Skip to content
Residential / Group Housing · 4 buildings · 269 unitsRERA P52100054519

Orizzonte Phase - I

Deedo IDDP-PUN-V5HN

Completion was pushed back 4 months, to Apr 2028; no MahaRERA orders on record; 51% of its units are booked.

Sus, Pune 411021 · by Galaxy Ventures

DeliveryExtended 4 moPromised Dec 2027 · now due Apr 2028RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales51% booked137 of 269 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2028

  • This projectRegistered 25 Jan 2024, completion promised 31 Dec 2027, revised to 30 Apr 2028.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

4 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100054519
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210005451925 Jan 202431 Dec 202730 Apr 2028Galaxy VenturesProject page
Documents207

1 document held by Deedo, 206 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN Card.pdf · uploaded 10 Nov 2023Source

Legal

  • Other – LegalPartnership Deed 1.pdf · uploaded 10 Nov 2023Source
  • Other – LegalPartnership Galaxy Ventures.pdf · uploaded 10 Nov 2023Source
  • Other – LegalReceipt Partnership change.pdf · uploaded 10 Nov 2023Source
  • Legal Title reportSearch Circular 28.pdf · uploaded 1 Dec 2023Source
  • Legal Title reportsearch report 30 years 2023.pdf · uploaded 1 Dec 2023Source
  • Declaration Form BForm B promoter.pdf · uploaded 1 Dec 2023Source
Show all 207 documentsShow fewer documents

Migrated

  • 1 PAN CardPAN Card.pdf · uploaded 10 Nov 2023Source
  • 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 10 Nov 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentFloor Plan 2.pdf · uploaded 10 Nov 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentFloor Plan 3.pdf · uploaded 10 Nov 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentFloor Plan.pdf · uploaded 10 Nov 2023Source
  • 4 Building Plan Approval / NA Order for plotted developmentPodium.pdf · uploaded 10 Nov 2023Source
  • 5 Building Plan Approval / NA Order for plotted developmentElevation 2.pdf · uploaded 10 Nov 2023Source
  • 6 Building Plan Approval / NA Order for plotted developmentElevation.pdf · uploaded 10 Nov 2023Source
  • 7 Building Plan Approval / NA Order for plotted developmentParking Layout.pdf · uploaded 10 Nov 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate.pdf · uploaded 10 Nov 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate.pdf · uploaded 10 Nov 2023Source
  • 1 Disclosure of Interest in Other Real Estate Organizationsdeclaration of partners.pdf · uploaded 10 Nov 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration Bank Ac.pdf · uploaded 10 Nov 2023Source
  • 1 Other – LegalPartnership Deed 1.pdf · uploaded 10 Nov 2023Source
  • 2 Other – LegalPartnership Galaxy Ventures.pdf · uploaded 10 Nov 2023Source
  • 3 Other – LegalReceipt Partnership change.pdf · uploaded 10 Nov 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC - GALAXY VENTURES.pdf · uploaded 24 Nov 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate 1.pdf · uploaded 24 Nov 2023Source
  • 1 Other – TechnicalExplanation of querries.pdf · uploaded 24 Nov 2023Source
  • 2 Other – TechnicalEmail To Maharera by PMRDA.pdf · uploaded 24 Nov 2023Source
  • 1 Copy of the legal title reportSearch Circular 28.pdf · uploaded 1 Dec 2023Source
  • 2 Copy of the legal title reportsearch report 30 years 2023.pdf · uploaded 1 Dec 2023Source
  • 1 a Details of encumbrances concerned to FinanceLegal Encumbrances.pdf · uploaded 1 Dec 2023Source
  • 1 b Details of encumbrances concerned to LegalLegal Encumbrances.pdf · uploaded 1 Dec 2023Source
  • 1 Declaration in FORM BForm B promoter.pdf · uploaded 1 Dec 2023Source
  • 1 Proforma of Agreement for saleDraft ATS Galaxy Ventures nov 2023.pdf · uploaded 1 Dec 2023Source
  • 1 Proforma of Allotment letterDraft Allotment letter.pdf · uploaded 1 Dec 2023Source
  • 1 Deviation Report with respect to Allotment letterDeviation allotment letter.pdf · uploaded 1 Dec 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation of ATS Galaxy Venture.pdf · uploaded 1 Dec 2023Source
  • 2 a Details of encumbrances concerned to FinanceDecl Financial Encumbranc.pdf · uploaded 20 Dec 2023Source
  • 2 b Details of encumbrances concerned to LegalDecl Financial Encumbranc.pdf · uploaded 20 Dec 2023Source
  • 2 Copy of Layout Approval (in case of layout)Layout for sake of convenience.pdf · uploaded 20 Dec 2023Source
  • 1 Declaration about Commencement CertificateForm D decl CC.pdf · uploaded 20 Dec 2023Source
  • 1 CERSAI detailsCersai Undertaking.pdf · uploaded 20 Dec 2023Source
  • 3 Copy of Layout Approval (in case of layout)layout Jan 2024 GV SUS 17 jan 2024.pdf · uploaded 17 Jan 2024Source
  • 3 Other – TechnicalDeclaration for Query 2024.pdf · uploaded 17 Jan 2024Source
  • 4 Other – Technicallayout Jan 2024 GV SUS 17 jan 2024.pdf · uploaded 17 Jan 2024Source
  • 4 Copy of Layout Approval (in case of layout)Lay out 2024.pdf · uploaded 14 Jul 2024Source
  • 8 Building Plan Approval / NA Order for plotted developmentSanction plan 1.pdf · uploaded 14 Jul 2024Source
  • 9 Building Plan Approval / NA Order for plotted developmentAll Sanction plans.pdf · uploaded 14 Jul 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC Galexy Ventures 2024.pdf · uploaded 14 Jul 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Architect Certificate.pdf · uploaded 14 Jul 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer certificate.pdf · uploaded 14 Jul 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA Certificate.pdf · uploaded 14 Jul 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Cert Sept 2024.pdf · uploaded 7 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate Sept 2024.pdf · uploaded 7 Nov 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Enginner cert sept 2024.pdf · uploaded 7 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Eng cert.pdf · uploaded 7 Nov 2024Source
  • 1 Disclosure of sold/ booked inventorysold inventary.pdf · uploaded 7 Nov 2024Source
  • 1 Copy of Layout Approval (in case of layout)Lay out orizzonte 2024.pdf · uploaded 7 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Cert Sept 2024.pdf · uploaded 7 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate Sept 2024.pdf · uploaded 7 Nov 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Enginner cert sept 2024.pdf · uploaded 7 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Eng cert.pdf · uploaded 7 Nov 2024Source
  • 1 Disclosure of sold/ booked inventorysold inventary.pdf · uploaded 7 Nov 2024Source
  • 1 Copy of Layout Approval (in case of layout)Lay out orizzonte 2024.pdf · uploaded 7 Nov 2024Source
  • 1 Copy of Layout Approval (in case of layout)Lay out orizzonte 2024.pdf · uploaded 7 Nov 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate Sept 2024.pdf · uploaded 7 Nov 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Cert Sept 2024.pdf · uploaded 7 Nov 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Enginner cert sept 2024.pdf · uploaded 7 Nov 2024Source
  • 1 Disclosure of sold/ booked inventorysold inventary.pdf · uploaded 7 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Eng cert.pdf · uploaded 7 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate 31 march 2024.pdf · uploaded 21 Nov 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENG CERT 31 march 2024.pdf · uploaded 21 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate 31 March 2024.pdf · uploaded 21 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate 31 march 2024.pdf · uploaded 21 Nov 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENG CERT 31 march 2024.pdf · uploaded 21 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate 31 March 2024.pdf · uploaded 21 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate 31 march 2024.pdf · uploaded 21 Nov 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENG CERT 31 march 2024.pdf · uploaded 21 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate 31 March 2024.pdf · uploaded 21 Nov 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate 31 march 2024.pdf · uploaded 21 Nov 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate 31 March 2024.pdf · uploaded 21 Nov 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENG CERT 31 march 2024.pdf · uploaded 21 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Cert Sept 2024.pdf · uploaded 9 Dec 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Cert Sept 2024.pdf · uploaded 9 Dec 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Cert Sept 2024.pdf · uploaded 9 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 14 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 14 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 14 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 27 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 27 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 27 Apr 2025Source
  • Form 1Form 1 March 2024.pdf · uploaded 8 Sep 2025Source
  • Form 1Form 1 June 2024.pdf · uploaded 8 Sep 2025Source
  • Form 1Form 1 Sep 2024.pdf · uploaded 8 Sep 2025Source
  • Form 1Form 1 31-03-2025.pdf · uploaded 8 Sep 2025Source
  • Form 2Engineer Certificate 31-03-2024.pdf · uploaded 8 Sep 2025Source
  • Form 2Engineer Certificate 30-06-2024.pdf · uploaded 8 Sep 2025Source
  • Form 2Engineer Certificate 30-09-2024.pdf · uploaded 8 Sep 2025Source
  • Form 2Engineer Certificate 31-03-2025.pdf · uploaded 8 Sep 2025Source
  • Form 3Form 3 31-03-2024_compressed.pdf · uploaded 8 Sep 2025Source
  • Form 3FORM-3 - 30-06-2024 - converted.pdf · uploaded 8 Sep 2025Source
  • Form 3Form 3 30-09-24 - converted.pdf · uploaded 8 Sep 2025Source
  • Form 3Form 3 31-03-2025.pdf · uploaded 8 Sep 2025Source
  • Disclosure of Sold and Booked InventoryDISCLOSURE 31-03-2024.pdf · uploaded 8 Sep 2025Source
  • Disclosure of Sold and Booked InventoryDISCLOSURE 30-06-2024.pdf · uploaded 8 Sep 2025Source
  • Disclosure of Sold and Booked InventoryDISCLOSURE 30-09-2024.pdf · uploaded 8 Sep 2025Source
  • Disclosure of Sold and Booked InventoryDISCLOSURE 31-03-2025.pdf · uploaded 8 Sep 2025Source
  • Withdrawal Update Form 1Form1 June 2025 .pdf · uploaded 8 Sep 2025Source
  • Withdrawal Update Form 2Engineer Certificate 30-06-2025.pdf · uploaded 8 Sep 2025Source
  • Withdrawal Update Form 3Form 3 June 2025.pdf · uploaded 8 Sep 2025Source
  • Form 1Architect Certificate 31-12-2024.pdf · uploaded 12 Sep 2025Source
  • Form 2Engineer Certificate 31-12-2024.pdf · uploaded 12 Sep 2025Source
  • Form 3Form 3 - 31-12-24_compressed.pdf · uploaded 12 Sep 2025Source
  • Disclosure of Sold and Booked InventoryDISCLOSURE 31-12-2024.pdf · uploaded 12 Sep 2025Source
  • Withdrawal Update Form 1Form 1 Architectu0027s Certificate.pdf · uploaded 18 Nov 2025Source
  • Withdrawal Update Form 2Form 2 30-09-2025.pdf · uploaded 18 Nov 2025Source
  • Withdrawal Update Form 3Form 3_compressed.pdf · uploaded 18 Nov 2025Source
  • Form 2A (FY 2023-2024)Form 2A FY 2023-2024 Orizzonte PH-1.pdf · uploaded 18 Nov 2025Source
  • Form 2A (FY 2024-2025)Form 2A FY 2024-2025 Orizzonte PH-1.pdf · uploaded 18 Nov 2025Source
  • Form 5 (FY 2024-2025)Form 5 galaxy.pdf · uploaded 18 Nov 2025Source
  • Withdrawal Update Form 1Galaxy VenturesArchitect Certificate 03-01-26.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 2Engineer Certificate Galaxy Ventures Sagar.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 3Galaxy ventures Form 3 Dec 2025_compressed.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 1GALAXY VENTURES ARCHITECT CERTIFICATE 02-04-2026.pdf · uploaded 28 Apr 2026Source
  • Withdrawal Update Form 2Engineer Certificate Galaxy Ventures 31-03-2026.pdf · uploaded 28 Apr 2026Source
  • Withdrawal Update Form 3Form_3_March_26_compressed.pdf · uploaded 28 Apr 2026Source
  • Withdrawal Update Form 1Adobe Scan 04 Jul 2026 (2).pdf · uploaded 25 Jul 2026Source
  • Withdrawal Update Form 2engineer Certificate 30-06-2026 (1).pdf · uploaded 25 Jul 2026Source
  • Withdrawal Update Form 3Galaxy Form 3 Signed Copy (1)-compressed.pdf · uploaded 25 Jul 2026Source

Technical

  • DocumentLayout.pdf · uploaded 10 Nov 2023Source
  • DocumentFloor Plan 2.pdf · uploaded 10 Nov 2023Source
  • DocumentFloor Plan 3.pdf · uploaded 10 Nov 2023Source
  • DocumentFloor Plan.pdf · uploaded 10 Nov 2023Source
  • DocumentPodium.pdf · uploaded 10 Nov 2023Source
  • DocumentElevation 2.pdf · uploaded 10 Nov 2023Source
  • DocumentElevation.pdf · uploaded 10 Nov 2023Source
  • DocumentParking Layout.pdf · uploaded 10 Nov 2023Source
  • Other – TechnicalExplanation of querries.pdf · uploaded 24 Nov 2023Source
  • Other – TechnicalEmail To Maharera by PMRDA.pdf · uploaded 24 Nov 2023Source
  • DocumentLayout for sake of convenience.pdf · uploaded 20 Dec 2023Source
  • Documentlayout Jan 2024 GV SUS 17 jan 2024.pdf · uploaded 17 Jan 2024Source
  • Other – TechnicalDeclaration for Query 2024.pdf · uploaded 17 Jan 2024Source
  • Other – Technicallayout Jan 2024 GV SUS 17 jan 2024.pdf · uploaded 17 Jan 2024Source
  • DocumentLay out 2024.pdf · uploaded 14 Jul 2024Source
  • DocumentSanction plan 1.pdf · uploaded 14 Jul 2024Source
  • DocumentAll Sanction plans.pdf · uploaded 14 Jul 2024Source
  • DocumentLay out orizzonte 2024.pdf · uploaded 7 Nov 2024Source
  • DocumentLay out orizzonte 2024.pdf · uploaded 7 Nov 2024Source
  • DocumentLay out orizzonte 2024.pdf · uploaded 7 Nov 2024Source
  • DocumentPlan 01.pdf · uploaded 19 Nov 2025Source
  • DocumentPlan 01.pdf · uploaded 19 Nov 2025Source
  • DocumentPlan 02.pdf · uploaded 19 Nov 2025Source
  • DocumentPlan 03.pdf · uploaded 19 Nov 2025Source
  • DocumentPlan 04.pdf · uploaded 19 Nov 2025Source
  • DocumentPlan 05.pdf · uploaded 19 Nov 2025Source
  • DocumentPlan 06.pdf · uploaded 19 Nov 2025Source
  • DocumentPlan 07.pdf · uploaded 19 Nov 2025Source
  • DocumentPlan 08.pdf · uploaded 19 Nov 2025Source
  • DocumentPlan 09.pdf · uploaded 19 Nov 2025Source
  • DocumentPlan 10.pdf · uploaded 19 Nov 2025Source
  • DocumentPlan 11.pdf · uploaded 19 Nov 2025Source
  • DocumentPlan 12.pdf · uploaded 19 Nov 2025Source
  • Document01.pdf · uploaded 4 Dec 2025Source
  • Document02.pdf · uploaded 4 Dec 2025Source
  • Document03.pdf · uploaded 4 Dec 2025Source
  • Document04.pdf · uploaded 4 Dec 2025Source
  • Document05.pdf · uploaded 4 Dec 2025Source
  • Document06.pdf · uploaded 4 Dec 2025Source
  • Document07.pdf · uploaded 4 Dec 2025Source
  • Document08.pdf · uploaded 4 Dec 2025Source
  • Document09.pdf · uploaded 4 Dec 2025Source
  • Document10.pdf · uploaded 4 Dec 2025Source
  • Document11.pdf · uploaded 4 Dec 2025Source
  • Document12.pdf · uploaded 4 Dec 2025Source
  • Document02 - Main Plan.pdf · uploaded 18 Dec 2025Source
  • Document01.pdf · uploaded 18 Dec 2025Source
  • Document02 - Main Plan.pdf · uploaded 18 Dec 2025Source
  • Document03.pdf · uploaded 18 Dec 2025Source
  • Document04.pdf · uploaded 18 Dec 2025Source
  • Document05.pdf · uploaded 18 Dec 2025Source
  • Document06.pdf · uploaded 18 Dec 2025Source
  • Document07.pdf · uploaded 18 Dec 2025Source
  • Document08.pdf · uploaded 18 Dec 2025Source
  • Document09.pdf · uploaded 18 Dec 2025Source
  • Document10.pdf · uploaded 18 Dec 2025Source
  • Document11.pdf · uploaded 18 Dec 2025Source
  • Document12.pdf · uploaded 18 Dec 2025Source

Technical (Architect)

  • DocumentForm 1 Architect Certificate Sept 2024.pdf · uploaded 7 Nov 2024Source
  • DocumentForm 1 Architect Certificate Sept 2024.pdf · uploaded 7 Nov 2024Source
  • DocumentForm 1 Architect Certificate Sept 2024.pdf · uploaded 7 Nov 2024Source
  • DocumentForm 1 Architect Certificate 31 march 2024.pdf · uploaded 21 Nov 2024Source
  • DocumentForm 1 Architect Certificate 31 march 2024.pdf · uploaded 21 Nov 2024Source
  • DocumentForm 1 Architect Certificate 31 march 2024.pdf · uploaded 21 Nov 2024Source
  • DocumentForm 1 Architect Certificate 31 march 2024.pdf · uploaded 21 Nov 2024Source
  • DocumentForm 1.pdf · uploaded 14 Feb 2025Source
  • DocumentForm 1.pdf · uploaded 27 Apr 2025Source
  • DocumentAdobe Scan 04 Jul 2026 (2).pdf · uploaded 25 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 Enginner cert sept 2024.pdf · uploaded 7 Nov 2024Source
  • DocumentForm 2 Enginner cert sept 2024.pdf · uploaded 7 Nov 2024Source
  • DocumentForm 2 Enginner cert sept 2024.pdf · uploaded 7 Nov 2024Source
  • DocumentForm 2 ENG CERT 31 march 2024.pdf · uploaded 21 Nov 2024Source
  • DocumentForm 2 ENG CERT 31 march 2024.pdf · uploaded 21 Nov 2024Source
  • DocumentForm 2 ENG CERT 31 march 2024.pdf · uploaded 21 Nov 2024Source
  • DocumentForm 2 ENG CERT 31 march 2024.pdf · uploaded 21 Nov 2024Source
  • DocumentForm 2.pdf · uploaded 14 Feb 2025Source
  • DocumentForm 2.pdf · uploaded 27 Apr 2025Source
  • Documentengineer Certificate 30-06-2026 (1).pdf · uploaded 25 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 27/1 (Part), S. No. 26/3 (Part)

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
Office space, Shop, 3BHK, 4BHK, 2BHK, 5BHK & more269 units in all
Address
S.No. 26/3 (Part), 27/1 (part) Village SUS, Tal Mulshi, Dist Pune, Sus, SusPIN 411021
Village
Sus, Mulshi taluka
Land area for this project
18,600 sq m (2,00,209 sq ft)
Permissible built-up area
57,256 sq m (6,16,296 sq ft)
Sanctioned built-up area
57,256 sq m (6,16,296 sq ft)
Recreational open space
1,908 sq m (20,532 sq ft)
Designated bank account
85
Developed in phases
Yes

Survey, CTS, gat or plot numbers

27/1 (Part)S. No. 26/3 (Part)

Land as published on MahaRERA's project page

S. No. 26/3 (Part), 27/1 (Part), Village Sus, Taluka Mulshi, District Pune

Boundaries

North
By 24 mtrs Sus Mahalunge proposed raod
South
By part of S No 27 and 36 and proposed DP Road
East
by part of S No 27 H No 1
West
By part of S No 26

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking269 units

137 of 269 units booked (51%), as the promoter reported to MahaRERA

Office space · 8 unitsShop · 35 units3BHK · 132 units4BHK · 10 units2BHK · 80 units5BHK & more · 4 units
BuildingTypeCarpet areaUnitsBooked
AOffice space215.43 sq m · 2,319 sq ft20
AOffice space328.28 sq m · 3,534 sq ft20
AShop49.45 sq m · 532 sq ft40
AShop54.33 sq m · 585 sq ft30
AShop61.6 sq m · 663 sq ft10
AShop61.62 sq m · 663 sq ft20
AShop77.02 sq m · 829 sq ft10
B3BHK100.03 sq m · 1,077 sq ft80
Show all 33 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
B3BHK104.41 sq m · 1,124 sq ft80
B3BHK104.57 sq m · 1,126 sq ft140
B3BHK148.23 sq m · 1,596 sq ft20
B3BHK149.34 sq m · 1,607 sq ft20
B4BHK164.85 sq m · 1,774 sq ft50
B4BHK263.1 sq m · 2,832 sq ft10
BOffice space215.43 sq m · 2,319 sq ft20
BOffice space328.28 sq m · 3,534 sq ft20
BShop49.45 sq m · 532 sq ft80
BShop52.69 sq m · 567 sq ft20
BShop54.33 sq m · 585 sq ft60
BShop61.6 sq m · 663 sq ft20
BShop61.62 sq m · 663 sq ft40
BShop77.02 sq m · 829 sq ft10
BShop89.5 sq m · 963 sq ft10
Building D2BHK74.89 sq m · 806 sq ft3635
Building D3BHK100.25 sq m · 1,079 sq ft2323
Building D3BHK100.41 sq m · 1,081 sq ft2422
Building D3BHK100.67 sq m · 1,084 sq ft4846
Building D3BHK106.57 sq m · 1,147 sq ft22
Building D3BHK116.88 sq m · 1,258 sq ft11
Building D4BHK129.43 sq m · 1,393 sq ft44
Building D5BHK & more155.99 sq m · 1,679 sq ft33
Building D5BHK & more176.6 sq m · 1,901 sq ft11
MHADA2BHK49.84 sq m · 536 sq ft440

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals11

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSakaar Architects and planners—
ArchitectSwapnil Gulabchand Sheth—
Chartered accountantDoshi Jethale and Associates—
Chartered accountantMA Bagwan and Associates—
Chartered accountantSubash Chhaganiram Bathiya—
Chartered accountantSurendra Kumar Sharma—
EngineerDigvijay Digambar Kokate—
EngineerDilip Vitthal Patil—
Show all 11 professionalsShow fewer professionals
RoleNameRegistration no.
EngineerPeafulla Diwakar Kale—
EngineerSagar Gangaram Khebade—
OtherSanjay Manohar Sagavekar—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology