Skip to content
Residential / Group Housing · 6 buildings · 303 unitsRERA P52100022487 +1

Celestial City

Deedo IDDP-PUN-5A7W

Completion was pushed back 1 year to Sep 2026, and that date has passed too; no MahaRERA orders on record; 85% of its units are booked.

Ravet, Pune 412101 · Property rates in Ravet · Promoter: Rama Synergy Spaces

Delivery5 mo latePromised May 2026 · revised Sep 2026 · that date has passed tooRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales85% booked259 of 303 units · as the promoter reported to MahaRERA
Celestial City project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

Completion was pushed back 1 year to Sep 2026, and that date has passed too

  • P52100022487Registered 25 Sep 2019, completion promised 30 Mar 2023, revised to 29 Mar 2024, and still not shown completed today.
  • P52100028977Registered 23 Apr 2021, completion promised 31 May 2026, revised to 30 Sep 2026, and still not shown completed today.

2 extension certificates on record.

2 registrations · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

6 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrations2
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210002248725 Sep 201930 Mar 202329 Mar 2024Rama Synergy SpacesProject page
P5210002897723 Apr 202131 May 202630 Sep 2026Rama Synergy SpacesProject page
Documents221

4 documents held by Deedo, 217 filings listed on MahaRERA's project page

Registration certificate (2)

  • Registration certificateP52100022487 · 25 Sep 2019ViewSource
  • Registration certificateP52100028977 · 20 Aug 2026ViewSource

Extension certificate (2)

  • Extension certificateP52100022487 · 6 Mar 2023ViewSource
  • Extension certificateP52100028977 · 19 Aug 2026ViewSource

Finance

  • PAN CardP52100028977 · RSS PAN Card.pdf · uploaded 13 Apr 2021Source

Legal

  • Legal Title reportP52100022487 · Title Report - Celestial City_compressed.pdf · uploaded 9 Sep 2019Source
  • Declaration Form BP52100022487 · Declaration Form B.pdf · uploaded 9 Sep 2019Source
  • Legal Title reportP52100022487 · TITLE CERTIFICATE - Celestial.pdf · uploaded 6 Dec 2019Source
Show all 221 documentsShow fewer documents

Legal

  • Legal Title reportP52100028977 · Legal Title Certificate Celestial City Ph II bldg I J K.pdf · uploaded 13 Apr 2021Source
  • Declaration Form BP52100028977 · Declaration in FORM B Mar 2021.pdf · uploaded 13 Apr 2021Source
  • Declaration Form BP52100028977 · Form B - Celestial Ph-II (I,J,K) - Extension.pdf · uploaded 4 Jun 2024Source

Migrated

  • 1 Copy of the legal title reportP52100022487 · Title Report - Celestial City_compressed.pdf · uploaded 9 Sep 2019Source
  • 1 Details of encumbrancesP52100022487 · Encumbrances Certificate.pdf · uploaded 9 Sep 2019Source
  • 1 Copy of Layout Approval (in case of layout)P52100022487 · Layout.pdf · uploaded 9 Sep 2019Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100022487 · A1 Floor Plan.pdf · uploaded 9 Sep 2019Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100022487 · E1 Floor Plan.pdf · uploaded 9 Sep 2019Source
  • 3 Building Plan Approval / NA Order for plotted developmentP52100022487 · H1 Floor Plan.pdf · uploaded 9 Sep 2019Source
  • 1 Declaration in FORM BP52100022487 · Declaration Form B.pdf · uploaded 9 Sep 2019Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100022487 · Form 3 CA - Celestial City.pdf · uploaded 9 Sep 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100022487 · COMMENCEMENT Dtd 30 07 2019.pdf · uploaded 23 Sep 2019Source
  • 1 Proforma of Allotment letterP52100022487 · DECLARATION.pdf · uploaded 23 Sep 2019Source
  • 2 Copy of the legal title reportP52100022487 · TITLE CERTIFICATE - Celestial.pdf · uploaded 6 Dec 2019Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100022487 · Form 2A Celestial City Ph II_compressed.pdf · uploaded 17 Feb 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100022487 · RSS Celestial City Ph II.PDF · uploaded 23 Jan 2021Source
  • 1 Copy of Layout Approval (in case of layout)P52100028977 · Layout.pdf · uploaded 26 Feb 2021Source
  • 2 Copy of Layout Approval (in case of layout)P52100028977 · Calculation sheet.pdf · uploaded 26 Feb 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100028977 · I bldg terrace and first floor plan.pdf · uploaded 26 Feb 2021Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100028977 · J bldg first and terrace floor plan.pdf · uploaded 26 Feb 2021Source
  • 3 Building Plan Approval / NA Order for plotted developmentP52100028977 · K bldg first and terrace floor plan.pdf · uploaded 26 Feb 2021Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028977 · FORM 2 Celestial City Ph II I J K Feb 2021.pdf · uploaded 26 Feb 2021Source
  • 1 Details of encumbrancesP52100028977 · Encumbrances Certificate.pdf · uploaded 1 Mar 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100028977 · Commencement certificate.pdf · uploaded 15 Mar 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028977 · FORM 1 Final compressed.pdf · uploaded 15 Mar 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · Form 3.pdf · uploaded 15 Mar 2021Source
  • 1 Proforma of Allotment letterP52100028977 · Proforma of the allotment letter and agreement for sale_compressed.pdf · uploaded 15 Mar 2021Source
  • 1 PAN CardP52100028977 · RSS PAN Card.pdf · uploaded 13 Apr 2021Source
  • 1 Copy of the legal title reportP52100028977 · Legal Title Certificate Celestial City Ph II bldg I J K.pdf · uploaded 13 Apr 2021Source
  • 1 Declaration in FORM BP52100028977 · Declaration in FORM B Mar 2021.pdf · uploaded 13 Apr 2021Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100022487 · CA Rera Certificate Celestial City AEH 14 04 2021.pdf · uploaded 29 Apr 2021Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · CA Rera Certificate Celestial CIty I J K 14 04 2021.pdf · uploaded 5 May 2021Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100022487 · CA Certificate Celestial City Ph II AEH 02 06 2021.pdf · uploaded 7 Jun 2021Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100022487 · Form 3 - Celestial City Ph II AEH 02 06 2021.pdf · uploaded 24 Jun 2021Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · Form 3 - Celestial City Building I, J, K June 2021.pdf · uploaded 24 Jun 2021Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100022487 · CA Rera Certificate Celestial City AEH 16072021 20210724.pdf · uploaded 11 Aug 2021Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · CA Rera Certificate Celestial IJK 16072021.pdf · uploaded 11 Aug 2021Source
  • 1 Disclosure of sold/ booked inventoryP52100022487 · Celestial City AEH Inventory-min.pdf · uploaded 19 Aug 2021Source
  • 1 Disclosure of sold/ booked inventoryP52100028977 · Celestial City I J K Inventory-min.pdf · uploaded 19 Aug 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100022487 · CELESTIAL CITY PHASE - I - A E H_11zon.pdf · uploaded 20 Aug 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100028977 · CELESTIAL CITY PHASE-II - I J K_11zon.pdf · uploaded 20 Aug 2021Source
  • 1 Declaration about Commencement CertificateP52100028977 · From - D Celestial City Ph-II I J K BLDG.pdf · uploaded 25 Aug 2021Source
  • 1 Declaration about Commencement CertificateP52100022487 · Form - D Celestial City Ph-II AEH BLDG.pdf · uploaded 15 Sep 2021Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · CA Rera Certificate_Celestail City IJK_05102021_compressed.pdf · uploaded 6 Oct 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100022487 · Form 2 Celestial City Phase-II AEH_compressed.pdf · uploaded 9 Oct 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100028977 · Form 2 Celestial City Phase-II IJK_compressed.pdf · uploaded 9 Oct 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100022487 · Celestial City A,E,H- Form1_compressed.pdf · uploaded 11 Oct 2021Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028977 · Celestial City I,J,K - Form 1_compressed.pdf · uploaded 11 Oct 2021Source
  • 2 Disclosure of sold/ booked inventoryP52100022487 · CELESTIAL CITY PH-II AEH SEP-21 INVENTORY.pdf · uploaded 21 Oct 2021Source
  • 2 Disclosure of sold/ booked inventoryP52100028977 · CELESTIAL CITY PH-II IJK SEP-21 INVENTORY.pdf · uploaded 21 Oct 2021Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100022487 · CELESTIAL CITY PH-II AEH Arch CertIficate Form 1 DEC-21_compressed.pdf · uploaded 8 Jan 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028977 · CELESTIAL CITY PH-II IJK Arch CertIficate Form 1 DEC-21_compressed.pdf · uploaded 8 Jan 2022Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100022487 · Celestial City Ph-II AEH Form 2A DEC-22_compressed.pdf · uploaded 10 Jan 2022Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100028977 · Celestial City Ph-II IJK Form 2A DEC-22_compressed.pdf · uploaded 10 Jan 2022Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100022487 · Form-3 CELESTIAL PH II AEH_20220107_compressed.pdf · uploaded 12 Jan 2022Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · Form -3 CELESTIAL PH II IJK_20220107_compressed.pdf · uploaded 12 Jan 2022Source
  • 3 Disclosure of sold/ booked inventoryP52100022487 · Celestial City Ph-II AEH Inventory DEC-21_compressed.pdf · uploaded 22 Jan 2022Source
  • 3 Disclosure of sold/ booked inventoryP52100028977 · Celestial City Ph-II IJK Inventory DEC-21_compressed.pdf · uploaded 22 Jan 2022Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100022487 · Form-3_Celestial City AEH_21022022_Revised_compressed.pdf · uploaded 4 Mar 2022Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · Form-3_Celestial City IJK_21022022_Revised_compressed.pdf · uploaded 4 Mar 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100022487 · Form 1 Celestial City Ph-II AEH_compressed (1).pdf · uploaded 14 Apr 2022Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028977 · Form 1 Celestial City Ph-II IJK_compressed.pdf · uploaded 14 Apr 2022Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100022487 · FORM 3 CELESTIAL CITY PH-II AEH_11zon.pdf · uploaded 27 Apr 2022Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · FORM 3 CELESTIAL CITY PH-II IJK_11zon.pdf · uploaded 27 Apr 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100022487 · Form 5 Celestial City Ph-II AEH GE 464 Rama Synergy Spaces_001929.pdf · uploaded 28 Apr 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100028977 · Form 5 Celestial City Ph-II IJK GE 465 Rama Synergy Spaces_001930.pdf · uploaded 28 Apr 2022Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100022487 · Form 1 Celestial City Ph-II AEH 110722_11zon.pdf · uploaded 13 Jul 2022Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028977 · fORM 1 Celestial City Ph-II IJK 110722_11zon.pdf · uploaded 13 Jul 2022Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100022487 · Form 3 Celestial City Ph-II AEH_11zon 140722.pdf · uploaded 14 Jul 2022Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · Form 3 Celestial City Ph-II IJK_11zon 140722.pdf · uploaded 14 Jul 2022Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · Form 3 Celestial City Ph-II IJK_11zon 140722.pdf · uploaded 14 Jul 2022Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100022487 · Form 3 Celestial City AEH 290822_11zon.pdf · uploaded 30 Aug 2022Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100022487 · Form 3 Celestial City AEH 290822_11zon.pdf · uploaded 30 Aug 2022Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100022487 · FORM 1 CELESTIAL CITY PH-II AEH compressed.pdf · uploaded 11 Oct 2022Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028977 · FORM 1 CELESTIAL CITY PH-II IJK cpmressed.pdf · uploaded 11 Oct 2022Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100022487 · Form 3 Celestial City Ph-III AEH_11zon.pdf · uploaded 12 Oct 2022Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · Form 3 Celesstial City Ph-III IJK_11zon.pdf · uploaded 12 Oct 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100022487 · Form 5 Celestial City Ph-II AEH GE 194 Rama Synergy Spaces_001891.pdf · uploaded 28 Oct 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100028977 · Form 5 Celestial City Ph-II IJK GE 195 Rama Synergy Spaces_001892.pdf · uploaded 28 Oct 2022Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100022487 · Form 3 Celestial City Ph-II AEH DEC-22_11zon.pdf · uploaded 16 Jan 2023Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100022487 · Form 3 Celestial City Ph-II AEH DEC-22_11zon.pdf · uploaded 16 Jan 2023Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · Form 3 Celestial City Ph-II IJK DEC-22_11zon.pdf · uploaded 16 Jan 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100022487 · Form 1 Celestial City Ph-II AEH.pdf · uploaded 19 Jan 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028977 · Form 1 Celestial City Ph-II IJK.pdf · uploaded 19 Jan 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028977 · Form 1 Celestial City Ph-II IJK.pdf · uploaded 19 Jan 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100022487 · FORM 1 CELESTIAL CITY PH-II AEH_11zon.pdf · uploaded 18 Apr 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100022487 · FORM 1 CELESTIAL CITY PH-II AEH_11zon.pdf · uploaded 18 Apr 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028977 · Form 1 Celestial City Ph-II IJK MAR-23_11zon.pdf · uploaded 18 Apr 2023Source
  • 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100022487 · Form 3 Celestial City Ph-II AEH MAR-23_11zon.pdf · uploaded 5 May 2023Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · Form 3 Celestial City Ph-II IJK MAR-23_11zon.pdf · uploaded 5 May 2023Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100022487 · Form 1 CELESTIAL CITY PH-II AEH 070723.pdf · uploaded 20 Jul 2023Source
  • 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100022487 · Form 3 CELESTIAL CITY PH-II AEH 070723.pdf · uploaded 20 Jul 2023Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028977 · Form 1 CELESTIAL CITY PH-II IJK 070723.pdf · uploaded 20 Jul 2023Source
  • 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · Form 3 CELESTIAL CITY PH-II IJK 070723.pdf · uploaded 20 Jul 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100022487 · Form 2 Celestial City Ph-II AEH.pdf · uploaded 8 Aug 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028977 · Form 2 Cerlestial City Ph-II IJK.pdf · uploaded 8 Aug 2023Source
  • 4 Disclosure of sold/ booked inventoryP52100022487 · CELESTIAL CITY PH-II AEH Inventory.pdf · uploaded 12 Oct 2023Source
  • 4 Disclosure of sold/ booked inventoryP52100028977 · CELESTIAL CITY PH-IJK Inventory.pdf · uploaded 12 Oct 2023Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100022487 · Form 1 Celestial City Ph-II AEH SEPTEMBER-23-23.pdf · uploaded 18 Oct 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100022487 · Form 1 Celestial City Ph-II AEH SEPTEMBER-23.pdf · uploaded 18 Oct 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100022487 · FORM 2 Celestial City AEH Ph-II SEPTEMBER-23.pdf · uploaded 18 Oct 2023Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028977 · Form 1 Celestial City Ph-II IJK SEPTEMBER-23.pdf · uploaded 18 Oct 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028977 · Form 1 Celestial City Ph-II IJK SEPTEMBER-23.pdf · uploaded 18 Oct 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028977 · FORM 2 Celestial City Ph-II IJK SEPTEMBER-23.pdf · uploaded 18 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100022487 · Form 2A Celestial City Ph-II AEH SEPTEMBER-23.pdf · uploaded 19 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100028977 · Form 2A Celestial City Ph-II IJK SEPTEMBER-23.pdf · uploaded 19 Oct 2023Source
  • 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100022487 · FORM 3 CELESTIAL CITY PH-II AEH SEP-23 071023.pdf · uploaded 30 Oct 2023Source
  • 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · FORM 3 CELESTIAL CITY PH-II IJK SEP-23 071023.pdf · uploaded 30 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100022487 · Form 5 Celestial City Ph-II AEH Annual Report.pdf · uploaded 16 Nov 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100028977 · Form 5 Celetisl City Ph-II IJK Ph-I Annual Report.pdf · uploaded 16 Nov 2023Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100022487 · Form 1 Celestial City Ph-II.pdf · uploaded 16 Jan 2024Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028977 · Form 1 Celestial City Ph-II.pdf · uploaded 16 Jan 2024Source
  • 5 Disclosure of sold/ booked inventoryP52100022487 · Celestial City Phase II A, E, H.pdf · uploaded 20 Jan 2024Source
  • 5 Disclosure of sold/ booked inventoryP52100028977 · Celestial City Phase II I, J, K.pdf · uploaded 20 Jan 2024Source
  • 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100022487 · Form 3 - Celestial City Ph II A, E, H.pdf · uploaded 22 Jan 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100022487 · Form 2A Celestial City Phase II A, E, H.pdf · uploaded 23 Jan 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100028977 · Form 2A Celestial City Phase II I, J, K.pdf · uploaded 23 Jan 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028977 · Form 2 - Celestial City Phase II I, J, K.pdf · uploaded 25 Jan 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100022487 · Form 2 - Celestial City Phase II A, E, H.pdf · uploaded 27 Jan 2024Source
  • 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · Form 3 - Celestial City Phase II I, J, K.pdf · uploaded 27 Jan 2024Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100022487 · Form 1 - Celestial City Ph-II (A,E,H Bldg).pdf · uploaded 5 Mar 2024Source
  • 6 Disclosure of sold/ booked inventoryP52100022487 · Disclosure of inventory - Celestial Ph-II (A,E,H Bldg).pdf · uploaded 5 Mar 2024Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100022487 · Completion Certificate A Bldg.pdf · uploaded 5 Mar 2024Source
  • 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100022487 · Completion Certificate E, H Bldg.pdf · uploaded 5 Mar 2024Source
  • 1 Architect’s Certificate on Completion of Project (Form 4)P52100022487 · Form 4 - Celestial Ph-II (A,E,H Bldg).pdf · uploaded 5 Mar 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100022487 · Form 2 - Celestial City Ph-II (A,E,H Bldg).pdf · uploaded 30 Mar 2024Source
  • 18 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100022487 · Form 3 - Celestial City Ph-II (A,E,H Bldg).pdf · uploaded 30 Mar 2024Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100022487 · FORM 2A CELESTIAL CITY PH-II (A,E,H).pdf · uploaded 5 Apr 2024Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100028977 · FORM 2A CELESTIAL CITY PH-II (I,J,K).pdf · uploaded 5 Apr 2024Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028977 · Celestial City Ph-II (I J K).pdf · uploaded 10 Apr 2024Source
  • 7 Disclosure of sold/ booked inventoryP52100022487 · Celestial Ph-II (AEH).pdf · uploaded 11 Apr 2024Source
  • 6 Disclosure of sold/ booked inventoryP52100028977 · Celestial Ph-II (IJK).pdf · uploaded 11 Apr 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028977 · Celestial Ph-II.pdf · uploaded 15 Apr 2024Source
  • 19 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100022487 · Celestial Ph-II.pdf · uploaded 16 Apr 2024Source
  • 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · Celestial Ph-II.pdf · uploaded 16 Apr 2024Source
  • 2 Declaration in FORM BP52100028977 · Form B - Celestial Ph-II (I,J,K) - Extension.pdf · uploaded 4 Jun 2024Source
  • 8 Disclosure of sold/ booked inventoryP52100022487 · Celestial City Ph-II (A,E,H).pdf · uploaded 16 Jul 2024Source
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028977 · Celestial City Ph-II (I,J,K).pdf · uploaded 16 Jul 2024Source
  • 7 Disclosure of sold/ booked inventoryP52100028977 · Celestial City Ph-II (I,J,K).pdf · uploaded 16 Jul 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028977 · Celestial City Ph-II (I,J,K).pdf · uploaded 18 Jul 2024Source
  • 18 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · Celestial City Ph-II (I,J,K).pdf · uploaded 19 Jul 2024Source
  • 1 Details of encumbrancesP52100028977 · Declaration reg Encumbrances - Celestial Ph-II (IJK) - Finance (cs of mortgage deed).pdf · uploaded 7 Oct 2024Source
  • 2 a Details of encumbrances concerned to FinanceP52100028977 · Declaration reg Encumbrances - Celestial Ph-II (IJK) - Legal (cs of mortgage deed).pdf · uploaded 7 Oct 2024Source
  • 1 b Details of encumbrances concerned to LegalP52100028977 · Declaration reg Encumbrances - Celestial Ph-II (IJK) - Legal (cs of mortgage deed).pdf · uploaded 7 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryP52100022487 · Celestial Ph-II (AEH).pdf · uploaded 19 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028977 · Celestial Ph-II (IJK).pdf · uploaded 19 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryP52100028977 · Celestial Ph-II (IJK).pdf · uploaded 19 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028977 · Celestial Ph-II (IJK).pdf · uploaded 22 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · Celestial Ph-II (IJK).pdf · uploaded 23 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100022487 · Form 5 - F Y 2023-24 - Celestial Ph-II (AEH).pdf · uploaded 27 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100028977 · Form 2A - F Y 2023-24 - Celestial Ph-II (IJK).pdf · uploaded 27 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100028977 · Form 5 - F Y 2023-24 - Celestial Ph-II (IJK).pdf · uploaded 27 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100028977 · Form 2A - F Y 2021-22 - Celestial Ph-II (IJK).pdf · uploaded 28 Nov 2024Source
  • 1 Disclosure of sold/ booked inventoryP52100022487 · Celestial City Ph-II (AEH).pdf · uploaded 9 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryP52100028977 · Celestial City Ph-II (IJK).pdf · uploaded 9 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028977 · Celestial Ph-II (IJK).pdf · uploaded 13 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028977 · Celestial Ph-II (IJK).pdf · uploaded 14 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · Celestial Ph-II (IJK).pdf · uploaded 17 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028977 · Celestial Ph-II (IJK).pdf · uploaded 14 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028977 · Celestial Ph-II (IJK).pdf · uploaded 15 Apr 2025Source
  • Form 1P52100028977 · Celestial Ph-II (IJK).pdf · uploaded 31 May 2025Source
  • Form 2P52100028977 · Celestial Ph-II (IJK).pdf · uploaded 31 May 2025Source
  • Form 3P52100028977 · Celestial Ph-II (IJK).pdf · uploaded 31 May 2025Source
  • Disclosure of Sold and Booked InventoryP52100028977 · Celestial Ph-II (IJK).pdf · uploaded 31 May 2025Source
  • Form 5 (FY 2023-2024)P52100028977 · Form 5 - F Y 2023-24 - Celestial Ph-II (IJK).pdf · uploaded 28 Aug 2025Source
  • Withdrawal Update Form 1P52100028977 · Celestial Ph-II (IJK) - Form 1 (signed).pdf · uploaded 11 Apr 2026Source
  • Withdrawal Update Form 2P52100028977 · Celestial Ph-II (IJK) - Form 2 (signed).pdf · uploaded 11 Apr 2026Source
  • Withdrawal Update Form 3P52100028977 · Celestial Ph-II (IJK) - Form 3 (signed).pdf · uploaded 11 Apr 2026Source
  • Withdrawal Update Form 1P52100028977 · Celestial Ph-II (IJK) - Form 1 (signed).pdf · uploaded 14 Apr 2026Source
  • Withdrawal Update Form 1P52100028977 · Celestial Ph-II (IJK) - Form 1 (signed).pdf · uploaded 14 Apr 2026Source
  • Withdrawal Update Form 2P52100028977 · Celestial Ph-II (IJK) - Form 2 (signed).pdf · uploaded 14 Apr 2026Source
  • Withdrawal Update Form 2P52100028977 · Celestial Ph-II (IJK) - Form 2 (signed).pdf · uploaded 14 Apr 2026Source
  • Withdrawal Update Form 3P52100028977 · Celestial Ph-II (IJK) - Form 3 (signed).pdf · uploaded 14 Apr 2026Source
  • Withdrawal Update Form 3P52100028977 · Celestial Ph-II (IJK) - Form 3 (signed).pdf · uploaded 14 Apr 2026Source
  • Withdrawal Update Form 1P52100028977 · Celestial Ph-II (IJK) - Form 1 (signed).pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2P52100028977 · Celestial Ph-II (IJK) - Form 2 (signed).pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3P52100028977 · Celestial Ph-II (IJK) - Form 3 (signed).pdf · uploaded 20 Apr 2026Source
  • Form 2A (FY 2024-2025)P52100028977 · Celestial Ph-II (IJK) - Form 2A - Mar 2025.pdf · uploaded 22 Apr 2026Source
  • Form 2A (FY 2025-2026)P52100028977 · Celestial Ph-II (IJK) - Form 2A - Mar 2026.pdf · uploaded 22 Apr 2026Source
  • Form 5 (FY 2024-2025)P52100028977 · Form 5 - F Y 2024-25 - Celestial Ph-II (IJK).pdf · uploaded 23 Apr 2026Source
  • Withdrawal Update Form 1P52100028977 · Celestial Ph-II (IJK) - Form 1 (signed).pdf · uploaded 17 Jul 2026Source
  • Withdrawal Update Form 2P52100028977 · Celestial Ph-II (IJK) - Form 2 (signed).pdf · uploaded 17 Jul 2026Source
  • Withdrawal Update Form 3P52100028977 · Celestial Ph-II (IJK) - Form 3 (signed).pdf · uploaded 17 Jul 2026Source

Technical

  • DocumentP52100022487 · Layout.pdf · uploaded 9 Sep 2019Source
  • DocumentP52100022487 · A1 Floor Plan.pdf · uploaded 9 Sep 2019Source
  • DocumentP52100022487 · E1 Floor Plan.pdf · uploaded 9 Sep 2019Source
  • DocumentP52100022487 · H1 Floor Plan.pdf · uploaded 9 Sep 2019Source
  • DocumentP52100028977 · Layout.pdf · uploaded 26 Feb 2021Source
  • DocumentP52100028977 · Calculation sheet.pdf · uploaded 26 Feb 2021Source
  • DocumentP52100028977 · I bldg terrace and first floor plan.pdf · uploaded 26 Feb 2021Source
  • DocumentP52100028977 · J bldg first and terrace floor plan.pdf · uploaded 26 Feb 2021Source
  • DocumentP52100028977 · K bldg first and terrace floor plan.pdf · uploaded 26 Feb 2021Source
  • DocumentP52100028977 · 02 LAYOUT PLAN.pdf · uploaded 23 Apr 2026Source
  • DocumentP52100028977 · Sheet No 41.pdf · uploaded 23 Apr 2026Source
  • DocumentP52100028977 · Sheet No 42.pdf · uploaded 23 Apr 2026Source
  • DocumentP52100028977 · Sheet No 45.pdf · uploaded 23 Apr 2026Source
  • DocumentP52100028977 · Sheet No 46.pdf · uploaded 23 Apr 2026Source
  • DocumentP52100028977 · Sheet No 49.pdf · uploaded 23 Apr 2026Source
  • DocumentP52100028977 · Sheet No 50.pdf · uploaded 23 Apr 2026Source
  • OthersP52100028977 · Format D with CC.pdf · uploaded 23 Apr 2026Source
  • OthersP52100028977 · marked Parking (IJK).pdf · uploaded 23 Apr 2026Source
  • DocumentP52100028977 · Marked Plot Area - Sanctioned Layout.pdf · uploaded 11 May 2026Source
  • DocumentP52100028977 · Marked Built up Area.pdf · uploaded 11 May 2026Source
  • DocumentP52100028977 · marked Parking (IJK).pdf · uploaded 11 May 2026Source

Technical (Architect)

  • DocumentP52100022487 · Form 1 - Celestial City Ph-II (A,E,H Bldg).pdf · uploaded 5 Mar 2024Source
  • DocumentP52100028977 · Celestial Ph-II (IJK).pdf · uploaded 19 Oct 2024Source
  • DocumentP52100028977 · Celestial Ph-II (IJK).pdf · uploaded 13 Jan 2025Source
  • DocumentP52100028977 · Celestial Ph-II (IJK).pdf · uploaded 14 Apr 2025Source
  • DocumentP52100028977 · Celestial Ph-II (IJK) - Form 1 (signed).pdf · uploaded 17 Jul 2026Source

Technical (Engineer)

  • DocumentP52100022487 · Form 2 - Celestial City Ph-II (A,E,H Bldg).pdf · uploaded 30 Mar 2024Source
  • DocumentP52100028977 · Celestial Ph-II (IJK).pdf · uploaded 22 Oct 2024Source
  • DocumentP52100028977 · Celestial Ph-II (IJK).pdf · uploaded 14 Jan 2025Source
  • DocumentP52100028977 · Celestial Ph-II (IJK) - Form 2 (signed).pdf · uploaded 17 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvals78 P, 86/2 P

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Phases
2
Unit types
2BHK, 3BHK, 4BHK303 units in all
Address
78 P and 86/2 P, Ravet Aundh Road, S No 78 P and 86/2 P, Ravet Aundh Road, Near Expressway, Ravet, Pimpri Chichwad, Pune, MHPIN 412101
Village
Ravet, Haveli taluka
Designated bank account
82
Developed in phases
Yes
Also registered as
Celestial City Phase II Building A, E, H, Celestial City Phase II Building I, J, K

Survey, CTS, gat or plot numbers

78 P86/2 P

Boundaries

North
18m wide dp road
South
Celestial city Phase II future phase
East
Celestial City Phase II completed Block
West
Part of S No 85

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking303 units

259 of 303 units booked (85%), as the promoter reported to MahaRERA

2BHK · 136 units3BHK · 142 units4BHK · 25 units
RERABuildingTypeCarpet areaUnitsBooked
P52100022487A2BHK48.12 sq m · 518 sq ft66
P52100022487A2BHK48.18 sq m · 519 sq ft55
P52100022487A2BHK48.81 sq m · 525 sq ft11
P52100022487A2BHK54.85 sq m · 590 sq ft66
P52100022487A2BHK54.89 sq m · 591 sq ft66
P52100022487A3BHK63.51 sq m · 684 sq ft55
P52100022487A3BHK63.95 sq m · 688 sq ft11
P52100022487A3BHK72.47 sq m · 780 sq ft63
Show all 42 unit rowsShow fewer unit rows
RERABuildingTypeCarpet areaUnitsBooked
P52100022487A4BHK75.93 sq m · 817 sq ft66
P52100022487A4BHK82.13 sq m · 884 sq ft55
P52100022487E2BHK52.65 sq m · 567 sq ft66
P52100022487E2BHK52.72 sq m · 567 sq ft66
P52100022487E2BHK55.68 sq m · 599 sq ft66
P52100022487E2BHK55.7 sq m · 600 sq ft66
P52100022487E3BHK72.59 sq m · 781 sq ft55
P52100022487E3BHK72.64 sq m · 782 sq ft65
P52100022487E3BHK72.66 sq m · 782 sq ft66
P52100022487E3BHK72.72 sq m · 783 sq ft65
P52100022487H2BHK55.82 sq m · 601 sq ft66
P52100022487H2BHK56.04 sq m · 603 sq ft66
P52100022487H2BHK57.88 sq m · 623 sq ft66
P52100022487H2BHK58.32 sq m · 628 sq ft66
P52100022487H3BHK72.66 sq m · 782 sq ft1111
P52100022487H3BHK72.72 sq m · 783 sq ft1210
P52100028977I2BHK61.85 sq m · 666 sq ft66
P52100028977I2BHK62.22 sq m · 670 sq ft66
P52100028977I2BHK67.2 sq m · 723 sq ft1412
P52100028977I3BHK83.23 sq m · 896 sq ft72
P52100028977I3BHK83.53 sq m · 899 sq ft147
P52100028977I3BHK83.58 sq m · 900 sq ft76
P52100028977J2BHK61.85 sq m · 666 sq ft66
P52100028977J2BHK62.22 sq m · 670 sq ft66
P52100028977J3BHK83.23 sq m · 896 sq ft76
P52100028977J3BHK83.53 sq m · 899 sq ft145
P52100028977J3BHK83.58 sq m · 900 sq ft76
P52100028977J4BHK104.91 sq m · 1,129 sq ft1414
P52100028977K2BHK61.85 sq m · 666 sq ft66
P52100028977K2BHK62.22 sq m · 670 sq ft66
P52100028977K2BHK65.26 sq m · 702 sq ft1414
P52100028977K3BHK83.23 sq m · 896 sq ft75
P52100028977K3BHK83.53 sq m · 899 sq ft145
P52100028977K3BHK83.58 sq m · 900 sq ft77

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectAnil Pawar—P52100028977
Chartered accountantMadhusudan Jhanwar—P52100028977
EngineerAkshay Nigade—P52100028977
EngineerShrikant S Patil—P52100028977

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology