Orizzonte Phase - I
Deedo IDDP-PUN-V5HNCompletion was pushed back 4 months, to Apr 2028; no MahaRERA orders on record; 51% of its units are booked.
Sus, Pune 411021 · by Galaxy Ventures
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2028
- This projectRegistered 25 Jan 2024, completion promised 31 Dec 2027, revised to 30 Apr 2028.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
4 buildings
Open a building to see every flat, floor by floor.
- A17 floors · 15 units0% booked
- B29 floors · 68 units0% booked
- Building D25 floors · 142 units96% booked
- MHADA11 floors · 44 units0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100054519
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100054519 | 25 Jan 2024 | 31 Dec 2027 | 30 Apr 2028 | Galaxy Ventures | Project page |
Documents207
1 document held by Deedo, 206 filings listed on MahaRERA's project page
Finance
- PAN CardPAN Card.pdf · uploaded 10 Nov 2023Source
Legal
- Other – LegalPartnership Deed 1.pdf · uploaded 10 Nov 2023Source
- Other – LegalPartnership Galaxy Ventures.pdf · uploaded 10 Nov 2023Source
- Other – LegalReceipt Partnership change.pdf · uploaded 10 Nov 2023Source
- Legal Title reportSearch Circular 28.pdf · uploaded 1 Dec 2023Source
- Legal Title reportsearch report 30 years 2023.pdf · uploaded 1 Dec 2023Source
- Declaration Form BForm B promoter.pdf · uploaded 1 Dec 2023Source
Show all 207 documentsShow fewer documents
Migrated
- 1 PAN CardPAN Card.pdf · uploaded 10 Nov 2023Source
- 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 10 Nov 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentFloor Plan 2.pdf · uploaded 10 Nov 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentFloor Plan 3.pdf · uploaded 10 Nov 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentFloor Plan.pdf · uploaded 10 Nov 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentPodium.pdf · uploaded 10 Nov 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentElevation 2.pdf · uploaded 10 Nov 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentElevation.pdf · uploaded 10 Nov 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentParking Layout.pdf · uploaded 10 Nov 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate.pdf · uploaded 10 Nov 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate.pdf · uploaded 10 Nov 2023Source
- 1 Disclosure of Interest in Other Real Estate Organizationsdeclaration of partners.pdf · uploaded 10 Nov 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration Bank Ac.pdf · uploaded 10 Nov 2023Source
- 1 Other – LegalPartnership Deed 1.pdf · uploaded 10 Nov 2023Source
- 2 Other – LegalPartnership Galaxy Ventures.pdf · uploaded 10 Nov 2023Source
- 3 Other – LegalReceipt Partnership change.pdf · uploaded 10 Nov 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCC - GALAXY VENTURES.pdf · uploaded 24 Nov 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate 1.pdf · uploaded 24 Nov 2023Source
- 1 Other – TechnicalExplanation of querries.pdf · uploaded 24 Nov 2023Source
- 2 Other – TechnicalEmail To Maharera by PMRDA.pdf · uploaded 24 Nov 2023Source
- 1 Copy of the legal title reportSearch Circular 28.pdf · uploaded 1 Dec 2023Source
- 2 Copy of the legal title reportsearch report 30 years 2023.pdf · uploaded 1 Dec 2023Source
- 1 a Details of encumbrances concerned to FinanceLegal Encumbrances.pdf · uploaded 1 Dec 2023Source
- 1 b Details of encumbrances concerned to LegalLegal Encumbrances.pdf · uploaded 1 Dec 2023Source
- 1 Declaration in FORM BForm B promoter.pdf · uploaded 1 Dec 2023Source
- 1 Proforma of Agreement for saleDraft ATS Galaxy Ventures nov 2023.pdf · uploaded 1 Dec 2023Source
- 1 Proforma of Allotment letterDraft Allotment letter.pdf · uploaded 1 Dec 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation allotment letter.pdf · uploaded 1 Dec 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation of ATS Galaxy Venture.pdf · uploaded 1 Dec 2023Source
- 2 a Details of encumbrances concerned to FinanceDecl Financial Encumbranc.pdf · uploaded 20 Dec 2023Source
- 2 b Details of encumbrances concerned to LegalDecl Financial Encumbranc.pdf · uploaded 20 Dec 2023Source
- 2 Copy of Layout Approval (in case of layout)Layout for sake of convenience.pdf · uploaded 20 Dec 2023Source
- 1 Declaration about Commencement CertificateForm D decl CC.pdf · uploaded 20 Dec 2023Source
- 1 CERSAI detailsCersai Undertaking.pdf · uploaded 20 Dec 2023Source
- 3 Copy of Layout Approval (in case of layout)layout Jan 2024 GV SUS 17 jan 2024.pdf · uploaded 17 Jan 2024Source
- 3 Other – TechnicalDeclaration for Query 2024.pdf · uploaded 17 Jan 2024Source
- 4 Other – Technicallayout Jan 2024 GV SUS 17 jan 2024.pdf · uploaded 17 Jan 2024Source
- 4 Copy of Layout Approval (in case of layout)Lay out 2024.pdf · uploaded 14 Jul 2024Source
- 8 Building Plan Approval / NA Order for plotted developmentSanction plan 1.pdf · uploaded 14 Jul 2024Source
- 9 Building Plan Approval / NA Order for plotted developmentAll Sanction plans.pdf · uploaded 14 Jul 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentCC Galexy Ventures 2024.pdf · uploaded 14 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Architect Certificate.pdf · uploaded 14 Jul 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer certificate.pdf · uploaded 14 Jul 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA Certificate.pdf · uploaded 14 Jul 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Cert Sept 2024.pdf · uploaded 7 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate Sept 2024.pdf · uploaded 7 Nov 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Enginner cert sept 2024.pdf · uploaded 7 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Eng cert.pdf · uploaded 7 Nov 2024Source
- 1 Disclosure of sold/ booked inventorysold inventary.pdf · uploaded 7 Nov 2024Source
- 1 Copy of Layout Approval (in case of layout)Lay out orizzonte 2024.pdf · uploaded 7 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Cert Sept 2024.pdf · uploaded 7 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate Sept 2024.pdf · uploaded 7 Nov 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Enginner cert sept 2024.pdf · uploaded 7 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Eng cert.pdf · uploaded 7 Nov 2024Source
- 1 Disclosure of sold/ booked inventorysold inventary.pdf · uploaded 7 Nov 2024Source
- 1 Copy of Layout Approval (in case of layout)Lay out orizzonte 2024.pdf · uploaded 7 Nov 2024Source
- 1 Copy of Layout Approval (in case of layout)Lay out orizzonte 2024.pdf · uploaded 7 Nov 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate Sept 2024.pdf · uploaded 7 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Cert Sept 2024.pdf · uploaded 7 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Enginner cert sept 2024.pdf · uploaded 7 Nov 2024Source
- 1 Disclosure of sold/ booked inventorysold inventary.pdf · uploaded 7 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Eng cert.pdf · uploaded 7 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate 31 march 2024.pdf · uploaded 21 Nov 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENG CERT 31 march 2024.pdf · uploaded 21 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate 31 March 2024.pdf · uploaded 21 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate 31 march 2024.pdf · uploaded 21 Nov 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENG CERT 31 march 2024.pdf · uploaded 21 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate 31 March 2024.pdf · uploaded 21 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate 31 march 2024.pdf · uploaded 21 Nov 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENG CERT 31 march 2024.pdf · uploaded 21 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate 31 March 2024.pdf · uploaded 21 Nov 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate 31 march 2024.pdf · uploaded 21 Nov 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate 31 March 2024.pdf · uploaded 21 Nov 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENG CERT 31 march 2024.pdf · uploaded 21 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Cert Sept 2024.pdf · uploaded 9 Dec 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Cert Sept 2024.pdf · uploaded 9 Dec 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Cert Sept 2024.pdf · uploaded 9 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 14 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 14 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 14 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 27 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 27 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 27 Apr 2025Source
- Form 1Form 1 March 2024.pdf · uploaded 8 Sep 2025Source
- Form 1Form 1 June 2024.pdf · uploaded 8 Sep 2025Source
- Form 1Form 1 Sep 2024.pdf · uploaded 8 Sep 2025Source
- Form 1Form 1 31-03-2025.pdf · uploaded 8 Sep 2025Source
- Form 2Engineer Certificate 31-03-2024.pdf · uploaded 8 Sep 2025Source
- Form 2Engineer Certificate 30-06-2024.pdf · uploaded 8 Sep 2025Source
- Form 2Engineer Certificate 30-09-2024.pdf · uploaded 8 Sep 2025Source
- Form 2Engineer Certificate 31-03-2025.pdf · uploaded 8 Sep 2025Source
- Form 3Form 3 31-03-2024_compressed.pdf · uploaded 8 Sep 2025Source
- Form 3FORM-3 - 30-06-2024 - converted.pdf · uploaded 8 Sep 2025Source
- Form 3Form 3 30-09-24 - converted.pdf · uploaded 8 Sep 2025Source
- Form 3Form 3 31-03-2025.pdf · uploaded 8 Sep 2025Source
- Disclosure of Sold and Booked InventoryDISCLOSURE 31-03-2024.pdf · uploaded 8 Sep 2025Source
- Disclosure of Sold and Booked InventoryDISCLOSURE 30-06-2024.pdf · uploaded 8 Sep 2025Source
- Disclosure of Sold and Booked InventoryDISCLOSURE 30-09-2024.pdf · uploaded 8 Sep 2025Source
- Disclosure of Sold and Booked InventoryDISCLOSURE 31-03-2025.pdf · uploaded 8 Sep 2025Source
- Withdrawal Update Form 1Form1 June 2025 .pdf · uploaded 8 Sep 2025Source
- Withdrawal Update Form 2Engineer Certificate 30-06-2025.pdf · uploaded 8 Sep 2025Source
- Withdrawal Update Form 3Form 3 June 2025.pdf · uploaded 8 Sep 2025Source
- Form 1Architect Certificate 31-12-2024.pdf · uploaded 12 Sep 2025Source
- Form 2Engineer Certificate 31-12-2024.pdf · uploaded 12 Sep 2025Source
- Form 3Form 3 - 31-12-24_compressed.pdf · uploaded 12 Sep 2025Source
- Disclosure of Sold and Booked InventoryDISCLOSURE 31-12-2024.pdf · uploaded 12 Sep 2025Source
- Withdrawal Update Form 1Form 1 Architectu0027s Certificate.pdf · uploaded 18 Nov 2025Source
- Withdrawal Update Form 2Form 2 30-09-2025.pdf · uploaded 18 Nov 2025Source
- Withdrawal Update Form 3Form 3_compressed.pdf · uploaded 18 Nov 2025Source
- Form 2A (FY 2023-2024)Form 2A FY 2023-2024 Orizzonte PH-1.pdf · uploaded 18 Nov 2025Source
- Form 2A (FY 2024-2025)Form 2A FY 2024-2025 Orizzonte PH-1.pdf · uploaded 18 Nov 2025Source
- Form 5 (FY 2024-2025)Form 5 galaxy.pdf · uploaded 18 Nov 2025Source
- Withdrawal Update Form 1Galaxy VenturesArchitect Certificate 03-01-26.pdf · uploaded 13 Feb 2026Source
- Withdrawal Update Form 2Engineer Certificate Galaxy Ventures Sagar.pdf · uploaded 13 Feb 2026Source
- Withdrawal Update Form 3Galaxy ventures Form 3 Dec 2025_compressed.pdf · uploaded 13 Feb 2026Source
- Withdrawal Update Form 1GALAXY VENTURES ARCHITECT CERTIFICATE 02-04-2026.pdf · uploaded 28 Apr 2026Source
- Withdrawal Update Form 2Engineer Certificate Galaxy Ventures 31-03-2026.pdf · uploaded 28 Apr 2026Source
- Withdrawal Update Form 3Form_3_March_26_compressed.pdf · uploaded 28 Apr 2026Source
- Withdrawal Update Form 1Adobe Scan 04 Jul 2026 (2).pdf · uploaded 25 Jul 2026Source
- Withdrawal Update Form 2engineer Certificate 30-06-2026 (1).pdf · uploaded 25 Jul 2026Source
- Withdrawal Update Form 3Galaxy Form 3 Signed Copy (1)-compressed.pdf · uploaded 25 Jul 2026Source
Technical
- DocumentLayout.pdf · uploaded 10 Nov 2023Source
- DocumentFloor Plan 2.pdf · uploaded 10 Nov 2023Source
- DocumentFloor Plan 3.pdf · uploaded 10 Nov 2023Source
- DocumentFloor Plan.pdf · uploaded 10 Nov 2023Source
- DocumentPodium.pdf · uploaded 10 Nov 2023Source
- DocumentElevation 2.pdf · uploaded 10 Nov 2023Source
- DocumentElevation.pdf · uploaded 10 Nov 2023Source
- DocumentParking Layout.pdf · uploaded 10 Nov 2023Source
- Other – TechnicalExplanation of querries.pdf · uploaded 24 Nov 2023Source
- Other – TechnicalEmail To Maharera by PMRDA.pdf · uploaded 24 Nov 2023Source
- DocumentLayout for sake of convenience.pdf · uploaded 20 Dec 2023Source
- Documentlayout Jan 2024 GV SUS 17 jan 2024.pdf · uploaded 17 Jan 2024Source
- Other – TechnicalDeclaration for Query 2024.pdf · uploaded 17 Jan 2024Source
- Other – Technicallayout Jan 2024 GV SUS 17 jan 2024.pdf · uploaded 17 Jan 2024Source
- DocumentLay out 2024.pdf · uploaded 14 Jul 2024Source
- DocumentSanction plan 1.pdf · uploaded 14 Jul 2024Source
- DocumentAll Sanction plans.pdf · uploaded 14 Jul 2024Source
- DocumentLay out orizzonte 2024.pdf · uploaded 7 Nov 2024Source
- DocumentLay out orizzonte 2024.pdf · uploaded 7 Nov 2024Source
- DocumentLay out orizzonte 2024.pdf · uploaded 7 Nov 2024Source
- DocumentPlan 01.pdf · uploaded 19 Nov 2025Source
- DocumentPlan 01.pdf · uploaded 19 Nov 2025Source
- DocumentPlan 02.pdf · uploaded 19 Nov 2025Source
- DocumentPlan 03.pdf · uploaded 19 Nov 2025Source
- DocumentPlan 04.pdf · uploaded 19 Nov 2025Source
- DocumentPlan 05.pdf · uploaded 19 Nov 2025Source
- DocumentPlan 06.pdf · uploaded 19 Nov 2025Source
- DocumentPlan 07.pdf · uploaded 19 Nov 2025Source
- DocumentPlan 08.pdf · uploaded 19 Nov 2025Source
- DocumentPlan 09.pdf · uploaded 19 Nov 2025Source
- DocumentPlan 10.pdf · uploaded 19 Nov 2025Source
- DocumentPlan 11.pdf · uploaded 19 Nov 2025Source
- DocumentPlan 12.pdf · uploaded 19 Nov 2025Source
- Document01.pdf · uploaded 4 Dec 2025Source
- Document02.pdf · uploaded 4 Dec 2025Source
- Document03.pdf · uploaded 4 Dec 2025Source
- Document04.pdf · uploaded 4 Dec 2025Source
- Document05.pdf · uploaded 4 Dec 2025Source
- Document06.pdf · uploaded 4 Dec 2025Source
- Document07.pdf · uploaded 4 Dec 2025Source
- Document08.pdf · uploaded 4 Dec 2025Source
- Document09.pdf · uploaded 4 Dec 2025Source
- Document10.pdf · uploaded 4 Dec 2025Source
- Document11.pdf · uploaded 4 Dec 2025Source
- Document12.pdf · uploaded 4 Dec 2025Source
- Document02 - Main Plan.pdf · uploaded 18 Dec 2025Source
- Document01.pdf · uploaded 18 Dec 2025Source
- Document02 - Main Plan.pdf · uploaded 18 Dec 2025Source
- Document03.pdf · uploaded 18 Dec 2025Source
- Document04.pdf · uploaded 18 Dec 2025Source
- Document05.pdf · uploaded 18 Dec 2025Source
- Document06.pdf · uploaded 18 Dec 2025Source
- Document07.pdf · uploaded 18 Dec 2025Source
- Document08.pdf · uploaded 18 Dec 2025Source
- Document09.pdf · uploaded 18 Dec 2025Source
- Document10.pdf · uploaded 18 Dec 2025Source
- Document11.pdf · uploaded 18 Dec 2025Source
- Document12.pdf · uploaded 18 Dec 2025Source
Technical (Architect)
- DocumentForm 1 Architect Certificate Sept 2024.pdf · uploaded 7 Nov 2024Source
- DocumentForm 1 Architect Certificate Sept 2024.pdf · uploaded 7 Nov 2024Source
- DocumentForm 1 Architect Certificate Sept 2024.pdf · uploaded 7 Nov 2024Source
- DocumentForm 1 Architect Certificate 31 march 2024.pdf · uploaded 21 Nov 2024Source
- DocumentForm 1 Architect Certificate 31 march 2024.pdf · uploaded 21 Nov 2024Source
- DocumentForm 1 Architect Certificate 31 march 2024.pdf · uploaded 21 Nov 2024Source
- DocumentForm 1 Architect Certificate 31 march 2024.pdf · uploaded 21 Nov 2024Source
- DocumentForm 1.pdf · uploaded 14 Feb 2025Source
- DocumentForm 1.pdf · uploaded 27 Apr 2025Source
- DocumentAdobe Scan 04 Jul 2026 (2).pdf · uploaded 25 Jul 2026Source
Technical (Engineer)
- DocumentForm 2 Enginner cert sept 2024.pdf · uploaded 7 Nov 2024Source
- DocumentForm 2 Enginner cert sept 2024.pdf · uploaded 7 Nov 2024Source
- DocumentForm 2 Enginner cert sept 2024.pdf · uploaded 7 Nov 2024Source
- DocumentForm 2 ENG CERT 31 march 2024.pdf · uploaded 21 Nov 2024Source
- DocumentForm 2 ENG CERT 31 march 2024.pdf · uploaded 21 Nov 2024Source
- DocumentForm 2 ENG CERT 31 march 2024.pdf · uploaded 21 Nov 2024Source
- DocumentForm 2 ENG CERT 31 march 2024.pdf · uploaded 21 Nov 2024Source
- DocumentForm 2.pdf · uploaded 14 Feb 2025Source
- DocumentForm 2.pdf · uploaded 27 Apr 2025Source
- Documentengineer Certificate 30-06-2026 (1).pdf · uploaded 25 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 27/1 (Part), S. No. 26/3 (Part)
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- Office space, Shop, 3BHK, 4BHK, 2BHK, 5BHK & more269 units in all
- Address
- S.No. 26/3 (Part), 27/1 (part) Village SUS, Tal Mulshi, Dist Pune, Sus, SusPIN 411021
- Village
- Sus, Mulshi taluka
- Location
- 18.54540, 73.77783
- Land area for this project
- 18,600 sq m (2,00,209 sq ft)
- Permissible built-up area
- 57,256 sq m (6,16,296 sq ft)
- Sanctioned built-up area
- 57,256 sq m (6,16,296 sq ft)
- Recreational open space
- 1,908 sq m (20,532 sq ft)
- Designated bank account
- 85
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S. No. 26/3 (Part), 27/1 (Part), Village Sus, Taluka Mulshi, District Pune
Boundaries
- North
- By 24 mtrs Sus Mahalunge proposed raod
- South
- By part of S No 27 and 36 and proposed DP Road
- East
- by part of S No 27 H No 1
- West
- By part of S No 26
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking269 units
137 of 269 units booked (51%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A | Office space | 215.43 sq m · 2,319 sq ft | 2 | 0 |
| A | Office space | 328.28 sq m · 3,534 sq ft | 2 | 0 |
| A | Shop | 49.45 sq m · 532 sq ft | 4 | 0 |
| A | Shop | 54.33 sq m · 585 sq ft | 3 | 0 |
| A | Shop | 61.6 sq m · 663 sq ft | 1 | 0 |
| A | Shop | 61.62 sq m · 663 sq ft | 2 | 0 |
| A | Shop | 77.02 sq m · 829 sq ft | 1 | 0 |
| B | 3BHK | 100.03 sq m · 1,077 sq ft | 8 | 0 |
Show all 33 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| B | 3BHK | 104.41 sq m · 1,124 sq ft | 8 | 0 |
| B | 3BHK | 104.57 sq m · 1,126 sq ft | 14 | 0 |
| B | 3BHK | 148.23 sq m · 1,596 sq ft | 2 | 0 |
| B | 3BHK | 149.34 sq m · 1,607 sq ft | 2 | 0 |
| B | 4BHK | 164.85 sq m · 1,774 sq ft | 5 | 0 |
| B | 4BHK | 263.1 sq m · 2,832 sq ft | 1 | 0 |
| B | Office space | 215.43 sq m · 2,319 sq ft | 2 | 0 |
| B | Office space | 328.28 sq m · 3,534 sq ft | 2 | 0 |
| B | Shop | 49.45 sq m · 532 sq ft | 8 | 0 |
| B | Shop | 52.69 sq m · 567 sq ft | 2 | 0 |
| B | Shop | 54.33 sq m · 585 sq ft | 6 | 0 |
| B | Shop | 61.6 sq m · 663 sq ft | 2 | 0 |
| B | Shop | 61.62 sq m · 663 sq ft | 4 | 0 |
| B | Shop | 77.02 sq m · 829 sq ft | 1 | 0 |
| B | Shop | 89.5 sq m · 963 sq ft | 1 | 0 |
| Building D | 2BHK | 74.89 sq m · 806 sq ft | 36 | 35 |
| Building D | 3BHK | 100.25 sq m · 1,079 sq ft | 23 | 23 |
| Building D | 3BHK | 100.41 sq m · 1,081 sq ft | 24 | 22 |
| Building D | 3BHK | 100.67 sq m · 1,084 sq ft | 48 | 46 |
| Building D | 3BHK | 106.57 sq m · 1,147 sq ft | 2 | 2 |
| Building D | 3BHK | 116.88 sq m · 1,258 sq ft | 1 | 1 |
| Building D | 4BHK | 129.43 sq m · 1,393 sq ft | 4 | 4 |
| Building D | 5BHK & more | 155.99 sq m · 1,679 sq ft | 3 | 3 |
| Building D | 5BHK & more | 176.6 sq m · 1,901 sq ft | 1 | 1 |
| MHADA | 2BHK | 49.84 sq m · 536 sq ft | 44 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals11
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Sakaar Architects and planners | — |
| Architect | Swapnil Gulabchand Sheth | — |
| Chartered accountant | Doshi Jethale and Associates | — |
| Chartered accountant | MA Bagwan and Associates | — |
| Chartered accountant | Subash Chhaganiram Bathiya | — |
| Chartered accountant | Surendra Kumar Sharma | — |
| Engineer | Digvijay Digambar Kokate | — |
| Engineer | Dilip Vitthal Patil | — |
Show all 11 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Engineer | Peafulla Diwakar Kale | — |
| Engineer | Sagar Gangaram Khebade | — |
| Other | Sanjay Manohar Sagavekar | — |
Source: MahaRERA project page. Contact details are not shown.