Krushna Kunj
Deedo IDDP-RAI-ZMXVIts promised completion date, Dec 2025, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 78% of its units are booked.
Ghot, Raigarh 410210 · by Krushna Dham Builders & Developers Ghot
Buying a flat here?
See every deed registered on it.
Its promised completion date, Dec 2025, has passed and MahaRERA does not show it completed
- This projectRegistered 11 Sep 2018, completion promised 30 Dec 2025, and still not shown completed today.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
8 buildings
Open a building to see every flat, floor by floor.
- Building No 1 And 2 Flats7 floors
- Building No 1 And 2 Shops7 floors · 115 units52% booked
- Building No 34 floors · 24 units100% booked
- Building No 44 floors · 20 units100% booked
- Building No 54 floors · 24 units100% booked
- Building No 64 floors · 48 units100% booked
- Building No 77 floors · 70 units73% booked
- Building No 84 floors · 32 units100% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52000017765
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52000017765 | 11 Sep 2018 | 30 Dec 2025 | 30 Dec 2025 | Krushna Dham Builders & Developers Ghot | Project page |
Documents168
1 document held by Deedo, 167 filings listed on MahaRERA's project page
Finance
- PAN CardPAN CARD - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 28 Aug 2018Source
Legal
- Legal Title reportLEGAL TITLE REPORT - 5-2 - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 28 Aug 2018Source
- Legal Title reportLEGAL TITLE REPORT - 5-4-7 - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 28 Aug 2018Source
- Legal Title reportLEGAL TITLE REPORT - 5-5 - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 28 Aug 2018Source
- Legal Title reportLEGAL TITLE REPORT - 5-6 - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 28 Aug 2018Source
- Declaration Form BFORM B - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 28 Aug 2018Source
- Otherdeclaration.pdf · uploaded 17 Aug 2021Source
Show all 168 documentsShow fewer documents
Migrated
- 1 PAN CardPAN CARD - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 28 Aug 2018Source
- 1 Copy of the legal title reportLEGAL TITLE REPORT - 5-2 - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 28 Aug 2018Source
- 2 Copy of the legal title reportLEGAL TITLE REPORT - 5-4-7 - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 28 Aug 2018Source
- 3 Copy of the legal title reportLEGAL TITLE REPORT - 5-5 - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 28 Aug 2018Source
- 4 Copy of the legal title reportLEGAL TITLE REPORT - 5-6 - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 28 Aug 2018Source
- 1 Details of encumbrancesLETTER OF ENCUMBRANCES - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 28 Aug 2018Source
- 1 Copy of Layout Approval (in case of layout)LAYOUT PLAN - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 28 Aug 2018Source
- 1 Building Plan Approval (IOD)COMMENCEMENT CERTIFICATE - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 28 Aug 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 28 Aug 2018Source
- 1 Declaration in FORM BFORM B - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 28 Aug 2018Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 28 Aug 2018Source
- 1 Proforma of Allotment letterProforma of the allotment letter and agreement for sale - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 28 Aug 2018Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 29 Aug 2018Source
- 1 Certificates of CA (Form 3)CA CERTIFICATE - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 3 Sep 2018Source
- 2 Proforma of Allotment letterAGREEMENT FOR SALE PDF.pdf · uploaded 11 Aug 2020Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 RERA KDBD 19-20.pdf · uploaded 10 Mar 2021Source
- 2 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE - KRUSHNA DHAM B AND D GHOT (1).pdf · uploaded 31 Jul 2021Source
- 1 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf · uploaded 31 Jul 2021Source
- 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 1 AND 2 SHOP.pdf · uploaded 31 Jul 2021Source
- 2 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 1 AND 2.pdf · uploaded 31 Jul 2021Source
- 3 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 3.pdf · uploaded 31 Jul 2021Source
- 4 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 4.pdf · uploaded 31 Jul 2021Source
- 5 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 5.pdf · uploaded 31 Jul 2021Source
- 6 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 6A.pdf · uploaded 31 Jul 2021Source
- 7 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 6B.pdf · uploaded 31 Jul 2021Source
- 8 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 7A.pdf · uploaded 31 Jul 2021Source
- 9 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 7B.pdf · uploaded 31 Jul 2021Source
- 10 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 8A.pdf · uploaded 31 Jul 2021Source
- 11 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 8B.pdf · uploaded 31 Jul 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM 5 RERA KDBD 18-19.pdf · uploaded 31 Jul 2021Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 RERA KDBD 19-20.pdf · uploaded 31 Jul 2021Source
- 3 Proforma of Allotment letterproforma of agreement for sale KRSH DHAM B AND D GHOT - revised.pdf · uploaded 9 Aug 2021Source
- 1 Otherdeclaration.pdf · uploaded 17 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 RERA KDBD 20-21.pdf · uploaded 31 Dec 2021Source
- 2 Details of encumbrancesINDEX-2.pdf · uploaded 6 Nov 2022Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 - 30-06-2019.pdf · uploaded 22 Jul 2023Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 - 30-06-2020.pdf · uploaded 22 Jul 2023Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 - 30-06-2021.pdf · uploaded 22 Jul 2023Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 - 30-06-2022.pdf · uploaded 22 Jul 2023Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)5 - FORM 1 - 30-09-2019.pdf · uploaded 22 Jul 2023Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)6 - FORM 1 - 31-12-2019.pdf · uploaded 22 Jul 2023Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)7 - FORM 1 - 30-09-2020.pdf · uploaded 22 Jul 2023Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)8 - FORM 1 - 31-03-2020.pdf · uploaded 22 Jul 2023Source
- 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)9 - FORM 1 - 31-12-2020.pdf · uploaded 22 Jul 2023Source
- 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)10 - FORM 1 - 31-03-2021.pdf · uploaded 22 Jul 2023Source
- 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)11 - FORM 1 - 30-09-2021.pdf · uploaded 22 Jul 2023Source
- 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)12 - FORM 1 - 31-12-2021.pdf · uploaded 22 Jul 2023Source
- 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)13 - FORM 1 - 31-03-2022.pdf · uploaded 22 Jul 2023Source
- 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)14 - FORM 1 - 30-09-2022.pdf · uploaded 22 Jul 2023Source
- 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)15 - FORM 1 - 31-12-2022.pdf · uploaded 22 Jul 2023Source
- 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)16 - FORM 1 - 31-03-2023.pdf · uploaded 22 Jul 2023Source
- 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)17 - FORM 1 - 30-06-2023.pdf · uploaded 22 Jul 2023Source
- 12 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - BLDG NO 1 TO 8_11zon.pdf · uploaded 22 Jul 2023Source
- 2 Certificates of CA (Form 3)18 - FORM 3 - 31-12-2018.pdf · uploaded 22 Jul 2023Source
- 3 Certificates of CA (Form 3)19 - FORM 3 - 31-03-2019.pdf · uploaded 22 Jul 2023Source
- 4 Certificates of CA (Form 3)20 - FORM 3 - 30-06-2019.pdf · uploaded 22 Jul 2023Source
- 5 Certificates of CA (Form 3)21 - FORM 3 - 30-09-2019.pdf · uploaded 22 Jul 2023Source
- 6 Certificates of CA (Form 3)22 - FORM 3 - 31-12-2019.pdf · uploaded 22 Jul 2023Source
- 7 Certificates of CA (Form 3)23 - FORM 3 - 31-03-2020.pdf · uploaded 22 Jul 2023Source
- 8 Certificates of CA (Form 3)24 - FORM 3 - 30-06-2020.pdf · uploaded 22 Jul 2023Source
- 9 Certificates of CA (Form 3)25 - FORM 3 - 30-09-2020.pdf · uploaded 22 Jul 2023Source
- 10 Certificates of CA (Form 3)26 - FORM 3 - 31-12-2020.pdf · uploaded 22 Jul 2023Source
- 11 Certificates of CA (Form 3)27 - FORM 3 - 31-03-2021.pdf · uploaded 22 Jul 2023Source
- 12 Certificates of CA (Form 3)28 - FORM 3 - 30-06-2021.pdf · uploaded 22 Jul 2023Source
- 13 Certificates of CA (Form 3)29 - FORM 3 - 30-09-2021.pdf · uploaded 22 Jul 2023Source
- 14 Certificates of CA (Form 3)30 - FORM 3 - 31-12-2021.pdf · uploaded 22 Jul 2023Source
- 15 Certificates of CA (Form 3)31 - FORM 3 - 31-03-2022.pdf · uploaded 22 Jul 2023Source
- 16 Certificates of CA (Form 3)32 - FORM 3 - 30-06-2022.pdf · uploaded 22 Jul 2023Source
- 17 Certificates of CA (Form 3)33 - FORM 3 - 30-09-2022.pdf · uploaded 22 Jul 2023Source
- 18 Certificates of CA (Form 3)34 - FORM 3 - 31-12-2022.pdf · uploaded 22 Jul 2023Source
- 19 Certificates of CA (Form 3)35 - FORM 3 - 31-03-2023.pdf · uploaded 22 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 - 31-03-2022.pdf · uploaded 22 Jul 2023Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)1 - FORM 2 - 30-06-2019.pdf · uploaded 4 Nov 2023Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)1 - FORM 2 - 30-06-2019.pdf · uploaded 4 Nov 2023Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2 - FORM 2 - 30-09-2019.pdf · uploaded 4 Nov 2023Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)3 - FORM 2 - 31-12-2019.pdf · uploaded 4 Nov 2023Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)4 - FORM 2 - 31-03-2020.pdf · uploaded 4 Nov 2023Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)5 - FORM 2 - 30-06-2020.pdf · uploaded 4 Nov 2023Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)6 - FORM 2 - 30-09-2020.pdf · uploaded 4 Nov 2023Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)7 - FORM 2 - 31-12-2020.pdf · uploaded 4 Nov 2023Source
- 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)8 - FORM 2 - 31-03-2021.pdf · uploaded 4 Nov 2023Source
- 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)9 - FORM 2 - 30-06-2021.pdf · uploaded 4 Nov 2023Source
- 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)10 - FORM 2 - 30-09-2021.pdf · uploaded 4 Nov 2023Source
- 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)11 - FORM 2 - 31-12-2021.pdf · uploaded 4 Nov 2023Source
- 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)12 - FORM 2 - 31-03-2022.pdf · uploaded 4 Nov 2023Source
- 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)13 - FORM 2 - 30-06-2022.pdf · uploaded 4 Nov 2023Source
- 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)14 - FORM 2 - 30-09-2022.pdf · uploaded 4 Nov 2023Source
- 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)15 - FORM 2 - 31-12-2022.pdf · uploaded 4 Nov 2023Source
- 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)16 - FORM 2 - 31-03-2023.pdf · uploaded 4 Nov 2023Source
- 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 - 30-09-2023.pdf · uploaded 6 Jan 2024Source
- 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 - 30-06-2023.pdf · uploaded 6 Jan 2024Source
- 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 - 30-09-2023.pdf · uploaded 6 Jan 2024Source
- 13 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 30-06-2023.pdf · uploaded 6 Jan 2024Source
- 14 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 30-09-2023.pdf · uploaded 6 Jan 2024Source
- 20 Certificates of CA (Form 3)FORM 3 - 30-06-2023.pdf · uploaded 6 Jan 2024Source
- 2 Copy of Layout Approval (in case of layout)LAYOUT PLAN - 1.pdf · uploaded 18 Jan 2024Source
- 3 Copy of Layout Approval (in case of layout)LAYOUT PLAN - 2.pdf · uploaded 18 Jan 2024Source
- 4 Copy of Layout Approval (in case of layout)LAYOUT PLAN - 3.pdf · uploaded 18 Jan 2024Source
- 5 Copy of Layout Approval (in case of layout)LAYOUT PLAN - 4.pdf · uploaded 18 Jan 2024Source
- 6 Copy of Layout Approval (in case of layout)LAYOUT PLAN - 5.pdf · uploaded 18 Jan 2024Source
- 7 Copy of Layout Approval (in case of layout)LAYOUT PLAN - 6.pdf · uploaded 18 Jan 2024Source
- 8 Copy of Layout Approval (in case of layout)LAYOUT PLAN - 6.pdf · uploaded 18 Jan 2024Source
- 9 Copy of Layout Approval (in case of layout)LAYOUT PLAN - 7.pdf · uploaded 18 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A - 2019 - 20.pdf · uploaded 31 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A - 2020-21.pdf · uploaded 31 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A - 2021-22.pdf · uploaded 31 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A - 2022-23.pdf · uploaded 31 Jan 2024Source
- 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 - 30-12-2023.pdf · uploaded 6 Feb 2024Source
- 15 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 31-12-2023.pdf · uploaded 6 Feb 2024Source
- 21 Certificates of CA (Form 3)FORM 3 - 31-12-2023.pdf · uploaded 6 Feb 2024Source
- 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM-1 KRUSHNA KUNJ - 30-12-2023.pdf · uploaded 7 Feb 2024Source
- 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM - 1 - 31-03-2024.pdf · uploaded 14 Aug 2024Source
- 22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM - 2 - 31-03-2024.pdf · uploaded 14 Aug 2024Source
- 22 Certificates of CA (Form 3)FORM 3 - 07-08-2024.pdf · uploaded 14 Aug 2024Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 - 30-06-2024.pdf · uploaded 1 Mar 2025Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 - 30-09-2024.pdf · uploaded 1 Mar 2025Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 - 31-12-2024.pdf · uploaded 1 Mar 2025Source
- 1 Certificates of CA (Form 3)FORM 3 - 30-06-2024.pdf · uploaded 1 Mar 2025Source
- 2 Certificates of CA (Form 3)FORM 3 - 30-09-2024.pdf · uploaded 1 Mar 2025Source
- 3 Certificates of CA (Form 3)FORM 3 - 31-12-2024.pdf · uploaded 1 Mar 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 - 30-06-2024.pdf · uploaded 1 Mar 2025Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 - 30-06-2024.pdf · uploaded 1 Mar 2025Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 - 30-09-2024.pdf · uploaded 1 Mar 2025Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 - 31-12-2024.pdf · uploaded 1 Mar 2025Source
- 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 30-06-2024.pdf · uploaded 1 Mar 2025Source
- 2 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 30-09-2024.pdf · uploaded 1 Mar 2025Source
- 3 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY - 31-12-2024.pdf · uploaded 1 Mar 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 - 22-23.pdf · uploaded 5 Mar 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FROM 5 - 23-24.pdf · uploaded 5 Mar 2025Source
- Form 1FORM 1 - 31-03-2025.pdf · uploaded 13 Sep 2025Source
- Form 2FORM 2 - 31-03-2025.pdf · uploaded 13 Sep 2025Source
- Form 3FORM 3 - 31-03-2025.pdf · uploaded 13 Sep 2025Source
- Disclosure of Sold and Booked InventoryDISCLOSURE OF SOLD INVENTORY - 31-03-2025.pdf · uploaded 13 Sep 2025Source
- Form 2A (FY 2024-2025)FORM 2A - 2024-25.pdf · uploaded 10 Oct 2025Source
- Withdrawal Update Form 1FORM 1 - 30-06-2025.pdf · uploaded 14 Oct 2025Source
- Withdrawal Update Form 1FORM 1 - 30-06-2025.pdf · uploaded 14 Oct 2025Source
- Withdrawal Update Form 2FORM 2 - 30-06-2025.pdf · uploaded 14 Oct 2025Source
- Withdrawal Update Form 2FORM 2 - 30-06-2025.pdf · uploaded 14 Oct 2025Source
- Withdrawal Update Form 3FORM 3 - 30-06-2025.pdf · uploaded 14 Oct 2025Source
- Withdrawal Update Form 3FORM 3 - 30-06-2025.pdf · uploaded 14 Oct 2025Source
- Form 5 (FY 2024-2025)FORM 5 - 2024 - 25.pdf · uploaded 17 Oct 2025Source
Technical
- DocumentCOMMENCEMENT CERTIFICATE - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 28 Aug 2018Source
- DocumentLAYOUT PLAN - KRUSHNA DHAM BUILDERS AND DEVELOPERS GHOT.pdf · uploaded 28 Aug 2018Source
- DocumentLAYOUT PLAN - 3.pdf · uploaded 18 Jan 2024Source
- DocumentLAYOUT PLAN - 4.pdf · uploaded 18 Jan 2024Source
- DocumentLAYOUT PLAN - 5.pdf · uploaded 18 Jan 2024Source
- DocumentLAYOUT PLAN - 6.pdf · uploaded 18 Jan 2024Source
- DocumentLAYOUT PLAN - 6.pdf · uploaded 18 Jan 2024Source
- DocumentLAYOUT PLAN - 7.pdf · uploaded 18 Jan 2024Source
- DocumentLAYOUT PLAN - 1.pdf · uploaded 18 Jan 2024Source
- DocumentLAYOUT PLAN - 2.pdf · uploaded 18 Jan 2024Source
Technical (Architect)
Technical (Engineer)
- DocumentFORM 2 - 30-06-2024.pdf · uploaded 1 Mar 2025Source
- DocumentFORM 2 - 30-06-2024.pdf · uploaded 1 Mar 2025Source
- DocumentFORM 2 - 30-09-2024.pdf · uploaded 1 Mar 2025Source
- DocumentFORM 2 - 31-12-2024.pdf · uploaded 1 Mar 2025Source
- DocumentFORM 2 - 30-06-2025.pdf · uploaded 10 Oct 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 5/47 GHOT, 5/5
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- —333 units in all
- Address
- Survey No. 5/2, 5/5, 5/6, 5/4-7 Ghot, Ghot, PanvelPIN 410210
- Village
- Ghot, Panvel taluka
- Land area for this project
- 11,130 sq m (1,19,802 sq ft)
- Permissible built-up area
- 16,655 sq m (1,79,273 sq ft)
- Sanctioned built-up area
- 16,655 sq m (1,79,273 sq ft)
- Recreational open space
- 1,109 sq m (11,939 sq ft)
- Designated bank account
- 171
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
SURVEY NO. 5/2, 5/5, 5/6, 5/4-7 GHOT
Boundaries
- North
- 0
- South
- 0
- East
- 0
- West
- 0
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking333 units
333 units registered
| Building | Type | Carpet area | Units |
|---|---|---|---|
| Building No 1 And 2 Shops | — | — | 115 |
| Building No 3 | — | — | 24 |
| Building No 4 | — | — | 20 |
| Building No 5 | — | — | 24 |
| Building No 6 | — | — | 48 |
| Building No 7 | — | — | 70 |
| Building No 8 | — | — | 32 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals6
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | An Arch | — |
| Chartered accountant | Abhl & Associates | — |
| Chartered accountant | Sachin Sunil Jain | — |
| Engineer | Rajendra Balkrishna Gavandi | — |
| Engineer | Yateesh Rajaram Tare | — |
| Other | Chandresh Buildtech | — |
Source: MahaRERA project page. Contact details are not shown.