Commercial · 1 building · 5 unitsRERA P52100049728

Amar Summit

Deedo IDDP-PUN-BTQH

It is due for completion in Dec 2027, with no extension on record; MahaRERA lists it: deregistered; 0% of its units are booked.

Shivajinagar Bhamburda, Pune 411016 · by Silverleaf Associates Llp

DeliveryDue Dec 2027No extension on recordRegulatoryDeregistered1 MahaRERA listing or order on recordSales0% booked0 of 5 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

It is due for completion in Dec 2027, with no extension on record

  • This projectRegistered 22 Feb 2023, completion promised 31 Dec 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory record1

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100049728
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210004972822 Feb 202331 Dec 202731 Dec 2027Silverleaf Associates LLPProject page
Documents109

1 document held by Deedo, 108 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN - SILVERLEAF ASSOCIATES.pdf · uploaded 3 Feb 2023Source

Legal

  • Declaration Form BFORM B - AFFIDAVIT.pdf · uploaded 4 Feb 2023Source
  • Legal Title reportTitle Report.pdf · uploaded 10 Feb 2023Source
  • Other – LegalLegal Title Report.pdf · uploaded 13 Feb 2023Source
  • Legal Title reportAMAR SUMMIT - TITLE REPORT.pdf · uploaded 17 Aug 2023Source
  • Legal Title reportAMAR SUMMIT - TITLE REPORT.pdf · uploaded 17 Aug 2023Source
  • Legal Title reportSupplementary Title Report.pdf · uploaded 2 Aug 2024Source
Show all 109 documentsShow fewer documents

Legal

  • Legal Title reportTHIRD SUPPL REPORT - SUMMIT.pdf · uploaded 26 Feb 2025Source
  • OthersTITILE REPORT-4TH SUPPL.pdf · uploaded 30 Sep 2025Source
  • Declaration Form BTITILE REPORT-4TH SUPPL.pdf · uploaded 30 Sep 2025Source

Migrated

  • 1 PAN CardPAN - SILVERLEAF ASSOCIATES.pdf · uploaded 3 Feb 2023Source
  • 1 Copy of Layout Approval (in case of layout)LAYOUT PLAN.pdf · uploaded 3 Feb 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN.pdf · uploaded 3 Feb 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERFICATE.pdf · uploaded 3 Feb 2023Source
  • 1 Declaration about Commencement CertificateDECLARATION OF COMMENCEMENT.pdf · uploaded 3 Feb 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - ARCHITECT'S CERTIFICATE.pdf · uploaded 3 Feb 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - ENGINEER'S CERTIFICATE.pdf · uploaded 3 Feb 2023Source
  • 1 CERSAI detailsCERSAI REPORT.pdf · uploaded 3 Feb 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - CA CERTIFICATE.pdf · uploaded 3 Feb 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSEPERATE BANK ACCOUNT DETAILS.pdf · uploaded 3 Feb 2023Source
  • 1 Deviation Report with respect to Allotment letterDEVIATION WITH ALLLOTMENT.pdf · uploaded 3 Feb 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDEVIATION WITH AGREEMENT.pdf · uploaded 3 Feb 2023Source
  • 1 a Details of encumbrances concerned to FinanceEncumbrance Certificate.pdf · uploaded 4 Feb 2023Source
  • 1 b Details of encumbrances concerned to LegalEncumbrance Certificate.pdf · uploaded 4 Feb 2023Source
  • 1 Declaration in FORM BFORM B - AFFIDAVIT.pdf · uploaded 4 Feb 2023Source
  • 1 Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 6 Feb 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest.pdf · uploaded 7 Feb 2023Source
  • 1 Copy of the legal title reportTitle Report.pdf · uploaded 10 Feb 2023Source
  • 1 Other – TechnicalBuilding Layout Pages 2,3,4.pdf · uploaded 10 Feb 2023Source
  • 1 Proforma of Agreement for saleAGREEMENT TO SALE.pdf · uploaded 13 Feb 2023Source
  • 1 Other – LegalLegal Title Report.pdf · uploaded 13 Feb 2023Source
  • 2 Copy of the legal title reportAMAR SUMMIT - TITLE REPORT.pdf · uploaded 17 Aug 2023Source
  • 3 Copy of the legal title reportAMAR SUMMIT - TITLE REPORT.pdf · uploaded 17 Aug 2023Source
  • 2 a Details of encumbrances concerned to FinanceAS_Encumbrances Cert- Finance.pdf · uploaded 26 Aug 2023Source
  • 2 b Details of encumbrances concerned to LegalAS_Encumbrances Cert- Finance.pdf · uploaded 26 Aug 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - ARCHITECT'S CERTIFICATE-.pdf · uploaded 26 Aug 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - ENGINEER'S CERTIFICATE-.pdf · uploaded 26 Aug 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A - QUALITY ASSURANCE CERT_2022-23.pdf · uploaded 26 Aug 2023Source
  • 1 Disclosure of sold/ booked inventoryAS - Disclosure of Sold and Unsold.pdf · uploaded 26 Aug 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - ARCHITECT'S CERTIFICATE.pdf · uploaded 20 Oct 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - ENGINEER'S CERTIFICATE.pdf · uploaded 20 Oct 2023Source
  • 2 Disclosure of sold/ booked inventoryAS - Disclosure of Sold and Unsold.pdf · uploaded 20 Oct 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_Amar Summit_Mar 2023.pdf · uploaded 23 Oct 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_Amar Summit_Sept 2023.pdf · uploaded 23 Oct 2023Source
  • 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameAS - Declaration about seperate bank account.pdf · uploaded 3 Nov 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 - Amar Summit 2022-23.pdf · uploaded 21 Nov 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - ARCHITECT'S CERT_AMAR SUMMIT.pdf · uploaded 19 Jan 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - ENGINEER'S CERTI_AMAR SUMMIT.pdf · uploaded 19 Jan 2024Source
  • 3 Disclosure of sold/ booked inventoryDisclosure of Sold and Unsold Units.pdf · uploaded 19 Jan 2024Source
  • 1 Home Buyer /Allottee Grievance Redressal CellREREA GRIEVANCE REDRESSAL CELL.pdf · uploaded 19 Jan 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 _Amar Summit_Dec2023 original.pdf · uploaded 27 Mar 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - ENGINEER'S CERTI_AMAR SUMMIT.pdf · uploaded 3 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A - QUALITY ASSURANCE CERT_2023-24.pdf · uploaded 3 May 2024Source
  • 4 Disclosure of sold/ booked inventoryAS - Disclosure of Sold Unsold Units.pdf · uploaded 3 May 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - ARCHITECT'S CERT_AMAR SUMMIT.pdf · uploaded 15 May 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_Amar Summit_MAR 2024.pdf · uploaded 15 May 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - ARCHITECT'S CERT_AMAR SUMMIT-.pdf · uploaded 20 Jul 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - ENGINEER'S CERTI_AMAR SUMMIT.pdf · uploaded 20 Jul 2024Source
  • 5 Disclosure of sold/ booked inventoryAS - Disclosure of Sold Unsold Units.pdf · uploaded 20 Jul 2024Source
  • 4 Copy of the legal title reportSupplementary Title Report.pdf · uploaded 2 Aug 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_Amar Summit_JUN 2024.pdf · uploaded 20 Aug 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_Amar Summit_JUN 2024.pdf · uploaded 20 Aug 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Amar Summit 2023-24.pdf · uploaded 8 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)SUMMIT FORM 2 SEPT 24.pdf · uploaded 10 Oct 2024Source
  • 2 Disclosure of sold/ booked inventorySUMMIT DISCLOSURE OF SOLD UNSOLD SEPT 24.pdf · uploaded 10 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - ARCHITECT'CERT_AMAR SUMMIT.pdf · uploaded 17 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_Amar Summit_SEPT 2024.pdf · uploaded 25 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-ARCHITECT'S CERT_AS_Dec 24.pdf · uploaded 17 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - ENGINEERS CERT_AS Dec 24.pdf · uploaded 17 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryAS-DISCLOSURE OF SOLD UNSOLD INVENTORY_Dec 24.pdf · uploaded 17 Jan 2025Source
  • 1 Copy of the legal title reportTHIRD SUPPL REPORT - SUMMIT.pdf · uploaded 26 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_Amar Summit_DEC 2024.pdf · uploaded 24 Mar 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)AS-Sold Unsold Units_Mar 25.pdf · uploaded 18 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-ENGINEER'S CERTI_AS_Mar 25.pdf · uploaded 18 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryAS-Sold Unsold Units_Mar 25.pdf · uploaded 18 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-ARCHITECT'S CERT_AS_Mar 25.pdf · uploaded 21 Apr 2025Source
  • Withdrawal Update Form 1FORM 1-ARCHITECTu0027S CERT_AS_Mar 25.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 1FORM 1-ARCHITECTu0027S CERT_AS_June 25.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 1FORM 1 SUMMIT SEPT 2025.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 2FORM 2-ENGINEERu0027S CERTI_AS_Mar 25.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 2FORM 2-ENGINEERu0027S CERTI_AS_June 25.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 2FORM 2 SUMMIT SEPT 2025.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 3FORM 3 SUMMIT MARCH 2025.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 3FORM 3 SUMMIT JUNE 2025.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 3FORM 3 SUMMIT SEPT 2025.pdf · uploaded 30 Sep 2025Source
  • Form 5 (FY 2022-2023)Form 5 - Amar Summit 2022-23.pdf · uploaded 5 Dec 2025Source
  • Form 5 (FY 2023-2024)Form 5 - Amar Summit 2023-24.pdf · uploaded 5 Dec 2025Source
  • Form 5 (FY 2024-2025)Form 5 - Amar Summit 2024-25.pdf · uploaded 5 Dec 2025Source
  • Withdrawal Update Form 1FORM 1 ARCHITECT CERT AS Dec 25.pdf · uploaded 17 Jan 2026Source
  • Withdrawal Update Form 2FORM 2 ENGINEER CERTI AS Dec 25.pdf · uploaded 17 Jan 2026Source
  • Withdrawal Update Form 3FORM 3 SUMMIT SEPT 2025.pdf · uploaded 17 Jan 2026Source
  • Withdrawal Update Form 1FORM 1 ARCHITECT CERT AS Dec 25.pdf · uploaded 4 Feb 2026Source
  • Withdrawal Update Form 2FORM 2 ENGINEER CERTI AS Dec 25.pdf · uploaded 4 Feb 2026Source
  • Withdrawal Update Form 3FORM 3_Amar Summit_Dec 2025.pdf · uploaded 4 Feb 2026Source
  • Withdrawal Update Form 1FORM 1-ARCHITECTS CERT_AS_Mar 26.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2FORM 2 ENGINEERS CERT MAR 26.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3FORM 3_Amar Summit_Dec 2025.pdf · uploaded 20 Apr 2026Source

Technical

  • DocumentLAYOUT PLAN.pdf · uploaded 3 Feb 2023Source
  • DocumentBUILDING PLAN.pdf · uploaded 3 Feb 2023Source
  • Other – TechnicalBuilding Layout Pages 2,3,4.pdf · uploaded 10 Feb 2023Source

Technical (Architect)

  • DocumentFORM 1 - ARCHITECT'CERT_AMAR SUMMIT.pdf · uploaded 17 Oct 2024Source
  • DocumentFORM 1-ARCHITECT'S CERT_AS_Dec 24.pdf · uploaded 17 Jan 2025Source
  • DocumentFORM 1-ARCHITECT'S CERT_AS_Mar 25.pdf · uploaded 21 Apr 2025Source
  • DocumentFORM 1-ARCHITECTS CERT_AS_Mar 26.pdf · uploaded 20 Apr 2026Source

Technical (Engineer)

  • DocumentSUMMIT FORM 2 SEPT 24.pdf · uploaded 10 Oct 2024Source
  • DocumentFORM 2 - ENGINEERS CERT_AS Dec 24.pdf · uploaded 17 Jan 2025Source
  • DocumentFORM 2-ENGINEER'S CERTI_AS_Mar 25.pdf · uploaded 18 Apr 2025Source
  • DocumentFORM 2 ENGINEERS CERT MAR 26.pdf · uploaded 20 Apr 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel CTS No 1084, Final Plot No 437

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Certificate Signed
Unit types
Office space5 units in all
Address
Final Plot No 437, CTS No 1084, University Road, Shivajinagar BhamburdaPIN 411016
Village
Pune (M Corp.), Pune City taluka
Land area for this project
6,700 sq m (72,118 sq ft)
Permissible built-up area
54,829 sq m (5,90,174 sq ft)
Sanctioned built-up area
11,351 sq m (1,22,181 sq ft)
Recreational open space
609 sq m (6,554 sq ft)
Designated bank account
76
Developed in phases
No

Survey, CTS, gat or plot numbers

CTS No 1084Final Plot No 437

Land as published on MahaRERA's project page

Final Plot No 437, CTS No 1084

Boundaries

North
45 Mtr Road
South
FPN 438 Hissa 1 and 438 Hissa 2
East
24 Mtr Road
West
Fpn 436

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking5 units

0 of 5 units booked (0%), as the promoter reported to MahaRERA

Office space · 5 units
TypeCarpet areaUnitsBooked
Office space1,505.42 sq m · 16,204 sq ft50

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals8

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectM.B. Chaudhari & Associates—
ArchitectPritika Manjrekar—
Chartered accountantApte & Co—
Chartered accountantP. S. Athavale & Co—
EngineerJW Consultants LLP—
EngineerSuresh Thakchand Ghodekar—
OtherAmar Builders and Promoters LLP—
OtherS J Contracts Pvt Ltd—

Source: MahaRERA project page. Contact details are not shown.