Kumar Paksha-B
Completion was pushed back 4 months, to Oct 2027; no MahaRERA orders on record; 19% of its units are booked.
Savardari, Pune 410501 · Promoter: Kumar Properties Lifespaces Private Limited
Completion was pushed back 4 months, to Oct 2027
- This projectRegistered 27 Feb 2018, completion promised 30 Jun 2027, revised to 30 Oct 2027.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100015448
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100015448 | 27 Feb 2018 | 30 Jun 2027 | 30 Oct 2027 | Kumar Properties Lifespaces Private Limited | Project page |
Documents130
2 documents held by Deedo, 128 filings listed on MahaRERA's project page
Finance
- PAN Cardpan- Developers.pdf · uploaded 29 Jan 2018Source
Legal
- Legal Title reportTitle Report_Adv Vinod_Savardari.pdf · uploaded 30 Jan 2018Source
- Declaration Form BForm B_Promoter_Savardari-compressed.pdf · uploaded 12 Feb 2018Source
- OtherName Change Certificate_Raj Developers.pdf · uploaded 21 Feb 2018Source
- Declaration Form Bscan - Form B.pdf · uploaded 16 Jul 2024Source
- Declaration Form BForm B- Chakan.pdf · uploaded 21 Oct 2024Source
Show all 130 documentsShow fewer documents
Legal
- Declaration Form BForm B - New Project Name.pdf · uploaded 10 Jul 2026Source
- Declaration Form BSale deed - Page 01 to 25.pdf · uploaded 10 Jul 2026Source
- Declaration Form BSale deed - Page 26 to 50.pdf · uploaded 10 Jul 2026Source
- Declaration Form BSale deed - Page 51 to 75.pdf · uploaded 10 Jul 2026Source
- Declaration Form BSale deed - Page 76 to 100.pdf · uploaded 10 Jul 2026Source
- Declaration Form BSale deed - Page 101 to 125.pdf · uploaded 10 Jul 2026Source
- Declaration Form BSale deed - Page 126 to 152.pdf · uploaded 10 Jul 2026Source
- Declaration Form BRevised Title Report.pdf · uploaded 18 Jul 2026Source
- Declaration Form B7-12 Extract.pdf · uploaded 18 Jul 2026Source
Migrated
- 1 PAN Cardpan- Developers.pdf · uploaded 29 Jan 2018Source
- 1 Copy of the legal title reportTitle Report_Adv Vinod_Savardari.pdf · uploaded 30 Jan 2018Source
- 1 Details of encumbrancesDeclaration for Encumbrances_Savardari.pdf · uploaded 30 Jan 2018Source
- 1 Building Plan Approval (IOD)Declaration for IOD_Savardari.pdf · uploaded 30 Jan 2018Source
- 1 Proforma of Allotment letterFinal Allotment (Booking) letter_RERA.pdf · uploaded 30 Jan 2018Source
- 1 Declaration in FORM BForm B_Promoter_Savardari-compressed.pdf · uploaded 12 Feb 2018Source
- 1 Copy of Layout Approval (in case of layout)Sanction Plan No-1_Savardari.pdf · uploaded 17 Feb 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_Savardari.pdf · uploaded 17 Feb 2018Source
- 2 Proforma of Allotment letterSale Agreement_Savardari Ph 1.pdf · uploaded 17 Feb 2018Source
- 1 Certificates of CA (Form 3)Form 3_CA Cert_Co-Promoter.pdf · uploaded 21 Feb 2018Source
- 2 Certificates of CA (Form 3)Form 3_CA Cert_Promoter and Co-Pro.pdf · uploaded 21 Feb 2018Source
- 3 Certificates of CA (Form 3)Form 3_CA Cert_Promoter.pdf · uploaded 21 Feb 2018Source
- 1 OtherName Change Certificate_Raj Developers.pdf · uploaded 21 Feb 2018Source
- 1 Certificates of CA (Form 5)Form 5_CA- Savardari.pdf · uploaded 4 Feb 2019Source
- 2 Details of encumbrancesIndex 2 - Mortgage Deed - Savardari- Capri.pdf · uploaded 12 Jul 2019Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Rajgurunagar Developer Savardhari B and C.pdf · uploaded 23 Jan 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineering Certificate Savardari.pdf · uploaded 23 Jan 2020Source
- 4 Certificates of CA (Form 3)Form 3_CA Cartificate_Savardari_compressed.pdf · uploaded 23 Jan 2020Source
- 5 Certificates of CA (Form 3)Form 3 Developers 2019 Savardari signed_compressed.pdf · uploaded 23 Jan 2020Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)sawardari B bldg.pdf · uploaded 7 Jun 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)sawardari C bldg.pdf · uploaded 7 Jun 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)chakan MIDC Form 2.pdf · uploaded 7 Jun 2021Source
- 6 Certificates of CA (Form 3)Form 3 Developers 2020 Savardari - Signed.pdf · uploaded 7 Jun 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 chakan Midc Ph1.pdf · uploaded 25 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 Playtor Chakan MIDC Phase1.pdf · uploaded 25 Jan 2023Source
- 1 Declaration about Commencement CertificateCircular 32 7thJune 2021- Declaration about commencement cert.pdf · uploaded 31 Jan 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Quality Assurance FY19-20.pdf · uploaded 31 Jan 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Quality Assurance FY20-21.pdf · uploaded 31 Jan 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality Assurance FY 21-22.pdf · uploaded 31 Jan 2023Source
- 1 Disclosure of sold/ booked inventoryDISCOLSURE OF SOLD_compressed.pdf · uploaded 31 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Playtor Chakan MIDC Phase I Form 5_21-22.pdf · uploaded 31 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)CHAKAN MIDC FORM 5 FY 2020-21.pdf · uploaded 1 Feb 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)chakan MIDC Form 5-FY2020-21_final_signed.pdf · uploaded 7 Feb 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificates.pdf · uploaded 6 May 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)20230508191618_11zon.pdf · uploaded 8 May 2023Source
- 2 Declaration in FORM Bscan - Form B.pdf · uploaded 16 Jul 2024Source
- 2 Disclosure of sold/ booked inventoryDisclosure of Sold-Unsold_.pdf · uploaded 16 Jul 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - chakan MIDC.pdf · uploaded 23 Jul 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - April23 to june 24.pdf · uploaded 23 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - 2022- 2023.pdf · uploaded 23 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A - 2023-2024.pdf · uploaded 23 Jul 2024Source
- 7 Certificates of CA (Form 3)Form 3 - 2023.pdf · uploaded 23 Jul 2024Source
- 8 Certificates of CA (Form 3)Form 3 - 2024.pdf · uploaded 23 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FFORM - 5.pdf · uploaded 12 Aug 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 July 24.pdf · uploaded 18 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 July 24.pdf · uploaded 18 Oct 2024Source
- 1 Declaration in FORM BForm B- Chakan.pdf · uploaded 21 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (C ) - Apil to june 23.pdf · uploaded 21 Oct 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (C ) - July to Sept 23.pdf · uploaded 21 Oct 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (C ) - Oct to Dec 23.pdf · uploaded 21 Oct 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (C ) - Jan to Mar 24.pdf · uploaded 21 Oct 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ( C ) - April To June 24 (1).pdf · uploaded 21 Oct 2024Source
- 1 Certificates of CA (Form 3)Form 3 - - 2024_11zon.pdf · uploaded 21 Oct 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)(Form 2A FY 2019-20).pdf · uploaded 21 Oct 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A - 19-20.pdf · uploaded 21 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 - 19-20.pdf · uploaded 21 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 - 19-20.pdf · uploaded 21 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 2A - 20-21.pdf · uploaded 21 Oct 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 - 20-21.pdf · uploaded 21 Oct 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)(Form 2A FY 2020-21).pdf · uploaded 21 Oct 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A - 20-21.pdf · uploaded 21 Oct 2024Source
- 1 CERSAI detailsDeclaration of CERSAI.pdf · uploaded 21 Oct 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A.pdf · uploaded 21 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 - 21-22.pdf · uploaded 21 Oct 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)(Form 2A FY 2021-22).pdf · uploaded 21 Oct 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A - 21-22.pdf · uploaded 21 Oct 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A.pdf · uploaded 21 Oct 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectAnnexure A.pdf · uploaded 21 Oct 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - July to Sept 2024.pdf · uploaded 8 Nov 2024Source
- 2 Certificates of CA (Form 3)Form 3 - July to Sept 2024.pdf · uploaded 8 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - July to Sept 2024.pdf · uploaded 8 Nov 2024Source
- 1 Certificates of CA (Form 5)Form 5 - 2017 -18.pdf · uploaded 12 Nov 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 - 2018 - 19.pdf · uploaded 12 Nov 2024Source
- 1 Disclosure of sold/ booked inventoryCircular 29 - Disclosure of Sold Booked Inventory.pdf · uploaded 12 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)fORM 5 - 2023 TO 2024.pdf · uploaded 13 Nov 2024Source
- Form 1Form 1 June 25.pdf · uploaded 22 Jun 2026Source
- Form 1Form 1 Sep 25.pdf · uploaded 22 Jun 2026Source
- Form 1Form 1 Dec 25.pdf · uploaded 22 Jun 2026Source
- Form 2Form 2 June 25.pdf · uploaded 22 Jun 2026Source
- Form 2Form 2 Sep 25.pdf · uploaded 22 Jun 2026Source
- Form 2Form 2 Dec 25.pdf · uploaded 22 Jun 2026Source
- Form 3Form 3 June 25.pdf · uploaded 22 Jun 2026Source
- Form 3Form 3 Sep 25.pdf · uploaded 22 Jun 2026Source
- Form 3Form 3 Dec 25.pdf · uploaded 22 Jun 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 June 25_2_11zon (1).pdf · uploaded 22 Jun 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 Sep 25_3_11zon.pdf · uploaded 22 Jun 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 Dec 25_1_11zon.pdf · uploaded 22 Jun 2026Source
- Form 1Form 1 March 26.pdf · uploaded 24 Jun 2026Source
- Form 2Form 2 March 26.pdf · uploaded 24 Jun 2026Source
- Form 3260624_FORM 3_March-2026.pdf · uploaded 24 Jun 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 March 26.pdf · uploaded 24 Jun 2026Source
- Withdrawal Update Form 11_Arch Certificate.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 22_Engg Certificate.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 33_CA Certificate.pdf · uploaded 30 Jul 2026Source
- Form 5 (FY 2025-2026)Form 5_Kumar Paksh_Signed.pdf · uploaded 1 Oct 2026Source
Technical
- DocumentDeclaration for IOD_Savardari.pdf · uploaded 30 Jan 2018Source
- DocumentSanction Plan No-1_Savardari.pdf · uploaded 17 Feb 2018Source
- DocumentPage 1 - Layout Plan (Highlighted).pdf · uploaded 4 Jul 2026Source
- DocumentPage 4 - Bldg B (FLoor Plans).pdf · uploaded 4 Jul 2026Source
- DocumentPage 5 - Bldg B (Elevation).pdf · uploaded 4 Jul 2026Source
- DocumentPage 6 - Bldg C (Floor Plans).pdf · uploaded 4 Jul 2026Source
- DocumentPage 7 - Bldg C (Elevation).pdf · uploaded 4 Jul 2026Source
Technical (Architect)
- DocumentForm 1 July 24.pdf · uploaded 18 Oct 2024Source
- DocumentForm 1 (C ) - Apil to june 23.pdf · uploaded 21 Oct 2024Source
- DocumentForm 1 (C ) - July to Sept 23.pdf · uploaded 21 Oct 2024Source
- DocumentForm 1 (C ) - Oct to Dec 23.pdf · uploaded 21 Oct 2024Source
- DocumentForm 1 (C ) - Jan to Mar 24.pdf · uploaded 21 Oct 2024Source
- DocumentForm 1 ( C ) - April To June 24 (1).pdf · uploaded 21 Oct 2024Source
- DocumentForm 1 - July to Sept 2024.pdf · uploaded 8 Nov 2024Source
- Document1_Arch Certificate.pdf · uploaded 30 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsGat No. 279
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1.5BHK, 1BHK, 1RK286 units in all
- Address
- Gat No. 279, Chakan MIDC Road, SavardariPIN 410501
- Village
- Savardari, Khed taluka
- Location
- 18.76928, 73.77596
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Boundaries
- North
- Adjacent Gat No 6
- South
- Adjacent Gat No 230
- East
- Open space of Project
- West
- Adjacent A bldg
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking286 units
55 of 286 units booked (19%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| B | 1.5BHK | 33.63 sq m · 362 sq ft | 52 | 8 |
| B | 1BHK | 22.97 sq m · 247 sq ft | 102 | 47 |
| B | 1RK | 15.91 sq m · 171 sq ft | 1 | 0 |
| C | 1.5BHK | 30.49 sq m · 328 sq ft | 44 | 0 |
| C | 1BHK | 20.75 sq m · 223 sq ft | 86 | 0 |
| C | 1RK | 14.97 sq m · 161 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals21
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Manoj Tatooskar | — |
| Architect | Priyanka Amol Kute | — |
| Architect | Vikas Achalkar | — |
| Chartered accountant | Akil Lodha Associates | — |
| Chartered accountant | Alok Shukla Associates | — |
| Chartered accountant | Supriya Abhijit Mundada | — |
| Engineer | Amruta Dnyaneshwar Pawar | — |
| Engineer | Dharitri Roy | — |
Show all 21 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Registered real estate agent | Amol Balasaheb Sonawane | — |
| Registered real estate agent | Anil Laxman Sathe | — |
| Registered real estate agent | Arun Rajmani Vishwakarma | — |
| Registered real estate agent | Indrajit Mahendra Bhosale | — |
| Registered real estate agent | Lalit Laxman Parab | — |
| Registered real estate agent | Mukul Manoj Gaikwad | — |
| Registered real estate agent | Omkar Shivaji Kachave | — |
| Registered real estate agent | Om Vijaykumar Kanade | — |
| Registered real estate agent | Rohan Lahu Deshmukh | — |
| Registered real estate agent | Santosh Madhukar Panchal | — |
| Registered real estate agent | Ujwala Santosh Brahmankar | — |
| Registered real estate agent | Vijay Sambhaji Mane | — |
| Registered real estate agent | Vinita Chaudhry | — |
Source: MahaRERA project page. Contact details are not shown.