Shantivan
Deedo IDDP-PUN-6DJDCompletion was pushed back 4 months, to Jan 2027; no MahaRERA orders on record; 56% of its units are booked.
Tathwade, Pune 411033 · by Trimurti Group Promoters & Builders
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Jan 2027
- This projectRegistered 11 Sep 2017, completion promised 30 Sep 2026, revised to 30 Jan 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100012989
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100012989 | 11 Sep 2017 | 30 Sep 2026 | 30 Jan 2027 | Trimurti Group Promoters & Builders | Project page |
Documents187
1 document held by Deedo, 186 filings listed on MahaRERA's project page
Finance
- PAN CardTRIMURTIGROUP PAN CARD.pdf · uploaded 5 Aug 2017Source
Legal
Migrated
- 1 PAN CardTRIMURTIGROUP PAN CARD.pdf · uploaded 5 Aug 2017Source
- 1 Copy of the legal title reportSearch Report.pdf · uploaded 5 Aug 2017Source
- 1 Details of encumbrancesEncumbrance Letter.pdf · uploaded 5 Aug 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 5 Aug 2017Source
Show all 187 documentsShow fewer documents
Migrated
- 1 Declaration in FORM BForm B.pdf · uploaded 5 Aug 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 5 Aug 2017Source
- 1 Proforma of Allotment letterAllotment letter.pdf · uploaded 5 Aug 2017Source
- 2 Proforma of Allotment letterAgreement of Sale.pdf · uploaded 5 Aug 2017Source
- 1 Copy of Layout Approval (in case of layout)Layout paln B-.pdf · uploaded 14 Aug 2017Source
- 1 Building Plan Approval (IOD)1st 2nd floor B-.pdf · uploaded 14 Aug 2017Source
- 2 Building Plan Approval (IOD)Parking B-.pdf · uploaded 14 Aug 2017Source
- 3 Building Plan Approval (IOD)4th Floor B-.pdf · uploaded 14 Aug 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 14 Aug 2017Source
- 1 Certificates of CA (Form 3)Form 3.pdf · uploaded 14 Aug 2017Source
- Form 1Form 1 FY 17-18.pdf · uploaded 4 Sep 2025Source
- Form 2Form 2 17-18.pdf · uploaded 4 Sep 2025Source
- Form 3Form 3 FY 17-18.pdf · uploaded 4 Sep 2025Source
- Disclosure of Sold and Booked InventoryFY 17-18.pdf · uploaded 4 Sep 2025Source
- Form 1Form 1 FY 18-19.pdf · uploaded 4 Sep 2025Source
- Form 2Form 2 18-19.pdf · uploaded 4 Sep 2025Source
- Form 3Form 3 FY 18-19.pdf · uploaded 4 Sep 2025Source
- Disclosure of Sold and Booked InventoryFY 18-19.pdf · uploaded 4 Sep 2025Source
- Form 1Form 1 FY 19-20.pdf · uploaded 4 Sep 2025Source
- Form 2Form 2 19-20.pdf · uploaded 4 Sep 2025Source
- Form 3Form 3 FY 19-20.pdf · uploaded 4 Sep 2025Source
- Disclosure of Sold and Booked InventoryFY 19-20.pdf · uploaded 4 Sep 2025Source
- Form 1Form 1 FY 20-21.pdf · uploaded 4 Sep 2025Source
- Form 2Form 2 20-21.pdf · uploaded 4 Sep 2025Source
- Form 3Form 3 FY 20-21.pdf · uploaded 4 Sep 2025Source
- Disclosure of Sold and Booked InventoryFY 20-21.pdf · uploaded 4 Sep 2025Source
- Form 1Form 1 FY 21-22.pdf · uploaded 4 Sep 2025Source
- Form 2Form 2 21-22.pdf · uploaded 4 Sep 2025Source
- Form 3Form 3 FY 21-22.pdf · uploaded 4 Sep 2025Source
- Disclosure of Sold and Booked InventoryFY 21-22.pdf · uploaded 4 Sep 2025Source
- Form 1Form 1 FY 22-23.pdf · uploaded 4 Sep 2025Source
- Form 2Form 2 22-23.pdf · uploaded 4 Sep 2025Source
- Form 3Form 3 FY 22-23.pdf · uploaded 4 Sep 2025Source
- Disclosure of Sold and Booked InventoryFY 22-23.pdf · uploaded 4 Sep 2025Source
- Form 5 (FY 2017-2018)Form 5 FY 17-18.pdf · uploaded 5 Sep 2025Source
- Form 5 (FY 2018-2019)Form 5 FY 18-19.pdf · uploaded 5 Sep 2025Source
- Form 5 (FY 2019-2020)Form 5 FY 19-20.pdf · uploaded 5 Sep 2025Source
- Form 5 (FY 2020-2021)Form 5 FY 20-21.pdf · uploaded 5 Sep 2025Source
- Form 5 (FY 2021-2022)Form 5 FY 21-22.pdf · uploaded 5 Sep 2025Source
- Form 5 (FY 2022-2023)Form 5 FY 22-23.pdf · uploaded 5 Sep 2025Source
- Form 1Form 1 17-18 Q2.pdf · uploaded 10 Dec 2025Source
- Form 2Form-2 17-18 Q2_0001.pdf · uploaded 10 Dec 2025Source
- Form 3Q 2 17-18_0001.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryQ-2.pdf · uploaded 10 Dec 2025Source
- Form 1form1 17-18 Q3.pdf · uploaded 10 Dec 2025Source
- Form 2Form-2 17-18 Q3_0001.pdf · uploaded 10 Dec 2025Source
- Form 3Q 3 17-18_0001.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryQ-3.pdf · uploaded 10 Dec 2025Source
- Others17-18.pdf · uploaded 10 Dec 2025Source
- Form 1Form-1 18-19 Q1_0001.pdf · uploaded 10 Dec 2025Source
- Form 2Form-2 18-19 Q1_0001.pdf · uploaded 10 Dec 2025Source
- Form 3Q 1 18-19_0001.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryTrimurty Pramoters Group-Shantivan_0002-1.pdf · uploaded 10 Dec 2025Source
- Form 1Form-1 18-19 Q2_0001.pdf · uploaded 10 Dec 2025Source
- Form 2Form-2 18-19 Q2_0001.pdf · uploaded 10 Dec 2025Source
- Form 3Q 2 18-19.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryTrimurty Pramoters Group-Shantivan_0002-2.pdf · uploaded 10 Dec 2025Source
- Form 1Form-1 18-19 Q3_0001.pdf · uploaded 10 Dec 2025Source
- Form 2Form-2 18-19 Q3_0001.pdf · uploaded 10 Dec 2025Source
- Form 3Q 3 18-19_0001.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryTrimurty Pramoters Group-Shantivan_0002-3.pdf · uploaded 10 Dec 2025Source
- Others18-19.pdf · uploaded 10 Dec 2025Source
- Form 1Form-1 19-20 Q1_0001.pdf · uploaded 10 Dec 2025Source
- Form 2Form-2 19-20 Q1_0001.pdf · uploaded 10 Dec 2025Source
- Form 3Q 1 19-20_0001.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryTrimurty Pramoters Group-Shantivan_0003-1.pdf · uploaded 10 Dec 2025Source
- Form 1Form-1 19-20 Q2_0001.pdf · uploaded 10 Dec 2025Source
- Form 2Form-2 19-20 Q2_0001.pdf · uploaded 10 Dec 2025Source
- Form 3Q 2 19-20_0001.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryTrimurty Pramoters Group-Shantivan_0003-2.pdf · uploaded 10 Dec 2025Source
- Form 1Form-1 19-20 Q3_0001.pdf · uploaded 10 Dec 2025Source
- Form 2Form-2 19-20 Q3_0001.pdf · uploaded 10 Dec 2025Source
- Form 3Q 3 19-20_0001.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryTrimurty Pramoters Group-Shantivan_0003-3.pdf · uploaded 10 Dec 2025Source
- Others19-20.pdf · uploaded 10 Dec 2025Source
- Form 1Form-1 20-21 Q1_0001.pdf · uploaded 10 Dec 2025Source
- Form 2Form-2 20-21 Q1_0001.pdf · uploaded 10 Dec 2025Source
- Form 3Q 1 20-21_0001.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryTrimurty Pramoters Group-Shantivan_0004-1.pdf · uploaded 10 Dec 2025Source
- Form 1Form-1 20-21 Q2_0001.pdf · uploaded 10 Dec 2025Source
- Form 2Form-2 20-21 Q2_0001.pdf · uploaded 10 Dec 2025Source
- Form 3Q 2 20-21_0001.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryTrimurty Pramoters Group-Shantivan_0004-2.pdf · uploaded 10 Dec 2025Source
- Form 1Form-1 20-21 Q3_0001.pdf · uploaded 10 Dec 2025Source
- Form 2Form-2 20-21 Q3_0001.pdf · uploaded 10 Dec 2025Source
- Form 3Q 3 20-21_0001.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryTrimurty Pramoters Group-Shantivan_0004-3.pdf · uploaded 10 Dec 2025Source
- Others20-21.pdf · uploaded 10 Dec 2025Source
- Form 1Form-1 21-22 Q1_0001.pdf · uploaded 10 Dec 2025Source
- Form 2Form-2 21-22 Q1_0001.pdf · uploaded 10 Dec 2025Source
- Form 3Q 1 21-22_0001.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryTrimurty Pramoters Group-Shantivan_0005-1.pdf · uploaded 10 Dec 2025Source
- Form 1Form-1 21-22 Q2_0001.pdf · uploaded 10 Dec 2025Source
- Form 2Form-2 21-22 Q2_0001.pdf · uploaded 10 Dec 2025Source
- Form 3Q 2 21-22_0001.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryTrimurty Pramoters Group-Shantivan_0005-2.pdf · uploaded 10 Dec 2025Source
- Form 1Form-1 21-22 Q3_0001.pdf · uploaded 10 Dec 2025Source
- Form 2Form-2 21-22 Q3_0001.pdf · uploaded 10 Dec 2025Source
- Form 3Q 3 21-22_0001.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryTrimurty Pramoters Group-Shantivan_0005-3.pdf · uploaded 10 Dec 2025Source
- Others21-22.pdf · uploaded 10 Dec 2025Source
- Form 1Form-1 22-23 Q1_0001.pdf · uploaded 10 Dec 2025Source
- Form 2Form-2 22-23 Q1_0001.pdf · uploaded 10 Dec 2025Source
- Form 3Q 1 22-23_0001.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryTrimurty Pramoters Group-Shantivan_0006-1.pdf · uploaded 10 Dec 2025Source
- Form 1Form-1 22-23 Q2_0001.pdf · uploaded 10 Dec 2025Source
- Form 2Form-2 22-23 Q2_0001.pdf · uploaded 10 Dec 2025Source
- Form 3Q 2 22-23_0001.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryTrimurty Pramoters Group-Shantivan_0006-2.pdf · uploaded 10 Dec 2025Source
- Form 1Form-1 22-23 Q3_0001.pdf · uploaded 10 Dec 2025Source
- Form 2Form-2 22-23 Q3_0001.pdf · uploaded 10 Dec 2025Source
- Form 3Q 3 22-23_0001.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryTrimurty Pramoters Group-Shantivan_0006-3.pdf · uploaded 10 Dec 2025Source
- Others22-23.pdf · uploaded 10 Dec 2025Source
- Form 2A (FY 2017-2018)17-18.pdf · uploaded 14 Sep 2026Source
- Form 2A (FY 2018-2019)18-19.pdf · uploaded 14 Sep 2026Source
- Form 2A (FY 2019-2020)19-20.pdf · uploaded 14 Sep 2026Source
- Form 2A (FY 2020-2021)20-21.pdf · uploaded 14 Sep 2026Source
- Form 2A (FY 2021-2022)21-22.pdf · uploaded 14 Sep 2026Source
- Form 2A (FY 2022-2023)22-23.pdf · uploaded 14 Sep 2026Source
- Form 2A (FY 2023-2024)23-24.pdf · uploaded 14 Sep 2026Source
- Form 2A (FY 2024-2025)24-25.pdf · uploaded 14 Sep 2026Source
- Form 2A (FY 2025-2026)25-26.pdf · uploaded 14 Sep 2026Source
- Form 2A (FY 2026-2027)26-27..pdf · uploaded 14 Sep 2026Source
- Form 5 (FY 2023-2024)Form-5 2023-24_0001.pdf · uploaded 14 Sep 2026Source
- Form 5 (FY 2024-2025)Form-5 2024-25_0001.pdf · uploaded 14 Sep 2026Source
- Form 1Form-1 23-24 Q1.pdf · uploaded 16 Sep 2026Source
- Form 2Form-2 23-24 Q1_0001.pdf · uploaded 16 Sep 2026Source
- Form 3Form 3-Q 1 23-24_0001.pdf · uploaded 16 Sep 2026Source
- Disclosure of Sold and Booked InventoryDisclosure Q1-Shantivan_0007-1.pdf · uploaded 16 Sep 2026Source
- Form 1Form-1 23-24 Q2.pdf · uploaded 16 Sep 2026Source
- Form 2Form-2 23-24 Q2_0001.pdf · uploaded 16 Sep 2026Source
- Form 3Form 3-Q 2 23-24_0001.pdf · uploaded 16 Sep 2026Source
- Disclosure of Sold and Booked InventoryDisclosure Q2-Shantivan_0007-2.pdf · uploaded 16 Sep 2026Source
- Form 1Form-1 23-24 Q3.pdf · uploaded 16 Sep 2026Source
- Form 2Form-2 23-24 Q3_0001.pdf · uploaded 16 Sep 2026Source
- Form 3Form 3-Q 3 23-24_0001.pdf · uploaded 16 Sep 2026Source
- Disclosure of Sold and Booked InventoryDisclosure Q3-Shantivan_0007-3.pdf · uploaded 16 Sep 2026Source
- Form 1Form 1 FY 23-24 Q4.pdf · uploaded 16 Sep 2026Source
- Form 2Form-2 23-24 Q4_0001.pdf · uploaded 16 Sep 2026Source
- Form 3Form 3-Q 4 23-24_0001.pdf · uploaded 16 Sep 2026Source
- Disclosure of Sold and Booked InventoryDisclosure Q4-Shantivan_0007-4.pdf · uploaded 16 Sep 2026Source
- Form 1Form-1 24-25 Q1.pdf · uploaded 16 Sep 2026Source
- Form 2Form-2 24-25 Q1.pdf · uploaded 16 Sep 2026Source
- Form 3Q 1 24-25_0001.pdf · uploaded 16 Sep 2026Source
- Disclosure of Sold and Booked InventoryTrimurty Pramoters Group-Shantivan_0008-1.pdf · uploaded 16 Sep 2026Source
- Form 1Form-1 24-25 Q2.pdf · uploaded 16 Sep 2026Source
- Form 2Form-2 24-25 Q2_0001.pdf · uploaded 16 Sep 2026Source
- Form 3Q 2 24-25_0001.pdf · uploaded 16 Sep 2026Source
- Disclosure of Sold and Booked InventoryTrimurty Pramoters Group-Shantivan_0008-2.pdf · uploaded 16 Sep 2026Source
- Form 1Form-1 24-25 Q3.pdf · uploaded 16 Sep 2026Source
- Form 2Form-2 24-25 Q3.pdf · uploaded 16 Sep 2026Source
- Form 3Q 3 24-25_0001.pdf · uploaded 16 Sep 2026Source
- Disclosure of Sold and Booked InventoryTrimurty Pramoters Group-Shantivan_0008-3.pdf · uploaded 16 Sep 2026Source
- Form 1Form-1 24-25 Q4.pdf · uploaded 16 Sep 2026Source
- Form 2Form-2 24-25 Q4_0001.pdf · uploaded 16 Sep 2026Source
- Form 3Q 4 24-25_0001.pdf · uploaded 16 Sep 2026Source
- Disclosure of Sold and Booked InventoryTrimurty Pramoters Group-Shantivan_0008-4.pdf · uploaded 16 Sep 2026Source
- Withdrawal Update Form 1Form-1 25-26 Q1.pdf · uploaded 30 Sep 2026Source
- Withdrawal Update Form 1Form-1 25-26 Q2.pdf · uploaded 30 Sep 2026Source
- Withdrawal Update Form 1Form-1 25-26 Q3.pdf · uploaded 30 Sep 2026Source
- Withdrawal Update Form 1Form-1 25-26 Q4.pdf · uploaded 30 Sep 2026Source
- Withdrawal Update Form 1Form-1 26-27 Q1.pdf · uploaded 30 Sep 2026Source
- Withdrawal Update Form 2Form 2-Q1.pdf · uploaded 30 Sep 2026Source
- Withdrawal Update Form 2Form-2 -Q2.pdf · uploaded 30 Sep 2026Source
- Withdrawal Update Form 2Form-2 Q3.pdf · uploaded 30 Sep 2026Source
- Withdrawal Update Form 2Form-2 -Q4.pdf · uploaded 30 Sep 2026Source
- Withdrawal Update Form 2Form-2 26-27.pdf · uploaded 30 Sep 2026Source
- Withdrawal Update Form 3Form 3 Q1 25-26.pdf · uploaded 30 Sep 2026Source
- Withdrawal Update Form 3Form 3 Q2 25-26.pdf · uploaded 30 Sep 2026Source
- Withdrawal Update Form 3Form 3 Q3 25-26.pdf · uploaded 30 Sep 2026Source
- Withdrawal Update Form 3Form 3 Q4 FY 25-26.pdf · uploaded 30 Sep 2026Source
- Withdrawal Update Form 3Form 3 Q1 FY 2026-27.pdf · uploaded 30 Sep 2026Source
Technical
Technical (Architect)
- DocumentForm-1 26-27 Q1.pdf · uploaded 30 Sep 2026Source
Technical (Engineer)
- DocumentForm-2 26-27.pdf · uploaded 30 Sep 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 56/3/2
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2 BHK, Shops18 units in all
- Address
- 56/3/2, Near Balaji College, Vision One MallPIN 411033
- Village
- Tathwade, Mulshi taluka
- Location
- 18.43895, 73.11675
- Land area for this project
- 3,140 sq m (33,799 sq ft)
- Permissible built-up area
- 1,804 sq m (19,413 sq ft)
- Sanctioned built-up area
- 871 sq m (9,374 sq ft)
- Recreational open space
- 320 sq m (3,446 sq ft)
- Designated bank account
- 212
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
56/3/2
Boundaries
- North
- Property Of Mr Pawar
- South
- Silver Twin
- East
- Dharti Green
- West
- Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking18 units
10 of 18 units booked (56%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2 BHK | 1,104.29 sq m · 11,886 sq ft | 16 | 10 |
| Shops | 19.32 sq m · 208 sq ft | 2 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals1
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Chavan Deepak Dattatray | — |
Source: MahaRERA project page. Contact details are not shown.