr 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Architect certificate Q3 2023-24.pdf · uploaded 29 Apr 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Architect certificate Q4 FY 2023-24.pdf · uploaded 29 Apr 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engineer certificate- HA.pdf · uploaded 29 Apr 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q2 2023-24.pdf · uploaded 29 Apr 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Engineer certificate Q3 2023-24.pdf · uploaded 29 Apr 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Engg certificate Q4 FY 2023-24.pdf · uploaded 29 Apr 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 -CA certificate.pdf · uploaded 29 Apr 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-Jul-Sep 23 FY 2023-24 HA_compressed.pdf · uploaded 29 Apr 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-Oct-Dec 23 FY 2023-24 HA_compressed.pdf · uploaded 29 Apr 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-CA Certificate Q4 FY 23-24.pdf · uploaded 2 May 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-Architects certificate Q1 2023-24.pdf · uploaded 30 Nov 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Architect certificate Q2 FY 24-25.pdf · uploaded 30 Nov 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-CA certificate Q1 2023-24_compressed.pdf · uploaded 30 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2-Engineer certificate Q1 2023-24.pdf · uploaded 30 Nov 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Engineers certificate Q2 FY 24-25.pdf · uploaded 30 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A-QA certificate.pdf · uploaded 30 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A-QA certificate.pdf · uploaded 30 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)built charms corporation form5 heena ashish_0001.pdf · uploaded 9 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-Architect certificat Q3 FY-24-25.pdf · uploaded 17 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- CA certificate Q2 FY 24-25_compressed.pdf · uploaded 17 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2-Engineers Certificate Q3 FY 24-25.pdf · uploaded 25 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-CA certificate_compressed.pdf · uploaded 11 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)BCC- Form 1_architect certificate.pdf · uploaded 30 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)BCC- Form 2_engineer certificate.pdf · uploaded 30 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)BCC-Form 3 -ca certificate_.pdf · uploaded 2 May 2025Source
- Withdrawal Update Form 1Form 1- Architect certificate Q4 FY 2023-24.pdf · uploaded 26 May 2025Source
- Withdrawal Update Form 2Form 2- Engg certificate Q4 FY 2023-24.pdf · uploaded 26 May 2025Source
- Withdrawal Update Form 3Form 3-CA Certificate Q4 FY 23-24.pdf · uploaded 26 May 2025Source
- Form 1BCC- Form 1_architect certificate.pdf · uploaded 27 May 2025Source
- Form 2BCC- Form 2_engineer certificate.pdf · uploaded 27 May 2025Source
- Form 3BCC-Form 3 -ca certificate_.pdf · uploaded 27 May 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold & unsold_0001.pdf · uploaded 27 May 2025Source
- Withdrawal Update Form 1Form 1-Architect certificate Q1 FY 2025-2.pdf · uploaded 28 Jul 2025Source
- Withdrawal Update Form 1Form 1-Architect certificate Q1 FY 2025-2.pdf · uploaded 28 Jul 2025Source
- Withdrawal Update Form 2Form 2-Engg Certificate Q1 FY 2025-26.pdf · uploaded 28 Jul 2025Source
- Withdrawal Update Form 2Form 2-Engg Certificate Q1 FY 2025-26.pdf · uploaded 28 Jul 2025Source
- Withdrawal Update Form 3Form 3 Q1 FY 2025-26.pdf · uploaded 28 Jul 2025Source
- Withdrawal Update Form 3Form 3 Q1 FY 2025-26.pdf · uploaded 28 Jul 2025Source
- Form 2A (FY 2024-2025)Form 2A-QA 2024-25.pdf · uploaded 4 Aug 2025Source
- Form 1Form 1-Architect certificat Q3 FY-24-25.pdf · uploaded 11 Nov 2025Source
- Form 2Form 2-Engineers Certificate Q3 FY 24-25.pdf · uploaded 11 Nov 2025Source
- Form 3Form 3-CA certificate Q3.pdf · uploaded 11 Nov 2025Source
- Disclosure of Sold and Booked Inventorysold inventory.pdf · uploaded 11 Nov 2025Source
- Withdrawal Update Form 1Form 1-Architect certificate Q1 FY 2025-2.pdf · uploaded 12 Nov 2025Source
- Withdrawal Update Form 2Form 2-Engg Certificate Q1 FY 2025-26.pdf · uploaded 12 Nov 2025Source
- Withdrawal Update Form 3Built Charms Corporation CA Certificate 11-07-2025_0001_compressed.pdf · uploaded 12 Nov 2025Source
- Withdrawal Update Form 1architect certificate Q2 2025-26.pdf · uploaded 25 Nov 2025Source
- Withdrawal Update Form 2Engineers Certificate Q2 2025-26.pdf · uploaded 25 Nov 2025Source
- Withdrawal Update Form 3form 3-CA certificate Q2 2025-26.pdf · uploaded 25 Nov 2025Source
- Form 5 (FY 2023-2024)built charms corporation form5 heena ashish_0001.pdf · uploaded 1 Dec 2025Source
- Form 5 (FY 2024-2025)Form 5- FY 2024-25.pdf · uploaded 1 Dec 2025Source
- Withdrawal Update Form 1Architect certificate Q3 2025-26.pdf · uploaded 20 Feb 2026Source
- Withdrawal Update Form 2Engineer Certificate Q3 2025-26.pdf · uploaded 20 Feb 2026Source
- Withdrawal Update Form 3CA Certificate Q3 2025-26_compressed.pdf · uploaded 20 Feb 2026Source
- Withdrawal Update Form 1Form 1-BCC.pdf · uploaded 20 May 2026Source
- Withdrawal Update Form 2Form 2-BCC.pdf · uploaded 20 May 2026Source
- Withdrawal Update Form 3Form 3-BCC.pdf · uploaded 20 May 2026Source
- Form 2A (FY 2025-2026)Form 2A FY 2025-26.pdf · uploaded 31 Jul 2026Source
- Withdrawal Update Form 1BCC architects certificate Q1.pdf · uploaded 12 Aug 2026Source
- Withdrawal Update Form 2BCC engineer certificate 30-6-2026.pdf · uploaded 12 Aug 2026Source
- Withdrawal Update Form 3ca certificate BCC Q1 FY 2026-27.pdf · uploaded 12 Aug 2026Source
- Withdrawal Update Form 1BCC architects certificate Q1.pdf · uploaded 21 Aug 2026Source
- Withdrawal Update Form 1BCC architects certificate Q1.pdf · uploaded 21 Aug 2026Source
- Withdrawal Update Form 2BCC engineer certificate 30-6-2026.pdf · uploaded 21 Aug 2026Source
- Withdrawal Update Form 2BCC engineer certificate 30-6-2026.pdf · uploaded 21 Aug 2026Source
- Withdrawal Update Form 3ca certificate BCC Q1 FY 2026-27.pdf · uploaded 21 Aug 2026Source
- Withdrawal Update Form 3ca certificate BCC Q1 FY 2026-27.pdf · uploaded 21 Aug 2026Source
Technical
- Document6 (3)_compressed.pdf · uploaded 14 Jun 2023Source
- DocumentLayout.pdf · uploaded 14 Jun 2023Source
- Document2_compressed.pdf · uploaded 14 Jun 2023Source
- Document3 (3)_compressed.pdf · uploaded 14 Jun 2023Source
- Document4 (3)_compressed.pdf · uploaded 14 Jun 2023Source
- Document5 (2)_compressed.pdf · uploaded 14 Jun 2023Source
- DocumentHeena Ashish Saction Plan Revised 23 Floor-1.pdf · uploaded 8 Sep 2023Source
- DocumentHeena Ashish Saction Plan Revised 23 Floor-2.pdf · uploaded 8 Sep 2023Source
- DocumentHeena Ashish Saction Plan Revised 23 Floor-3.pdf · uploaded 8 Sep 2023Source
- DocumentHeena Ashish Saction Plan Revised 23 Floor-4.pdf · uploaded 8 Sep 2023Source
Technical (Architect)
- DocumentForm 1-Architects certificate Q1 2023-24.pdf · uploaded 30 Nov 2024Source
- DocumentForm 1- Architect certificate Q2 FY 24-25.pdf · uploaded 30 Nov 2024Source
- DocumentForm 1-Architect certificat Q3 FY-24-25.pdf · uploaded 17 Jan 2025Source
- DocumentBCC- Form 1_architect certificate.pdf · uploaded 30 Apr 2025Source
- DocumentBCC architects certificate Q1.pdf · uploaded 29 Jul 2026Source
Technical (Engineer)
- DocumentForm 2-Engineer certificate Q1 2023-24.pdf · uploaded 30 Nov 2024Source
- DocumentForm 2- Engineers certificate Q2 FY 24-25.pdf · uploaded 30 Nov 2024Source
- DocumentForm 2-Engineers Certificate Q3 FY 24-25.pdf · uploaded 25 Jan 2025Source
- DocumentBCC- Form 2_engineer certificate.pdf · uploaded 30 Apr 2025Source
- DocumentBCC engineer certificate 30-6-2026.pdf · uploaded 12 Aug 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel HISSA 3, SURVEY 112
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 3BHK, Office space, Shop202 units in all
- Address
- SURVEY 112, HISSA 3, beturkar pada kalyan, Beturkar PadaPIN 421301
- Village
- Chikanghar, Kalyan taluka
- Land area for this project
- 3,750 sq m (40,365 sq ft)
- Permissible built-up area
- 17,075 sq m (1,83,796 sq ft)
- Sanctioned built-up area
- 17,075 sq m (1,83,796 sq ft)
- Designated bank account
- 76
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
SURVEY 112, HISSA 3
Boundaries
- North
- Balance Survey No 112
- South
- 18 Mtr Wide Dp Road
- East
- Property Of Prakash Jadhav
- West
- Survey No 111
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking202 units
1 of 202 units booked (0%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 57.62 sq m · 620 sq ft | 36 | 0 |
| 2BHK | 60.33 sq m · 649 sq ft | 2 | 0 |
| 2BHK | 62.09 sq m · 668 sq ft | 1 | 0 |
| 2BHK | 63.46 sq m · 683 sq ft | 73 | 0 |
| 2BHK | 79.26 sq m · 853 sq ft | 1 | 0 |
| 2BHK | 80.26 sq m · 864 sq ft | 1 | 0 |
| 3BHK | 72.72 sq m · 783 sq ft | 22 | 0 |
| 3BHK | 74.5 sq m · 802 sq ft | 6 | 1 |
Show all 31 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 37.22 sq m · 401 sq ft | 3 | 0 |
| Office space | 39.18 sq m · 422 sq ft | 15 | 0 |
| Office space | 46.37 sq m · 499 sq ft | 3 | 0 |
| Office space | 46.59 sq m · 501 sq ft | 3 | 0 |
| Office space | 49.71 sq m · 535 sq ft | 3 | 0 |
| Office space | 64.05 sq m · 689 sq ft | 3 | 0 |
| Office space | 65.39 sq m · 704 sq ft | 3 | 0 |
| Office space | 79.55 sq m · 856 sq ft | 3 | 0 |
| Shop | 22.11 sq m · 238 sq ft | 3 | 0 |
| Shop | 28.67 sq m · 309 sq ft | 1 | 0 |
| Shop | 35.4 sq m · 381 sq ft | 1 | 0 |
| Shop | 35.92 sq m · 387 sq ft | 1 | 0 |
| Shop | 36 sq m · 388 sq ft | 1 | 0 |
| Shop | 36.91 sq m · 397 sq ft | 3 | 0 |
| Shop | 39.43 sq m · 424 sq ft | 1 | 0 |
| Shop | 41.63 sq m · 448 sq ft | 1 | 0 |
| Shop | 43.81 sq m · 472 sq ft | 3 | 0 |
| Shop | 45.95 sq m · 495 sq ft | 1 | 0 |
| Shop | 64.97 sq m · 699 sq ft | 1 | 0 |
| Shop | 69.42 sq m · 747 sq ft | 1 | 0 |
| Shop | 101.19 sq m · 1,089 sq ft | 1 | 0 |
| Shop | 102.99 sq m · 1,109 sq ft | 1 | 0 |
| Shop | 105.41 sq m · 1,135 sq ft | 4 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals33
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Subhedar And Associates | — |
| Chartered accountant | Aakash Rajkumar Bhavnani | — |
| Chartered accountant | Mohit Prakash Jain | — |
| Engineer | Ajay Mahale | — |
| Other | Aakash Bhavnani | — |
| Registered real estate agent | Ajay Kumar Trilochan Prasad Shukla | — |
| Registered real estate agent | Being Prop Life Style LLP | — |
| Registered real estate agent | Bhavesh Shaligram Chaudhry | — |
Show all 33 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Registered real estate agent | Deepak Kanniswamy Thevar | — |
| Registered real estate agent | Gurpreet Singh Bhupinder Singh Anand | — |
| Registered real estate agent | Headways Realty | — |
| Registered real estate agent | Home Bazaar Services Pvt Ltd | — |
| Registered real estate agent | Home Corner Advisory LLP | — |
| Registered real estate agent | Home Land Realtors | — |
| Registered real estate agent | Home Street Realtors | — |
| Registered real estate agent | Investors Clinic Infratech Private Limited | — |
| Registered real estate agent | Lalit Ramesh Dapke | — |
| Registered real estate agent | Mangesh Sanjay Shinde | — |
| Registered real estate agent | Mayur Rakesh Mathur | — |
| Registered real estate agent | Property Pillars LLP | — |
| Registered real estate agent | Rakesh Gajanan Gidh | — |
| Registered real estate agent | Rakesh Singh | — |
| Registered real estate agent | Ravi Balkrishna Thorat | — |
| Registered real estate agent | Regnum Group | — |
| Registered real estate agent | Sachin Shivaji Torane | — |
| Registered real estate agent | Sagar Rajendra Patil | — |
| Registered real estate agent | Satish Tukaram Ghawali | — |
| Registered real estate agent | Stonebridge Real Estate Advisory Pvt Ltd | — |
| Registered real estate agent | Tushar Bhagwan Bijlani | — |
| Registered real estate agent | Vashdev Ladharam Vijur | — |
| Registered real estate agent | Viren Vilas Tawde | — |
| Registered real estate agent | Vishal Balasaheb Fulwar | — |
| Registered real estate agent | Yogesh Nanikram Ramsinghani | — |
Source: MahaRERA project page. Contact details are not shown.