Sun City
Deedo IDDP-RAI-C21GIt is due for completion in Dec 2026, with no extension on record; no MahaRERA orders on record; 92% of its units are booked.
Damat, Raigarh 410201 · by Rajnir Enterprises Private Limited
Buying a flat here?
See every deed registered on it.
It is due for completion in Dec 2026, with no extension on record
- This projectRegistered 4 Jul 2018, completion promised 31 Dec 2026.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
4 buildings
Open a building to see every flat, floor by floor.
- Building No 13 floors · 21 units100% booked
- Building No 2 Wing A, B, C6 floors · 103 units96% booked
- Building No 3 Wing A, B6 floors · 84 units100% booked
- Building No 4 Wing A B Wing5 floors · 53 units66% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52000017041
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52000017041 | 4 Jul 2018 | 31 Dec 2026 | 31 Dec 2026 | Rajnir Enterprises Private Limited | Project page |
Documents129
1 document held by Deedo, 128 filings listed on MahaRERA's project page
Finance
- PAN CardREPL Pan Card.pdf · uploaded 30 Jun 2018Source
Legal
- Legal Title reportTITLE REPORT (REPL PHASE 3) NEW.pdf · uploaded 30 Jun 2018Source
- Declaration Form BFORM B (1).pdf · uploaded 30 Jun 2018Source
- Declaration Form Bform b (affidavit cum declaration).pdf · uploaded 24 Jan 2025Source
- Declaration Form BNotary Affidavit cum Declaration_page-0001.pdf · uploaded 19 Mar 2025Source
Show all 129 documentsShow fewer documents
Migrated
- 1 Details of encumbrancesEncumbrance.pdf · uploaded 30 Jun 2018Source
- 1 Copy of Layout Approval (in case of layout)LAYOUT BLD 1.pdf · uploaded 30 Jun 2018Source
- 2 Copy of Layout Approval (in case of layout)LAYOUT BLD 2.pdf · uploaded 30 Jun 2018Source
- 3 Copy of Layout Approval (in case of layout)LAYOUT BLD 3.pdf · uploaded 30 Jun 2018Source
- 4 Copy of Layout Approval (in case of layout)LAYOUT BLD4.pdf · uploaded 30 Jun 2018Source
- 1 Building Plan Approval (IOD)LAYOUT BLD 1.pdf · uploaded 30 Jun 2018Source
- 2 Building Plan Approval (IOD)LAYOUT BLD 2.pdf · uploaded 30 Jun 2018Source
- 3 Building Plan Approval (IOD)LAYOUT BLD 3.pdf · uploaded 30 Jun 2018Source
- 4 Building Plan Approval (IOD)LAYOUT BLD4.pdf · uploaded 30 Jun 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate (1).pdf · uploaded 30 Jun 2018Source
- 1 Declaration in FORM BFORM B (1).pdf · uploaded 30 Jun 2018Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer's certificate (1).pdf · uploaded 30 Jun 2018Source
- 1 Certificates of CA (Form 3)CHARTERED_ACCOUNT_1.pdf · uploaded 30 Jun 2018Source
- 2 Certificates of CA (Form 3)CHARTERED_ACCOUNT_2.pdf · uploaded 30 Jun 2018Source
- 3 Certificates of CA (Form 3)CHARTERED_ACCOUNT_3.pdf · uploaded 30 Jun 2018Source
- 1 Proforma of Allotment letterSALE 1 TO 5.pdf · uploaded 30 Jun 2018Source
- 2 Proforma of Allotment lettersale agreement 6 TO 10.pdf · uploaded 30 Jun 2018Source
- 3 Proforma of Allotment lettersale agreement 11 TO 15.pdf · uploaded 30 Jun 2018Source
- 4 Proforma of Allotment lettersale agreement 16 TO 20.pdf · uploaded 30 Jun 2018Source
- 5 Proforma of Allotment lettersale agreement 21 TO 25.pdf · uploaded 30 Jun 2018Source
- 6 Proforma of Allotment lettersale agreement26 TO 30.pdf · uploaded 30 Jun 2018Source
- 7 Proforma of Allotment lettersale agreement 31 TO 35.pdf · uploaded 30 Jun 2018Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect certificate.pdf · uploaded 2 Jul 2018Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)form 1 Architects certificate.pdf · uploaded 15 Feb 2021Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form 2 engineers certificate.pdf · uploaded 15 Feb 2021Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)Rajnir Enterprises Pvt Ltd (Society Certificate).pdf · uploaded 21 Jun 2021Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)form 1 (Architects certificate).pdf · uploaded 16 Oct 2021Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 ENGINEER CERTIFICATE.pdf · uploaded 16 Oct 2021Source
- 4 Certificates of CA (Form 3)CA CERTIFICATE.pdf · uploaded 23 Oct 2021Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 Architects certificate.pdf · uploaded 4 Mar 2022Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form 2 engineer certificate.pdf · uploaded 4 Mar 2022Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE.pdf · uploaded 11 Oct 2022Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE.pdf · uploaded 11 Oct 2022Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECTS CERTIFICATE.pdf · uploaded 3 Feb 2023Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE.pdf · uploaded 3 Feb 2023Source
- 1 Declaration about Commencement CertificateC C COPY.pdf · uploaded 14 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)REPORT STATEMENT OF ACCOUNT PERIOD 2018-2019.pdf · uploaded 14 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)REPORT STATEMENT OF ACCOUNT PERIOD 2019-2020.pdf · uploaded 14 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)REPORT STATEMENT OF ACCOUNT PERIOD 2020 - 2021.pdf · uploaded 14 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)REPORT STATEMENT OF ACCOUNT PERIOD 2021-2022.pdf · uploaded 14 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Suncity EC 31-03-23.pdf · uploaded 10 May 2023Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT LETTER.pdf · uploaded 22 May 2023Source
- 5 Building Plan Approval (IOD)PLAN COPY.pdf · uploaded 4 Aug 2023Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECTS CERTIFICATE.pdf · uploaded 8 Nov 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)ENGINEERS CERTIFICATE.pdf · uploaded 18 Nov 2023Source
- 5 Certificates of CA (Form 3)CHARTERED ACCOUNT.pdf · uploaded 3 Jan 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 22 TO 23.pdf · uploaded 8 Jan 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 (SUNCITY).pdf · uploaded 8 Jan 2024Source
- 8 Proforma of Allotment letterALLOTMENT LETTER FORMAT.pdf · uploaded 8 Jan 2024Source
- 1 Proforma of Agreement for sale1 Proforma of Allotment letter.pdf · uploaded 8 Jan 2024Source
- 2 Proforma of Agreement for sale2.pdf · uploaded 8 Jan 2024Source
- 3 Proforma of Agreement for sale3.pdf · uploaded 8 Jan 2024Source
- 4 Proforma of Agreement for sale4 Proforma of Allotment letter.pdf · uploaded 8 Jan 2024Source
- 5 Proforma of Agreement for sale5 Proforma of Allotment letter.pdf · uploaded 8 Jan 2024Source
- 6 Proforma of Agreement for sale6 Proforma of Allotment letter.pdf · uploaded 8 Jan 2024Source
- 7 Proforma of Agreement for sale7 Proforma of Allotment letter.pdf · uploaded 8 Jan 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeparate Bank Account Details.pdf · uploaded 8 Jan 2024Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameEncumbrances Concerned to legal.pdf · uploaded 8 Jan 2024Source
- 1 Deviation Report with respect to Allotment letterDeviation Report allotment letter.pdf · uploaded 8 Jan 2024Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report agreement for sale (1).pdf · uploaded 8 Jan 2024Source
- 1 Disclosure of sold/ booked inventoryP52000017041_FileName_0.pdf · uploaded 15 Jan 2024Source
- 1 Disclosure of Interest in Other Real Estate Organizations(karan asrani)disclosure of interest in other real estate organization.pdf · uploaded 15 Jan 2024Source
- 2 Disclosure of Interest in Other Real Estate Organizationsdisclosure of interest in other real estate organization (Rajendra).pdf · uploaded 15 Jan 2024Source
- 3 Disclosure of Interest in Other Real Estate Organizationsdisclosure of interest in other real estate organization (Sweety lodha).pdf · uploaded 15 Jan 2024Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 ARCHITECT CERTIFICATE.pdf · uploaded 2 Feb 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2 ENGINEERS CERTIFICATE.pdf · uploaded 2 Feb 2024Source
- 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architects Certificate (sun city).pdf · uploaded 17 Apr 2024Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer certificate suncity.pdf · uploaded 17 Apr 2024Source
- 1 a Details of encumbrances concerned to Financeencumbrance letter.pdf · uploaded 8 Jan 2025Source
- 1 Deviation Report with respect to Allotment letterdeviation letter (allotement letter).pdf · uploaded 8 Jan 2025Source
- 1 b Details of encumbrances concerned to Legalencumbrance letter.pdf · uploaded 8 Jan 2025Source
- 1 Deviation Report with respect to model copy of Agreementdeviation report (agreement for sale) (1).pdf · uploaded 8 Jan 2025Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 ARCHITECT CERTIFICATE.pdf · uploaded 15 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryoutput (1).pdf · uploaded 15 Jan 2025Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSEPARATE BANK ACCOUNT.pdf · uploaded 15 Jan 2025Source
- 1 Declaration in FORM Bform b (affidavit cum declaration).pdf · uploaded 24 Jan 2025Source
- 1 Certificates of CA (Form 3)form 3 (sun city) (1).pdf · uploaded 24 Jan 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 31ST MARCH.pdf · uploaded 24 Jan 2025Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 ENGINEER CERTIFICATE.pdf · uploaded 24 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5.pdf · uploaded 24 Jan 2025Source
- 1 Declaration in FORM BNotary Affidavit cum Declaration_page-0001.pdf · uploaded 19 Mar 2025Source
- 1 Disclosure of sold/ booked inventoryUNSOLD INVENTORY.pdf · uploaded 19 Mar 2025Source
- 1 Other – Technicalsummary report.pdf · uploaded 19 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - QA - Engineer (SUNCITY).pdf · uploaded 19 Mar 2025Source
- 1 Disclosure of sold/ booked inventoryMERGED (1).pdf · uploaded 15 Apr 2025Source
- 1 Other – TechnicalPERT CHART CONSTRUCTION.pdf · uploaded 15 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)form 2A - ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE_page-0001.pdf · uploaded 16 Apr 2025Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)form 1 architects certificate.pdf · uploaded 8 May 2025Source
- 1 Certificates of CA (Form 3)FORM 3 ANNEXURE D (1).pdf · uploaded 8 May 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form - 2 engineers certificate.pdf · uploaded 8 May 2025Source
- 1 Disclosure of sold/ booked inventoryGetUserDocumentFileContent.pdf · uploaded 8 May 2025Source
- Withdrawal Update Form 1FORM 1 - REPL.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 1FORM 1 - REPL.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 1FORM 1 - REPL.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 2form 2 - suncity.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 2form 2 - suncity.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 2form 2 - suncity.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 3FORM 3 - SUNCITY.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 3FORM 3 - SUNCITY.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 3FORM 3 - SUNCITY.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 1FORM 1 - REPL.pdf · uploaded 21 May 2026Source
- Withdrawal Update Form 2form 2 - suncity.pdf · uploaded 21 May 2026Source
- Withdrawal Update Form 3FORM 3 - SUNCITY.pdf · uploaded 21 May 2026Source
Technical
- DocumentLAYOUT BLD 1.pdf · uploaded 30 Jun 2018Source
- DocumentLAYOUT BLD 2.pdf · uploaded 30 Jun 2018Source
- DocumentLAYOUT BLD 3.pdf · uploaded 30 Jun 2018Source
- DocumentLAYOUT BLD4.pdf · uploaded 30 Jun 2018Source
- DocumentLAYOUT BLD 1.pdf · uploaded 30 Jun 2018Source
- DocumentLAYOUT BLD 2.pdf · uploaded 30 Jun 2018Source
- DocumentLAYOUT BLD 3.pdf · uploaded 30 Jun 2018Source
- DocumentLAYOUT BLD4.pdf · uploaded 30 Jun 2018Source
- DocumentPLAN COPY.pdf · uploaded 4 Aug 2023Source
- Other – Technicalsummary report.pdf · uploaded 19 Mar 2025Source
- Other – TechnicalPERT CHART CONSTRUCTION.pdf · uploaded 15 Apr 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel SURVEY NO 73-1
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1 BHK, 1BHK, Shop, 2BHK, 1RK261 units in all
- Address
- Survey No 73-1, Internal Road, Near Shelu Railway StationPIN 410201
- Village
- Damat, Karjat taluka
- Location
- 19.04686, 73.31339
- Land area for this project
- 9,210 sq m (99,136 sq ft)
- Permissible built-up area
- 8,486 sq m (91,342 sq ft)
- Sanctioned built-up area
- 8,486 sq m (91,342 sq ft)
- Recreational open space
- 850 sq m (9,148 sq ft)
- Designated bank account
- 109
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
SURVEY NO 73-1
Boundaries
- North
- Survey No 71
- South
- Survey No 73-2
- East
- Survey No 73-2
- West
- Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking261 units
239 of 261 units booked (92%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building No 1 | 1 BHK | 18.16 sq m · 195 sq ft | 2 | 2 |
| Building No 1 | 1BHK | 17.89 sq m · 193 sq ft | 2 | 2 |
| Building No 1 | 1BHK | 18.01 sq m · 194 sq ft | 8 | 8 |
| Building No 1 | Shop | 8.8 sq m · 95 sq ft | 1 | 1 |
| Building No 1 | Shop | 15.29 sq m · 165 sq ft | 4 | 4 |
| Building No 1 | Shop | 18.41 sq m · 198 sq ft | 3 | 3 |
| Building No 1 | Shop | 19.46 sq m · 209 sq ft | 1 | 1 |
| Building No 2 Wing A, B, C | 1BHK | 28.6 sq m · 308 sq ft | 64 | 64 |
Show all 27 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building No 2 Wing A, B, C | 2BHK | 40.12 sq m · 432 sq ft | 2 | 2 |
| Building No 2 Wing A, B, C | 2BHK | 40.2 sq m · 433 sq ft | 4 | 4 |
| Building No 2 Wing A, B, C | 2BHK | 40.21 sq m · 433 sq ft | 4 | 2 |
| Building No 2 Wing A, B, C | 2BHK | 41.15 sq m · 443 sq ft | 2 | 1 |
| Building No 2 Wing A, B, C | Shop | 45.15 sq m · 486 sq ft | 1 | 1 |
| Building No 2 Wing A, B, C | Shop | 9.2 sq m · 99 sq ft | 8 | 8 |
| Building No 2 Wing A, B, C | Shop | 9.75 sq m · 105 sq ft | 2 | 2 |
| Building No 2 Wing A, B, C | Shop | 10.31 sq m · 111 sq ft | 8 | 7 |
| Building No 2 Wing A, B, C | Shop | 14.48 sq m · 156 sq ft | 8 | 8 |
| Building No 3 Wing A, B | 1BHK | 30.07 sq m · 324 sq ft | 6 | 6 |
| Building No 3 Wing A, B | 1BHK | 31.92 sq m · 344 sq ft | 1 | 1 |
| Building No 3 Wing A, B | 1BHK | 32.8 sq m · 353 sq ft | 5 | 5 |
| Building No 3 Wing A, B | 1RK | 16.51 sq m · 178 sq ft | 1 | 1 |
| Building No 3 Wing A, B | 1RK | 16.74 sq m · 180 sq ft | 5 | 5 |
| Building No 3 Wing A, B | 1RK | 18.04 sq m · 194 sq ft | 1 | 1 |
| Building No 3 Wing A, B | 1RK | 18.45 sq m · 199 sq ft | 5 | 5 |
| Building No 3 Wing A, B | 1RK | 21.57 sq m · 232 sq ft | 60 | 60 |
| Building No 4 Wing A B Wing | 1BHK | 17.86 sq m · 192 sq ft | 16 | 10 |
| Building No 4 Wing A B Wing | 1BHK | 26 sq m · 280 sq ft | 37 | 25 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals2
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Structilis Consultantants Pvt Ltd | — |
| Engineer | Adharshila Consultants | — |
Source: MahaRERA project page. Contact details are not shown.