Palm Spring A, B, E
Deedo IDDP-PUN-SYHJIts promised completion date, Jun 2024, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 60% of its units are booked.
Ravet, Pune 412101 · Property rates in Ravet · Promoter: Aryavedant promoters & builders
Its promised completion date, Jun 2024, has passed and MahaRERA does not show it completed
- This projectRegistered 15 Aug 2020, completion promised 15 Jun 2024, and still not shown completed today.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
3 buildings
Open a building to see every flat, floor by floor.
- A Building14 floors · 95 units75% booked
- B Building14 floors · 48 units60% booked
- E Building7 floors · 23 units0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100026083
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100026083 | 15 Aug 2020 | 15 Jun 2024 | 15 Jun 2024 | Aryavedant promoters & builders | Project page |
Documents127
1 document held by Deedo, 126 filings listed on MahaRERA's project page
Finance
- PAN CardAryavedant Pancard.pdf · uploaded 14 Jul 2020Source
Legal
- Legal Title reportpartnership deep 1 compressed.pdf · uploaded 14 Jul 2020Source
- Legal Title reporttitle search new 12 10 2019 compressed 1 5.pdf · uploaded 14 Jul 2020Source
- Legal Title reporttitle search new 12 10 2019 compressed 6 11.pdf · uploaded 14 Jul 2020Source
- Declaration Form BForm B encumbrance certificate compressed.pdf · uploaded 14 Jul 2020Source
Show all 127 documentsShow fewer documents
Migrated
- 2 Copy of the legal title reporttitle search new 12 10 2019 compressed 1 5.pdf · uploaded 14 Jul 2020Source
- 3 Copy of the legal title reporttitle search new 12 10 2019 compressed 6 11.pdf · uploaded 14 Jul 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentnew commencement Scan 06 Nov 2019 compressed.pdf · uploaded 14 Jul 2020Source
- 1 Declaration in FORM BForm B encumbrance certificate compressed.pdf · uploaded 14 Jul 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 REVISED PALM SPRINGS WING A B D compressed.pdf · uploaded 14 Jul 2020Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A CERT compressed.pdf · uploaded 14 Jul 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA CERTIFICATE 7 AUG 2020 compressed.pdf · uploaded 8 Aug 2020Source
- 1 Details of encumbrancesREVISED encumbrance certificate.pdf · uploaded 12 Aug 2020Source
- 1 Copy of Layout Approval (in case of layout)LAYOUT COMPRESS FINAL.pdf · uploaded 12 Aug 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentLAYOUT COMPRESS FINAL.pdf · uploaded 12 Aug 2020Source
- 2 Building Plan Approval / NA Order for plotted development01] FULL POTENTIAL IOD.pdf · uploaded 12 Aug 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 FINAL FOR REGISTRATION.pdf · uploaded 12 Aug 2020Source
- 1 Proforma of Allotment letterAGREEMENT TO SALE A B 1 TO 33.pdf · uploaded 12 Aug 2020Source
- 2 Proforma of Allotment letterALLOTMENT LETTER A B 34.pdf · uploaded 12 Aug 2020Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 A,B AND D BUILDING 27-11-2020_compressed.pdf · uploaded 7 Jan 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)PALM SPRING FORM 2 NOV.pdf · uploaded 7 Jan 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 19 Aug 2021Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 A B D_compressed.pdf · uploaded 19 Aug 2021Source
- 1 Disclosure of sold/ booked inventoryABD sold unsold.pdf · uploaded 19 Aug 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 A B Dcompressed.pdf · uploaded 19 Aug 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 A B Dcompressed.pdf · uploaded 19 Aug 2021Source
- 2 Copy of Layout Approval (in case of layout)plan copy_compressed (1).pdf · uploaded 7 Dec 2021Source
- 3 Copy of Layout Approval (in case of layout)scan0662.pdf · uploaded 7 Dec 2021Source
- 4 Copy of Layout Approval (in case of layout)scan0666.pdf · uploaded 7 Dec 2021Source
- 2 Commencement Certificates / NA Order for plotted developmentCommencement Revise Cert_compressed.pdf · uploaded 7 Dec 2021Source
- 1 Declaration about Commencement Certificateformat D.pdf · uploaded 10 Dec 2021Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1_compressed.pdf · uploaded 24 Dec 2021Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 24 Dec 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 _compressed.pdf · uploaded 24 Dec 2021Source
- 5 Copy of Layout Approval (in case of layout)Layout plan (2).pdf · uploaded 28 Dec 2021Source
- 1 CERSAI detailsCERSAI_Search_Report_200226730401_For_Asset_Based_Search_28_12_2021_10_46_52_399.pdf · uploaded 28 Dec 2021Source
- 2 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 28 Dec 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 -2020-21.pdf · uploaded 23 Mar 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Rera Letter .pdf · uploaded 11 Jul 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Palm spring_compressed.pdf · uploaded 11 Jul 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ganesh nakhate Rera Letter AB building .pdf · uploaded 12 Jan 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Palm springs A B And E_compressed.pdf · uploaded 12 Jan 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 ABE Bldg.pdf · uploaded 8 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)ab building.pdf · uploaded 17 Feb 2023Source
- 3 Disclosure of sold/ booked inventorySold unsold.pdf · uploaded 24 Feb 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 12 Apr 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Palm Springs A B E.pdf · uploaded 17 Apr 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3 (A B E)_compressed.pdf · uploaded 3 Jun 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech Certificate 28-06-23 ABE.pdf · uploaded 28 Jun 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Palm Springs ABE F2_compressed.pdf · uploaded 30 Jun 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_11zon.pdf · uploaded 9 Oct 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)plam springs October 23.pdf · uploaded 9 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20) (1).pdf · uploaded 11 Oct 2023Source
- 4 Disclosure of sold/ booked inventoryA B building Sold Unsold.pdf · uploaded 11 Oct 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3 (ABE BUILDING)_compressed.pdf · uploaded 19 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FY 22-23 Form 5 ABE Rera (1).pdf · uploaded 8 Mar 2024Source
- 5 Disclosure of sold/ booked inventorySold Unsold Inventory ABE Rera.pdf · uploaded 1 Apr 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 ABE.pdf · uploaded 1 Apr 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Cerificate Form2.pdf · uploaded 3 Apr 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)palm spring ABE march qtr f1.pdf · uploaded 20 Apr 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 A,B,E Building Q2 FY 24-25_11zon.pdf · uploaded 8 Nov 2024Source
- 1 Disclosure of sold/ booked inventoryAB Sold Unsold QTR 2 FY 24-25 (1).pdf · uploaded 8 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)AB Rera Engineer Site Supervisor Certificate Qtr 2 FY 24-25 (2).pdf · uploaded 8 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA FORM-3 (A B E)JUNE-23_compressed.pdf · uploaded 3 Dec 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3 (A B E)-DEC-23_compressed.pdf · uploaded 3 Dec 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-ABEJUNE-24_compressed.pdf · uploaded 3 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1.pdf · uploaded 7 Dec 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate_ palm spring A,B,E.pdf · uploaded 7 Dec 2024Source
- 1 Disclosure of Interest in Other Real Estate Organizationsf3_compressed.pdf · uploaded 7 Dec 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 sep 2022.pdf · uploaded 9 Dec 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 sep 2021.pdf · uploaded 9 Dec 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 sep 2021.pdf · uploaded 9 Dec 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sep 2020.pdf · uploaded 9 Dec 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 2022.pdf · uploaded 9 Dec 2024Source
- 1 Other – TechnicalFORM 4 a b e.pdf · uploaded 27 Mar 2025Source
- Form 1form 1.pdf · uploaded 6 Sep 2025Source
- Form 2form 2.pdf · uploaded 6 Sep 2025Source
- Form 3form 3.pdf · uploaded 6 Sep 2025Source
- Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 6 Sep 2025Source
- Form 1form 1.pdf · uploaded 6 Sep 2025Source
- Form 2form 2.pdf · uploaded 6 Sep 2025Source
- Form 3form 3.pdf · uploaded 6 Sep 2025Source
- Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 6 Sep 2025Source
- Form 1form 1.pdf · uploaded 6 Sep 2025Source
- Form 2form 2.pdf · uploaded 6 Sep 2025Source
- Form 3form 3.pdf · uploaded 6 Sep 2025Source
- Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 6 Sep 2025Source
- Form 1form 1.pdf · uploaded 6 Sep 2025Source
- Form 2form 2.pdf · uploaded 6 Sep 2025Source
- Form 3form 3.pdf · uploaded 6 Sep 2025Source
- Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 6 Sep 2025Source
- Form 1form 1.pdf · uploaded 6 Sep 2025Source
- Form 2form 2.pdf · uploaded 6 Sep 2025Source
- Form 3form 3.pdf · uploaded 6 Sep 2025Source
- Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 6 Sep 2025Source
- Form 1form 1.pdf · uploaded 6 Sep 2025Source
- Form 2form 2.pdf · uploaded 6 Sep 2025Source
- Form 3form 3.pdf · uploaded 6 Sep 2025Source
- Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 6 Sep 2025Source
- Form 1form 1.pdf · uploaded 6 Sep 2025Source
- Form 2form 2.pdf · uploaded 6 Sep 2025Source
- Form 3form 3.pdf · uploaded 6 Sep 2025Source
- Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 6 Sep 2025Source
- Form 1form 1.pdf · uploaded 6 Sep 2025Source
- Form 2form 2.pdf · uploaded 6 Sep 2025Source
- Form 3FORM 3.pdf · uploaded 6 Sep 2025Source
- Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 6 Sep 2025Source
Technical
- DocumentLAYOUT COMPRESS FINAL.pdf · uploaded 12 Aug 2020Source
- DocumentLAYOUT COMPRESS FINAL.pdf · uploaded 12 Aug 2020Source
- Document01] FULL POTENTIAL IOD.pdf · uploaded 12 Aug 2020Source
- Documentplan copy_compressed (1).pdf · uploaded 7 Dec 2021Source
- Documentscan0662.pdf · uploaded 7 Dec 2021Source
- Documentscan0666.pdf · uploaded 7 Dec 2021Source
- DocumentLayout plan (2).pdf · uploaded 28 Dec 2021Source
- Other – TechnicalFORM 4 a b e.pdf · uploaded 27 Mar 2025Source
Technical (Architect)
Technical (Engineer)
- DocumentEngineer Cerificate Form2.pdf · uploaded 3 Apr 2024Source
- DocumentEngineer certificate_ palm spring A,B,E.pdf · uploaded 7 Dec 2024Source
- DocumentForm 2 sep 2022.pdf · uploaded 9 Dec 2024Source
- DocumentForm 2 sep 2021.pdf · uploaded 9 Dec 2024Source
- DocumentForm 2 sep 2021.pdf · uploaded 9 Dec 2024Source
- DocumentForm 2 Sep 2020.pdf · uploaded 9 Dec 2024Source
- DocumentForm 2 March 2022.pdf · uploaded 9 Dec 2024Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvals109/2 P
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, 1RK, Shop166 units in all
- Address
- 109/2 P, Ravet, PunePIN 412101
- Village
- Ravet, Haveli taluka
- Location
- 18.64559, 73.74325
- Designated bank account
- 171
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Boundaries
- North
- By 18 Mtr Wide Road And Prop Of Vinayak Bhongale
- South
- By Remaining Prop From Sr No 109 2
- East
- Byproperty Of Ramesh Bhondve Others From Sr No 111
- West
- By Propertyof Vasant Kate
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking166 units
100 of 166 units booked (60%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Building | 1BHK | 34.68 sq m · 373 sq ft | 2 | 1 |
| A Building | 1BHK | 41.08 sq m · 442 sq ft | 2 | 0 |
| A Building | 1BHK | 41.2 sq m · 443 sq ft | 2 | 1 |
| A Building | 1BHK | 42.09 sq m · 453 sq ft | 16 | 8 |
| A Building | 1BHK | 42.1 sq m · 453 sq ft | 8 | 6 |
| A Building | 1BHK | 42.56 sq m · 458 sq ft | 12 | 9 |
| A Building | 1BHK | 42.77 sq m · 460 sq ft | 8 | 5 |
| A Building | 2BHK | 63.43 sq m · 683 sq ft | 2 | 2 |
Show all 29 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Building | 2BHK | 66.41 sq m · 715 sq ft | 4 | 4 |
| A Building | 2BHK | 66.67 sq m · 718 sq ft | 4 | 3 |
| A Building | 2BHK | 66.78 sq m · 719 sq ft | 4 | 4 |
| A Building | 2BHK | 66.87 sq m · 720 sq ft | 21 | 18 |
| A Building | 2BHK | 67 sq m · 721 sq ft | 4 | 4 |
| A Building | 2BHK | 67.28 sq m · 724 sq ft | 6 | 6 |
| B Building | 1BHK | 40.05 sq m · 431 sq ft | 2 | 0 |
| B Building | 2BHK | 66.53 sq m · 716 sq ft | 10 | 6 |
| B Building | 2BHK | 66.57 sq m · 717 sq ft | 1 | 1 |
| B Building | 2BHK | 66.86 sq m · 720 sq ft | 12 | 11 |
| B Building | 2BHK | 67 sq m · 721 sq ft | 10 | 10 |
| B Building | 2BHK | 67.28 sq m · 724 sq ft | 10 | 1 |
| B Building | 2BHK | 70.86 sq m · 763 sq ft | 1 | 0 |
| B Building | 2BHK | 76.95 sq m · 828 sq ft | 2 | 0 |
| E Building | 1BHK | 35.47 sq m · 382 sq ft | 6 | 0 |
| E Building | 1BHK | 37.33 sq m · 402 sq ft | 6 | 0 |
| E Building | 1RK | 31.14 sq m · 335 sq ft | 6 | 0 |
| E Building | Shop | 7 sq m · 75 sq ft | 1 | 0 |
| E Building | Shop | 11.63 sq m · 125 sq ft | 1 | 0 |
| E Building | Shop | 12.23 sq m · 132 sq ft | 2 | 0 |
| E Building | Shop | 13.62 sq m · 147 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Spot Consultants | — |
| Chartered accountant | S S Dherange & Co | — |
| Engineer | K P Badgujar Consutants Pvt Ltd | — |
Source: MahaRERA project page. Contact details are not shown.