Rohan Anand
Deedo IDDP-PUN-S47JIt is due for completion in Dec 2026, with no extension on record; no MahaRERA orders on record; 38% of its units are booked.
Somatane, Pune 410506 · by Rohan Builders & Developers Private Limited · 100% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
It is due for completion in Dec 2026, with no extension on record
- P52100023186Registered 5 Dec 2019, completion promised 30 Dec 2024.
- P52100023451Registered 16 Dec 2019, completion promised 30 Dec 2026.
1 extension certificate on record.
2 registrations · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
5 buildings
Open a building to see every flat, floor by floor.
- Building A11 floors · 131 units61% booked
- Building B10 floors · 99 units56% booked
- Building C13 floors · 110 units49% booked
- Building D13 floors · 131 units73% booked
- Building E13 floors · 138 units60% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrations2
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100023186 | 5 Dec 2019 | 30 Dec 2024 | 30 Dec 2024 | Rohan Builders & Developers Private Limited | Project page |
| P52100023451 | 16 Dec 2019 | 30 Dec 2026 | 30 Dec 2026 | Rohan Builders & Developers Private Limited | Project page |
Documents267
3 documents held by Deedo, 264 filings listed on MahaRERA's project page
Registration certificate (2)
Finance
Show all 267 documentsShow fewer documents
Legal
- Declaration Form BP52100023451 · Form B 1.pdf · uploaded 30 Nov 2019Source
- Declaration Form BP52100023451 · Form B.pdf · uploaded 30 Nov 2019Source
- OtherP52100023186 · Proposed IOD.pdf · uploaded 30 Nov 2019Source
- Legal Title reportP52100023186 · Search and Title.pdf · uploaded 30 Nov 2019Source
- Declaration Form BP52100023186 · Form B 1.pdf · uploaded 30 Nov 2019Source
- Declaration Form BP52100023186 · Form B.pdf · uploaded 30 Nov 2019Source
- Declaration Form BP52100023451 · Form B - RBDPL date extension.pdf · uploaded 6 Oct 2023Source
Migrated
- 1 Copy of the legal title reportP52100023451 · Search and Title.pdf · uploaded 30 Nov 2019Source
- 1 Details of encumbrancesP52100023451 · Encumbrance.pdf · uploaded 30 Nov 2019Source
- 1 Copy of Layout Approval (in case of layout)P52100023451 · SANCTIONED IOD.pdf · uploaded 30 Nov 2019Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100023451 · Building Sanction Plan.pdf · uploaded 30 Nov 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100023451 · Commencement Certificate.pdf · uploaded 30 Nov 2019Source
- 1 Declaration in FORM BP52100023451 · Form B 1.pdf · uploaded 30 Nov 2019Source
- 2 Declaration in FORM BP52100023451 · Form B.pdf · uploaded 30 Nov 2019Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · CA Cert.pdf · uploaded 30 Nov 2019Source
- 1 OtherP52100023451 · Proposed IOD.pdf · uploaded 30 Nov 2019Source
- 1 PAN CardP52100023186 · RBDPL_PAN.pdf · uploaded 30 Nov 2019Source
- 1 Copy of the legal title reportP52100023186 · Search and Title.pdf · uploaded 30 Nov 2019Source
- 1 Details of encumbrancesP52100023186 · Encumbrance.pdf · uploaded 30 Nov 2019Source
- 1 Copy of Layout Approval (in case of layout)P52100023186 · SANCTIONED IOD.pdf · uploaded 30 Nov 2019Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100023186 · Building Sanction Plan.pdf · uploaded 30 Nov 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100023186 · Commencement Certificate.pdf · uploaded 30 Nov 2019Source
- 1 Declaration in FORM BP52100023186 · Form B 1.pdf · uploaded 30 Nov 2019Source
- 2 Declaration in FORM BP52100023186 · Form B.pdf · uploaded 30 Nov 2019Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023186 · CA Cert.pdf · uploaded 30 Nov 2019Source
- 1 Proforma of Allotment letterP52100023186 · Agreement Phase I.pdf · uploaded 30 Nov 2019Source
- 1 OtherP52100023186 · Proposed IOD.pdf · uploaded 30 Nov 2019Source
- 1 PAN CardP52100023451 · RBDPL PAN.pdf · uploaded 11 Dec 2019Source
- 2 PAN CardP52100023451 · Standard Capacitor PAN.pdf · uploaded 11 Dec 2019Source
- 1 Proforma of Allotment letterP52100023451 · Agreement Phase II.pdf · uploaded 11 Dec 2019Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · CA Cert Anand Phase II Mar 20.pdf · uploaded 14 Aug 2020Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023186 · CA Cert Anand Phase I Mar 20.pdf · uploaded 14 Aug 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023451 · Arch Cert Anand Phase II Mar 20.pdf · uploaded 17 Aug 2020Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100023451 · Engg 2A Anand II Mar 20.pdf · uploaded 17 Aug 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023186 · Arch Cert Anand Phase I Mar 20.pdf · uploaded 17 Aug 2020Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100023186 · Engg 2A Anand I Mar 20.pdf · uploaded 17 Aug 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · Engg Cert Anand Phase II Mar 20.pdf · uploaded 21 Aug 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023186 · Engg Cert Anand Phase I Mar 20.pdf · uploaded 21 Aug 2020Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023451 · Arch Cert Anand AB June 20.pdf · uploaded 16 Oct 2020Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100023451 · 2A ANAND AB June 20.pdf · uploaded 16 Oct 2020Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023186 · Arch Cert Anand CDE June 20.pdf · uploaded 16 Oct 2020Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100023186 · 2A ANAND CDE June 20.pdf · uploaded 16 Oct 2020Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100023451 · Form 5 Anand Phase II.pdf · uploaded 29 Oct 2020Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100023186 · Form 5 Anand Phase I.pdf · uploaded 29 Oct 2020Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · ANAND PHASE II Engg Cert - Sep 20.pdf · uploaded 17 Dec 2020Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100023451 · 2A ANAND PHASE II A B WINGS Sep 20.pdf · uploaded 17 Dec 2020Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · ANAND PHASE II CA Cert SEP 20.pdf · uploaded 17 Dec 2020Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023186 · ANAND PHASE I Engg Cert - Sep 20.pdf · uploaded 17 Dec 2020Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100023186 · 2A ANAND PHASE I CDE WINGS Sep 20.pdf · uploaded 17 Dec 2020Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023186 · ANAND PHASE I CA Cert SEP 20.pdf · uploaded 17 Dec 2020Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100023451 · Revised layout Rohan Anand.pdf · uploaded 1 Feb 2021Source
- 2 Commencement Certificates / NA Order for plotted developmentP52100023451 · Revised CC Rohan Anand.pdf · uploaded 1 Feb 2021Source
- 2 Copy of Layout Approval (in case of layout)P52100023186 · Revised layout Rohan Anand.pdf · uploaded 1 Feb 2021Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100023186 · Revised layout Rohan Anand.pdf · uploaded 1 Feb 2021Source
- 2 Commencement Certificates / NA Order for plotted developmentP52100023186 · Revised CC Rohan Anand.pdf · uploaded 1 Feb 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023186 · Anand Phase I Dec 2020.pdf · uploaded 16 Feb 2021Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023186 · Anand Phase II Dec 2020.pdf · uploaded 16 Feb 2021Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100023186 · 2A Rohan Anand Phase I CDE Dec 20.pdf · uploaded 16 Feb 2021Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · ANAND PHASE II Engg Cert.pdf · uploaded 31 Mar 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · ANAND PHASE 2 CA certificate DEC 2020 RotatePdf.pdf · uploaded 31 Mar 2021Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023186 · ANAND PHASE I Engg Cert.pdf · uploaded 31 Mar 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023186 · ANAND PHASE 1 CA certificate DEC 2020 RotatePdf.pdf · uploaded 31 Mar 2021Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · Engg Cer Anand Phase II AB Mar 21.pdf · uploaded 1 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100023451 · 2A Anand Phase II Mar 21.pdf · uploaded 1 Jul 2021Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023186 · Engg Cer Anand Phase I CDE Mar 21.pdf · uploaded 1 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100023186 · 2A Anand Phase I Mar 21.pdf · uploaded 1 Jul 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023451 · Anand- Phase II.pdf · uploaded 8 Jul 2021Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · Engg Cer Anand Phase II AB Mar 21.pdf · uploaded 8 Jul 2021Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023186 · Anand- Phase I.pdf · uploaded 8 Jul 2021Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023186 · Engg Cer Anand Phase I CDE Mar 21.pdf · uploaded 8 Jul 2021Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · CA Cert Anand Phase II Mar 21.pdf · uploaded 12 Aug 2021Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023186 · CA Cert Anand Phase I Mar 21.pdf · uploaded 12 Aug 2021Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023451 · Rohan Anand Phase II Architect Cert June 21.pdf · uploaded 14 Aug 2021Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · Engg Cert Anand Phase II June 21.pdf · uploaded 14 Aug 2021Source
- 1 Disclosure of sold/ booked inventoryP52100023451 · Inventory Update Anand Phase II June 21.pdf · uploaded 14 Aug 2021Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · CA Cert Anand Phase II June 21.pdf · uploaded 14 Aug 2021Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023186 · Rohan Anand Phase I Architect Cert June 21.pdf · uploaded 14 Aug 2021Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023186 · Engg Cert Anand Phase I June 21.pdf · uploaded 14 Aug 2021Source
- 1 Disclosure of sold/ booked inventoryP52100023186 · Inventory Update Anand Phase I June 21.pdf · uploaded 14 Aug 2021Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023186 · CA Cert Anand Phase I June 21.pdf · uploaded 14 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100023451 · Anand Phase II Form 5.pdf · uploaded 30 Sep 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100023186 · Anand Phase I Form 5.pdf · uploaded 30 Sep 2021Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023451 · Anand Phase II Buil AB Sept 21.pdf · uploaded 7 Oct 2021Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · Anand Phase II Engg Sep 21.pdf · uploaded 7 Oct 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100023451 · Anand Phase II 2A - Sep 21.pdf · uploaded 7 Oct 2021Source
- 2 Disclosure of sold/ booked inventoryP52100023451 · Anand Phase II Inventory Update - Sep 21.pdf · uploaded 7 Oct 2021Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · Anand Phase II CA Cert Sep 21.pdf · uploaded 7 Oct 2021Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023186 · Anand Phase I Buil CDE Sept 21.pdf · uploaded 7 Oct 2021Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023186 · Anand Phase I Engg Sep 21.pdf · uploaded 7 Oct 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100023186 · Anand Phase I 2A - Sep 21.pdf · uploaded 7 Oct 2021Source
- 2 Disclosure of sold/ booked inventoryP52100023186 · Anand Phase I Inventory Update - Sep 21.pdf · uploaded 7 Oct 2021Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023186 · Anand Phase I CA Cert Sep 21.pdf · uploaded 7 Oct 2021Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023451 · Arch Cert Anand Phase II Dec 21.pdf · uploaded 7 Jan 2022Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · Eng Ananad II Dec21.pdf · uploaded 7 Jan 2022Source
- 3 Disclosure of sold/ booked inventoryP52100023451 · Anand Phase II Dec 21.pdf · uploaded 7 Jan 2022Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · CA Rohan Anand P II Dec2021.pdf · uploaded 7 Jan 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023186 · Arch Cert Anand Phase I Dec 21.pdf · uploaded 7 Jan 2022Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023186 · Eng Ananad I Dec21.pdf · uploaded 7 Jan 2022Source
- 3 Disclosure of sold/ booked inventoryP52100023186 · Anand Phase I Dec 21.pdf · uploaded 7 Jan 2022Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023186 · CA Rohan Anand P I Dec2021.pdf · uploaded 7 Jan 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023451 · Form 1 Anand Ph 2 Mar 22.pdf · uploaded 7 Apr 2022Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · Engg Cert Anand Phase 2 Mar 22.pdf · uploaded 7 Apr 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100023451 · Form 2A QA Certificate_Anand Ph 2 AB Mar 22.pdf · uploaded 7 Apr 2022Source
- 4 Disclosure of sold/ booked inventoryP52100023451 · Inventory Anand Ph 2 Mar 22.pdf · uploaded 7 Apr 2022Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · Form 3 Anand Ph 2 Mar 22.pdf · uploaded 7 Apr 2022Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023186 · Form 1 Anand Ph 1 Mar 22.pdf · uploaded 7 Apr 2022Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023186 · Engg Cert Anand Phase 1 Mar 22.pdf · uploaded 7 Apr 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100023186 · Form 2A QA Certificate_Anand Ph 1 CDE Mar 22.pdf · uploaded 7 Apr 2022Source
- 4 Disclosure of sold/ booked inventoryP52100023186 · Inventory Anand Ph 1 Mar 22.pdf · uploaded 7 Apr 2022Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023186 · Form 3 Anand Ph 1 Mar 22.pdf · uploaded 7 Apr 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023451 · Form 1 Anand Ph 2.pdf · uploaded 7 Jul 2022Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · Form 2 Anand Ph 2.pdf · uploaded 7 Jul 2022Source
- 5 Disclosure of sold/ booked inventoryP52100023451 · Inventory Update Anand Ph 2.pdf · uploaded 7 Jul 2022Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · Form 3 Anand Ph 2.pdf · uploaded 7 Jul 2022Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023186 · Form 1 Anand Ph 1.pdf · uploaded 7 Jul 2022Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023186 · Form 2 Anand Ph 1.pdf · uploaded 7 Jul 2022Source
- 5 Disclosure of sold/ booked inventoryP52100023186 · Inventory Update Anand Ph 1.pdf · uploaded 7 Jul 2022Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023186 · Form 3 Anand Ph 1.pdf · uploaded 7 Jul 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100023451 · Anand Phase II FY 21 22.pdf · uploaded 30 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100023186 · Anand Phase I FY 21 22.pdf · uploaded 30 Sep 2022Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023451 · Arch Cert Anand Phase 2 Sep 22.pdf · uploaded 7 Oct 2022Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · Engg Cert Anand Phase 2 Sep 22.pdf · uploaded 7 Oct 2022Source
- 6 Disclosure of sold/ booked inventoryP52100023451 · Inv Update Anand Phase 2 Sep 22.pdf · uploaded 7 Oct 2022Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · CA Cert Phase 2 Anand Sep 22.pdf · uploaded 7 Oct 2022Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023186 · Arch Cert Anand Phase 1 Sep 22.pdf · uploaded 7 Oct 2022Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023186 · Engg Cert Anand Phase 1 Sep 22.pdf · uploaded 7 Oct 2022Source
- 6 Disclosure of sold/ booked inventoryP52100023186 · Inv Update Anand Phase 1 Sep 22.pdf · uploaded 7 Oct 2022Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023186 · CA Cert Phase 1 Anand Sep 22.pdf · uploaded 7 Oct 2022Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023451 · Arch Cert Anand Phase 2 Dec 22.pdf · uploaded 20 Jan 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · Engg Cert Anand Phase 2 Dec 22.pdf · uploaded 20 Jan 2023Source
- 7 Disclosure of sold/ booked inventoryP52100023451 · Inv update Anand Phase 2 Dec 22.pdf · uploaded 20 Jan 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · CA Cert Anand Phase 2 Dec 22.pdf · uploaded 20 Jan 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023186 · Arch Cert Anand Phase 1 Dec 22.pdf · uploaded 20 Jan 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023186 · Engg Cert Anand Phase 1 Dec 22.pdf · uploaded 20 Jan 2023Source
- 7 Disclosure of sold/ booked inventoryP52100023186 · Inv update Anand Phase 1 Dec 22.pdf · uploaded 20 Jan 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023186 · CA Cert Anand Phase 1 Dec 22.pdf · uploaded 20 Jan 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100023451 · Revised Sanction Plan_Anand_18 04 23.pdf · uploaded 20 Apr 2023Source
- 3 Commencement Certificates / NA Order for plotted developmentP52100023451 · Revised CC_Anand_18 04 23_c.pdf · uploaded 20 Apr 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023451 · Arch Cert Anand Ph 2 Q4.pdf · uploaded 20 Apr 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · Engg Cert Anand Ph 2 Q4.pdf · uploaded 20 Apr 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100023451 · Form 2A Q4 Anand Ph 2.pdf · uploaded 20 Apr 2023Source
- 8 Disclosure of sold/ booked inventoryP52100023451 · Inv Update Q4 Anand 2.pdf · uploaded 20 Apr 2023Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · CA Cert Anand Ph 2 Q4.pdf · uploaded 20 Apr 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100023186 · Revised Sanction Plan_Anand_18 04 23.pdf · uploaded 20 Apr 2023Source
- 3 Commencement Certificates / NA Order for plotted developmentP52100023186 · Revised CC_Anand_18 04 23_c.pdf · uploaded 20 Apr 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023186 · Arch Cert Anand Ph 1 Q4.pdf · uploaded 20 Apr 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023186 · Engg Cert Anand Ph 1 Q4.pdf · uploaded 20 Apr 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100023186 · Form 2A Q4 Anand Ph 1.pdf · uploaded 20 Apr 2023Source
- 8 Disclosure of sold/ booked inventoryP52100023186 · Inv Update Q4 Anand 1.pdf · uploaded 20 Apr 2023Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023186 · CA Cert Anand Ph 1 Q4.pdf · uploaded 20 Apr 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023451 · Form 1 Arch Cert Anand Ph 2.pdf · uploaded 20 Jul 2023Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · Form 2 Anand Ph 2.pdf · uploaded 20 Jul 2023Source
- 9 Disclosure of sold/ booked inventoryP52100023451 · Inventory Update Anand Ph 2.pdf · uploaded 20 Jul 2023Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · Form 3 CA Cert Anand Ph 2.pdf · uploaded 20 Jul 2023Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023186 · Form 1 Arch Cert Anand Ph 1.pdf · uploaded 20 Jul 2023Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023186 · Form 2 Anand Ph 1.pdf · uploaded 20 Jul 2023Source
- 9 Disclosure of sold/ booked inventoryP52100023186 · Inventory Update Anand Ph 1.pdf · uploaded 20 Jul 2023Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023186 · Form 3 CA Cert Anand Ph 1.pdf · uploaded 20 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100023451 · FORM 5 FY 23 ANAND PH 2.pdf · uploaded 30 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100023186 · FORM 5 FY 23 ANAND PH 1.pdf · uploaded 30 Sep 2023Source
- 1 Declaration about Commencement CertificateP52100023451 · Format D Revised Commencement Declaration.pdf · uploaded 6 Oct 2023Source
- 3 Declaration in FORM BP52100023451 · Form B - RBDPL date extension.pdf · uploaded 6 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100023451 · Form 2A - Quality Assurance Mar 23.pdf · uploaded 6 Oct 2023Source
- 10 Disclosure of sold/ booked inventoryP52100023451 · Inventory update - Sep 23.pdf · uploaded 6 Oct 2023Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · Form 3 CA Cert Anand Ph 2.pdf · uploaded 6 Oct 2023Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · CA Cert - Sep 23-c.pdf · uploaded 6 Oct 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023451 · Architect Cert Anand Phase 2 Sep -23.pdf · uploaded 19 Oct 2023Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · Engg Cert Anand Phase 2 Sep 23.pdf · uploaded 19 Oct 2023Source
- 11 Disclosure of sold/ booked inventoryP52100023451 · Inventory Update Anand Phase 2 Sep 23.pdf · uploaded 19 Oct 2023Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · Engg Cert Anand Phase 2 Sep 23.pdf · uploaded 19 Oct 2023Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023186 · Architect Cert Anand Phase 1 Sep -23.pdf · uploaded 19 Oct 2023Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023186 · Engg Cert Anand Phase 1 Sep 23.pdf · uploaded 19 Oct 2023Source
- 10 Disclosure of sold/ booked inventoryP52100023186 · Inventory Update Anand Phase 1 Sep 23.pdf · uploaded 19 Oct 2023Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023186 · CA Cert Rohan Anand Phase 1 Sep 23.pdf · uploaded 19 Oct 2023Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023451 · Arch Cert Rohan Anand Ph 2 Dec 23.pdf · uploaded 20 Jan 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · Engg Cert Rohan Anand Ph 2 Dec 23.pdf · uploaded 20 Jan 2024Source
- 12 Disclosure of sold/ booked inventoryP52100023451 · Inventory Update Anand Ph 2 Dec 23.pdf · uploaded 20 Jan 2024Source
- 18 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · CA Cert Rohan Anand Ph 2 Dec 23.pdf · uploaded 20 Jan 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023186 · Arch Cert Rohan Anand Ph 1 Dec 23.pdf · uploaded 20 Jan 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023186 · Engg Cert Rohan Anand Ph 1 Dec 23.pdf · uploaded 20 Jan 2024Source
- 11 Disclosure of sold/ booked inventoryP52100023186 · Inventory Update Anand Ph 1 Dec 23.pdf · uploaded 20 Jan 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023186 · CA Cert Rohan Anand Ph 1 Dec 23.pdf · uploaded 20 Jan 2024Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023451 · Arch Cert Rohan Anand Phase 2 Mar 24.pdf · uploaded 20 Apr 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · Engg Cert Rohan Anand Ph 2 Mar 24.pdf · uploaded 20 Apr 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100023451 · Quality Assurance Rohan Anand Ph 2 Mar 24.pdf · uploaded 20 Apr 2024Source
- 13 Disclosure of sold/ booked inventoryP52100023451 · Inventory Update Rohan Anand Ph 2 Mar 24.pdf · uploaded 20 Apr 2024Source
- 19 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · CA Cert Rohan Anand Ph 2 Mar 24.pdf · uploaded 20 Apr 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023186 · Arch Cert Rohan Anand Phase 1 Mar 24.pdf · uploaded 20 Apr 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023186 · Engg Cert Rohan Anand Ph 1 Mar 24.pdf · uploaded 20 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100023186 · Quality Assurance Rohan Anand Ph 1 Mar 24.pdf · uploaded 20 Apr 2024Source
- 12 Disclosure of sold/ booked inventoryP52100023186 · Inventory Update Rohan Anand Ph 1 Mar 24.pdf · uploaded 20 Apr 2024Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023186 · CA Cert Rohan Anand Ph 1 Mar 24.pdf · uploaded 20 Apr 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023451 · Rohan Anand P II Jun 24.pdf · uploaded 20 Jul 2024Source
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · Rohan Anand P II.pdf · uploaded 20 Jul 2024Source
- 14 Disclosure of sold/ booked inventoryP52100023451 · Rohan Anand P II.pdf · uploaded 20 Jul 2024Source
- 20 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · Rohan Anand PII June 24.pdf · uploaded 20 Jul 2024Source
- 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023186 · Rohan Anand P I June 24.pdf · uploaded 20 Jul 2024Source
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023186 · Rohan Anand P I.pdf · uploaded 20 Jul 2024Source
- 13 Disclosure of sold/ booked inventoryP52100023186 · Rohan Anand PI.pdf · uploaded 20 Jul 2024Source
- 18 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023186 · Rohan Anand P1 June 24.pdf · uploaded 20 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100023451 · Form 5 - Anand Phase 2 FY 23-24.pdf · uploaded 9 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100023186 · Form 5 - Anand Phase 1 FY 23-24.pdf · uploaded 9 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023451 · Anand P II.pdf · uploaded 19 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · Rohan Anand P II.pdf · uploaded 19 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · Anand P II.pdf · uploaded 19 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100023451 · Rohan Anand P 2.pdf · uploaded 19 Oct 2024Source
- 1 Architect’s Certificate on Completion of Project (Form 4)P52100023186 · Form 4 Anand and OC.pdf · uploaded 28 Oct 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100023186 · O C Anand Phase 1 CDE Building.pdf · uploaded 28 Oct 2024Source
- 1 Architect’s Certificate on Completion of Project (Form 4)P52100023186 · Form 4 Anand Phase 1.pdf · uploaded 18 Nov 2024Source
- 2 Architect’s Certificate on Completion of Project (Form 4)P52100023186 · Form 4 Anand Phase 1.pdf · uploaded 18 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023451 · Arch Cert Anand Phase 2 Dec 24.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · CA Cert Anand Phase 2 Dec 24.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · Engg Cert Anand Phase 2 Dec 24.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100023451 · Inv Update Anand Phase 2 Dec 24.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100023451 · Rohan Anand Phase II.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100023451 · Rohan Anand Phase 2.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100023451 · Rohan Anand Phase 2.pdf · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryP52100023451 · Rohan Anand Phase 2.pdf · uploaded 19 Apr 2025Source
- Withdrawal Update Form 1P52100023451 · Rohan Anand Phase 2.pdf · uploaded 19 Jul 2025Source
- Withdrawal Update Form 2P52100023451 · Form 2 Anand Phase 2 June 25.pdf · uploaded 19 Jul 2025Source
- Withdrawal Update Form 3P52100023451 · Rohan Anand.pdf · uploaded 19 Jul 2025Source
- Form 2A (FY 2024-2025)P52100023451 · Rohan Anand Phase 2.pdf · uploaded 24 Jul 2025Source
- Form 5 (FY 2024-2025)P52100023451 · Anand Phase 2.pdf · uploaded 15 Sep 2025Source
- Form 5 (FY 2024-2025)P52100023186 · Rohan Anand Form 5.pdf · uploaded 29 Sep 2025Source
- Withdrawal Update Form 1P52100023451 · Rohan Anand Phase 2.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 2P52100023451 · Rohan Anand Phase 2.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 3P52100023451 · Rohan Anand Phase 2.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 1P52100023451 · Rohan Anand Phase 2.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2P52100023451 · Rohan Anand Phase 2.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3P52100023451 · Rohan Anand Phase 2.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1P52100023451 · Rohan Anand Phase 2.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P52100023451 · Rohan Anand Phase 2.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P52100023451 · Rohan Anand Phase 2.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P52100023451 · Rohan Anand Phase 2.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2P52100023451 · Rohan Anand Phase 2.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3P52100023451 · Rohan Anand Phase 2.pdf · uploaded 20 Jul 2026Source
- Form 2A (FY 2025-2026)P52100023451 · Rohan Anand Phase 2.pdf · uploaded 2 Sep 2026Source
- Form 5 (FY 2025-2026)P52100023451 · Rohan Anand Phase 2.pdf · uploaded 29 Sep 2026Source
Technical
- DocumentP52100023451 · SANCTIONED IOD.pdf · uploaded 30 Nov 2019Source
- DocumentP52100023451 · Building Sanction Plan.pdf · uploaded 30 Nov 2019Source
- DocumentP52100023186 · SANCTIONED IOD.pdf · uploaded 30 Nov 2019Source
- DocumentP52100023186 · Building Sanction Plan.pdf · uploaded 30 Nov 2019Source
- DocumentP52100023451 · Revised layout Rohan Anand.pdf · uploaded 1 Feb 2021Source
- DocumentP52100023186 · Revised layout Rohan Anand.pdf · uploaded 1 Feb 2021Source
- DocumentP52100023186 · Revised layout Rohan Anand.pdf · uploaded 1 Feb 2021Source
- DocumentP52100023451 · Revised Sanction Plan_Anand_18 04 23.pdf · uploaded 20 Apr 2023Source
- DocumentP52100023186 · Revised Sanction Plan_Anand_18 04 23.pdf · uploaded 20 Apr 2023Source
- DocumentP52100023451 · Sanction Plan Rohan Anand 05 06 25.pdf · uploaded 19 Jul 2025Source
- DocumentP52100023451 · Commencement Certificate_compressed.pdf · uploaded 19 Jul 2025Source
Technical (Architect)
- DocumentP52100023186 · Rohan Anand P I June 24.pdf · uploaded 28 Sep 2024Source
- DocumentP52100023451 · Anand P II.pdf · uploaded 19 Oct 2024Source
- DocumentP52100023451 · Arch Cert Anand Phase 2 Dec 24.pdf · uploaded 20 Jan 2025Source
- DocumentP52100023451 · Rohan Anand Phase II.pdf · uploaded 19 Apr 2025Source
- DocumentP52100023451 · Rohan Anand Phase 2.pdf · uploaded 20 Jul 2026Source
Technical (Engineer)
- DocumentP52100023186 · Rohan Anand P I.pdf · uploaded 30 Sep 2024Source
- DocumentP52100023451 · Anand P II.pdf · uploaded 19 Oct 2024Source
- DocumentP52100023451 · Engg Cert Anand Phase 2 Dec 24.pdf · uploaded 20 Jan 2025Source
- DocumentP52100023451 · Rohan Anand Phase 2.pdf · uploaded 19 Apr 2025Source
- DocumentP52100023451 · Rohan Anand Phase 2.pdf · uploaded 20 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 110/112/2/2, 110/112/2/3
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Phases
- 2
- Unit types
- —, 1BHK, 1 Room, 2BHK, Studio609 units in all
- Address
- GAT NO 110 Part and 112 Part, Somatane Phata Road, SomatanePIN 410506
- Village
- Somatane, Mawal taluka
- Location
- 18.70437, 73.67603
- Land area for this project
- 3,285 sq m (35,364 sq ft)
- Permissible built-up area
- 16,752 sq m (1,80,320 sq ft)
- Sanctioned built-up area
- 13,653 sq m (1,46,961 sq ft)
- Recreational open space
- 2,000 sq m (21,528 sq ft)
- Designated bank account
- 99
- Developed in phases
- Yes
- Also registered as
- Rohan Anand Phase II, Rohan Anand Phase I
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
GAT NO 110 Part and 112 Part
Boundaries
- North
- Adj Gat No 109
- South
- Road
- East
- ADJ GAT NO 115 and 116
- West
- ADJ GAT NO 112 Part and 110 Part
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking609 units
232 of 609 units booked (38%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100023451 | Building A | — | — | 131 | — |
| P52100023451 | Building B | — | — | 99 | — |
| P52100023186 | Building C | 1BHK | 36.91 sq m · 397 sq ft | 1 | 1 |
| P52100023186 | Building C | 1BHK | 36.92 sq m · 397 sq ft | 1 | 1 |
| P52100023186 | Building C | 1BHK | 37.08 sq m · 399 sq ft | 2 | 2 |
| P52100023186 | Building C | 1BHK | 37.13 sq m · 400 sq ft | 1 | 0 |
| P52100023186 | Building C | 1 Room | 11.81 sq m · 127 sq ft | 1 | 0 |
| P52100023186 | Building C | 2BHK | 46.96 sq m · 505 sq ft | 29 | 5 |
Show all 21 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100023186 | Building C | 2BHK | 47 sq m · 506 sq ft | 14 | 8 |
| P52100023186 | Building C | 2BHK | 47.02 sq m · 506 sq ft | 8 | 7 |
| P52100023186 | Building C | 2BHK | 47.06 sq m · 507 sq ft | 6 | 5 |
| P52100023186 | Building C | 2BHK | 47.1 sq m · 507 sq ft | 10 | 9 |
| P52100023186 | Building C | 2BHK | 47.11 sq m · 507 sq ft | 30 | 16 |
| P52100023186 | Building C | 2BHK | 47.72 sq m · 514 sq ft | 1 | 0 |
| P52100023186 | Building C | 2BHK | 49.96 sq m · 538 sq ft | 2 | 0 |
| P52100023186 | Building C | Studio | 26.3 sq m · 283 sq ft | 4 | 0 |
| P52100023186 | Building D | 1BHK | 29.04 sq m · 313 sq ft | 131 | 95 |
| P52100023186 | Building E | Studio | 23.61 sq m · 254 sq ft | 58 | 37 |
| P52100023186 | Building E | Studio | 23.74 sq m · 256 sq ft | 2 | 1 |
| P52100023186 | Building E | Studio | 23.77 sq m · 256 sq ft | 76 | 44 |
| P52100023186 | Building E | Studio | 23.9 sq m · 257 sq ft | 2 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals37
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Ankur Associates | — | P52100023451 |
| Architect | Ankur Associates | — | P52100023186 |
| Architect | Ar Prakash Kulkarni | — | P52100023451 |
| Architect | Ar Prakash Kulkarni | — | P52100023186 |
| Chartered accountant | Golesha & Company | — | P52100023451 |
| Chartered accountant | Golesha & Company | — | P52100023186 |
| Chartered accountant | Mahendra Golesha | — | P52100023186 |
| Chartered accountant | Mahendra Golesha | — | P52100023451 |
Show all 37 professionalsShow fewer professionals
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Engineer | Jitendra Kumar Jain | — | P52100023451 |
| Engineer | Jitendra Kumar Jain | — | P52100023186 |
| Engineer | Paresh Vartak | — | P52100023451 |
| Engineer | Pratik Deepak Bhatewara | — | P52100023451 |
| Engineer | Satish Pise | — | P52100023186 |
| Engineer | Satish Pise | — | P52100023451 |
| Other | Rbdpl | — | P52100023186 |
| Other | Rbdpl | — | P52100023451 |
| Registered real estate agent | Emirus Realty Private Limited | — | P52100023186 |
| Registered real estate agent | Emirus Realty Private Limited | — | P52100023451 |
| Registered real estate agent | Full Basket Property Services Private Limited | — | P52100023186 |
| Registered real estate agent | Full Basket Property Services Private Limited | — | P52100023451 |
| Registered real estate agent | HomeAdda | — | P52100023186 |
| Registered real estate agent | HomeAdda | — | P52100023451 |
| Registered real estate agent | House Mart Properties | — | P52100023451 |
| Registered real estate agent | JM Financial Products Limited | — | P52100023451 |
| Registered real estate agent | JM Financial Products Limited | — | P52100023186 |
| Registered real estate agent | MDN Properties Private Limited | — | P52100023451 |
| Registered real estate agent | MDN Properties Private Limited | — | P52100023186 |
| Registered real estate agent | Omkar Sarjerao Patole | — | P52100023186 |
| Registered real estate agent | Omkar Sarjerao Patole | — | P52100023451 |
| Registered real estate agent | Pin Click Property Management Pvt Ltd. | — | P52100023186 |
| Registered real estate agent | Pin Click Property Management Pvt Ltd. | — | P52100023451 |
| Registered real estate agent | Proptiger Marketing Services Private Limited | — | P52100023186 |
| Registered real estate agent | Proptiger Marketing Services Private Limited | — | P52100023451 |
| Registered real estate agent | Square Yards Consulting Private Limited | — | P52100023186 |
| Registered real estate agent | Square Yards Consulting Private Limited | — | P52100023451 |
| Registered real estate agent | Trespect India Private Ltd | — | P52100023186 |
| Registered real estate agent | Trespect India Private Ltd | — | P52100023451 |