Dipti SkyCity
Deedo IDDP-THN-ZVKRCompletion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 15% of its units are booked.
Ambarnath, Maharashtra 400102 · Promoter: Dipti Home Makers Pvt Ltd
Completion was pushed back 4 months, to Apr 2027
- P51700008856Registered 19 Aug 2017, completion promised 31 Jul 2023, and still not shown completed today.
- P51700048627Registered 10 Jan 2023, completion promised 31 Dec 2026, revised to 30 Apr 2027.
No extension certificate on record.
2 registrations · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
3 buildings
Open a building to see every flat, floor by floor.
- Building No 19 floors · 42 units50% booked
- Building No 39 floors · 56 units25% booked
- Dipti Sky City Building No 712 floors · 132 units23% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrations2
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700008856 | 19 Aug 2017 | 31 Jul 2023 | 31 Jul 2023 | Dipti Home Makers Pvt Ltd | Project page |
| P51700048627 | 10 Jan 2023 | 31 Dec 2026 | 30 Apr 2027 | Dipti Home Makers Pvt Ltd | Project page |
Documents163
2 documents held by Deedo, 161 filings listed on MahaRERA's project page
Registration certificate (2)
Finance
- PAN CardP51700048627 · DHMPL PAN CARD.pdf · uploaded 6 Oct 2022Source
Legal
- Legal Title reportP51700008856 · title.pdf · uploaded 27 Jul 2017Source
- Declaration Form BP51700008856 · Declaration.pdf · uploaded 27 Jul 2017Source
- OtherP51700008856 · final OC Himalaya.pdf · uploaded 6 Feb 2018Source
- OtherP51700008856 · OC Satpura Building 1.pdf · uploaded 26 Mar 2018Source
- Declaration Form BP51700048627 · Scan-4-5.pdf · uploaded 8 Oct 2022Source
Show all 163 documentsShow fewer documents
Legal
- Legal Title reportP51700048627 · Title certificate.pdf · uploaded 24 Nov 2022Source
- Other – LegalP51700048627 · Declaration cum Undertaking 25042025.pdf · uploaded 25 Apr 2025Source
- Other – LegalP51700048627 · Declaration Rationale account change 24042025.pdf · uploaded 25 Apr 2025Source
- Other – LegalP51700048627 · Format A 24042025.pdf · uploaded 25 Apr 2025Source
- Other – LegalP51700048627 · Form 3 Opal Bay Revised 25042025.pdf · uploaded 25 Apr 2025Source
- Other – LegalP51700048627 · Form 3 Sky City March 2025_compressed.pdf · uploaded 25 Apr 2025Source
- Other – LegalP51700048627 · Declaration cum undertaking Sky City 24042025.pdf · uploaded 25 Apr 2025Source
Migrated
- 1 Copy of the legal title reportP51700008856 · title.pdf · uploaded 27 Jul 2017Source
- 1 Details of encumbrancesP51700008856 · No encumbrances.pdf · uploaded 27 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)P51700008856 · 1.pdf · uploaded 27 Jul 2017Source
- 2 Copy of Layout Approval (in case of layout)P51700008856 · 2 com.pdf · uploaded 27 Jul 2017Source
- 3 Copy of Layout Approval (in case of layout)P51700008856 · 3.pdf · uploaded 27 Jul 2017Source
- 1 Building Plan Approval (IOD)P51700008856 · 1.pdf · uploaded 27 Jul 2017Source
- 2 Building Plan Approval (IOD)P51700008856 · 2 com.pdf · uploaded 27 Jul 2017Source
- 3 Building Plan Approval (IOD)P51700008856 · 3.pdf · uploaded 27 Jul 2017Source
- 1 Declaration in FORM BP51700008856 · Declaration.pdf · uploaded 27 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700008856 · Arch Certific.pdf · uploaded 27 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700008856 · Eng Certi.pdf · uploaded 27 Jul 2017Source
- 1 Proforma of Allotment letterP51700008856 · Sample Allotment Letter.pdf · uploaded 27 Jul 2017Source
- 1 Certificates of CA (Form 3)P51700008856 · Form 3 - Ambernath 1 to 3.pdf · uploaded 31 Jul 2017Source
- 2 Proforma of Allotment letterP51700008856 · Draft Agreement.pdf · uploaded 31 Jul 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700008856 · final OC Himalaya.pdf · uploaded 6 Feb 2018Source
- 1 OtherP51700008856 · final OC Himalaya.pdf · uploaded 6 Feb 2018Source
- 2 OtherP51700008856 · OC Satpura Building 1.pdf · uploaded 26 Mar 2018Source
- 1 Certificates of Architect (Form 4)P51700008856 · FORM 4.pdf · uploaded 19 Dec 2018Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51700008856 · OC Satpura Building No 1.pdf · uploaded 26 Oct 2021Source
- 1 PAN CardP51700048627 · DHMPL PAN CARD.pdf · uploaded 6 Oct 2022Source
- 1 a Details of encumbrances concerned to FinanceP51700048627 · Scan-1.pdf · uploaded 8 Oct 2022Source
- 1 b Details of encumbrances concerned to LegalP51700048627 · Scan-1.pdf · uploaded 8 Oct 2022Source
- 1 Copy of Layout Approval (in case of layout)P51700048627 · Approved Plan All Pages.pdf · uploaded 8 Oct 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP51700048627 · Approved Plan All Pages.pdf · uploaded 8 Oct 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700048627 · CC.pdf · uploaded 8 Oct 2022Source
- 1 Declaration about Commencement CertificateP51700048627 · Scan-3.pdf · uploaded 8 Oct 2022Source
- 1 Declaration in FORM BP51700048627 · Scan-4-5.pdf · uploaded 8 Oct 2022Source
- 1 Proforma of Allotment letterP51700048627 · Allotment Letter.pdf · uploaded 8 Oct 2022Source
- 2 a Details of encumbrances concerned to FinanceP51700048627 · Undertaking for CERSAI.pdf · uploaded 23 Nov 2022Source
- 2 b Details of encumbrances concerned to LegalP51700048627 · Undertaking for CERSAI.pdf · uploaded 23 Nov 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP51700048627 · Format A for unique Bank Account.pdf · uploaded 23 Nov 2022Source
- 1 Deviation Report with respect to Allotment letterP51700048627 · Deviation Report for AL.pdf · uploaded 23 Nov 2022Source
- 1 Copy of the legal title reportP51700048627 · Title certificate.pdf · uploaded 24 Nov 2022Source
- 3 a Details of encumbrances concerned to FinanceP51700048627 · No encumbrances.pdf · uploaded 6 Dec 2022Source
- 3 b Details of encumbrances concerned to LegalP51700048627 · No encumbrances.pdf · uploaded 6 Dec 2022Source
- 1 CERSAI detailsP51700048627 · Undertaking for CERSAI.pdf · uploaded 6 Dec 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700048627 · Form 3 with UDIN.pdf · uploaded 14 Dec 2022Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP51700048627 · Format A CKS.pdf · uploaded 14 Dec 2022Source
- 1 Proforma of Agreement for saleP51700048627 · Agreement for Sale Bldg 7 15th Dec.pdf · uploaded 16 Dec 2022Source
- 1 Deviation Report with respect to model copy of AgreementP51700048627 · Deviation Report for AFS.pdf · uploaded 16 Dec 2022Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP51700048627 · Disclosure of Directors 2nd Jan 2023_compressed.pdf · uploaded 2 Jan 2023Source
- 4 a Details of encumbrances concerned to FinanceP51700048627 · RERA Encumbrance certificate 24th Feb 2023.pdf · uploaded 25 Feb 2023Source
- 4 b Details of encumbrances concerned to LegalP51700048627 · RERA Encumbrance certificate 24th Feb 2023.pdf · uploaded 25 Feb 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700048627 · Form 1 31st Dec 2022.pdf · uploaded 29 May 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700048627 · Form 1 31st March 2023.pdf · uploaded 29 May 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700048627 · Annexure A-Form 1 June 2023.pdf · uploaded 5 Sep 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700048627 · Dipti Skycity Form 2 30th june 2023.pdf · uploaded 5 Sep 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700048627 · FORM 1 - ANNEXURE A - 30-09-2023.pdf · uploaded 25 Oct 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700048627 · FORM 2 - ANNEXURE B - 30-09-2023.pdf · uploaded 25 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P51700048627 · Form 2A 2022-23.pdf · uploaded 25 Oct 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700048627 · Form 3 30-09-2023.pdf · uploaded 25 Oct 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700048627 · Form 3 RERA June 2023.pdf · uploaded 11 Nov 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51700048627 · FORM 5 ANNUAL AUDIT REPORT OF STATUTORY.pdf · uploaded 22 Nov 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700048627 · Form 2 - Annexure B - 31-03-2023.pdf · uploaded 29 Nov 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700048627 · Form 3 March 2023.pdf · uploaded 29 Nov 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700048627 · Form 2 Quarter Jan 2023-March 2023_0001.pdf · uploaded 29 Dec 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700048627 · Form 2 Quarter April 2023 to June 2023_0001.pdf · uploaded 29 Dec 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700048627 · Form 2 Quarter June 2023-Sep 2023_0001.pdf · uploaded 29 Dec 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700048627 · Form 3 Quarter April 2023-June 2023_0001.pdf · uploaded 29 Dec 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700048627 · Form 1 Quarter 1 31032023_0001.pdf · uploaded 20 Jan 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700048627 · Form 1 Quarter 2 30062023_0001.pdf · uploaded 20 Jan 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700048627 · Form 1 Quarter 3 30092023_0001.pdf · uploaded 20 Jan 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700048627 · Form 1 Quarter 4 31122023_0001.pdf · uploaded 20 Jan 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700048627 · Form 2 Quarter 1 31032023_0001.pdf · uploaded 20 Jan 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700048627 · Form 2 Quarter 2 30062023_0001.pdf · uploaded 20 Jan 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700048627 · Form 2 Quarter 3 30092023_0001.pdf · uploaded 20 Jan 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700048627 · FOrm 2 Quarter 4 31122023.pdf · uploaded 20 Jan 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700048627 · Form 3 Quarter 4 31122023_0001.pdf · uploaded 20 Jan 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51700048627 · Form 5 from HSMP for 2022-23.pdf · uploaded 11 Mar 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700048627 · Form 1 Dipti Skycity March 2024 Signed_0001.pdf · uploaded 20 Apr 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700048627 · Form 2 Sky city March 2024 Signed_0001.pdf · uploaded 20 Apr 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700048627 · Form 3 Dipti Sky City March 2024 Signed_0001.pdf · uploaded 20 Apr 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700048627 · Form 1 Skycity 30062024 Signed_0001.pdf · uploaded 20 Jul 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700048627 · Form 3 SkyCity 30062024 Signed_0001.pdf · uploaded 20 Jul 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700048627 · Form 2 SkyCity 30062024 signed_0001.pdf · uploaded 24 Jul 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700048627 · Form 3 Skycity Sep 2024 signed_compressed.pdf · uploaded 19 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700048627 · Form 1 Skycity Sep 2024 Signed_0001.pdf · uploaded 21 Oct 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700048627 · Form 1 Skycity Sep 2024 Signed_0001_0001.pdf · uploaded 21 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700048627 · Form 2 Skycity Sep 2024 signed_0001.pdf · uploaded 21 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700048627 · Form 1 Skycity Signed Dec 2024_0001.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700048627 · Form 3 Skycity Signed Dec 2024 New_0001.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700048627 · Form 2 Signed Skycity Dec 2024.pdf · uploaded 27 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700048627 · Form 1 Sky City March 2025.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700048627 · Form 3 Sky City March 2025_compressed.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700048627 · Form 2 Sky city March 2025.pdf · uploaded 19 Apr 2025Source
- 1 Other – LegalP51700048627 · Declaration cum Undertaking 25042025.pdf · uploaded 25 Apr 2025Source
- 2 Other – LegalP51700048627 · Declaration Rationale account change 24042025.pdf · uploaded 25 Apr 2025Source
- 3 Other – LegalP51700048627 · Format A 24042025.pdf · uploaded 25 Apr 2025Source
- 4 Other – LegalP51700048627 · Form 3 Opal Bay Revised 25042025.pdf · uploaded 25 Apr 2025Source
- 5 Other – LegalP51700048627 · Form 3 Sky City March 2025_compressed.pdf · uploaded 25 Apr 2025Source
- 6 Other – LegalP51700048627 · Declaration cum undertaking Sky City 24042025.pdf · uploaded 25 Apr 2025Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)P51700048627 · Form B HDFC 09th july 2025.pdf · uploaded 15 Jul 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700048627 · Form 1 Skycity June 2025_0001.pdf · uploaded 19 Jul 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700048627 · Skycity form 2 June 2025_0001.pdf · uploaded 19 Jul 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700048627 · Form 3 Skycity signed revised_0001.pdf · uploaded 22 Jul 2025Source
- Withdrawal Update Form 1P51700048627 · Form 1 Dipti Sky City June 2026.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 1P51700048627 · Form 1 Skycity June 2025_0001.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 1P51700048627 · Form 1 Skycity Sep 2025.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 1P51700048627 · Form 1 Skycity Sep 2025.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 1P51700048627 · Form 1 Skycity Sep 2025.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 1P51700048627 · Form 1 Skycity Sep 2025.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 1P51700048627 · Form 1 Skycity Sep 2025.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 1P51700048627 · form 1 Skycity Dec 2025.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 1P51700048627 · Form 1 Sky City March 2026.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 1P51700048627 · Form 1 Dipti Sky City June 2026.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 2P51700048627 · Form 2 Dipti Sky City June 2026.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 2P51700048627 · Form 2 Dipti Sky City June 2026.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 2P51700048627 · Form 2 Dipti Skycity Sep 2025 signed_0001.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 2P51700048627 · Form 2 Dipti Skycity Sep 2025 signed_0001.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 2P51700048627 · Form 2 Dipti Skycity Sep 2025 signed_0001.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 2P51700048627 · Form 2 Dipti Skycity Sep 2025 signed_0001.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 2P51700048627 · Form 2 Dipti Skycity Sep 2025 signed_0001.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 2P51700048627 · Form 2 Sky City_0001.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 2P51700048627 · Form 2 Skycity March 2026.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 2P51700048627 · Form 2 Dipti Sky City June 2026.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 3P51700048627 · Form 3 Skycity June 2026_0001.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 3P51700048627 · Form 3 Skycity signed revised_0001.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 3P51700048627 · Form 3 Skycity Signed_0001.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 3P51700048627 · Form 3 Skycity Signed_0001.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 3P51700048627 · Form 3 Skycity Signed_0001.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 3P51700048627 · Form 3 Skycity Signed_0001.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 3P51700048627 · Form 3 Skycity Signed_0001.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 3P51700048627 · Form 3 Dipti Sky City Dec 2025.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 3P51700048627 · Form 3 Skycity March 2026.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 3P51700048627 · Form 3 Skycity June 2026_0001.pdf · uploaded 30 Jul 2026Source
- Form 2A (FY 2025-2026)P51700048627 · Form 2A 2025-26.pdf · uploaded 1 Oct 2026Source
- Form 5 (FY 2025-2026)P51700048627 · Form 5 Sky city 2025-26.pdf · uploaded 1 Oct 2026Source
Technical
- DocumentP51700008856 · 2 com.pdf · uploaded 27 Jul 2017Source
- DocumentP51700008856 · 3.pdf · uploaded 27 Jul 2017Source
- DocumentP51700008856 · 1.pdf · uploaded 27 Jul 2017Source
- DocumentP51700008856 · 1.pdf · uploaded 27 Jul 2017Source
- DocumentP51700008856 · 2 com.pdf · uploaded 27 Jul 2017Source
- DocumentP51700008856 · 3.pdf · uploaded 27 Jul 2017Source
- DocumentP51700048627 · Approved Plan All Pages.pdf · uploaded 8 Oct 2022Source
- DocumentP51700048627 · Approved Plan All Pages.pdf · uploaded 8 Oct 2022Source
Technical (Architect)
- DocumentP51700008856 · Arch Certific.pdf · uploaded 27 Jul 2017Source
- DocumentP51700048627 · Form 1 Skycity Sep 2024 Signed_0001.pdf · uploaded 21 Oct 2024Source
- DocumentP51700048627 · Form 1 Skycity Sep 2024 Signed_0001_0001.pdf · uploaded 21 Oct 2024Source
- DocumentP51700048627 · Form 1 Skycity Signed Dec 2024_0001.pdf · uploaded 20 Jan 2025Source
- DocumentP51700048627 · Form 1 Sky City March 2025.pdf · uploaded 19 Apr 2025Source
- DocumentP51700048627 · Form 1 Skycity June 2025_0001.pdf · uploaded 19 Jul 2025Source
- DocumentP51700048627 · Form 1 Dipti Sky City June 2026.pdf · uploaded 30 Jul 2026Source
Technical (Engineer)
- DocumentP51700008856 · Eng Certi.pdf · uploaded 27 Jul 2017Source
- DocumentP51700048627 · Form 2 Skycity Sep 2024 signed_0001.pdf · uploaded 21 Oct 2024Source
- DocumentP51700048627 · Form 2 Signed Skycity Dec 2024.pdf · uploaded 27 Jan 2025Source
- DocumentP51700048627 · Form 2 Sky city March 2025.pdf · uploaded 19 Apr 2025Source
- DocumentP51700048627 · Skycity form 2 June 2025_0001.pdf · uploaded 19 Jul 2025Source
- DocumentP51700048627 · Form 2 Dipti Sky City June 2026.pdf · uploaded 30 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvals54 3B 54 3D 57 1, Survey no 543b 543d 571 pt at Ambarnath
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Phases
- 2
- Unit types
- 2BHK, 1BHK, —230 units in all
- Address
- Survey no 54-3b 54-3d 57-1 ptPIN 400102
- Village
- Ambarnath (R), Chavindra taluka
- Location
- 19.19022, 73.17289
- Designated bank account
- 220
- Developed in phases
- Yes
- Also registered as
- Dipti SkyCity Building 1 and 3, Dipti Skycity Bldg No. 7
Survey, CTS, gat or plot numbers
Boundaries
- North
- boundary of ambernath
- South
- centre for handicapped-p 186p 54-3
- East
- 24 mtr dp road
- West
- survey no 54-a and b
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking230 units
35 of 230 units booked (15%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P51700008856 | Building No 1 | 2BHK | 51.32 sq m · 552 sq ft | 14 | 4 |
| P51700008856 | Building No 1 | 2BHK | 51.9 sq m · 559 sq ft | 28 | 17 |
| P51700008856 | Building No 3 | 1BHK | 33.33 sq m · 359 sq ft | 28 | 8 |
| P51700008856 | Building No 3 | 1BHK | 33.72 sq m · 363 sq ft | 28 | 6 |
| P51700048627 | Dipti Sky City Building No 7 | — | — | 132 | — |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals9
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Jitendra Patel Samarthya Engineers K Patel | — | P51700048627 |
| Architect | Mr Jitendra S Patel Samarthya Engineers | — | P51700008856 |
| Architect | Pramod Kamble | — | P51700048627 |
| Chartered accountant | Anita Choudhari | — | P51700048627 |
| Chartered accountant | Ashish C Halwai | — | P51700048627 |
| Chartered accountant | Dixit Dattatray and Associates D Dixit | — | P51700048627 |
| Chartered accountant | Mohandas and Co M Shetty | — | P51700048627 |
| Engineer | Atul Kudtarkar and Associates | — | P51700048627 |
| Engineer | Manzur Husain Hebballi | — | P51700048627 |
Source: MahaRERA project page. Contact details are not shown.