Bliss Studio
Deedo IDDP-RAI-KFQ0It is due for completion in Dec 2026, with no extension on record; no MahaRERA orders on record; 37% of its units are booked.
Tadwadi, Raigarh 410201 · by Balsam Builders
Buying a flat here?
See every deed registered on it.
It is due for completion in Dec 2026, with no extension on record
- This projectRegistered 17 May 2017, completion promised 19 Dec 2026.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52000000003
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52000000003 | 17 May 2017 | 19 Dec 2026 | 19 Dec 2026 | Balsam Builders | Project page |
Documents165
2 documents held by Deedo, 163 filings listed on MahaRERA's project page
Finance
- PAN CardBalsam Builders Pan Card.PDF · uploaded 4 May 2017Source
Legal
- Legal Title reportTITLE REPORT - 1MB.pdf · uploaded 5 May 2017Source
- Declaration Form BDECLERATION IN FORM B 1 MB.pdf · uploaded 12 May 2017Source
- Legal Title reportTITLE CLEARANCE CERTIFICATE - 13-2-2018 1 MB.pdf · uploaded 25 May 2018Source
- OtherFORM-4 WITHDRAWAL REQUEST.pdf · uploaded 3 Jul 2019Source
- OtherCertificate_Balsam Builders.pdf · uploaded 3 Jul 2019Source
Show all 165 documentsShow fewer documents
Legal
Migrated
- 1 PAN CardBalsam Builders Pan Card.PDF · uploaded 4 May 2017Source
- 1 Copy of the legal title reportTITLE REPORT - 1MB.pdf · uploaded 5 May 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentNA ORDER.PDF · uploaded 5 May 2017Source
- 1 Signed Proforma of the allotment letter and agreement for saleAGREEMENT FOR SALE & ALLOTMENT LETTER.pdf · uploaded 10 May 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 ARCHITECT CERTIFICATE - 1MB.pdf · uploaded 11 May 2017Source
- 1 Declaration in FORM BDECLERATION IN FORM B 1 MB.pdf · uploaded 12 May 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2- AJIT TYAGI - 1- 1MB.pdf · uploaded 12 May 2017Source
- 1 Certificates of CA (Form 3)FORM 3- CA.PDF · uploaded 12 May 2017Source
- 1 Certificates of CA (Form 5)FORM 5- CA.PDF · uploaded 12 May 2017Source
- 1 Details of encumbrancesDETAILS OF ENCUMBRANCES.pdf · uploaded 15 May 2017Source
- 1 Copy of Layout Approval (in case of layout)SANCTION PLAN 1-3.pdf · uploaded 8 Sep 2017Source
- 2 Copy of Layout Approval (in case of layout)SANCTION PLAN 2-3.pdf · uploaded 8 Sep 2017Source
- 3 Copy of Layout Approval (in case of layout)SANCTION PLAN 3-3.pdf · uploaded 8 Sep 2017Source
- 1 Building Plan Approval (IOD)SANCTION PLAN 1-3.pdf · uploaded 8 Sep 2017Source
- 2 Building Plan Approval (IOD)SANCTION PLAN 2-3.pdf · uploaded 8 Sep 2017Source
- 3 Building Plan Approval (IOD)SANCTION PLAN 3-3.pdf · uploaded 8 Sep 2017Source
- 2 Copy of the legal title reportTITLE CLEARANCE CERTIFICATE - 13-2-2018 1 MB.pdf · uploaded 25 May 2018Source
- 4 Copy of Layout Approval (in case of layout)SANCTION PLAN - 2018 - 1MB.pdf · uploaded 25 May 2018Source
- 4 Building Plan Approval (IOD)SANCTION PLAN - 2018 - 1MB.pdf · uploaded 25 May 2018Source
- 2 Commencement Certificates / NA Order for plotted developmentREVISED NA ORDER- 3-2-2018 1 MB.pdf · uploaded 25 May 2018Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)MahaRERA_FORM 1_ARCHITECT 1 MB- 20-03-2018.pdf · uploaded 25 May 2018Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)MahaRERA_FORM 2_ENGINEER 23-5-2018.pdf · uploaded 25 May 2018Source
- 2 Certificates of CA (Form 3)MahaRERA_FORM 3_CA Pg 1 to 5.pdf · uploaded 25 May 2018Source
- 3 Certificates of CA (Form 3)MahaRERA_FORM 3_CA Pg 6 to 16.pdf · uploaded 25 May 2018Source
- 2 Certificates of CA (Form 5)MahaRERA_FORM 5_CA- 21-05-2018.pdf · uploaded 25 May 2018Source
- 2 Signed Proforma of the allotment letter and agreement for saleAGREEMENT FOR SALE DRAFT-2018.pdf · uploaded 25 May 2018Source
- 3 Signed Proforma of the allotment letter and agreement for saleALLOTMENT LETTER-2018.pdf · uploaded 25 May 2018Source
- 1 OtherFORM-4 WITHDRAWAL REQUEST.pdf · uploaded 3 Jul 2019Source
- 2 OtherCertificate_Balsam Builders.pdf · uploaded 3 Jul 2019Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)MahaRERA_FORM 1_ARCHITECT 4-8-2021.pdf · uploaded 7 Aug 2021Source
- 4 Certificates of CA (Form 3)MahaRERA_FORM 3_CA- 1.pdf · uploaded 24 Sep 2021Source
- 5 Certificates of CA (Form 3)MahaRERA_FORM 3_CA- 2.pdf · uploaded 24 Sep 2021Source
- 3 Certificates of CA (Form 5)MahaRERA_FORM 5_CA- 21-9-2021.pdf · uploaded 24 Sep 2021Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)MahaRERA_FORM 2_ENGINEER 27-9-2021.pdf · uploaded 29 Sep 2021Source
- 1 Declaration about Commencement CertificateFORMAT D -CC Decleration.pdf · uploaded 8 Dec 2022Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH.pdf · uploaded 8 Dec 2022Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENG.pdf · uploaded 8 Dec 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)2017.PDF · uploaded 8 Dec 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)2018.pdf · uploaded 8 Dec 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)2021.pdf · uploaded 8 Dec 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)2022.pdf · uploaded 8 Dec 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameRERA BANK LETTER.pdf · uploaded 8 Dec 2022Source
- 2 a Details of encumbrances concerned to FinanceNO ENCUMBRANCE LEGAL TITLE TO LAND.pdf · uploaded 13 Dec 2022Source
- 1 b Details of encumbrances concerned to LegalNO ENCUMBRANCE LEGAL TITLE TO LAND.pdf · uploaded 13 Dec 2022Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER.pdf · uploaded 13 Dec 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A.pdf · uploaded 13 Dec 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 13 Dec 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A.pdf · uploaded 13 Dec 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_2.pdf · uploaded 13 Dec 2022Source
- 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD - UNSOLD INVENTORY (1).pdf · uploaded 13 Dec 2022Source
- 6 Certificates of CA (Form 3)MahaRERA_FORM 3_CA- 29-11-2022_1-9.pdf · uploaded 13 Dec 2022Source
- 7 Certificates of CA (Form 3)MahaRERA_FORM 3_CA- 29-11-2022_10-end.pdf · uploaded 13 Dec 2022Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1.pdf · uploaded 11 May 2023Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY.pdf · uploaded 11 May 2023Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameRERA BANK LETTER 10-5-2023.pdf · uploaded 11 May 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A.pdf · uploaded 13 May 2023Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)MahaRERA_FORM 2_ENGINEER 22-05-2023 NEW.pdf · uploaded 9 Jun 2023Source
- 8 Certificates of CA (Form 3)MahaRERA_FORM 3_CA- 22-05-2023 (2)_compressed (1).pdf · uploaded 9 Jun 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A - Disclosure of Interest in other Real Estate Organizations - 2.pdf · uploaded 9 Jun 2023Source
- 2 Declaration about Commencement CertificateDECL CC.pdf · uploaded 18 Oct 2023Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH.pdf · uploaded 18 Oct 2023Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENG.pdf · uploaded 18 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)ENG 2A.pdf · uploaded 18 Oct 2023Source
- 3 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 18 Oct 2023Source
- 9 Certificates of CA (Form 3)CA (1).pdf · uploaded 18 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)CA FORM 5.pdf · uploaded 27 Oct 2023Source
- 1 Proforma of Agreement for saleAGREEMENT FOR SALE DRAFT.pdf · uploaded 28 Oct 2023Source
- 3 Declaration about Commencement CertificateFORMAT D -CC Decleration B.pdf · uploaded 23 Dec 2023Source
- 2 Declaration in FORM BFORM B (8).pdf · uploaded 23 Dec 2023Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)BLISS FORM 1.pdf · uploaded 23 Dec 2023Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER.pdf · uploaded 23 Dec 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM-2A.pdf · uploaded 23 Dec 2023Source
- 4 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD - UNSOLD INVENTORY_compressed.pdf · uploaded 23 Dec 2023Source
- 10 Certificates of CA (Form 3)FORM 3 (3).pdf · uploaded 23 Dec 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5.PDF · uploaded 23 Dec 2023Source
- 4 Declaration about Commencement CertificateNEW DECLARATION OF CC.pdf · uploaded 28 May 2024Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1.pdf · uploaded 28 May 2024Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)MahaRERA_FORM 2.pdf · uploaded 28 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM-2A.pdf · uploaded 28 May 2024Source
- 5 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD - UNSOLD INVENTORY compressed.pdf · uploaded 5 Jun 2024Source
- 11 Certificates of CA (Form 3)MahaRERA_FORM 3_CA- NEW_compressed.pdf · uploaded 5 Jun 2024Source
- 1 Certificates of CA (Form 3)CA CERTIFICATE (2).pdf · uploaded 28 Oct 2024Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE SEPT.pdf · uploaded 27 Feb 2025Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE DEC.pdf · uploaded 27 Feb 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENIGNEER CERTIFICATE SEPT.pdf · uploaded 27 Feb 2025Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENIGNEER CERTIFICATE DEC.pdf · uploaded 27 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2 (A) SEPT.pdf · uploaded 27 Feb 2025Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2(A) DEC.pdf · uploaded 27 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 SEPT.pdf · uploaded 27 Feb 2025Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 DEC.pdf · uploaded 27 Feb 2025Source
- 1 Certificates of CA (Form 3)CA CERTIFICATE DEC_11zon.pdf · uploaded 3 Mar 2025Source
- Withdrawal Update Form 1Architecture - Form 1.pdf · uploaded 8 Oct 2025Source
- Withdrawal Update Form 1Architecture - Form 1.pdf · uploaded 8 Oct 2025Source
- Withdrawal Update Form 1Architecture - Form 1.pdf · uploaded 8 Oct 2025Source
- Withdrawal Update Form 1Architecture - Form 1.pdf · uploaded 8 Oct 2025Source
- Withdrawal Update Form 1Architecture - Form 1.pdf · uploaded 8 Oct 2025Source
- Withdrawal Update Form 2ENGINEER - FORM 2 .pdf · uploaded 8 Oct 2025Source
- Withdrawal Update Form 2ENGINEER - FORM 2 .pdf · uploaded 8 Oct 2025Source
- Withdrawal Update Form 2ENGINEER - FORM 2 .pdf · uploaded 8 Oct 2025Source
- Withdrawal Update Form 2ENGINEER - FORM 2 .pdf · uploaded 8 Oct 2025Source
- Withdrawal Update Form 2ENGINEER - FORM 2 .pdf · uploaded 8 Oct 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 8 Oct 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 8 Oct 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 8 Oct 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 8 Oct 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 8 Oct 2025Source
- Withdrawal Update Form 1Architecture - Form 1.pdf · uploaded 9 Oct 2025Source
- Withdrawal Update Form 2ENGINEER - FORM 2 .pdf · uploaded 9 Oct 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 9 Oct 2025Source
- Withdrawal Update Form 1Architecture - Form 1.pdf · uploaded 13 Oct 2025Source
- Withdrawal Update Form 1Architecture - Form 1.pdf · uploaded 13 Oct 2025Source
- Withdrawal Update Form 2ENGINEER - FORM 2 .pdf · uploaded 13 Oct 2025Source
- Withdrawal Update Form 2ENGINEER - FORM 2 .pdf · uploaded 13 Oct 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 13 Oct 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 13 Oct 2025Source
- Withdrawal Update Form 1FORM 1 ARCHITECT CERTIFICATE.pdf · uploaded 10 Feb 2026Source
- Withdrawal Update Form 2FORM 2 ENGINEER CERTIFICATE.pdf · uploaded 10 Feb 2026Source
- Withdrawal Update Form 3FROM 3 CA CERTIFICATE.pdf · uploaded 10 Feb 2026Source
- Withdrawal Update Form 1FROM 1 ARCHITECT CERTIFICATE.pdf · uploaded 11 Feb 2026Source
- Withdrawal Update Form 2FORM 2 ENGINEER CERTIFICATE.pdf · uploaded 11 Feb 2026Source
- Withdrawal Update Form 3FORM 3 CA CERTIFICATE.pdf · uploaded 11 Feb 2026Source
- Form 2A (FY 2023-2024)Form 2A 2023-2024.pdf · uploaded 28 Apr 2026Source
- Form 2A (FY 2024-2025)Form 2A 2024-2025.pdf · uploaded 28 Apr 2026Source
- Withdrawal Update Form 1FORM 1 ARCHITECT CERTIFICATE 31-03-26.pdf · uploaded 13 May 2026Source
- Withdrawal Update Form 2FORM 2 ENGINEER CERTIFICATE 31-03-2026.pdf · uploaded 13 May 2026Source
- Withdrawal Update Form 3FORM 3 CA CERTIFICATE 31-03-2026.pdf · uploaded 13 May 2026Source
- Form 2A (FY 2025-2026)FORM 2A.pdf · uploaded 13 May 2026Source
- Withdrawal Update Form 1FORM 1 ARCHITECT CERTIFICATE 31-03-26.pdf · uploaded 20 May 2026Source
- Withdrawal Update Form 1FORM 1 ARCHITECT CERTIFICATE 31-03-26.pdf · uploaded 20 May 2026Source
- Withdrawal Update Form 2FORM 2 ENGINEER CERTIFICATE 31-03-2026.pdf · uploaded 20 May 2026Source
- Withdrawal Update Form 2FORM 2 ENGINEER CERTIFICATE 31-03-2026.pdf · uploaded 20 May 2026Source
- Withdrawal Update Form 3FORM 3 CA CERTIFICATE 31-03-2026.pdf · uploaded 20 May 2026Source
- Withdrawal Update Form 3FORM 3 CA CERTIFICATE 31-03-2026.pdf · uploaded 20 May 2026Source
- Withdrawal Update Form 1FORM 1 ARCHITECT CERTIFICATE 30-06-2026.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 2FORM 2 ENGINEER CERTIFICATE 30-06-2026.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 3FORM 3 CA CERTIFICATE 30-06-2026.pdf · uploaded 14 Aug 2026Source
Technical
- DocumentSANCTION PLAN 1-3.pdf · uploaded 8 Sep 2017Source
- DocumentSANCTION PLAN 2-3.pdf · uploaded 8 Sep 2017Source
- DocumentSANCTION PLAN 3-3.pdf · uploaded 8 Sep 2017Source
- DocumentSANCTION PLAN 1-3.pdf · uploaded 8 Sep 2017Source
- DocumentSANCTION PLAN 2-3.pdf · uploaded 8 Sep 2017Source
- DocumentSANCTION PLAN 3-3.pdf · uploaded 8 Sep 2017Source
- DocumentSANCTION PLAN - 2018 - 1MB.pdf · uploaded 25 May 2018Source
- DocumentSANCTION PLAN - 2018 - 1MB.pdf · uploaded 25 May 2018Source
- DocumentBUILDING PLAN APPROVAL PART 1 PAGE 1 AND 2.pdf · uploaded 17 Sep 2026Source
- DocumentBUILDING PLAN APPROVAL PART 2 PAGE 3.pdf · uploaded 17 Sep 2026Source
- DocumentBUILDING PLAN APPROVAL.pdf · uploaded 23 Sep 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel Gut No 102 Plot No 38 to 67
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- Wind d studio apt, Wing a studio apt, Wing b studio apt, Wing c studio apt, Wing d studio apt, Wing e studio apt300 units in all
- Address
- Gut No 102 Plot No 38 to 67, PATHRAJ, PATHRAJPIN 410201
- Village
- Tadwadi, Karjat taluka
- Location
- 19.06367, 73.45293
- Land area for this project
- 8,696 sq m (93,603 sq ft)
- Permissible built-up area
- 10,433 sq m (1,12,300 sq ft)
- Sanctioned built-up area
- 10,433 sq m (1,12,300 sq ft)
- Recreational open space
- 6,188 sq m (66,607 sq ft)
- Designated bank account
- 220
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Gut No 102 Plot No 38 to 67
Boundaries
- North
- Survey No 49
- South
- Survey No 47
- East
- Internal Road
- West
- Internal Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking300 units
110 of 300 units booked (37%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Wind d studio apt | 28.96 sq m · 312 sq ft | 32 | 0 |
| Wing a studio apt | 23.71 sq m · 255 sq ft | 20 | 18 |
| Wing a studio apt | 26.53 sq m · 286 sq ft | 30 | 28 |
| Wing b studio apt | 28.96 sq m · 312 sq ft | 32 | 26 |
| Wing b studio apt | 31.66 sq m · 341 sq ft | 48 | 38 |
| Wing c studio apt | 28.96 sq m · 312 sq ft | 16 | 0 |
| Wing c studio apt | 31.66 sq m · 341 sq ft | 24 | 0 |
| Wing d studio apt | 31.66 sq m · 341 sq ft | 48 | 0 |
| Wing e studio apt | 25.16 sq m · 271 sq ft | 20 | 0 |
| Wing e studio apt | 26.53 sq m · 286 sq ft | 30 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Manan Dedhia | — |
| Chartered accountant | Tilakchandra Shirsat | — |
| Engineer | Ajeet Kumar Tyagi | — |
Source: MahaRERA project page. Contact details are not shown.