The Hyphen
Completion was pushed back 4 months, to Apr 2030; no MahaRERA orders on record; 17% of its units are booked.
Mohammadwadi, Pune 411048 · Property rates in Mohammadwadi · Promoter: Dynasty AGR Constro LLP
Completion was pushed back 4 months, to Apr 2030
- This projectRegistered 27 Dec 2023, completion promised 30 Dec 2029, revised to 30 Apr 2030.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
3 buildings
Open a building to see every flat, floor by floor.
- Commercial1 floor · 24 units17% booked
- T121 floors · 66 units21% booked
- T219 floors · 54 units13% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100054125
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100054125 | 27 Dec 2023 | 30 Dec 2029 | 30 Apr 2030 | Dynasty AGR Constro LLP | Project page |
Documents148
1 document held by Deedo, 147 filings listed on MahaRERA's project page
Finance
- PAN CardPan Dynasty Agr Constro LLP.pdf · uploaded 31 Oct 2023Source
Legal
- Declaration Form BForm B Promoters_compressed.pdf · uploaded 31 Oct 2023Source
- Other – LegalForm B.pdf · uploaded 6 Dec 2023Source
- Legal Title reportFormat A.pdf · uploaded 12 Dec 2023Source
- Legal Title reportFlow of Title.pdf · uploaded 12 Dec 2023Source
- Legal Title reportTitle Search Report_compressed-1-12.pdf · uploaded 12 Dec 2023Source
- Legal Title reportTitle Search Report_compressed-13-24.pdf · uploaded 12 Dec 2023Source
Show all 148 documentsShow fewer documents
Legal
- Legal Title reportTitle Search Report_compressed-25-36.pdf · uploaded 12 Dec 2023Source
- Legal Title reportTitle Search Report_compressed-37-49.pdf · uploaded 12 Dec 2023Source
- Legal Title reportLegal Title Report.pdf · uploaded 21 Apr 2025Source
- Legal Title reportFlow of Title-1.pdf · uploaded 21 Apr 2025Source
- Legal Title reportFlow of Title-2.pdf · uploaded 21 Apr 2025Source
- Legal Title reportFlow of Title-3.pdf · uploaded 21 Apr 2025Source
- Legal Title reportFlow of Title-4.pdf · uploaded 21 Apr 2025Source
- Legal Title reportFlow of Title-5.pdf · uploaded 21 Apr 2025Source
Migrated
- 1 PAN CardPan Dynasty Agr Constro LLP.pdf · uploaded 31 Oct 2023Source
- 1 Declaration in FORM BForm B Promoters_compressed.pdf · uploaded 31 Oct 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclouser of Interest Rajiv Sir.pdf · uploaded 31 Oct 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDisclouser of Interest Aakash Sir.pdf · uploaded 31 Oct 2023Source
- 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 31 Oct 2023Source
- 1 a Details of encumbrances concerned to FinanceEncumbrance Finance.pdf · uploaded 2 Nov 2023Source
- 1 b Details of encumbrances concerned to LegalEncumbrance Finance.pdf · uploaded 2 Nov 2023Source
- 1 CERSAI detailsSelf Declaration Cersai.pdf · uploaded 2 Nov 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration Separate Bank Acc.pdf · uploaded 2 Nov 2023Source
- 1 Deviation Report with respect to Allotment letterDeviations Allotment.pdf · uploaded 2 Nov 2023Source
- 1 Declaration about Commencement CertificateDeclaration CC.pdf · uploaded 4 Nov 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed.pdf · uploaded 4 Nov 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 F.pdf · uploaded 4 Nov 2023Source
- 1 Proforma of Agreement for saleAgreement.pdf · uploaded 4 Nov 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviations Agr_compressed-1-10.pdf · uploaded 4 Nov 2023Source
- 2 Deviation Report with respect to model copy of AgreementDeviations Agr_compressed-11-20.pdf · uploaded 4 Nov 2023Source
- 3 Deviation Report with respect to model copy of AgreementDeviations Agr_compressed-21-30.pdf · uploaded 4 Nov 2023Source
- 4 Deviation Report with respect to model copy of AgreementDeviations Agr_compressed-31-45.pdf · uploaded 4 Nov 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 16 Nov 2023Source
- 1 Copy of Layout Approval (in case of layout)1-13.pdf · uploaded 22 Nov 2023Source
- 2 Copy of Layout Approval (in case of layout)2-13.pdf · uploaded 22 Nov 2023Source
- 1 Building Plan Approval / NA Order for plotted development3-13.pdf · uploaded 22 Nov 2023Source
- 2 Building Plan Approval / NA Order for plotted development4-13.pdf · uploaded 22 Nov 2023Source
- 3 Building Plan Approval / NA Order for plotted development5-13.pdf · uploaded 22 Nov 2023Source
- 4 Building Plan Approval / NA Order for plotted development6-13.pdf · uploaded 22 Nov 2023Source
- 5 Building Plan Approval / NA Order for plotted development7-13.pdf · uploaded 22 Nov 2023Source
- 6 Building Plan Approval / NA Order for plotted development8-13.pdf · uploaded 22 Nov 2023Source
- 7 Building Plan Approval / NA Order for plotted development9-13.pdf · uploaded 22 Nov 2023Source
- 8 Building Plan Approval / NA Order for plotted development10-13.pdf · uploaded 22 Nov 2023Source
- 9 Building Plan Approval / NA Order for plotted development11-13.pdf · uploaded 22 Nov 2023Source
- 10 Building Plan Approval / NA Order for plotted development12-13.pdf · uploaded 22 Nov 2023Source
- 11 Building Plan Approval / NA Order for plotted development13-13.pdf · uploaded 22 Nov 2023Source
- 1 Other – TechnicalForm 3.pdf · uploaded 23 Nov 2023Source
- 2 a Details of encumbrances concerned to FinanceLegal Encumbrance.pdf · uploaded 6 Dec 2023Source
- 2 b Details of encumbrances concerned to LegalLegal Encumbrance.pdf · uploaded 6 Dec 2023Source
- 1 Other – LegalForm B.pdf · uploaded 6 Dec 2023Source
- 1 Copy of the legal title reportFormat A.pdf · uploaded 12 Dec 2023Source
- 2 Copy of the legal title reportFlow of Title.pdf · uploaded 12 Dec 2023Source
- 3 Copy of the legal title reportTitle Search Report_compressed-1-12.pdf · uploaded 12 Dec 2023Source
- 4 Copy of the legal title reportTitle Search Report_compressed-13-24.pdf · uploaded 12 Dec 2023Source
- 5 Copy of the legal title reportTitle Search Report_compressed-25-36.pdf · uploaded 12 Dec 2023Source
- 6 Copy of the legal title reportTitle Search Report_compressed-37-49.pdf · uploaded 12 Dec 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)dynasty age march 24 architect form 1.pdf · uploaded 11 Jun 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Q3.pdf · uploaded 11 Jun 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineers certificate Q4.pdf · uploaded 11 Jun 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Dynasty.pdf · uploaded 11 Jun 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)DYNESY AGR FORM 3 DEC -2023_compressed.pdf · uploaded 11 Jun 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)DYNESTY AGR FORM 3 MARCH -24_compressed.pdf · uploaded 11 Jun 2024Source
- 1 Copy of Layout Approval (in case of layout)PLAN 01-08_compressed.pdf · uploaded 14 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q1.pdf · uploaded 14 Nov 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q2.pdf · uploaded 14 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q1_compressed.pdf · uploaded 14 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q2_compressed.pdf · uploaded 14 Nov 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q1_compressed.pdf · uploaded 14 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q2_compressed.pdf · uploaded 14 Nov 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCC2141-23-10-2024.pdf · uploaded 14 Nov 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentPLAN 04-08_compressed.pdf · uploaded 14 Nov 2024Source
- 7 Building Plan Approval / NA Order for plotted developmentPLAN 08-08_compressed.pdf · uploaded 14 Nov 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentPLAN 07-08_compressed.pdf · uploaded 14 Nov 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentPLAN 06-08_compressed.pdf · uploaded 14 Nov 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentPLAN 05-08_compressed.pdf · uploaded 14 Nov 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentPLAN 03-08_compressed.pdf · uploaded 14 Nov 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentPLAN 02-08_compressed.pdf · uploaded 14 Nov 2024Source
- 1 Declaration about Commencement CertificateDYNASTY AGR DECLARATION ABOUT CCC.pdf · uploaded 14 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Dynasty.pdf · uploaded 20 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5.pdf · uploaded 20 Dec 2024Source
- 1 Other – TechnicalUndertaking about com date dec -2027.pdf · uploaded 24 Dec 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 15 Feb 2025Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)FORMAT B DYNSTY AGR.pdf · uploaded 15 Feb 2025Source
- 1 a Details of encumbrances concerned to FinanceDYNESTY ENCUMBRANCES FOR 50 CR.pdf · uploaded 3 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)DYNESTY FORM 2 OCT 2024.pdf · uploaded 3 Mar 2025Source
- 1 b Details of encumbrances concerned to LegalDYNESTY ENCUMBRANCES FOR 50 CR.pdf · uploaded 3 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form1 dynesty agr constro llp.pdf · uploaded 6 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 DEC - 2024.pdf · uploaded 6 Mar 2025Source
- 1 Copy of the legal title reportLegal Title Report.pdf · uploaded 21 Apr 2025Source
- 2 Copy of the legal title reportFlow of Title-1.pdf · uploaded 21 Apr 2025Source
- 3 Copy of the legal title reportFlow of Title-2.pdf · uploaded 21 Apr 2025Source
- 4 Copy of the legal title reportFlow of Title-3.pdf · uploaded 21 Apr 2025Source
- 5 Copy of the legal title reportFlow of Title-4.pdf · uploaded 21 Apr 2025Source
- 6 Copy of the legal title reportFlow of Title-5.pdf · uploaded 21 Apr 2025Source
- 1 Proforma of Agreement for saleArticles_of_Agreement_ FORMAT THE HYPHEN.pdf · uploaded 25 Apr 2025Source
- Form 1Form 1 Q1.pdf · uploaded 22 Jun 2026Source
- Form 1Form 1 Q2.pdf · uploaded 22 Jun 2026Source
- Form 1Form 1 Q3.pdf · uploaded 22 Jun 2026Source
- Form 2Form 2 Q1.pdf · uploaded 22 Jun 2026Source
- Form 2Form 2 Q2 F.pdf · uploaded 22 Jun 2026Source
- Form 2Form 2 Q3.pdf · uploaded 22 Jun 2026Source
- Form 3Form 3 Q1_.pdf · uploaded 22 Jun 2026Source
- Form 3Form 3 Q2_F.pdf · uploaded 22 Jun 2026Source
- Form 3Form 3 Q3.pdf · uploaded 22 Jun 2026Source
- Disclosure of Sold and Booked InventoryPromoters Disclosure.pdf · uploaded 22 Jun 2026Source
- Disclosure of Sold and Booked InventoryPromoters Disclosure.pdf · uploaded 22 Jun 2026Source
- Disclosure of Sold and Booked InventoryPromoters Disclosure.pdf · uploaded 22 Jun 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 25 Jun 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 25 Jun 2026Source
- Withdrawal Update Form 3Form 3_.pdf · uploaded 25 Jun 2026Source
- Form 2A (FY 2024-2025)Form 2A.pdf · uploaded 26 Jun 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 24 Jul 2026Source
- Withdrawal Update Form 2Form 2_The Hypen_Signed.pdf · uploaded 24 Jul 2026Source
- Withdrawal Update Form 3Form 3 Q1 The Hyphen_compressed.pdf · uploaded 24 Jul 2026Source
Technical
- Document3-13.pdf · uploaded 22 Nov 2023Source
- Document4-13.pdf · uploaded 22 Nov 2023Source
- Document5-13.pdf · uploaded 22 Nov 2023Source
- Document6-13.pdf · uploaded 22 Nov 2023Source
- Document7-13.pdf · uploaded 22 Nov 2023Source
- Document8-13.pdf · uploaded 22 Nov 2023Source
- Document9-13.pdf · uploaded 22 Nov 2023Source
- Document10-13.pdf · uploaded 22 Nov 2023Source
- Document11-13.pdf · uploaded 22 Nov 2023Source
- Document12-13.pdf · uploaded 22 Nov 2023Source
- Document13-13.pdf · uploaded 22 Nov 2023Source
- Document1-13.pdf · uploaded 22 Nov 2023Source
- Document2-13.pdf · uploaded 22 Nov 2023Source
- Other – TechnicalForm 3.pdf · uploaded 23 Nov 2023Source
- DocumentPLAN 01-08_compressed.pdf · uploaded 14 Nov 2024Source
- DocumentPLAN 02-08_compressed.pdf · uploaded 14 Nov 2024Source
- DocumentPLAN 03-08_compressed.pdf · uploaded 14 Nov 2024Source
- DocumentPLAN 04-08_compressed.pdf · uploaded 14 Nov 2024Source
- DocumentPLAN 05-08_compressed.pdf · uploaded 14 Nov 2024Source
- DocumentPLAN 06-08_compressed.pdf · uploaded 14 Nov 2024Source
- DocumentPLAN 07-08_compressed.pdf · uploaded 14 Nov 2024Source
- DocumentPLAN 08-08_compressed.pdf · uploaded 14 Nov 2024Source
- Other – TechnicalUndertaking about com date dec -2027.pdf · uploaded 24 Dec 2024Source
Technical (Architect)
Technical (Engineer)
- DocumentForm 2 Q1_compressed.pdf · uploaded 14 Nov 2024Source
- DocumentForm 2 Q2_compressed.pdf · uploaded 14 Nov 2024Source
- DocumentDYNESTY FORM 2 OCT 2024.pdf · uploaded 3 Mar 2025Source
- DocumentFORM 2 DEC - 2024.pdf · uploaded 6 Mar 2025Source
- DocumentForm 2_The Hypen_Signed.pdf · uploaded 24 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsSr. No. 20 Hissa No. 9 to 16 (Part) Plot B Mohammadwadi
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- Restaurant, Shop, 3BHK, 4BHK144 units in all
- Address
- Sr. No. 20 Hissa No. 9 to 16 (Part) Plot B Mohammadwadi, Sr. No. 20 Hissa No. 9 to 16(Part) Plot B, MohammadwadiPIN 411048
- Village
- Mohammadwadi, Haveli taluka
- Location
- 18.27552, 73.54412
- Designated bank account
- 85
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Boundaries
- North
- By Nala
- South
- By Sr No 21
- East
- By Sr No 20-18
- West
- By Sr No 20-8
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking144 units
25 of 144 units booked (17%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Commercial | Restaurant | 515.35 sq m · 5,547 sq ft | 1 | 0 |
| Commercial | Shop | 10.26 sq m · 110 sq ft | 1 | 0 |
| Commercial | Shop | 118.79 sq m · 1,279 sq ft | 1 | 0 |
| Commercial | Shop | 122.61 sq m · 1,320 sq ft | 1 | 0 |
| Commercial | Shop | 129.88 sq m · 1,398 sq ft | 1 | 0 |
| Commercial | Shop | 131.38 sq m · 1,414 sq ft | 1 | 0 |
| Commercial | Shop | 136.52 sq m · 1,469 sq ft | 1 | 1 |
| Commercial | Shop | 141.06 sq m · 1,518 sq ft | 1 | 1 |
Show all 30 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Commercial | Shop | 144.36 sq m · 1,554 sq ft | 1 | 0 |
| Commercial | Shop | 157.4 sq m · 1,694 sq ft | 1 | 0 |
| Commercial | Shop | 169.93 sq m · 1,829 sq ft | 1 | 1 |
| Commercial | Shop | 172.71 sq m · 1,859 sq ft | 1 | 0 |
| Commercial | Shop | 174.3 sq m · 1,876 sq ft | 1 | 0 |
| Commercial | Shop | 177.8 sq m · 1,914 sq ft | 1 | 0 |
| Commercial | Shop | 178.24 sq m · 1,919 sq ft | 1 | 0 |
| Commercial | Shop | 178.25 sq m · 1,919 sq ft | 1 | 0 |
| Commercial | Shop | 180.6 sq m · 1,944 sq ft | 1 | 0 |
| Commercial | Shop | 189.62 sq m · 2,041 sq ft | 1 | 0 |
| Commercial | Shop | 194.63 sq m · 2,095 sq ft | 1 | 0 |
| Commercial | Shop | 211.34 sq m · 2,275 sq ft | 1 | 0 |
| Commercial | Shop | 223.45 sq m · 2,405 sq ft | 1 | 1 |
| Commercial | Shop | 289.83 sq m · 3,120 sq ft | 1 | 0 |
| Commercial | Shop | 299.46 sq m · 3,223 sq ft | 1 | 0 |
| Commercial | Shop | 438.15 sq m · 4,716 sq ft | 1 | 0 |
| T1 | 3BHK | 114.78 sq m · 1,235 sq ft | 22 | 5 |
| T1 | 3BHK | 115.42 sq m · 1,242 sq ft | 22 | 3 |
| T1 | 4BHK | 172.02 sq m · 1,852 sq ft | 22 | 6 |
| T2 | 3BHK | 114.84 sq m · 1,236 sq ft | 18 | 3 |
| T2 | 3BHK | 114.95 sq m · 1,237 sq ft | 18 | 1 |
| T2 | 4BHK | 170.99 sq m · 1,841 sq ft | 18 | 3 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals6
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Mandviwala Qutub and Assocaites | — |
| Architect | Voussoirs | — |
| Chartered accountant | Radhika Khandelwal & Associates | — |
| Engineer | Farid Kazi | — |
| Engineer | Mashalkar K M | — |
| Engineer | Satish Jagtap | — |
Source: MahaRERA project page. Contact details are not shown.